Roofing Materials Asbestos Assessment Report.pdf
PDF 2 MB Posted
- Attached to
- Replace Roof, Project 06 0009
- Solicitation number
- FA8601-09-B-0006
About this file
Asbestos Report
View the file
Other files
| File | Type | Posted |
|---|---|---|
| FA8601-09-B-0006 Amendment 0005.pdf | ||
| Addendum Number 2.pdf | ||
| General Wage Decision Number OH080029 OH29.pdf | ||
| FA8601-09-B-0006 Amendment 0004.pdf | ||
| Responses to RFI on FA8601-09-B-0006.pdf | ||
| FA8601-09-B-0006 Amendment 0003.pdf | ||
| General Wage Decision OH080029 OH29.pdf | ||
| FA8601-09-B-0006 Amendment 0002.pdf | ||
| Project 06-0009 Site Visit Sign-in Sheet.pdf | ||
| Site visit roof.docx | DOCX document | |
| Amendment 0001.rtf | RTF text file | |
| Drawings for Addendum 1.pdf | ||
| Addendum 1.doc | DOC document | |
| Wage Determination as of 3 July 2009.docx | DOCX document | |
| Drawings 1 May 2009.pdf | ||
| Specifications 1 May 2009.pdf | ||
| Solicitation.doc | DOC document |
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ROOFING MATERIALS
ASBESTOS ASSESSMENT REPORT
FOR
Building No. 20005 Wright Patterson Air Force Base
Architect – Engineer Services Project No. 0610091, Contract No. 08-D0009: Task # 01: A-E DSN – 060009
TesTech Project Number: 27345
Prepared by:
TesTech, Inc.
8534 Yankee Street Dayton, Ohio 45458
Prepared for:
SFA Architects, Inc.
300 West Fourth Street Cincinnati, Ohio 45202
Inspection Conducted:
February 9-10, 2009
8534 Yankee Street 1428 Sadlier Circle E. Drive 810 Morrison Road Dayton, OH 45458 Indianapolis, IN 46239 Columbus, OH 43230 Tel: 937-435-3200 Tel: 317-353-1622 Tel: 614-863-4537 Fax: 937-291-6549 Fax: 317-353-2054 Fax: 614-863-4547 www.testechinc.com
March 6, 2009
SFA Architects, Inc.
300 West Fourth Street Cincinnati, Ohio 45202
Attention: John P. Rademacher, AIA, Re: Roofing Materials Asbestos Assessment
Building No. 20005 Wright-Patterson Air Force Base Fairborn, Ohio
TesTech File # 27345
Dear Mr. Rademacher:
TesTech, Inc. (TesTech) is pleased to submit the Asbestos Assessment Report for the Roofing Materials contained on the building located at the above-referenced site. The enclosed report presents the results of a site investigation, quantities of materials on site, and their location throughout the building.
We appreciate the opportunity to offer these services to you. If you have any questions regarding this report or if we may be of further assistance to you, please contact our office at your earliest convenience.
Respectfully yours, Reviewed by:
TesTech, Inc.
Bruce Gardner Janice Denney HAZMAT Assessment Supervisor Environmental Department Manager
Q:\Environmental Dept\ENVIRONM\27xxx-Folder\27345 - SFA WPAFB Building 2005\ Asbestos Cover Letter.doc
Putting Our Experience to Work for You.
TABLE OF CONTENTS
Page
1.0 Scope of Services 3
2.0 Asbestos Assessment 4
2.1 Introduction 4
2.2 Methodology 4
2.3 Analysis of Bulk Samples 5
3.0 Reliance and Limitations 7
4.0 Summary and Recommendations 8
4.1 Asbestos Assessment 8
Attachments
A – Asbestos Hazard Evaluation Specialist License and Training Certifications B – Asbestos Bulk Sample Log C – Sample Location Plan
D – Asbestos Inspection and Assessment Summary (All Samples) E – Asbestos Inspection and Assessment Summary (Positive Samples Only)
F – Laboratory Analytical Reports
Roofing Materials Asbestos Assessment Report March 6, 2009
TesTech Job # 27345
1.0 SCOPE OF SERVICES
In December 2008, SFA Architects, Inc. contracted with TesTech, Inc. (TesTech) to conduct an Asbestos Assessment of the roof and related structures of Building 20005 located on Wright Patterson Air Force Base (WPAFB). TesTech was informed that the existing 4-ply built up roof system would be replaced on the above referenced building. SFA instructed TesTech that all roofing materials suspected of containing asbestos that would be encountered during completion of the project must be sampled.
The Asbestos Assessment was performed to complete the Scope of Services outlined in TesTech’s proposal E08-102 dated December 10, 2008.
Bruce Gardner and Joseph Saunders, Senior Environmental Specialists with TesTech and certified Asbestos Hazard Evaluation Specialists conducted the inspection of interior and exterior portions of the roof of Building 20005 on February 9 and 10, 2009.
2.0 ASBESTOS ASSESSMENT
2.1 Introduction
The National Emission Standards for Hazardous Air Pollutants (NESHAP) requires notification for every facility prior to demolition or major renovation. Prior to demolition or major renovation activities, the facility must be inspected for all (friable and non-friable) ACM. Federal Regulations have systematically controlled or banned asbestos in construction materials since 1971, but an asbestos-free building cannot be guaranteed without a thorough survey of the building. This inspection must be performed by an Ohio Department of Health (ODH) Certified Asbestos Hazard Evaluation Specialist.
On February 9, 2009, TesTech State of Ohio Asbestos Hazard Evaluation Specialists (Bruce Gardner, ES34228 and Joseph Saunders, ES34837) performed an asbestos assessment of the exterior portions of the roof of Building 20005. On February 10, 2009, interior portions of the roof were also inspected.
The purpose for conducting the Roof Inspection was to:
• Identify accessible suspect asbestos containing building materials that would be impacted during the proposed roof replacement project.
• Collect and analyze bulk samples in accordance with U.S. Environmental Protection Agency (EPA) recommended guidelines.
• Report the types and locations of asbestos-containing materials present in the areas of the building that would be impacted during the proposed roof replacement project.
2.2 Methodology
During the roof inspection, the Asbestos Hazard Evaluation Specialists looked for suspect ACM on building components such as roofing materials, flashing, caulk and siding. Samples of suspect materials were collected in accordance with protocol outlined in the Asbestos Hazard Emergency Response Act (AHERA) (Section 763.86). Although the AHERA regulation currently applies only to schools, it is considered “state of the art” in terms of protocol for conducting building inspections for ACMs and is specified for compliance with the Occupational Safety and Health Administration (OSHA) asbestos regulations. Copies of TesTech’s Asbestos Hazard Evaluation Specialist’s license and training certifications are included in Attachment A.
One-hundred twenty-five (125) bulk samples were collected from a total of thirty-five (35) different homogeneous areas on the interior and exterior portions of the roof system. A Homogeneous Area is defined as: "an area of surfacing material, thermal system insulation, or miscellaneous material that is uniform in color and texture".
To limit disturbance and to prevent the release of asbestos fibers, the inspector performed bulk sampling of suspect materials in accordance with generally accepted procedures outlined in the current EPA Guidance Document and in accordance with AHERA (Section 763.86) protocol.
Each sample was collected and placed in a clean, sealable vial or sealed bag and labeled with a unique sample identification number. This sample number was recorded on a Bulk Sample Log Sheet and on the sample vial or bag. Supplemental information was also recorded on the Bulk Sample Log Sheet, including a brief description and location of the sample and the type of material sampled (e.g. thermal insulation, fireproofing, and acoustical plaster). A copy of the Asbestos Bulk Sample Log is included in Attachment B. A Sample Location Plan depicting the approximate sample locations is included in Appendix C.
2.3 Analysis of Bulk Samples
The samples were submitted, under chain of custody, to Carolina Environmental, Inc. laboratory in Cary, North Carolina for analysis. The Carolina Environmental, Inc. laboratory is fully accredited by the National Voluntary Laboratory Accreditation Program (NVLAP #101048-0).
NVLAP is the agency sponsored by the National Institute of Standards and Technology, providing EPA accreditation of laboratories analyzing bulk samples for asbestos content by polarized-light microscopy (PLM) under AHERA. Bulk samples were analyzed for asbestos content using EPA Method 600/R-93/116, which utilizes stereoscopic microscopy and PLM coupled with dispersion staining. This analytical method, which the EPA currently recommends for the determination of asbestos in bulk samples of friable insulation materials, can be used for qualitative identification of six (6) morphologically different types of asbestos fibers: chrysotile, amosite, crocidolite, anthophyllite, tremolite, and actinolite asbestos.
This method specifies that the asbestos content in a bulk sample shall be estimated and reported as a finite percentage (rounded to the nearest percent) within the range of 0 to 100.
Minute quantities of asbestos in bulk samples may be reported as "trace" or less than 1 percent (<1%). This analytical method determines the "area percent” asbestos, or the percentage of the area of a microscopic field of view that is occupied by asbestos fibers. According to guidelines established by the Ohio Department of Health (ODH) and the EPA, building materials which contain less that one (1) percent asbestos are not considered ACMs; however, according to OSHA protocol, any amount of asbestos should be treated as hazardous material and precautions should be taken during demolition or renovation of the building to protect the health and safety of the workers and the public.
The results of bulk sample analyses were reported in a standard written laboratory report. This written report includes the client name, the laboratory identification numbers assigned to each bulk sample upon receipt by the laboratory sample custodian, and the field number assigned to each bulk sample during the building inspection. The composition of the bulk sample is reported in percentages of asbestos (i.e., chrysotile, amosite, crocidolite, or other) and non-asbestos (i.e., cellulose, fiberglass, synthetic, or other) components.
ACMs are divided into three (3) categories: surfacing material, thermal system insulation, and miscellaneous material:
Surfacing Materials
No bulk samples of surfacing materials were collected during the inspection at the project site.
Thermal System Insulation
For thermal system insulation (TSI), such as piping insulation, a minimum of three (3) samples should be randomly collected from each homogeneous area.
Six (6) bulk samples of TSI were collected from piping observed in five (5) air conditioning units on the roof of Building 20005. Asbestos was detected in each of the TSI samples submitted for analysis.
Miscellaneous Material
Miscellaneous materials, such as roofing materials and caulking, are known to contain asbestos. Miscellaneous material and non-friable suspected ACMs are typically sampled "in a manner sufficient to determine" whether the material in question contains asbestos. In some cases, non-friable materials, such as fire doors, are assumed to contain asbestos.
One hundred and nineteen (119) bulk samples of miscellaneous materials were collected during the inspection of the interior and exterior portions of the roof of Building 20005 at the project site and submitted to an accredited NVLAP laboratory for asbestos analysis using PLM analysis. Laboratory analysis indicated that asbestos was detected in sixty (60) of the miscellaneous materials submitted for analysis.
The analytical results of the samples collected during the ACM inspection are summarized on the Inspection and Assessment Summary Table in Appendix D. This table provides the following information:
• A description of the material sampled.
• The location from where the sample was collected.
• The percentage and type of asbestos present.
• The identification number assigned to the sample by the evaluation specialist in the field.
• The nature of the non-asbestos material that was identified in each sample.
Appendix E contains a summary of only the samples that contained asbestos. A copy of the Bulk Sample and Point Count Analytical Laboratory Reports are included in Appendix F.
3.0 RELIANCE AND LIMITATIONS
The findings, results, recommendations, and conclusions presented in this report are based only on materials sampled during the assessment conducted on February 9 and 10, 2009. This investigation has relied on the accuracy and completeness of the analytical laboratories, private databases, and other sources in preparing this report. While TesTech has taken reasonable steps to ensure the accuracy of this report, it does not warrant the accuracy or completeness of such information that was attained through outside sources in connection with the conclusions contained in this study.
Based on the deteriorated condition of the roof, TesTech, and their subcontractor that performed the patching, are not responsible for leakage, or associated damage that may occur, during or subsequent to the sampling event.
4.0 SUMMARY AND RECOMMENDATIONS
4.1 Asbestos Assessment
On February 9 and 10, 2009, TesTech State of Ohio Asbestos Hazard Evaluation Specialists (Bruce Gardner, ES34228 and Joseph Saunders, ES34837) performed a roof inspection of Building No. 20005 located on WPAFB for asbestos containing materials. A summary of the findings from the Roofing Materials Asbestos Assessment follows:
Laboratory analysis indicated that asbestos was detected in the six (6) bulk samples collected from the TSI in the exterior air conditioning units. According to the Occupational Safety and Health Administration (OSHA) and Ohio Department of Health (ODH), the TSI in the air conditioning units must be managed to protect the safety of workers and the general public.
TesTech recommends that, prior to the roof renovation, the TSI from the air conditioning units be removed by a licensed Ohio Asbestos Hazard Abatement Contractor.
One hundred and nineteen (119) bulk samples of miscellaneous material were collected during the inspection of the interior and exterior portions of the roof of Building 20005. The samples were submitted to an accredited NVLAP laboratory for asbestos analysis using PLM analysis. Laboratory analysis indicated that asbestos was detected in sixty (60) of the miscellaneous materials submitted for analysis.
TesTech recommends that, prior to the roof renovation, the roofing membrane, flashing, window caulking, and Transite™ be removed by a licensed Ohio Asbestos Hazard Abatement Contractor.
APPENDIX B
ASBESTOS BULK SAMPLE LOG
WPAFB - BUILDING 20005 - ROOF INSPECTION
Sample # H A Color Type Location 27345-1 1 black/gray Roof membrane 15' S x 15' E of SE corner 27345-2 1 black/gray Roof membrane 15' S x 40' E of SE corner 27345-3 1 black/gray Roof membrane 30' S x 55' E of SE corner 27345-4 2 black/gray Flashing 5' S x 6' N of NE corner 27345-5 3 black/gray Flashing 30' W of SE edge 27345-6 1 black/gray Roof membrane 30' W x 20' N of NE edge 27345-7 1 black/gray Roof membrane 55' W x 20' N of NE edge 27345-8 1 black/gray Roof membrane 25' E x 30' S of NE edge 27345-9 1 black/gray Roof membrane 30' E x 20' N of NE edge 27345-10 1 black/gray Roof membrane 30' E of N edge 27345-11 4 black/gray Flashing 10' E of S edge 27345-12 4 black/gray Flashing 15' S x 10' E of S edge 27345-13 1 black/gray Roof membrane 20' S x 15' E of S edge 27345-14 1 black/gray Roof membrane 25' S x 25' E of S edge 27345-15 1 black/gray Roof membrane 30' S x 20' E of S edge 27345-16 1 black/gray Roof membrane 30' S x 35' E of S edge 27345-17 1 black/gray Roof membrane 40' S x 30' E of S edge 27345-18 7 black roof cement SE corner (front of raised roof) 27345-19 8 black/gray Flashing 15' W of SE corner 27345-20 8 black/gray Flashing 20' W x 5' N (front of raised roof) 27345-21 1 black/gray Roof membrane 15' W x 10' N ( front of raised roof) 27345-22 1 black/gray Roof membrane 10' N x 5' W (front of raised roof) 27345-23 1 black/gray Roof membrane 35' N x 15' W (front of raised roof) 27345-24 9 black Flashing 40' N x 20' W (front of raised roof) 27345-25 1 black/gray Roof membrane 55' N x 15' W (front of raised roof) 27345-26 1 black Roof membrane 70' N SE edge (front of raised roof) 27345-27 1 black/gray Roof membrane 65' N x 15' W (front of raised roof) 27345-28 9 black Flashing roof hatch (front of raised roof) 27345-29 10 black/gray Roof membrane doghouse #6 (front of bldg.)
27345-30 11 black/gray Flashing doghouse #6 (front of bldg.)
27345-31 11 black/gray Flashing doghouse #5 (front of bldg.)
27345-32 10 black/gray Roof membrane doghouse #9 (front of bldg.)
27345-33 10 black/gray Roof membrane doghouse #1 (front of bldg.)
27345-34 1 black/gray Roof membrane 15' W x 5'N SE corner (upper roof) 27345-35 1 black/gray Roof membrane 25' N x 5'W SE corner (upper roof) 27345-36 1 black Roof membrane 60' N x 20'W SE corner (upper roof) 27345-37 1 black Roof membrane 85' N x 10' W SE corner (upper roof) 27345-38 1 black Roof membrane 100'N x 25'W SE corner (upper roof) 27345-39 10 black/gray Roof membrane doghouse #72 27345-40 10 black/gray Roof membrane doghouse #40 27345-41 10 black/gray Roof membrane doghouse #65 27345-42 10 black/gray Roof membrane doghouse # 62
Job # 27345
Sample # H A Color Type Location Job # 27345
27345-43 10 black/gray Roof membrane doghouse #59 27345-44 10 black/gray Roof membrane doghouse #56 27345-45 11 black/gray Flashing doghouse #56 27345-46 10 black/gray Roof membrane doghouse #47 27345-47 10 black/gray Roof membrane doghouse #50 27345-48 10 black/gray Roof membrane doghouse #54 27345-49 10 black/gray Roof membrane doghouse #38 27345-50 10 black/gray Roof membrane doghouse #41 27345-51 10 black/gray Roof membrane doghouse #44 27345-52 11 black/gray Flashing doghouse #44 27345-53 10 black/gray Roof membrane doghouse #35 27345-54 11 black/gray Flashing doghouse #35 27345-55 10 black/gray Roof membrane doghouse #32 27345-56 10 black/gray Roof membrane doghouse #29 27345-57 10 black/gray Roof membrane doghouse #26 27345-58 10 black/gray Roof membrane doghouse #23 27345-59 10 black/gray Roof membrane doghouse #20 27345-60 10 black/gray Roof membrane doghouse #15 27345-61 11 black/gray Flashing doghouse #15 27345-62 10 black/gray Roof membrane doghouse #13 27345-63 10 black/gray Roof membrane doghouse #11 27345-64 11 black/gray Flashing doghouse #6 27345-65 10 black/gray Roof membrane doghouse #6 27345-66 10 black/gray Roof membrane doghouse #4 27345-67 12 black/gray hangar flashing doghouse #2 27345-68 10 black/gray Roof membrane doghouse #2 27345-69 13 white glazing compound large raised roof 27345-70 13 white glazing compound large raised roof 27345-71 13 white glazing compound large raised roof 27345-72 14 gray doghouse caulking doghouse #5 - front of bldg.
27345-73 15 brown doghouse metal siding doghouse #5 - front of bldg.
27345-74 16 black doghouse shingle doghouse #5 - front of bldg.
27345-75 17 black doghouse felt paper doghouse #8 - front of bldg.
27345-76 15 brown doghouse metal siding doghouse #8 - front of bldg.
27345-77 18 gray metal over exp. Joint roof section in front of raised roof 27345-78 19 brown metal siding side of raised roof 27345-79 15 gray doghouse siding doghouse #8 - front of bldg.
27345-80 20 tan transite next to doghouse #3 - back of Hangar 27345-81 20 tan transite next to doghouse #5 - back of Hangar 27345-82 20 tan transite next to doghouse #7 - back of Hangar 27345-83 21 gray/white transite caulking next to doghouse #3 - back of Hangar 27345-84 21 gray/white transite caulking next to doghouse #5 - back of Hangar
Sample # H A Color Type Location Job # 27345
27345-85 21 gray/white transite caulking next to doghouse #7 - back of Hangar 27345-86 22 gray transite row 3 of rolled roof along W face 27345-87 22 gray transite row 3 of rolled roof along W face 27345-88 22 gray transite row 3 of rolled roof along W face 27345-89 23 tan/gray transite caulking row 3 of rolled roof along W face 27345-90 23 tan/gray transite caulking row 3 of rolled roof along W face 27345-91 23 tan/gray transite caulking row 3 of rolled roof along W face 27345-92 16 black doghouse shingle doghouse #19 27345-93 16 black doghouse shingle doghouse #28 27345-94 24 black expansion joint in front of raised roof 27345-95 24 black expansion joint in front of raised roof 27345-96 25 black/gray wood paneling interior windows at doghouse #10 27345-97 26 gray window caulk interior windows at doghouse #10 27345-98 26 black/gray wood paneling interior windows by doghouse #12 27345-99 25 gray wood paneling interior windows at doghouse #12 27345-100 28 tan caulking inside of doghouse #12 27345-101 26 gray window caulk interior windows at doghouse #13 27345-102 25 gray/black wood paneling interior windows at doghouse #13 27345-103 29 black black expansion above metal inside doghouse #16 27345-104 28 black black expansion above metal inside doghouse #36 27345-105 28 brown window caulk inside doghouse #36 27345-106 28 gray window caulk inside doghouse #45 27345-107 28 tan window caulk inside doghouse #70 27345-108 29 black black expansion above metal inside doghouse #70 27345-109 30 tan exp. joint between concrete near doghouse #61 27345-110 29 black black expansion above metal inside doghouse #59 27345-111 28 brown window caulk inside doghouse #58 27345-112 29 black black expansion above metal inside doghouse #30 27345-113 30 black felt paper inside doghouse #5 - front of bldg.
27345-114 31 gray insulation exterior AC Unit at doghouse #36 27345-115 32 tan plenium material exterior AC Unit at doghouse #54 27345-116 32 black plenium material exterior AC Unit at doghouse #72 27345-117 33 brown/tan AC Unit hatch gasket exterior AC Unit at doghouse #36 27345-118 33 black AC Unit hatch gasket exterior AC Unit at doghouse #54 27345-119 33 black AC Unit hatch gasket exterior AC Unit at doghouse #72 27345-120 34 white TSI at T-Joint exterior AC Unit at doghouse #36 27345-121 34 white TSI at T-Joint exterior AC Unit at doghouse #54 27345-122 34 white TSI at T-Joint exterior AC Unit at doghouse #72 27345-123 35 white/tan TSI - small pipe runs exterior AC Unit at doghouse #36 27345-124 35 white/tan TSI - small pipe runs exterior AC Unit at doghouse #54 27345-125 35 white/tan TSI - small pipe runs exterior AC Unit at doghouse #72
APPENDIX C
SAMPLE LOCATION PLAN
APPENDIX D
ASBESTOS INSPECTION AND ASSESSMENT SUMMARY
(All Samples)
ATTACHMENT E
ASBESTOS INSPECTION AND ASSESSMENT SUMMARY
(Positive Samples Only)
ATTACHMENT F
LABORATORY ANALYTICAL REPORTS