Attachment_3_PPI_Tool.pdf

PDF 330 KB Posted

Attached to
Afghanistan Air Force (AAR) C-130H Contractor Logistics Support (CLS)
Solicitation number
FA8553-19-R-0002
Issued by

About this file

This document provides instructions for completing the Past Performance Information (PPI) Tool required to submit the past performance portion of proposals for RFP FA8553-19-R-0002. The RFP is for Contractor Logistics Support (CLS) services to support four to six C-130H aircraft operated by the North Atlantic Treaty Organization Air Training Command-Afghanistan. The services will be performed at Kabul Main Operating Base and other Forward Operating Locations as needed. The contract will be a single-award, firm-fixed-price contract with an indefinite delivery/indefinite quantity structure and a one-year base period plus four one-year options. The PPI Tool requires offerors to provide details of relevant past performance, including contract information, descriptions of work performed, points of contact, and key personnel. Instructions are provided for downloading the PPI Tool, entering information, printing reports, and submission requirements.

Attachment 3-PPI Tool

View the file

Other files

File Type Posted
RFP_FA855319R0002_-_Clarification_-_15_May_2019.pdf PDF
ppi_tool.accdb MDB file
FA855319R0002_______0001.pdf PDF
Attachment_(9)_Afghanistan_C130_CLS_Pricing_Matrix.xlsx XLSX spreadsheet
Attachment_(2)_Performance_Based_Work_Statement.pdf PDF
Copy_of_FA855319R0002_Amendment1_Changes_24_April_19.xlsx XLSX spreadsheet
FA8553-19-R-0002_QA_Ver2_24_Apr_19.xlsx XLSX spreadsheet
FA8553-19-R-0002_Q&A.xlsx XLSX spreadsheet
Attachment_17_CDRL_A005_Contractor_Standard_Operating_Procedures.pdf PDF
Attachment_7_Past_Performance_Questionaire.pdf PDF
Attachment_12_GFP_Attachment.pdf PDF
Attachment_18_CDRL_A006_Technical_Report_Study_Services.pdf PDF
Attachment_19_CDRL_A007_Safety_Plan.pdf PDF
Attachment_11_SectionL_Attachment_Matrix.xlsx XLSX spreadsheet
Attachment_26_Appendix_F_C130_Hydro_MTL.pdf PDF
Attachment_25_Appendix_F_C130_Fuels_MTL.pdf PDF
Attachment_6_Transmittal_Letter.pdf PDF
Attachment_16_CDRL_A004_Conference_Minutes.pdf PDF
Attachment_22_Appendix_F_C130_Crew_Cheif_MTL.pdf PDF
Attachment_20_Apendix_F_MESL_AAF_Approved.pdf PDF
Attachment_21_Appendix_F_C130_Avionics_MTL.pdf PDF
Attachment_24_Appendix_F_C130_Engines_MTL.pdf PDF
FA855319R0002_Final.pdf PDF
Attachment_15_CDRL_A003_Conference_Agenda.pdf PDF
Attachment_23_Appendix_F_C130_E_and_E_MTL.pdf PDF
Attachment_5_Sub_Consent_Form.pdf PDF
Attachment_14_CDRL_A002_Quality_Control_Plan.pdf PDF
Attachment_13_CDRL_A001_Status_Report.pdf PDF
Attachment_2_PWS_19March.pdf PDF
Attachment_27_Afghanistan_Labor_Law.pdf PDF
Attachment_8_Relevancy_Table.pdf PDF
Attachment_4_Client_Authorization_Letter.pdf PDF
Attachment_10_Sample_Tasks.pdf PDF
Attachment_9_Afghanistan_C130_CLS_Pricing_Matrix.xlsx XLSX spreadsheet
Attachment_1_Cross_Reference_Matrix.pdf PDF
Show all 35

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFP FA8553-19-R-0002

Attachment 3

Instructions to Offerors Past Performance Information (PPI) for Offerors

Offerors must use the PPI Tool (Use latest version from FBO.gov) in order to electronically submit the PPI portion of the Past Performance Volume in accordance with the RFP.

Downloading the PPI Tool The PPI Tool can be downloaded by performing the following steps (if you are unable to download the Tool, contact the contracting officer for assistance):

1. Access the FedBizOpps (https://www.fbo.gov/) website.

2. Find the solicitation posting.

3. Locate the “ppi tool” link from the “All Files” column on the solicitation’s “Notice Details” tab .

4. Select the link and save the “ppi tool” to your computer. Name the file as the prime contractor + RFP number + file extension (e.g. XYZCompanyFA861710R6158.accdb).

Note: PPI Tools saved in Microsoft Office versions 2007 and greater will be saved with “.accdb” file extension.

Entering information in the PPI Tool After selecting and saving the tool, enter information by performing the following steps:

1. Open the saved PPI Tool.

2. Select the “Options” button from the “Security Warning” banner, if applicable

3. The “Security Alert” pop-up screen displays.

Figure 1: Security Alert Pop-up

• If a "read only" file is opened, in order to populate data in the file, click "Save As" in the "Read-Only" message bar. Enter the filename as the prime contractor + RFP number + file extension (e.g. XYZCompanyFA861710R6158.accdb).

https://www.fbo.gov/

4. Select the radio button “Enable this content” and then click “OK.” A setup pop-up screen displays.

Figure 2: Setup Pop-Up

5. Select the “Start” button. The “Application Setup” screen displays.

Figure 3: Application Setup Screen

Note: Once the Offeror’s Name and RFP Number have been entered they can be edited by selecting the “Edit Offeror And RFP Number” button from the “Contractor’s Menu”

6. Enter the Offeror’s Name and RFP Number and then click the “Next” button. The application setup continues.

Figure 4: Continue the Application Setup

7. Choose the appropriate option by selecting the corresponding radio button and then click the

“Next” button. The “Contractor’s Menu” displays.

Figure 5: Contractor’s Menu

8. Click the “Step 1: Set up Business Relationships” button to create a business relationship, if applicable, for each business entity before proceeding throughout the PPI Tool (refer to Section L of the RFP for detailed instructions). Identify all prime and sub-prime organizations and categorize them according to the appropriate role in the proposed acquisition. The “Business Relationships” screen displays.

Figure 6: Business Relationships

9. Click the “New” button to create a business relationship for the proposed acquisition. An additional “Business Relationships” screen displays.

Figure 7: Enter New Business Relationship

10. Complete the fields as follows (fields marked on the screen with an asterisk ‘*’ are required):

• Contractor’s Name: Self-explanatory

• Role in Proposed Acquisition: Choose one of the four options – Prime, Sub, Joint

Venture, or Other (Explain). An explanation comment box will display when you select “Other.”

• Place of Work: Location where contractor will perform work.

• Percentage of Work: Identify percentage of work contributed by specified business entity

• Responsibilities: Detail proposed responsibilities of specified business entity.

11. Select one of the buttons at the bottom of the screen.

• Add – Saves the current business relationship and allows for the addition of a new one.

• Close – Cancels the current business relationship without saving.

Note: In order to edit or delete an existing business relationship in the list, double-click on it.

12. Select the “Close” button on the “Business Relationships” screen after all of the business relationships has been added.

13. Click the “Step 2: Enter Past Performance Information (PPI)” button to enter the Past Performance Information. The “Past

Performance” screen displays.

Figure 8: Past Performance

14. Click the “New” button to enter Past Performance Information for the proposed acquisition.

An additional “Past Performance” screen displays.

Figure 9: Enter Past Performance Information

15. Complete the fields on each of the tabs as follows (fields on the screen marked with an asterisk ‘*’ are required):

• Contract Information Tab

Contractor: Select from the dropdown the appropriate business entity.

Cage Code: Self-explanatory.

Contract Number: If you don’t have a contract number, enter “N/A.”

If submitting an ordering type contractual vehicle (for example, including but not limited to an Indefinite Delivery “D” type contract per FAR 16.5), only after issuance of a delivery/task order does performance occur. Input the ordering type contract number in the Contract Number PPI TOOL FIELD and the Task/Call/Delivery/Purchase Order.

Thoroughly read Section L. Paragraph II. D. 3 and Section M. Paragraph II.D.4. before entering the Contract Number into the PPI Tool.

Example: FA8562-05-D-0005

Program Title: Enter full name of program.

Contr Agency/Customer: Enter servicing contracting agency and customer (office symbols suffice).

DUNS Number: Self-explanatory

Delivery Task/Order:

If submitting a series of orders, in the Delivery Task/Order PPI TOOL FIELD, list the range of orders being submitted.

Two examples:

Orders 0001-0003

Or

Orders: (i.e., FA8562-15-F-0001, FA8562-16-F-0002, FA8562-17-F-0003) (New FAR Numbering System)

** Include a list of the series of orders in the Program Description PPI TOOL FIELD. If your series of orders consists of more than 5 individual orders include the information in a separate attachment.

If submitting a single, stand-alone task/call/delivery/purchase order, enter the individual order number.

Contract Type: Enter Firm-Fixed-Price (FFP), Cost Plus Fixed-Fee (CPFF), Indefinite

Delivery/Indefinite Quantity (ID/IQ), LH, Blanket Purchase Agreement (BPA), Cost Plus Incentive-Fee (CPIF), Cost Plus Award Fee (CPAF), etc. For additional clarification, click the question mark button.

Short Program Title (i.e., Acronym): Enter abbreviated title for the program or enter “N/A.”

Contract Dollar Value:

NOTE: If submitting an ordering type contractual vehicle (for example, including but not limited to an Indefinite Delivery “D” type contract per FAR 16.5), only after issuance of a delivery/task order does performance occur. Therefore, the “Contract Dollar Value” submitted here should be for the order (or series of orders), the offeror has performed under this ordering type contractual vehicle. Thoroughly read Section L. Paragraph II. D. 3 and Section M. Paragraph II.D.4. before entering the Contract Dollar Value into the PPI Tool. ** Include a list of the series of orders in the program description tab section of the PPI Tool as well. List the original and current total dollar value for each order. If your series of orders consists of more than 5 individual orders include the information in a separate attachment.

o Original: Input total contract dollar value, with all options if applicable. This is the amount originally awarded, on the referenced contract.

If BPA, provide total ceiling.

If submitting a stand-alone contract or purchase order, provide the amount originally awarded, on the referenced contract.

If submitting an Ordering Type Contract - series of orders, IN THIS PPI FIELD, include the sum of the original total dollar value for each individual order.

If submitting an Ordering Type Contract - single stand-alone task/call/delivery order, IN THIS PPI FIELD, provide the original total dollar value of the individual task/call/delivery order.

o Current: Input total contract dollar value, with all options if applicable, as the contract stands at time of PPI submission. This is the amount, as of the date of proposal submission, on the referenced contract.

o If submitting a stand-alone contract or purchase order, provide the amount originally awarded, on the referenced contract.

o If BPA, provide total ceiling.

If submitting an Ordering Type Contract, series of orders, IN THIS PPI FIELD, include the sum of the current total dollar value for each individual order.

If submitting an Ordering Type Contract, single stand-alone task/call/delivery order, IN THIS PPI FIELD, provide the current total dollar value of the individual order.

Explain the differences in Contract Value, if applicable: Enter an explanation of the difference between the original total dollar value and the current total dollar value as of the time of PPI submission.

Period of Performance (mm/dd/yy) NOTE: If the contract being submitted is an ordering type contractual vehicle (for example, including but not limited to an Indefinite Delivery “D” type contract per FAR 16.5), only after issuance of a delivery/task order does performance occur. The “Period of Performance” submitted here should be for the order (or series of orders), the offeror has performed under this ordering type contractual vehicle. If a series of orders is being submitted, the offeror should include the period of performance (of all the orders, in the series) together to get the “Period of Performance.” If the Period of Performances on the individual order or orders, within the series of orders has changed, these changes would need to be reflected in the “Current End Date” Section below. See Section L-900 Paragraph II. D for more information on proposal submission and Section M-900 Paragraph II. D.4 for evaluation information. ** Include a list of the series of orders in the program description tab section of the PPI Tool as well. List the Start Date, Original End Date and Current End Date for each order. If your series of orders consists of more than 5 individual orders include the information in a separate attachment.

o Start Date: Input start date of contract/order/series of orders.

o Original End Date: Input original end date of contract/order/series of orders based on award.

o Current End Date (if changed): Input end date, as the contract/order/series of orders stands at time of PPI submission.

o Explain the differences in Period of Performance, if applicable: Enter an explanation of the difference between “Original End Date” and “Current End Date.”

• Program Details Tab Brief Description of Effort as:

o Select Prime, Sub, Joint Venture, or Other (Explain). An explanation comment box will display when you select “Other.”

o Provide a brief description of the service provided and actual work performed under this contract reference.

o If proposing a series of orders under an ordering type contractual vehicle, provide a list of the orders in this series with the total dollar amount per order, the period of performance start date and end date per order. If more than 5 orders are in the series of orders, include the information in a separate attachment.

o Include the quantity managed for each contract/order/series of orders. If more than 5 orders are in the series of orders, include the information in a separate attachment.

o Include the type and complexities of data deliverables for each contract/order/series or orders. If more than 5 orders are in the series of orders, include the information in a separate attachment.

o ****If applicable: Provide information on performance problems encountered on the identified contracts. At a minimum, briefly describe the problem experienced, actions taken to alleviate the problem, and whether or not the problem was satisfactorily overcome.****

Explain how your performance on this contract is relevant for each applicable factor or subfactor, as instructed under Past Performance in Section M of the RFP. Include any unique aspects that demonstrate relevancy in this effort. Provide evidence to support such relevance to the requirements as described in the RFP.

Include relevant information concerning your compliance with FAR 52.219-8, Utilization of Small Business Concerns, on the contract you are submitting, if applicable.

Identify whether a subcontracting plan was required for the contract you are submitting. If one was required, identify in percentage terms the planned versus achieved goals during contract performance. Explain why goals were not met, if applicable:

• POC & Key Individuals Tab Key Individuals: Click the “New” button to specify any key individual or individuals who participated in this program or who may support the proposed acquisition. Also indicate their roles for both acquisitions, previous and current. To edit or delete an existing key individual, double-click an item from the list.

Note: In accordance with FAR 15.305(a)(2)(iii), relevant contract efforts performed by from key personnel may be evaluated. If you wish to include the past performance of individual key personnel, select the “New” button for each individual and fill out the necessary information.

Customer Points of Contact: Click the “Program/Site Manager,” “Contracting Officer” or “Admin POC” button for the point of contact that you would like to add, edit, or delete.

Note: For government contracts provide current information on Program Manager, Contracting Officer, and Admin POC, if available.

For commercial contracts provide points of contact fulfilling these same roles, if available.

16. Select from the buttons at the bottom of the Past Performance screen:

• Save – Saves the Past Performance Information and displays the “Contract Information” tab on the Past Performance screen.

• Close – Closes the Past Performance screen. If there were any updates, a pop-up window displays asking to save before closing.

• Delete – Deletes the current PPI record. A pop-up window displays, select “Yes” to delete the record or “No” to close the window without deleting the record.

Note: In order to edit or delete an existing PPI record in the list, double-click on it.

17. Select the “Close” button on the “Past Performance Information” screen after all of the PPI records have been added.

Printing Reports and Submitting PPI Tool In order to print the Business Relationships and PPI reports, perform the following steps:

1. Click the “Step 3: Print Report” button . A pop-up displays asking which report to print.

Figure 10: Select Report to Print

2. Select separately each of the two options, “Business Relationships” or “Past Performance.”

The Business Relationships and Past Performance documents will print separately; combine the two to create your Past Performance Volume.

In order to submit the Business Relationships and PPI, perform the following steps:

3. Click the “Step 4: Submit” button . The “Submission Instructions” screen displays.

Figure 11: Submission Instructions

4. Follow the submission instructions. Hard copies of the pages generated from this tool shall be used in the hard copy of the past performance volume subject to the limitations outlined in this RFP and should be Tab 1 of the past performance volume.

Note:

• Submit an electronic copy (e.g. CD) of the saved PPI database file with your proposal. If a prime contractor is submitting the file enter the filename as:

o prime contractor + RFP number + file extension (e.g.

XYZCompanyFA861710R6158.accdb)

If a subcontractor is submitting the file enter the filename as:

o subcontractor + RFP number + file extension (e.g.

ABCCompanyFA861710R6158.accdb)

• Once the file is saved to a CD or any location that is marked as “Read-only,” it must first be saved to the desktop in order to read/edit the file.

Editing Offeror and RFP Number In order to edit the Offeror name and/or the RFP number identified during start-up, perform the following steps:

1. Click the “Edit Offeror and RFP Number” button . The

“Application Setup” screen displays.

Figure 12: Change Name and RFP Number - Application Setup

2. Update the Offeror’s name and/or RFP number.

3. Click the “Next” button twice to return to the “Contractor’s Menu”.

File details come from the government source that posted it. Updated .