Attachment_23_Appendix_F_C130_E_and_E_MTL.pdf

PDF 207 KB Posted

Attached to
Afghanistan Air Force (AAR) C-130H Contractor Logistics Support (CLS)
Solicitation number
FA8553-19-R-0002
Issued by

About this file

This document provides details for a federal contract opportunity to provide Contractor Logistics Support (CLS) for four to six C-130H aircraft in support of the Afghanistan Air Force at Kabul, Afghanistan. The North Atlantic Treaty Organization Air Training Command-Afghanistan has a requirement for on-site and on-call sustainment and maintenance support of the C-130H aircraft. The Tactical Airlift Division of the Air Force Life Cycle Management Center intends to issue a Request for Proposal for a single-award, firm fixed price IDIQ contract to provide CLS for the aircraft. The period of performance will include a one-year base period and four one-year option periods. Support will be required at the Main Operating Base in Kabul and Forward Operating Locations as needed.

Attachment 23-Appendix F-C-130 E and E MTL

View the file

Other files

File Type Posted
RFP_FA855319R0002_-_Clarification_-_15_May_2019.pdf PDF
ppi_tool.accdb MDB file
FA855319R0002_______0001.pdf PDF
Attachment_(9)_Afghanistan_C130_CLS_Pricing_Matrix.xlsx XLSX spreadsheet
Attachment_(2)_Performance_Based_Work_Statement.pdf PDF
Copy_of_FA855319R0002_Amendment1_Changes_24_April_19.xlsx XLSX spreadsheet
FA8553-19-R-0002_QA_Ver2_24_Apr_19.xlsx XLSX spreadsheet
FA8553-19-R-0002_Q&A.xlsx XLSX spreadsheet
Attachment_17_CDRL_A005_Contractor_Standard_Operating_Procedures.pdf PDF
Attachment_7_Past_Performance_Questionaire.pdf PDF
Attachment_12_GFP_Attachment.pdf PDF
Attachment_18_CDRL_A006_Technical_Report_Study_Services.pdf PDF
Attachment_19_CDRL_A007_Safety_Plan.pdf PDF
Attachment_11_SectionL_Attachment_Matrix.xlsx XLSX spreadsheet
Attachment_3_PPI_Tool.pdf PDF
Attachment_26_Appendix_F_C130_Hydro_MTL.pdf PDF
Attachment_25_Appendix_F_C130_Fuels_MTL.pdf PDF
Attachment_6_Transmittal_Letter.pdf PDF
Attachment_16_CDRL_A004_Conference_Minutes.pdf PDF
Attachment_22_Appendix_F_C130_Crew_Cheif_MTL.pdf PDF
Attachment_20_Apendix_F_MESL_AAF_Approved.pdf PDF
Attachment_21_Appendix_F_C130_Avionics_MTL.pdf PDF
Attachment_24_Appendix_F_C130_Engines_MTL.pdf PDF
FA855319R0002_Final.pdf PDF
Attachment_15_CDRL_A003_Conference_Agenda.pdf PDF
Attachment_5_Sub_Consent_Form.pdf PDF
Attachment_14_CDRL_A002_Quality_Control_Plan.pdf PDF
Attachment_13_CDRL_A001_Status_Report.pdf PDF
Attachment_2_PWS_19March.pdf PDF
Attachment_27_Afghanistan_Labor_Law.pdf PDF
Attachment_8_Relevancy_Table.pdf PDF
Attachment_4_Client_Authorization_Letter.pdf PDF
Attachment_10_Sample_Tasks.pdf PDF
Attachment_9_Afghanistan_C130_CLS_Pricing_Matrix.xlsx XLSX spreadsheet
Attachment_1_Cross_Reference_Matrix.pdf PDF
Show all 35

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

اسم Name

امضاء شاگرد امضاء مربی/معلم شروع تاریخ تاریخ اتمام درجھ درجھ درجھ توضیح وظیفھ

Task Item

Level Nbr

* Purpose

ھدف

* Select and use ruler

انتخاب و استفاده از خط کش

* Select and use thickness gauge

انتخاب و استفاده از آلھ اندازه گیر ضخامت

* Use digital multi-meter

استعمال ملتی متر دیجیتلی

* Use analog multi-meter

استعمال ملتی متر انالوگ

* Use frequency meter

استعمال الھ اندازه گیری فریکونسی

* Use igniter circuit tester

استعمال امتحان کننده جریان جرقھ

* Select, inspect, cycle and use torque wrench

انتخاب , معاینھ دوران و استعمال رنج درجھ دار

* Select and use micrometer

انتخاب و استفاده از مایکرو متر/ الھ سنجش اشیای خورد و ریزه

* Use depth gauge

استفاده از الھ سنجش اعماق / عمق در تانکی ھای مواد سوخت

* Temperature

درجھ حرارت

* Pressure

فشار

* Atmosphere

اتموسفیر

* Air flow

جریان ھوا

* AC Electrical system

اساسات سیستم برق متناوب

* DC electrical system

اساسات سیستم برق مستقیم

* Solid State devices

الات حالت جامد

* Use wiring diagrams

استعمال دیاگرام سیم کشی

* Use schematics

استعمال منوال

* Troubleshoot

عارضھ یابی

* Electrostatic discharge (ESD)

خنثی نمودن فشار ستاتیک

* Purpose

ھدف

* Connect/disconnect

وصل کردن/ قطع کردن

* Conventional devices

الات ترسیم کننده

نمبر کارت

ID #

1.00

1.01

1.02

1.03

1.04

1.05

1.06

1.07

1.08

1.09

2.00

4.00

4.01

5.00

2.01

2.02

2.03

3.00

3.01

3.02

3.03

3.04

3.05

3.06

ELEMENTS OF PHYSICS عناصر فزیکی

ELECTRICAL CONNECTORS وصل کننده ھای برقی

C-130H Electro-Environmental Maintenance 797 Tasks وظایف اجرایوی حملھ پروازی حفظ و مراقبت طیاره سی - 130

لایحھ وظیفھ /پوست رتبھ Job Description/Title Rank

Trainee Signature Trainer Signature 3 Task Description Start Date Comp Date 1 2

MEASURING TOOLS ابزار اندازه گیری

ELECTRICAL سیستم برقی طیاره

ELECTRICAL FUNDEMENTALSاصول الکتریکی

SOLDER ELECTRICAL CONNECTORS وصل کننده ھای برقی

امضاء شاگرد امضاء مربی/معلم شروع تاریخ تاریخ اتمام درجھ درجھ درجھ توضیح وظیفھ

Task Item

Level NbrTrainee Signature Trainer Signature 3 Task Description Start Date Comp Date 1 2

* Electrical connector device fundamentals

اصول اتصال دستگاه برق

* Use wire maintenance kit

استفاده از صندوق حفظ و مراقبت لین ھا

* Assemble/disassemble connector plugs

یکجا کردن / جدا کردن پلک ھای وصل کننده ھا

* Replace/install splices

جاگزین کردن/نصب نمودن و یک جا کردن

* Replace/Install Terminals

جا گزین کردن /نصب کردن ترمینل ھا

* Identify wires and types

شناسایی لین ھا و انواع آن

* Inspect

معاینھ

* Remove Wiring

برداشتن لین ھا &ویرھا

* Repair Wiring

دوباره جور کردن لین ھا یا ویرھا

* Install Wiring

نصب نمودن ویر ھا ولین ھا

* Modular blocks

جوره کردن بلوک ھا

* Corrosion Control

کنترول کردن زنگ

Remove

* برداشتن/پس کردن

Install

* نصب نمودن

Remove

* برداشتن

Install

* نصب نمودن

Remove

* برداشتن

Install

* نصب نمودن

* Perform operational check

انجام دادن چک عملیاتی

* Troubleshoot system

سیستم عارضھ گیری

* Inspect system and components

معاینھ سیستم و اجزای آن

* Remove and install generator control unit

* Remove and install engine generator

Remove and install inverter

Remove and install bus tie contactor

Remove and install bus switching components

11.04

11.07

11.05

11.06

7.01

10.01

11.00

11.01

11.02

11.03

8.00

8.01

9.00

9.01

10.00

6.00

6.01

7.02

7.03

7.04

7.05

7.06

6.02

6.03

6.04

7.00

SOLDERLESS ELECTRICAL CONNECTORS

WIRESویرھا/ لین ھا

SWITCHES/PROTECTIVE DEVICESسویچ ھا /الات محافظتی

RELAY/SOCKETریلی یا ساکت

TRANSFORMER/POWER SUPPLYترانسفارمر /تقویت کننده برق

AC POWER SYSTEM

Task Item

Level NbrTrainee Signature Trainer Signature 3 Task Description Start Date Comp Date 1 2

* Perform operational check

انجام دادن چک عملیاتی

* Troubleshoot system

سیستم عارضھ گیری

* Inspect system and components

معاینھ سیستم و اجزای آن

* Remove and install transformer rectifier unit

* Remove and install reverse current relay

* Remove and install battery system components

Remove and install other system components

* Apply external power

* Troubleshoot system

سیستم عارضھ گیری

* Inspect system and components

معاینھ سیستم و اجزای آن

Remove and install external power receptacle

Remove and install contactor

Remove and install other system components

* Fundamentals of flight

اصول پرواز

* Component identification

تشخیص اجزای ترکیبی طیاره

* Operate flight controls

راھبرد کنترول پروازی طیاره

* System fundamentals

اصول و اساسات سیستم

* Perform operational check

انجام دادن چک عملیاتی

* Troubleshoot system

سیستم عارضھ گیری

* Inspect system and components

معاینھ سیستم و اجزای آن

* Remove and install anti-skid control box

نصب نمودن وبرداشتن بکس کنترولی ضد لغزش

* Remove and install wheel transducer

نصب نمودن وبرداشتن بدیل تایر

Remove and install other system components

نصب نمودن وبرداشتن دیگر اجزای سیستم

* Operational Checks of Aileron/Rudder Trim

چک عملیاتی رول ارتفاع ورول گردش

* Operational Checks of Elevator Trim

چک عملیاتی زاکرلکھ

* Troubleshoot system

سیستم عارضھ گیری

* Inspect system and components

معاینھ سیستم و اجزای آن

16.01

16.02

16.03

12.04

12.05

13.00

13.01

13.02

12.00

12.01

12.02

12.03

12.06

FLIGHT CONTROLS کنترول پروازی

PRIMARY FLIGHT CONTROL SYSTEMSسیستم کنترول اولیھ پرواز

ANTI-SKID SYSTEMسیستم ضد لغزش

FLIGHT CONTROL SYSTEMSسیستم کنترولی پرواز

DC POWER SYSTEM

EXTERNAL POWER SYSTEM

13.03

13.04

13.05

15.06

15.02

15.03

15.04

15.05

16.00

14.00

14.01

14.02

15.00

15.01

Task Item

Level NbrTrainee Signature Trainer Signature 3 Task Description Start Date Comp Date 1 2

* Remove and Install Elevator trim yoke switch

نصب نمودن وبرداشتن سویچ ھای بخش اخری کوچک رول ارتفاع

* Remove and Install Elevator trim selector switch

نصب نمودن وبرداشتن سویچ ھای انتخاب کننده بخش اخری کوچک رول ارتفاع

* Remove and Install Rudder/aileron trim switch

نصب نمودن وبرداشتن سویچ ھای بخش اخری کوچک رول ارتفاع و رول گردش

* Remove and Install Other system components

نصب نمودن وبرداشتن دیگر اجزای سیستم

* Operational fundamentals

اصول عملیاتی

* Perform operational check flaps

انجام دادن چک عملیاتی بالای ذاکریلکھ

* Troubleshoot flaps

عارضھ گیری ذاکرلکھ

* Inspect system and components

معاینھ سیستم و اجزای آن

Remove and Install Flap asymmetry brake switches

نصب نمودن وبرداشتن سویچ ھای متناسب کننده برک ھای ذاکرلکھ

Remove and Install Flap motor limit switches

نصب نمودن و برداشتن سویچ ھای حد موتور ذاکرلکھ

* Operational fundamentals

اصول عملیاتی

* Operational Check Engine overheat/fire warning

چک عملیاتی گرم شدن انجن و اخطاریھ اتش

* Operational Check GTC/APU/overheat/fire warning

چک عملیاتی کمپرسور گاز توربین /انجن کومکی/گرم امدن و اخطاریھ اتش

* Operational Check Nacelle overheat

عملیات چک ساختمان انجن و گرم امدن ان

* Operational Check Turbine overheat

چک عملیاتی گرم شدن بیش از حد توربین

* Troubleshoot Overheat/fire warning

عارضھ یابی گرم شدن بیش از حد /اخطاریھ اتش

* Troubleshoot Turbine overheat

عارضھ یابی گرم شدن بیش از حد توربین

* Troubleshoot Nacelle overheat

عارضھ گیری ساختمان پوش انجن گرم امده

* Inspect system and components

معاینھ سیستم و اجزای آن

* Remove and Install Thermostat

نصب و برداشتن ترموسات

* Remove and Install Fire/Overheat loop

نصب نمودن و برداشتن حلقھ گرم امدن یا اتش

* Remove and Install Fire Warning Control Box

نصب نمودن وبرداشتن بکس کنترول کننده اخطاریھ ھای اتش

* Remove and Install Overheat detectors

نصب نمودن وبرداشتن ردیاب ھای گرمی

* Remove and Install Turbine overheat wiring harness

نصب نمودن وبرداشتن لین ھا ی معلوم کردن گرمی توربین

Repair components

دوباره جور کردن اجزا

Bench check components

اجزای کھ توسط دست چک میشود

* Operational fundamentals

اصول عملیاتی

* Perform operational check

انجام دادن چک عملیاتی

* Troubleshoot system

سیستم عارضھ گیری

18.09

18.10

18.11

18.12

18.13

18.08

17.03

18.00

18.01

18.02

18.03

19.00

19.01

19.02

18.14

18.15

16.04

16.05

18.04

18.05

18.06

18.07

FIRE EXTINGUISHING SYSTEMسیستم ضد حریق

SECONDARY FLIGHT CONTROL SYSTEMSسیستم دومی کنترولی پرواز

FIRE/OVERHEAT WARNING اخطاریھ اتش / گرم امدن

FIRE/ OVERHEAT SYSTEMS سیستم ھا ی اتش گرفتن /گرم امدن

17.04

17.05

16.06

16.07

17.00

17.01

17.02

Task Item

Level NbrTrainee Signature Trainer Signature 3 Task Description Start Date Comp Date 1 2

* Inspect system and components

معاینھ سیستم و اجزای آن

* Remove and Install Squib

نصب و برداشتن بستھ امتحان شونده

* Remove and Install Agent bottle

نصب نمودن وبرداشتن بوتل مواد کیمیاوی

* Remove and Install Directional control valves

نصب نمودن وبرداشتن وال ھای کنترول جھت

* Remove and Install System plumbing

نصب وبرداشتن سیستم لولھ کشی

* Bench check components

اجزای کھ بالای چوکی چک میشود

* Operational fundamentals

اصول عملیاتی

* Cargo Ramp/Door

کارگو رمپ/ دروازه

* Arial Dellivery System (ADS)

سیستم انتقالات

* Troubleshoot system

سیستم عارضھ گیری

* Inspect system and components

معاینھ سیستم و اجزای آن

* Remove and Install Ramp switch

نصب نمودن و برداشتن سویچ رمپ

* Remove and Install Door switch

نصب نمودن و برداشتن سویچ دروازه

* Adjust Ramp limit switch

اجست نمودن سویچ اندازه رمپ

* Adjust Door switch

اجست نمودن سویچ دروازه

* Operational fundamentals

اصول عملیاتی

* Perform operational check

انجام دادن چک عملیاتی

* Troubleshoot system

سیستم عارضھ گیری

* Inspect system and components

معاینھ سیستم و اجزای آن

* Remove and Install Starter control switch

نصب وبرداشتن سویچ کنترولی چالان کننده

* Remove and Install Throttle ignition switch

نصب نمودن و برداشتن سویچ جرقھ و زیاد کردن سرعت

* Remove and Install Low speed ground idle switch

نصب نمودن و برداشتن سویچ سرعت اھستھ زمینی

* Operational fundamentals

اصول عملیاتی

* Perform operational check

انجام دادن چک عملیاتی

* Troubleshoot system

سیستم عارضھ گیری

* Inspect system and components

معاینھ سیستم و اجزای آن

* Bench check components

اجزای کھ توسط دست چک میشود

* Operational fundamentals

اصول عملیاتی

* Perform operational check

انجام دادن چک عملیاتی

23.00

23.01

22.00

22.01

22.02

22.03

22.04

21.03

21.04

21.05

21.06

20.06

20.07

20.08

21.00

21.01

20.03

20.04

20.05

19.05

19.06

19.07

19.08

20.00

21.02

19.03

19.04

20.01

20.02

CARGO DOOR CONTROL AND WARNING SYSTEMکنترول دروازه کارگو وسیستم اخطاریھ

STARTING AND IGNITIONچالانی و احتراق

FUEL WARNING AND CONTROL SYSTEM اخطاریھ مواد سوخت وکنترول سیستم

Non-ELECTROSTATIC FORMULATION (NESA) ANTI-ICING SYSTEMفورمول غیر الکتروستاتیک سیستم ضد یخ بندی

Task Item

Level NbrTrainee Signature Trainer Signature 3 Task Description Start Date Comp Date 1 2

* Attach wire to taps on transformer

ضمیمھ کردن سیم بر روی ترانسفار مر

* Inspect system and components

معاینھ سیستم و اجزای آن

* Bench check components

اجزای کھ توسط دست چک میشود

* Remove and Install Power transformer

نصب نمودن وبرداشتن ترانسفارمر برق

* Remove and Install NESA window leads and hardware

نصب نمودن و برداشتن

* Operational fundamentals

اصول عملیاتی

* Perform operational check

انجام دادن چک عملیاتی

* Troubleshoot system

سیستم عارضھ گیری

* Inspect system and components

معاینھ سیستم و اجزای آن

* Remove and Install System Components

نصب نمودن وبرداشتن دیگر اجزای سیستم

* Operational fundamentals

اصول عملیاتی

* Perform operational check

انجام دادن چک عملیاتی

* Troubleshoot system

سیستم عارضھ گیری

* Inspect system and components

معاینھ سیستم و اجزای آن

* Remove and Install Engine pressure regulator/shutoff valve

نصب نمودن و برداشتن ریگلاتور فشار انجن/یا وال بند کننده

* Remove and Install Wing anti-ice valve

نصب نمودن و برداشتن وال ضد یخ در بال ھا

* Remove and Install Bleed air ducts and clamps

نصب و برداشتن کلمپ ھا و کابالھای ھواکشی

* Perform leakage checks

انجام دادن چک لیکی ھا

* Perform bleed air decay check

انجام دادن ھواکشی و چک پوسیدگی ھا

Remove and Install Thermostat

نصب وبرداشتن ترموسات

Remove and Install Other system components

نصب وبرداشتن ترموسات دیگر اجزای سیستم

* Operational fundamentals

اصول عملیاتی

* Perform operational check

انجام دادن چک عملیاتی

* Troubleshoot system

سیستم عارضھ گیری

* Inspect system and components

معاینھ سیستم و اجزای آن

* Remove and Install Ice detector

نصب نمودن وبرداشتن ردیاب یخ

* Remove and Install Propellor De-ice timer

نصب نمودن وبرداشتن تایمر ضد یخ پروانھ

* Remove and Install Other system components

نصب نمودن وبرداشتن دیگر اجزای سیستم

* Operational fundamentals

اصول عملیاتی

26.03

26.04

26.05

26.06

27.00

25.07

25.08

26.00

26.01

26.02

25.02

25.03

25.04

25.05

25.06

25.10

25.09

24.03

24.04

25.00

25.01

23.05

23.06

24.00

24.01

24.02

23.02

23.03

23.04

ICE DETECTION SYSTEM

UNDERFLOOR HEAT SYSTEM

BLEED AIR SYSTEMسیستم ھواکشی

WING AND EMPENNAGE ANTI-ICING SYSTEMسیستم ضد یخ بندی بال و دمب طیاره

Task Item

Level NbrTrainee Signature Trainer Signature 3 Task Description Start Date Comp Date 1 2

* Perform operational check

انجام دادن چک عملیاتی

* Troubleshoot system

سیستم عارضھ گیری

* Inspect system and components

معاینھ سیستم و اجزای آن

* Remove and Install Shutoff valve

نصب نمودن و برداشتن وال بند کننده

* Remove and Install Diverter valve

نصب و برداشتن وال تبدیل کننده

Remove and InstallThermostat

نصب نمودن وبرداشتن ترموسات

Remove and Install Recirculating fan

نصب نمودن وبرداشتن پکھ دوران کننده

Remove and Install Other system components

نصب نمودن وبرداشتن دیگر اجزای سیستم

* Operational fundamentals

اصول عملیاتی

* Perform operational check

انجام دادن چک عملیاتی

* Troubleshoot system

سیستم عارضھ گیری

* Inspect system and components

معاینھ سیستم و اجزای آن

* Remove and Install Flow control valve

نصب نمودن و برداشتن وال کنترول کننده جریان

* Remove and Install Water separator sock

نصب نمودن وبرداشتن جداکننده اب

* Remove and Install Temperature control valve

نصب نمودن وبرداشتن وال کنترولی درجھ حرارت

* Remove and Install Water separator

نصب نمودن و برداشتن وا ل جداکننده

* Remove and Install Temperature control boxes

نصب نمودن و برداشتن بکس کنترولی درجھ حرارت

* Perform leakage checks

انجام دادن چک لیکی

* Service cooling turbine

سرویس نمودن توربین سرد کننده

* Operational fundamentals

اصول عملیاتی

* Perform operational check

انجام دادن چک عملیاتی

* Troubleshoot system

سیستم عارضھ گیری

* Troubleshoot Overboard vent system

معاینھ نمودن سیستم توده کنندن مواد سوخت

* Inspect system and components

معاینھ سیستم و اجزای آن

* Remove and Install Pressure controller

نصب نمودن وبرداشتن کنترول کننده فشار

* Remove and Install Outflow valve

نصب نمودن وبرداشتن وال جریان بیرونی

* Remove and Install Pneumatic relay

نصب نمودن و برداشتن بست بادی

* Remove and Install Safety valve

نصب نمودن وبرداشتن وال محا فظتی

* Remove and Install Filters

نصب و برداشتن فلتر ھا

* Repair components

دوباره جور کردن اجزا

* Perform pressure delay check

انجام دادن چک وقت یا تایم فشار

29.09

29.10

29.11

29.04

29.05

29.06

29.07

29.08

28.10

29.00

29.01

29.02

29.03

28.05

28.06

28.07

28.08

28.09

28.00

28.01

28.02

28.03

28.04

27.01

27.02

27.03

27.04

27.05

A/C SYSTEM

27.06

27.07

27.08

PRESSURIZATION SYSTEMسیستم فشار

Task Item

Level NbrTrainee Signature Trainer Signature 3 Task Description Start Date Comp Date 1 2

* Detect aircraft pressure leaks

تشخیص لیک ھای فشار طیاره

Remove and Install Diverter valve pressure controller

نمودن وبرداشتن وال تبدیل کننده و کنترول کننده فشار

Remove and Install Water separator anti-ice valve

نصب نمودن وبراشتن جدا کننده اب وال ضد یخ

Remove and Install Auxiliary vent valve

نصب نمودن وبرداشتن وال کومکی خالی کننده

Remove and Install Cooling turbine

نصب نمودن وبرداشتن توربین سرد کننده

Remove and Install Heat exchanger

نصب نمودن وبرداشتن مبدل حرارتی

Remove and Install Ram air duct

نصب نمودن وبرداشتن مجرای ھوای رمپ

Remove and Install Refrigeration unit

نصب نمودن و برداشتن بخش سرد کننده

Remove and Install Other system components

نصب نمودن و برداشتن دیگر اجزای سیستم

Repair components

درباره جور کردن اجزا

* Operational fundamentals

اصول عملیاتی

* Perform operational check

انجام دادن چک عملیاتی

* Troubleshoot system

سیستم عارضھ گیری

* Inspect system and components

معاینھ سیستم و اجزای آن

* Purge System

انداختن در سیستم

* Remove and Install Oxygen regulator

نصب نمودن وبرداشتن ریگلاتور اکسیجن

* Remove and Install Converter

نصب نمودن وبرداشتن مبدل یا تبدیل کننده

* Remove and Install Buildup/Vent valve

نصب نمودن /برداشتن جور کردن وال توده شونده مواد سوخت

* Remove and Install Shutoff drain valve

نصب وبرداشتن وال توده شودنده وبند کننده مواد سوخت

* Remove and Install Heat Exchanger

نصب وبرداشتن مبدل حرارتی

* Perform leak check

انجام دادن چک لیکی ھا

* Clean components

پاکی و صفایی اجزا

* Perform operational check

انجام دادن چک عملیاتی

* Troubleshoot system

سیستم عارضھ گیری

* Inspect system and components

معاینھ سیستم و اجزای آن

* Remove and install feather button

نصب نمودن وبرداشتن سویچ تغیر دھنده پروانھ ھا

* Perform operational check

انجام دادن چک عملیاتی

* Troubleshoot system

سیستم عارضھ گیری

* Inspect system and components

معاینھ سیستم و اجزای آن

32.00

32.01

32.02

30.11

31.00

31.01

31.02

31.03

30.06

30.07

30.08

30.09

30.10

30.01

30.02

30.03

30.04

30.05

29.12

30.00

29.19

29.20

29.21

PROPELLER FEATHER ELECTRICALپروانھ و سیستم تغیر دادن برقی ان

STATIC LINE RETRIEVER SYSTEM سیستم ساکن بازیاب

29.13

29.14

29.15

29.16

29.17

29.18

LIQUID OXYGEN (LOX) SYSTEMسیستم اکسیجن مایع

Task Item

Level NbrTrainee Signature Trainer Signature 3 Task Description Start Date Comp Date 1 2

* Remove and install Static line current limiter

نصب نمودن وبرداشتن اندازه گیر کرنت ھا

* Remove and install Static line switches

نصب نمودن وبرداشتن سویچ ھای لین فشار ستاتیک

Repair components

دوباره جور کردن اجزا

Bench Check Components

اجزای کھ توسط دست چک میشود

* Inspect system and components

معاینھ سیستم و اجزای آن

* Perform operational check

انجام دادن چک عملیاتی

* Troubleshoot system

سیستم عارضھ گیری

* Remove and install System Components

نصب نمودن و برداشتن اجزای سیستم

LIGHTING SYSTEMS

* Operational fundamentals اصول عملیاتی

* Remove and Install Landing light

* Inspect system and components معاینھ سیستم و اجزای آن

* Troubleshoot system سیستم عارضھ گیری Remove and Install Other system components نصب نمودن و برداشتن دیگر اجزای سیستم

* Operational fundamentals اصول عملیاتی

* Inspect system and components معاینھ سیستم و اجزای آن

* Troubleshoot system سیستم عارضھ گیری Remove and Install Other system components نصب نمودن و برداشتن دیگر اجزای سیستم

* Operational fundamentals اصول عملیاتی

* Perform operational check انجام دادن چک عملیاتی

* Remove and Install Other system components نصب نمودن و برداشتن دیگر اجزای سیستم

* Inspect system and components معاینھ سیستم و اجزای آن

36.04

36.05

35.04

36.00

36.01

36.02

36.03

34.11

35.00

35.01

35.02

35.03

34.12

35.05

34.06

34.07

34.08

34.09

34.10

34.01

34.02

34.03

34.04

34.05

33.00

33.01

33.02

33.03

34.00

32.03

32.04

32.05

32.06

Remove and Install Landing gear control panel

Adjust Limit switches

Perform operational check- Formation lights

Remove and Install Anticollision/Strobe light

Remove and Install Anticollision/Strobe light power supply

Perform operational check- Cargo compartment lighting

Perform operational check-Navigation lights

Perform operational check- Leading edge lights

Perform operational check- Taxi Lights

Perform operational check- Anticollision/Strobe lights

AIR DEFLECTOR DOORدروازه بادگیر ھوا

LANDING GEAR SYSTEMS

EXTERIOR LIGHTING

INTERIOR LIGHTING

Perform operational check- Landing lights

Perform operational check- Flight deck lighting

Task Item

Level NbrTrainee Signature Trainer Signature 3 Task Description Start Date Comp Date 1 2

* Troubleshoot system سیستم عارضھ گیری

Perform operational check انجام دادن چک عملیاتی Drain System

Purge System انداختن در سیستم Remove and Install Other system components نصب نمودن و برداشتن دیگر اجزای سیستم Perform leak check انجام دادن چک لیکی ھا Inspect system and components معاینھ سیستم و اجزای آن Clean components پاکی و صفایی اجزا

36.06

LIQUID OXYGEN CRYOTAINER/CART

37.00

37.01

37.02

37.03

37.04

37.05

37.06

Additional Task Form 797

File details come from the government source that posted it. Updated .