TMCR__TM86-01N_00.pdf
PDF 148 KB Posted
- Solicitation number
- FA8553-17-R-0019
About this file
Technical Manual Contract Requirements (TMCR)
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Industry_Q_and_A.pdf | ||
| FA855317R0019_______0004.pdf | ||
| Additional_Industry_Q_and_A_C-130H_ALR-69A_RFP.pdf | ||
| Industry_Q__A_C-130H_ALR-69A_RFP.pdf | ||
| Attachment_2__SOW_with_attachments.pdf | ||
| Attachment_3__C-130_RWR_Upgrade_Price_Matrix.xlsx | XLSX spreadsheet | |
| FA855317R0019___0001.pdf | ||
| FA855317R0019.pdf | ||
| DD_1423__CDRLs.pdf | ||
| FA855317R0019.pdf | ||
| Attachment_1__Consolidated_GFP.pdf | ||
| DD_1653.pdf | ||
| Attachment_3__C-130_RWR_Upgrade_Price_Matrix.xlsx | XLSX spreadsheet | |
| DD_254.pdf | ||
| Attachment_2__SOW_with_attachments.pdf | ||
| SOW.docx | DOCX document |
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TM-86-01N 1 April 2009 1
Air Force Technical Manual Contract Requirements (TMCR) for
INSTALLATION OF AN/ALR-69A(V) RADAR WARNING RECEIVER (RWR) ON SELECTED
C-130 AIRCRAFT (TCTO 1C-130-2016)
(Program/Modification/Military System)
ATTACHMENT , TO CDRL SEQUENCE NUMBER , EXHIBIT
REQUEST FOR PROPOSAL/CONTRACT:
Date: 7 May, 2009
Amendment #1 Date: 29 June 2016 – Update Para 1, 3, 4.2, 7, 9, 12.1, Section 2, Table 1, Table 2, Part B and Delivery Schedule
TMCR NUMBER: 0297
AFLCMC/WIUEG TOMA DATE
AFLCMC/WIUEG FMM DATE
AFLCMC/WIUEG FMM DATE
AFLCMC/WIUEG IETM TOMA DATE
AFLCMC/WLNCC PM DATE
AFLCMC/WIUEG TECH DATA SECTION CHIEF DATE
(Only Harwell J Butler, Timothy Bullock, or Randy Helmick can sign as Section Chief)
Technical Manual/Technical Order requirements contained herein have been cleared for use by OMB Paperwork Reduction Project No. 0704-0188.
29 June 2016
29 June 2016
30 June 2016
30 June 2016
6 July 2016
7 July 2016
CURRY.WILLIE.D.111
4071567
Digitally signed by CURRY.WILLIE.D.1114071567 DN: c=US, o=U.S. Government, ou=DoD, ou=PKI, ou=USAF, cn=CURRY.WILLIE.D.1114071567 Date: 2016.06.29 13:28:11 -04'00'
KUBIK.DONALD.G.10
25900134
Digitally signed by KUBIK.DONALD.G.1025900134 DN: c=US, o=U.S. Government, ou=DoD, ou=PKI, ou=CONTRACTOR, cn=KUBIK.DONALD.G.1025900134 Date: 2016.06.29 14:07:50 -04'00'
ALLEN.ROBERT.S.10
65343653
Digitally signed by ALLEN.ROBERT.S.1065343653 DN: c=US, o=U.S. Government, ou=DoD, ou=PKI, ou=USAF, cn=ALLEN.ROBERT.S.1065343653 Date: 2016.06.30 12:05:50 -04'00'
SPRING.LYLE.W.1136
454583
Digitally signed by SPRING.LYLE.W.1136454583 DN: c=US, o=U.S. Government, ou=DoD, ou=PKI, ou=USAF, cn=SPRING.LYLE.W.1136454583 Date: 2016.06.30 16:37:41 -04'00'
COULTER.AMY.E.126
5966744
Digitally signed by COULTER.AMY.E.1265966744 DN: c=US, o=U.S. Government, ou=DoD, ou=PKI, ou=USAF, cn=COULTER.AMY.E.1265966744 Date: 2016.07.05 10:29:14 -04'00'
BUTLER.HARWELL.J.
III.1066674033
Digitally signed by BUTLER.HARWELL.J.III.1066674033 DN: c=US, o=U.S. Government, ou=DoD, ou=PKI, ou=USAF, cn=BUTLER.HARWELL.J.III.1066674033 Date: 2016.07.06 08:02:12 -04'00'
2 TM-86-01N 1 April 2009
SECTION 1. TECHNICAL ORDER (TO) PROGRAM REQUIREMENTS
1. TMCR Tailoring. Offerors must tailor this TMCR document, including the associated tables, matrices and Specification/Standard Interface Records (SIRs). The tailored TMCR shall be attached to the CDRL for TO delivery, and shall be included in the proposal as a separate exhibit, referenced in the proposal SOW. Proposals shall be compatible with the Air Force infrastructure and support the Installation of AN/ALR-69A(V) Radar Warning Receiver (RWR) on Selected C-130 Aircraft (TCTO 1C-130-2016) Program Integrated Data System (IDS) requirements. Air Force TO Acquisition procedures, including procedures for tailoring this document, are found in TO 00-5-3, AF Technical Order Life Cycle Management, located on the Internet at www.tinker.af.mil/library/factsheets/factsheet.asp?id=6082 www.tinker.af.mil/technicalorders/index.asp.
Any terms or procedures found in this document may be researched there.
2. TO Program Scope. The offeror shall tailor Section 2 to propose the TO types (Table 1) and source data, TO updates, commercial manuals, and TOs prepared to Non Government Standards (NGS) (Table 2) required to support the Installation of AN/ALR-69A(V) Radar Warning Receiver (RWR) on Selected C- 130 Aircraft (TCTO 1C-130-2016) program objectives.
3. Commercial Manuals. Offerors shall propose the use of existing commercial manuals to the maxi-mum extent possible without impairing program support objectives. The proposal will describe the method used to recommend and submit specific manuals to the government for review and approval.
NOTES: a) Contractors may use Data Item Description (DID) DI-TMSS-80067, Technical Manual (TM) Contractor Furnished Aeronautical Equipment or Contractor Furnished Equipment (CFAE/CFE) Notices (located at http://dodssp.daps.dla.mil/assist.htm), to provide recommendation data. A copy is available from the TOMA upon request. b) Government activities will use MIL-PRF-32216, Evaluation of Commercial Off-The-Shelf (COTS) Manuals and Preparation of Supplemental Data, as a guide for review and acceptance of all recommended commercial manuals, and MIL-DTL-7700, Detail Specifica-tion: Flight Manuals, Air Refueling Procedures, and Abbreviated Checklists, as an additional guide for commercial Flight Manual contents.
4. Technical Manual Specifications and Standards (TMSS) Tailoring. TMSS are tailored by selecting between options offered in paragraph 6.2 of each TMSS. The tailoring is recorded in SIRs and added to Section 3 of this document for each TMSS required. NOTE: Tailoring must not change or delete man-datory requirements which are part of the Document Type Definition (DTD) structure.
4.1. AF options in some Joint-Service TMSS have been documented in preliminary SIRs included in Section 3. These preliminary SIRs provide the starting point for further tailoring. Offerors shall complete tailoring of the Joint-Service TMSS SIRs and provide recommended SIRs for other TMSS or NGS as applicable. NOTE: TMSS requirements marked “(F)” are specifically for Air Force use;
“(A)” is for Army, “(M)” is Marine Corps and “(N)” is Navy. Comply with all unmarked and “(F)” TMSS requirements as modified by the options in paragraph 6.2.
4.2. (T) Questions concerning TMSS requirements may be resolved by written request and justified suggestions for resolution submitted through the Procuring Contracting Officer (PCO) and WR- ALC/GFEAH Willie Curry, AFLCMC/WIUEG 235 Byron Street, Suite 19A, Robins AFB, GA 31098-1647, 478-222-1239, (DSN 472-1239). Deficiencies and suggested improvements shall be submitted to the TMSS Preparing Activity (PA). Approved recommendations, corrections and clari-fications will be maintained with contract documentation.
5. Subsequent TO/Data Requirements. Offerors shall propose a process for notifying the government when additional TO or source data requirements are identified subsequent to contract award. This pro-cess shall require government review and approval of recommended additional requirements prior to
TM-86-01N 1 April 2009 3 contractual approval. NOTE: The recommended notification process is to use CFAE/CFE Notices (DI-
TMSS-80067).
6. TO Development. The offeror shall propose TO development practices and procedures that ensure TOs and data are compatible with the Air Force Technical Order Concept of Operations (CONOPS) (on the AF Portal at https://wwwd.my.af.mil/afknprod/DocView.asp?DocID=1689861) and the Enhanced Technical Information Management System (ETIMS). In addition, TOs shall be written to a scope and depth of cov-erage sufficient to support the operations and maintenance concepts, and to the Reading Grade Level (RGL) specified in MIL-STD-38784, Standard Practice for Manuals, Technical: General Style and Format Requirements.
6.1. Page-oriented Military Specification (MILSPEC) TOs shall be formatted with text, graphics and delivery according to the TMSS specified in Section 2. The contractor shall develop TO files (tagged instances) using Standard Generalized Markup Language (SGML) according to the DTDs referenced in the appendix to MIL-STD-38784 and each applicable military detail or performance specification (MIL-DTL or MIL-PRF).
6.2. SGML-tagged TO files shall include required illustration (graphics) files in an approved graphics exchange format (select “Guidelines” and “Graphics” on the Technical Manual Specifica-tions and Standards (TMSS) web page (https://techdata.wpafb.af.mil/tmss/index.html, or contact the 754 ILMT via e-mail at SGMLSupport@wpafb.af.mil). NOTE: Illustration files developed and de-livered for other purposes shall be used in lieu of developing special TM illustration files whenever possible.
6.3. (T) Interactive Electronic Technical Manuals (IETMs) shall be developed IAW ASD/AIA S1000D, International Specification for Technical Publications Utilizing a Common Source Data-base, Version 4 or higher. Business rules for use of S1000D are included in the SIR found in Sec-tion 3 of this document. Contact the Procuring Contracting Officer (PCO) and IETM TO Manager to request guidance from the Air Force Preparing Activity (PA), 754 ELSG/ILMT, Technical Order Section, 4375 Chidlaw Rd Suite 6, WPAFB OH 45433-5006.
6.4. The offeror may propose use of other Non-Government Standards (NGS) for development of TOs, but must justify this choice based on life-cycle cost savings to the government and compatibil-ity with existing systems identified in the IDS and the System Support Plan.
6.5. The contractor shall contact 754 ELSG/ILMT for pre-approval before modifying or developing any new DTDs to support use of NGS, canceled TMSS, or undeveloped TMSS DTDs. If permission is granted, the offeror must submit any proposed DTDs through the PCO and TO Manager to 754 ELSG/ILMT for validation of TMSS compatibility with approved electronic TO (eTO) viewing so-lutions. New DTDs shall not be developed in lieu of existing DTDs, including those for legacy TMSS. Rules shall be so constructed that TO output complies with the functional requirements of the associated TMSS, and shall be documented in a SIR. DTDs and rule sets submitted and ap-proved in execution of the contract shall become the property of the Government. Direct questions about the application of SGML tagging to digital TO files to 754 ELSG/ILMT (SGMLSup-port@wpafb.af.mil).
7. TO Numbering. Offerors shall notify the government of manuals which require TO numbers. TO numbers are not required for manuals to be used exclusively by the offeror’s own personnel. (NOTE:
DI-TMSS-80067 may be used to provide the notification.) AF procedures for numbering TOs are de-scribed in TO 00-5-3 and TO 00-5-18, AF Technical Order Numbering System, (available at www.tinker.af.mil/library/factsheets/factsheet.asp?id=6082/ www.tinker.af.mil/technicalorders/index.asp).
4 TM-86-01N 1 April 2009
8. Data Rights. Government rights in data are specified in the Defense Federal Acquisition Regulation Supplement (DFARS), paragraphs 227-7102 through 227-7104. Offerors shall propose Unlimited Rights for all source data and TOs prepared specifically for the contract.
8.1. If some TOs or source data are copyrighted or contain proprietary data or procedures, offerors may propose Limited Rights or Government Purpose Rights (GPR) only. Proposed commercial manuals should be provided with at least GPR or Limited Rights. Copyrights shall be according to DFARS paragraphs 227-7103, 7105 or 7106.
8.2. Specifically, if an NGS is proposed, the government shall be given unlimited rights for all busi-ness rules (tailoring and application methods and procedures) and documented business processes developed for use in TO development. Government data rights shall extend to the common source database, transformation style sheets, and other tools or products used to author or display NGS technical data.
9. Classification, Distribution, Destruction, Disclosure, and Export Control Notices. Offerors shall determine the correct markings and controls for classified and restricted distribution data and TOs IAW the program’s Security Classification Guide (SCG) and DOD 5200.1-R DODM 5200.01, DODD DODI 5230.24, AFIs 21-303, 31-401 and 61-204, and MIL-STD-38784 (available at http://www.e-publishing.af.mil/ or http://dodssp.daps.dla.mil/assist.htm https://assist.dla.mil/online/start/index.cfm).
The markings and notices shall be reviewed during In-Process Reviews (IPR). NOTE: Distribution limitations will be determined on a case-by-case basis as TOs are developed, dependent upon TO con-tent.
10. TO Quality. Offerors shall propose a quality assurance program which ensures TOs are prepared IAW this contract. Recommended QA methods must include actual performance of procedures and use of desk-top analysis for non-procedural data. Simulation (walk-through/talk-through) should be re-served for those procedures which would activate explosive devices or present a hazard to personnel or equipment. Offerors’ proposals shall describe how the government will be allowed to interact with the contractor’s TO development team. NOTE: Quality requirements for the Joint Nuclear Weapons Pub-lications System (JNWPS) and for Non-nuclear Explosive Ordnance Disposal (EOD) Data are contained in TO 11N-1-1 and DOD Directive 5160.62, respectively. The government will performance-tests all JNWPS and EOD TOs.
10.1. (T) Conferences and Technical Reviews. Offerors shall propose sufficient conferences and reviews to allow insight into TO development processes and ensure contract compliance. Offerors should host an initial Guidance Conference or Technical Interchange Meeting (TIM) within 60 days of contract award to ensure mutual understanding of TO contract requirements, schedules, points of contact, etc. Periodic In-Process Reviews (IPRs) and Prepublication Reviews (PPR) ensure TOs are being developed according to contract requirements and that open discrepancies are cleared prior to publication. The TOMA must be notified 30 days prior to any conferences or reviews. For eTO based programs, IPRs subsequent to the initial review need to be accomplished using the approved viewing presentation system. NOTE: PPRs are required for critical safety and nuclear surety pro-cedures TOs, and may be required for other complex procedures TOs.
10.1.1 (T) Interactive Task Review (ITR)
The contractor shall integrate government Central Technical Order Control Unit (CTOCU) person-nel into the development process. During the maturity of the IETM database, the contractor is re-sponsible for the development of all the data, and CTOCU personnel will evaluate the data during the development. The contractor will provide CTOCU personnel access to the developmental IETM
TM-86-01N 1 April 2009 5 database. ITRs will be conducted to ensure developmental issues have been resolved and to verify all requirements have been met.
The contractor shall host and co-chair ITRs to ensure that the IETM database and additional data development is being developed in accordance with the contract and cited specifications. ITR intervals and completion criteria will be as stated in paragraph 10.1.1.1. Additional ITRs may be required based on the contractor's or government's evaluation of the IETM database and addi-tional data development process or the criticality and complexity of the material covered. Re-views will be conducted to evaluate database content and functionality in terms of relationships between data elements within the database. The contractor shall make a copy of the develop-ment database available to the government 30 days prior to the scheduled ITR. This database shall have the contractor’s Engineering (when applicable) and Quality Assurance review com-ments incorporated into the database prior to delivery for the scheduled review. Additionally, copies of the Database Discrepancy Reports will be available to the government at the scheduled review. All data presented for ITR will have the contractor’s Quality Assurance and engineering signatures (when appropriate) and meet full MIL-Spec requirements. The contractor shall sup-port ITRs with TO writers, engineers (if required), and any additional personnel that may have an impact on the IETM database preparation. A complete listing of source data used to develop the IETM database shall be at each ITR. This requirement may be waived by the TOMA on an event-by-event basis.
10.1.1.1 (T) ITR Requirements for the IETM database
1. (T) Initial Review. To meet criteria for the Initial Review, the IETM IDET must contain 80% of the required tasks for that system (i.e., if the system contains 100 tasks, 80 of those tasks would be present in the database for the Initial Review). The Initial Review will be delivered in conjunc-tion with the 80% IPR paper TO submittals. These tasks include:
a. Preparations
b. Restorations
c. General Instructions
d. Removals
e. Installations
f. Operational Checkouts
g. Fault Reporting Procedures
h. Fault Isolation Procedures
i. Parts Data
j. Available functionality
In addition to 80% of the tasks, the database will contain a percentage of the data required to sup-port those tasks. The following is a breakdown of that supporting data:
a. 100% of all consumables for 80% of the tasks authored
b. 100% of all Warnings, Cautions, and Notes for 80% of the tasks authored
c. 100% of parts data for 80% of the tasks being authored
d. 100% of descriptive information modules for 80% of the tasks authored
e. 100% of wiring data for 80% of the tasks authored
f. 100% of wiring diagrams for 80% of the tasks authored
6 TM-86-01N 1 April 2009
2. (T) Pre-Integration Review. The requirements for a Pre-Integration Review are the same as the 50% except for the percentage of data present in the database at the time of the ITR. The Pre- Integration Review will be delivered in conjunction with the Verification IPR copy of the paper TO submittals.
NOTE: If a contractor’s digital IETM format does not merge into the IETM data-base it will/may be sent back to the contractor for corrections.
10.2. TO Certification. Offerors shall propose their method for documenting certification that TO procedures are accurate, adequate, current, safe and usable for their intended purposes. Offerors shall notify the government at least 180 days prior of the need for any Government Furnished Infor-mation/Government Furnished Equipment (GFI/GFE) required to perform certification tasks.
10.3. (T) Verification Support. Offerors shall propose the methods, equipment and personnel re-quired to support government TO Verification. This support should consist of at least a Lead Tech-nical Writer, knowledgeable on the system and a System Qualified Engineer.
10.4. Technical Data Assessment (TDA – originally called First Article Testing). The program office, with the assistance of 754 ELSG/ILMT and the contractor, will determine the TDA requirements for each TO type. The contractor will submit an in-work sample of each type of SGML-tagged TO file to the program office concurrent with the first IPR, for TDA to verify compliance of the digital files to Air Force DSSs. Additional TDAs may be required based on initial results. The TDA parsing in no way relieves the contractor from correcting tagging errors that are noted during the composing effort.
Repeat TDAs shall be required whenever new DSS or DTD versions are used for TO development.
The contractor shall deliver a representative percentage of Indexed Portable Document Format (IPDF) TO files to verify indexing compliance with the Technical Order Conversion Requirements (TOCR) (on the AF Portal at https://wwwd.my.af.mil/afknprod/DocView.asp?DocID=5153963).
11. (T) TO and Source Data Maintenance. Offerors shall propose methods for maintaining accuracy, currency and configuration of TOs and source data throughout the contract period of performance.
Maintenance includes preparation of TO and source data updates to incorporate corrections, equipment configuration changes, and maintenance and operational concept changes. Editorial and Technical Con-tent cut-off will be the close and acceptance of the 80% minutes and closure of all action items from that In-Process Review (IPR).
12. TO Delivery. Offerors shall propose practices and procedures for secure access to or delivery of digital TO files, including those for Preliminary TOs (PTOs), source data, reproduction masters, and program support data. Practices and procedures shall be compatible with the program’s IDS. TO file delivery formats shall be according to applicable CDRLs and the tailored TM Delivery Requirements Matrices included in Section 2 of this document. Paper TO delivery is not acceptable for final delivery of TOs. EXCEPTION: For Commercial Manuals not available digitally.
12.1. SGML-Tagged Files. The contractor shall parse and compose SGML-tagged TO document files prior to delivery to the government, and verify that content tagging has been accomplished to the levels provided in the DTD. NOTE: The government will parse the files prior to acceptance us-ing the public domain “SGMLS Parser” (ftp://ftp.jclark.com/pub/SGMLS http://jclark.com/sp/).
12.2. SGML-Tagged Files for Use with the eTO Viewer. The contractor shall use the GFE ETIMS eTO Viewer/Transformer and Digital Formatted Output Specification Instance (DFOSI) to convert tagged instances to Hypertext Markup Language (HTML) files compatible with the eTO viewer, and certify the output complies with TMSS requirements.
TM-86-01N 1 April 2009 7
12.3. Interactive Electronic Technical Manuals (IETM). IETM data base delivery shall be accord-ing to the business rules for S1000D in Section 3 of this document.
12.4. Indexed Adobe™ Portable Document Format (IPDF) Files. The contractor shall validate indexing of PDF TO files using the specifications contained in the Technical Order Conversion Requirements (TOCR) found on the Air Force Portal at https://wwwd.my.af.mil/afknprod/DocView.asp?DocID=5153963.
13. (T) Schedules. Offerors shall include TO program events and schedules in their proposed Integrat-ed Master Plan (IMP) and Integrated Master Schedule (IMS), and update the IMS throughout the period of performance. NOTE: AF policy requires delivery of verified TOs prior to or concurrently with de-livery of operational equipment to the field (AFI 21-303, Technical Orders). This policy will determine TO development and delivery schedules throughout the acquisition phase of a program. Any change to the IMS must be coordinated with the TOMA/FMM. A copy of the updated IMS will be provided to the
TOMA/FMM.
14. Time Compliance Technical Orders (TCTOs). Offerors shall propose practices and procedures to develop AF TCTOs and related TO updates when tasked as part of the approval process for Engineering Change Proposals (ECPs) to configured items. Costs for TCTO package development must be included in ECP Costs – not included as direct proposal costs. NOTE: ECPs are reviewed and approved by the Government’s Configuration Control Board (CCB). When the CCB decides that a TCTO is the appro-priate method of implementation, the contractor may be requested to develop the TCTO package for Air Force coordination and approval. See TO 00-5-15, Air Force Time Compliance Technical order Process, (available at http://www.tinker.af.mil/library/factsheets/factsheet.asp?id=6082/00-5-15-WA- 1/00-5-15.PDF) for a detailed description of TCTO processes.
15. (T) TO Reproduction Management. Offerors shall propose practices and procedures for managing the program’s Preliminary TO reproduction requirements. MIL-HDBK-38790, Printing Production of Technical Manuals, may be used as guidance for TO printing format, paper weights, layout require-ments, etc. NOTE: Reproduction management for formal TO printing includes assembly of a print package (reproduction media, a reproduction assembly sheet).
8 TM-86-01N 1 April 2009
SECTION 2. TM TYPE AND DELIVERY REQUIREMENTS
NOTES:
Mark the TM Type Selection Tables indicating the applicable TO types and related specifications. For additional interface requirements see the program-specific Government Concept of Operations (GCO).
All page-based TOs developed under this contract must conform to the general style and format requirements of MIL-
STD-38784; IETMs must conform to S1000D and its business rules.
Check the ASSIST database, http://dodssp.daps.dla.mil/assist.htm, for updated versions of the required TMSS prior to initiating any work on this proposal/contract.
Manuals delivered using this table and DI-TMSS-80067, CFAE/CFE Notices, must be reviewed and approved by the Air
Force prior to delivery.
IPBs are developed IAW MIL-PRF-38807 MIL-DTL-38807, except that MIL-DTL-87929 will also be used for IPBs combined with work packages.
All checklists, except aircrew and nuclear weapons checklists, are developed IAW MIL-PRF-5096 MIL-DTL-5096.
MIL-PRF-83495 MIL-DTL-83495 requires MIL-HDBK-863 to be levied on engineering data for preparation of end item wiring data and schematic diagrams.
Delivery requirements are indicated in the TM Delivery Requirements matrices.
Change package format deliveries will be with accompanying back-up pages. Source data deliveries will be delivered in change package format without accompanying back-up pages. No manuscript source will be accepted.
FrameMaker files will be delivered with version 7.0 10.0 or higher for Flight Manuals using GFE furnished CD-ROM with supporting DTDs & FOSIs.
For further information on the Air Force Vision and TO Concept of Operations (CONOPS), see AF Portal URL https://wwwd.my.af.mil/afknprod/ASPs/DocMan/DocMain.asp?Filter=OO-EN-TO-PI&FolderID=OO-EN-TO-PI- 15&Tab=0.
TM-86-01N 1 April 2009 9
PART A – TM TYPE SELECTION TABLES.
TABLE 1
TMSS REQUIREMENTS FOR THE
Installation of AN/ALR-69A(V) Radar Warning Receiver (RWR) on Selected C-130 Aircraft (TCTO 1C-130-2016) Program
(System/Component)
Title or Type of Manuals Specification Required
1. Inspection TOs MIL-PRF-5096
a. Inspection and Maintenance Requirements (-6) Manual
b. Acceptance and Functional Check Flight (FCF) Procedures (-6CF)
Manual
c. Acceptance and Functional Check Flight (-6CL) Checklist
d. Workcards
e. Inspection Requirements Cards
f. Flow/Sequence Charts
g. Checklists
(1) Maintenance/Operations (Non-Aircrew)
(2) Operations (Aircrew)
2. Cargo Aircraft Loading and Offloading TOs MIL-PRF-5288
a. Manual
b. Checklists
3. Weight and Balance (Aircraft) MIL-PRF-5920
a. Loading Data Manual
b. Sample Basic Weight Checklists
4. Flight Manuals (see notes) MIL-DTL-7700
a. Flight Manual
b. Performance Data Manual
c. Air Refueling Manual
d. Air Refueling Checklist
5. List of Applicable Publications MIL-PRF-8031
6. Structural Repair Manuals (for Aircraft) MIL-PRF-9854
7. Munitions/Weapons Loading Procedures, Non- nuclear and Nuclear MIL-PRF-9977
a. Nuclear Weapons Basic Information and Loading Procedures
b. Nuclear Weapons Loading Procedures
c. Non-nuclear Munitions Basic
d. Non-nuclear Loading Procedures
e. Integrated Combat Turnaround Procedures
f. Non-nuclear Munitions Loading Standard Data Packages (SDPs)
g. Loading Procedures Checklists
h. Integrated Loading Procedures Checklists
i. Nuclear Weapons Loading Procedure Checklists
j. Integrated Combat Turnaround Procedures Checklists
k. NATO Stage B Cross-Servicing Checklists
10 TM-86-01N 1 April 2009
TMSS REQUIREMENTS FOR THE
Installation of AN/ALR-69A(V) Radar Warning Receiver (RWR) on Selected C-130 Aircraft (TCTO 1C-130-2016) Program
(System/Component)
Title or Type of Manuals Specification Required
8. Space Operations and Support Documentation TOs -- Commercial specification (all space systems & missiles) -- MILSPEC (Intercontinental Ballistic Missiles) -- MILSPEC (Space Systems)
ANSI/AIAA-R024-1993
MIL-PRF-38311
MIL-PRF-38314
a. Operations Manual
b. Operations Checklists
c. Technical Manuals and Related Checklists
9. Nuclear and Non-nuclear Weapon Delivery and Aircrew Procedures Manuals and Checklists
MIL-PRF-38384
a. Non-nuclear Weapon Delivery Manual (Strategic Bomber & Tactical Aircraft)
b. Nuclear Bomb Delivery Manual (Strategic Bomber Aircraft)
c. Aircrew Nuclear Weapon Delivery Manual (Strategic Bomber
Aircraft)
d. Aircrew Nuclear Weapon Delivery Manual (Tactical Aircraft)
e. Non-nuclear Weapon Delivery Checklist (Strategic Bomber &
Tactical Aircraft)
f. Nuclear Bomb Delivery Checklist (Strategic Bomber Aircraft)
g. Aircrew Nuclear Weapon Delivery Checklist (Tactical Aircraft)
h. Non-nuclear Weapon Delivery Source Data Packages
10. Work Unit Code Manual MIL-PRF-38769
11. Calibration Procedures MIL-PRF-38793
12. Time Compliance Technical Orders (TCTOs) MIL-PRF-38804
13. Aircraft Battle Damage Assessment and Repair TOs MIL-PRF-87158
14. Illustrated Parts Breakdown MIL-PRF-38807
15. On-Equipment Organizational Maintenance Manual Set (see notes) MIL-PRF-83495
a. General Equipment (GE) Manual
b. General System (GS) Manuals
c. Combined GE & GS Manual
d. Job Guide (JG) Manuals
e. Fault Reporting (FR) Manual
f. Fault Isolation (FI) Manual
g. Wiring Data (WD) Manual
h. Schematic Diagram (SD) Manual
16. Operation and Maintenance Instructions in Work Package Format MIL-DTL-87929
a. Maintenance Manuals
(1) Intermediate Maintenance
(2) Depot Maintenance
(3) Combined (I&D) Maintenance
(4) On Condition Maintenance
b. Operation & Maintenance Instruction Manuals
TM-86-01N 1 April 2009 11
TMSS REQUIREMENTS FOR THE
Installation of AN/ALR-69A(V) Radar Warning Receiver (RWR) on Selected C-130 Aircraft (TCTO 1C-130-2016) Program
(System/Component)
Title or Type of Manuals Specification Required
c. Special Manuals
(1) Aircraft Engine Testing and Trending Procedures
(2) Aircraft Power Package Testing Procedures
(3) Static Firing of Missile Motors
(4) System Peculiar Corrosion Control
(5) Nondestructive Inspection (NDI)
(6) Aircraft Structural Integrity Program (ASIP)
(7) ATE Operator Test Procedures
(8) Special Requirements for Storage and Maintenance Procedures;
AUR Munitions/Launchers and Associated Support Equipment, Conventional Components and CMBR Agents
(9) Parachute Packing Procedures
(10) Operators Instructions (Hand-Held Flight Computers)
(11) Installation - Engineering Facility (Ground C-E Equipment)
d. Checklists (IAW MIL-PRF-5096)
e. With Illustrated Parts Breakdown (see notes)
17. Commercial Manuals (Evaluate according to MIL-PRF-32216)
18. Aircraft Cross-servicing Guide MIL-DTL-22202
19. Interactive Electronic Technical Manuals
(IETM - Contact Bruce Gelinas, (478) 222-1267 or DSN 472-1267 AFLCMC/WIUEG , (478)327-5908, DSN 497-5908, or the C-130 Help Desk, (478) 222-1234, DSN 472-1234 or WRALC.GRU.C130.IMS@us.af.mil, for IDET Updater Tool.)
ASD-S1000D -
International Specification for Technical Publications Utilizing a Common Source Data Base
MIL-PRF-87268
Manuals, Interactive Electronic Technical General Content, Style, Format, and user interaction requirements
MIL-PRF-87269
performance Specification for the support of Data base, Revisable-Interactive Electronic Technical manuals
12 TM-86-01N 1 April 2009
TABLE 2
ADDITIONAL TM TYPE SELECTIONS
NOTES:
Check all applicable boxes.
For commercial manual supplemental data only, under the specification heading, enter “Same style and format,” “MIL-
PRF-38807” (for IPB data), or “MIL-STD-38784.”
For existing MIL-SPEC manuals not being updated to latest specification requirements, enter “Same style and format” under the specification heading.
For manuals proposed to NGS, list the type of manual in the appropriate column and the NGS in the Specification column. Manuals proposed to an approved NGS shall meet the functional requirements of the approved TMSS for the TO type, e.g., OMMS prepared to S1000D shall meet the requirements of MIL-PRF-83495 (which serves as business rules for manual style, format, and content).
TO Number, Title, or
Type of Manual
Specification
Com-mercial Manual
Change/ Revision
Supple-ment
Supple-mental
TM
Source Data
1. 1C-130-2-WA-2 Same Style and Format SD
2. 1C-130-2016** MIL-PRF-
38804 New
TCTO
3. 1C-130A-06 Same Style and Format Chg
4. 1C-130A-23 Same Style and Format Chg
5. 1C-130A-39 Same Style and Format Chg
6. 1C-130A-6 Same Style and Format Chg
7. 1C-130A-6WC-10 Same Style and Format Chg
8. 1C-130A-6WC-11 Same Style and Format Chg
9. 1C-130A-6WC-12 Same Style and Format Chg
10. 1C-130A-6WC-13 Same Style and Format Chg
11. 1C-130A-6WC-14 Same Style and Format Chg
12. 1C-130A-6WC-15 Same Style and Format Chg
13. 1C-130H-1* Same Style and Format Chg
14. 1C-130H-1-1* Same Style and Format Chg
15. 1C-130H-1CL-1* Same Style and Format Chg
16. 1C-130H-1CL-2* Same Style and Format Chg
17. 1C-130H-1CL-3* Same Style and Format Chg
18. 1C-130H-2-00FR-00-1 Same Style and Format Chg
19. 1C-130H-2-00GE-00-1 Same Style and Format Chg
20. 1C-130H-2-00JG-00-1 Same Style and Format Chg
21. 1C-130H-2-13 Same Style and Format Chg
TM-86-01N 1 April 2009 13
TO Number, Title, or
Type of Manual
Specification
Com-mercial Manual
Change/ Revision
Supple-ment
Supple-mental
TM
Source Data
22. 1C-130H-2-23GS-00-1 Same Style and Format Chg
23. 1C-130H-2-23JG-30-1 Same Style and Format Chg
24. 1C-130H-2-23JG-40-1 Same Style and Format Chg
25. 1C-130H-2-24GS-00-1 Same Style and Format Chg
26. 1C-130H-2-33GS-00-1 Same Style and Format Chg
27. 1C-130H-2-51JG-00-1 Same Style and Format Chg
28. 1C-130H-2-99FI-00-2 Same Style and Format Chg
29. 1C-130H-2-99GS-00-1 Same Style and Format Chg
30. 1C-130H-2-99JG-10-5-1 Same Style and Format Chg
31. 1C-130H-2-99JG-10-5-2 Same Style and Format Chg
32. 1C-130H-4-00-1 Same Style and Format Chg
33. 1C-130H-4-99-1 Same Style and Format Chg
34. 1C-130H-2-14 (A-1) Same Style and Format Chg
35. 1C-130H-2-23FI-40-1-1 (A-1) Same Style and Format Chg
36. 1C-130H-2-23FI-40-1-2 (A-1) Same Style and Format Chg
37. 1C-130H-2-23JG-20-10 (A-1) Same Style and Format Chg
38. 1C-130H-2-34GS-00-1 (A-1) Same Style and Format Chg
39. 1C-130H-2-99JG-10-1 (A-1) Same Style and Format Chg
40. 1C-130H-2-99JG-30-2 (A-1) Same Style and Format Chg
41. 1C-130H-4-24-1 (A-1) Same Style and Format Chg
42. 1C-130H-4-34-1 (A-1) Same Style and Format Chg
43. 1C-130H-4-51-1 (A-1) Same Style and Format Chg
44. 1C-130(K)H-1* (A-1) Same Style and Format Chg
45. 1C-130(K)H-1CL-2* (A-1) Same Style and Format Chg
46. 1C-130(K)H-1CL-3* (A-1) Same Style and Format Chg
* - Flight Manual ** - New Technical Order
14 TM-86-01N 1 April 2009
PART B - TM DELIVERY REQUIREMENTS
FOR
Installation of AN/ALR-69A(V) Radar Warning Receiver (RWR) on Selected C-130 Aircraft (TCTO 1C-130-2016)
(System/Item)
TM DATA TYPE DELIVERED (SEE TABLE 2).
(TMSS/Change/Supplement/etc.)
(Replicate form for each TM type required.)
Delivery Format Requirements Codes Digital delivery only:
P - Paper (draft or manuscript only. Cannot be used for final delivery) F - FrameMaker 7.0 or higher 10.0 through 12.0 (For FMs
- use GFE furnished CD-ROM with supporting DTDs & FOSIs). (For Flight Manuals – using Government furnished tags)
G - Standard Generalized Mark-up Language (SGML).
M - Mixed paper and digital (F, G, H, I or X) H - Hyper Text Mark-up Language (HTML)
E – IETM in IDET format
I - Indexed Portable Document Format (IPDF) File. (IPDF
- new/complete TOs or PDF - change/source packages)
X - Extensible Mark-up Language (XML)
All Final Delivery of graphics will be ISO Draw 6.0 or higher as Computer Graphic Metafile (CGM/4) for E/F/G/H/I/X
EXAMPLE: M(G/P)/2 [Paper and SGML/2 copies]
All change/source pages will be 100% vector art format, no raster art accepted. Back-up pages may be raster art.
All IETMs deliveries will be in IDET format. Contact Bruce Gelinas AFLCMC/WIUEG IETM TOMA for IDET Updater Tool.
Delivery format requirements codes indicate the media/file format to be delivered for each program event.
TCTO requirements are specified in the contract vehicle approving the TCTO.
When on-line access is a contractual requirement, copy quantity will normally be Ø (zero).
AFTO Form 158s will be provided by the Contractor after every In-Process Review (IPR).
TO Updates. From each IPR, will be provided to the TOMA/FMM 30 days prior to the next IPR.
Technical Content cut-off will be the close and acceptance of the 80% minutes and closure of all action items from that
In-Process Review (IPR).
The IETM Initial Review will be delivered in conjunction with the 80% IPR copies and the Pre-Integration Review will be delivered in conjunction with the verification copies. Contact Bruce Gelinas, (478) 222-1267 or DSN 472-1267 AFLCMC/WIUEG IETM TOMA, (478) 327-5908, DSN 497-5908 for IDET Updater Tool or for IETM Help Desk,
(478) 222-1234, DSN 472-1234.
For NGS or non-standard TMSS instances, delivery shall include the associated DTDs, FOSIs/Style Sheets, XML schemas, etc.
TM-86-01N 1 April 2009 15
DELIVERY SCHEDULE
Event Number of days data required prior to event Technical Review(s) (30 Days)
Verification (30 Days)
Prepublication Review
(30 Days)
Final TO Distribution (45 Days)
Enter Office Symbol and Address Enter delivery requirements code/copy quantities required
Attn: Randy Helmick TOMA Willie Curry (A-1) (Maint. Man. Only)
580 ACSG/GFEAH AFLCMC/WIUEG
235 Byron St., Suite 19A
ROBINS AFB GA 31098
P/1 P/I/1
P/1 P/I/1
M(I/P)/1 M(F/I/P)1 M(N/I/P)1
Attn: Suzanne Dunn-Poorman FMM Donald Kubik (A-1) (Flt. Man. Only)
580 ACSG/GFEAH AFLCMC/WIUEG
235 Byron St., Suite 19A
ROBINS AFB GA 31098
F/1 F/I/1
F/1 F/I/1
F/1 F/I/1 F/I/N/1
Attn: FMM Marvin Wheeler (A-1) (Flt. Man. Only)
AFLCMC/WIUEG
235 Byron St., Suite 19A
ROBINS AFB GA 31098
F/I/1
F/I/1
F/I/N/1
Attn: Bruce Gelinas Lyle Spring (A-1) (IETMs Only)
580 ACSG/GFEAH AFLCMC/WIUEG
235 Byron St., Suite 19A
ROBINS AFB GA 31098
E/1 P/2
E/1 P/2
0/0
E/1
Attn: ES David Seeger
560 ACSS.GFLB AFLCMC/WLNCC (A-1)
235 Byron St., Suite 19A Robins AFB, GA 31098-1670
M(I/P)/1
P/I/1
P/3 I/1
P/I/1
M(I/P)/1 M(I/P)/1 Ltr/1
I/Ltr/1
Total Copies Required: P/3 P/I/2
F/1 F/I/2 E/1 I/1
M(I/P)/1
P/6 P/I/2 F/1 F/I/2
E/1 I/2
F/1 I/1
M(I/P)/2
M(F/I/P)1 M(N/I/P)1
E/1 F/I/1 F/I/N/2 Ltr/2 I/Ltr/1
M(I/P)/1
16 TM-86-01N 1 April 2009
SECTION 3. SPECIFICATION/STANDARD INTERFACE RECORDS (SIRS)
All TMSS applicable to this contract shall have an appropriately tailored SIR attached to this section.
SIRs included in the untailored TMCR format represent the minimum tailoring requirements that must be includ-ed in the final contract, unless the entire SIR is not applicable; e.g., if MIL-DTL-22202D is not required, the en-tire SIR can be deleted.
MIL-STD-38784 must be included in all contracts/proposals for AF TMSS-developed TOs.
Most specification “Acquisition Requirements” list the same two items for paragraphs 6.2a and 6.2b. For this contract enter:
6.2a. The title, number and date of each specification will be listed in the heading of the applicable SIR.
6.2b. The issue of the DODISS used in this contract is (enter date).
Digital requirements shall not be tailored out. Tailoring shall be limited to the options expressed in paragraphs
6.2. Any requests for tailoring outside of these requirements must be coordinated with the specification Preparing Activity (PA) 754 ELSG/ILMT.
Unless otherwise indicated, copies of federal and military specifications, standards, and handbooks are available from the DoD Single Stock Point (DODSSP), Acquisition Streamlining and Standardization Information System (ASSIST) web page, http://www.dodssp.daps.dla.mil/assist.htm https://assist.dla.mil/online/start/index.cfm.
Non-government Standards (NGS) shall be provided by the offeror. The Government will not be responsible for providing NGS.
TMSS entries designated with A, F, M or N refer to Army, Air Force, Marine Corps or Navy requirements.
Beneficial comments, recommendations, additions, data etc. which may be of use in improving any Air Force TMSS should be addressed to “Air Force Technical Manual Specifications and Standards Office, 754 ELSG/ILMT, Wright- Patterson AFB, OH 45433”. Do not include the street address, a building number, or a zip+4.
SPECIFICATION/STANDARD INTERFACE RECORD FOR MIL-DTL-22202D, 31 March 1999
Supplement 1, 31 March 1999 Manual, Technical, Aircraft Cross-Servicing Guide, Preparation of
The requirements of 6.2 are met in this SIR (see below).
1.1 In addition to paper delivery, when this specification is used to develop digital delivery files (document type defi-nitions – DTDs) contact the PA for additional instructions.
2.3 Ensure the listing for STANAG/ASCC Air Standard Documents is current. List applicable STANAG/ASCC Air Standards below.
(List STANAG/ASCC Air Standard Documents here.)
2.2.1 (Added) “Other government documents, drawings, and publications.
DEPARTMENT OF DEFENSE
DOD 5200.1-R DoD Information Security Program Regulation DOD 5220.22-M National Industrial Security Program Operating Manual
4. Replace with: “4. VERIFICATION.
“All cross-servicing guides shall meet the requirements of sections 3 and 5 of this specification, as re-quired by the acquiring activity. The requirements set forth in this specification shall become a part of the contractor’s overall inspection system or quality program. The absence of any requirements in this specification shall not relieve the contractor of the responsibility of ensuring that all products or supplies submitted to the government for acceptance comply with all requirements of the contract. Use of sam-pling inspections shall be at the discretion of the contractor, and in accordance with commercially ac-ceptable quality assurance procedures. However, use of sampling in QA procedures does not authorize submission of known defective material, either indicated or actual, nor does it commit the government to accept defective material.”
TM-86-01N 1 April 2009 17
5. Replace with: “5. PACKAGING.
“5.1 Packaging Requirements. For acquisition purposes, the packaging requirements shall be as spec-ified in the contract or order. When the actual packaging of material is to be performed by DoD per-sonnel, these personnel need to contact the responsible packaging activity to determine packaging re-quirements. Packaging requirements are maintained by the Inventory Control Point’s packaging activ-ity within the Military Department’s System Command. Packaging data retrieval is available from the Military Department’s or Defense Agency’s automated packaging files, CD-ROM products, or the re-sponsible packaging activity.
“5.1.1 Encoded Computer Products. Packaging of encoded computer products for delivery shall be in accordance with the requirements of MIL-STD-1840.
“5.1.2 Classified Material. Classified material shall be packaged and identified in accordance with DOD 5200.1-R, DOD 5220.22-M, and the implementing Service regulations.”
6.2a Title, number, and date of the specification are listed above.
6.2b Issue of DODISS: (fill in issue of DODISS applicable to this contract) 6.2c Packaging requirements (see above).
6.2d Verification requirements (see above).
SPECIFICATION/STANDARD INTERFACE RECORD FOR MIL-STD-38784, 2 July 1995 Notice 1, 15 November 2000 Notice 2, 1 December 2000
Standard Practice for Manuals, Technical: General Style and Format Requirements
Global: Change references to “MIL-STD-1806” to read “DODD 5230.24.”
3.2.8 Continuous Tone Artwork. Delete paragraph.
3.2.9 Copy Freeze Date. Delete paragraph.
3.2.10 Cutline. Delete paragraph.
3.2.20 Layout Page. Delete paragraph.
4.2.1.2.1 Oversize Reproducible Copy. Delete paragraph.
4.2.7.1 Table Cutline (see 3.2.10). Delete paragraph.
4.2.8.1 Illustration Cutline (see 3.2.10). Delete paragraph.
4.2.8.3 Amend as follows: “4.2.8.3 Illustration legends (see 3.2.23). Legends shall be headed by the word “Leg-end” followed by the number of the figure to which it is applicable (see Figure 6). The entire legend shall be indented 5 spaces. If the legend is continued, the figure number and title shall be repeated, followed by a dash and the word “Continued.” Only that information which is necessary to clearly identify the items shall be included in the legend. Where methods such as the tabular presentation technique (as in an Illus-trated Parts Breakdown/Repair Parts and Special Tools List) are used, no legends are required.”
NOTE: The <figtable> element, if included in the DTD, shall not be used in maintenance manuals.
* 4.5.1.10 Disclosure Notice. Change 1st sentence to read: “…except those with Distribution Statement A, IAW AFI
21-303 (F):”
* 4.5.1.11 Distribution Statement. Replace the last sentence with: “Include both the distribution statement letter (“A,” “B,” etc.) and wording from DODD 5230.24. Include the “Reason,” “Controlling DoD office,” and “Date of Determination” when required. If the reason is “Proprietary Data,” then each TM page containing pro-prietary data must be marked with the company name and the word “Proprietary” (e.g., “Boeing Proprie-tary”).”
4.5.1.13 Destruction Notice. Change the existing sentence to read: "...or X shall be marked with Handling and De-struction Notice "a" (below) on the cover/title..." Add a new second sentence as follows: "Unclassified TOs authorized for Public Release (Distribution Statement "A") shall be marked with disposition notice "b" (be-low) on the title or T-2 page."
4.5.1.13.a. Designate existing paragraph as "a. HANDLING AND DESTRUCTION NOTICE..."
Add: "See TO 00-5-1 for specific destruction procedures."
18 TM-86-01N 1 April 2009
4.5.1.13.b (Added) b. “DISPOSITION NOTICE - Refer to TO 00-5-1 for disposition instructions.”
* 4.5.1.14 Copyright Credit Line. Add “If a copyright credit line is required, include a statement of government rights to publish, reproduce, and distribute the TM.”
4.5.3 List of Effective Pages. Change the first sentence to read: “A List of Effective Pages shall be prepared in ac-cordance with Figure 13. Page borders shall be optional.”
4.6.2 Photographs/line drawings. Delete paragraph.
4.6.3.1 Retouching. Delete paragraph.
4.6.3.2 Prescreened photographs. Delete paragraph.
4.6.4 Continuous Tone Artwork (see 3.2.8). Delete paragraph.
4.6.5 Combination Artwork. Delete paragraph.
4.6.12 Color in Illustrations. Delete the first sentence: “Unless otherwise specified (see 6.2), color shall not be used.”
4.6.12.1 Separation of Colors. Delete paragraph.
4.6.12.2 Register Marks. Delete paragraph.
4.6.20 Crop and Size Marks. Delete.
4.6.21 Mounting of Artwork. Delete paragraph.
4.6.22 Identifying Artwork. Delete paragraph.
4.6.23 Covering of Artwork. Delete paragraph.
4.6.24 Review of Illustrations. Delete paragraph.
4.7.1 Advanced Change Pages. Delete paragraph.
4.7.2 Changes to Cover and Title Page. In the first sentence, delete the phrase “Except for silk screened or otherwise expensive covers”.
4.7.3.4 Transmittal Cover Sheets. In the last sentence, delete the phrase “i.e. reproducible copy, negatives, magnetic tape, disk, etc.”.
4.7.3.5 Changes to Illustrations. Delete paragraph.
4.9.2 Safety Supplements (see Figure 37). Change first sentence to read: Safety supplement “SS” borders and the words “SAFETY SUPPLEMENT” at the top and bottom of the supplement shall be in red. Other text, letter-ing, numbering, etc, shall be in black.”
Figure 5, Example Typical RDC Page. Delete.
Figure 25 Cropping and Sizing of Illustrations. Delete.
Figure 26, Identification, Marking, and Protective Covering of Artwork. Delete.
SPECIFICATION/STANDARD INTERFACE RECORD FOR MIL-PRF-38804C, 1 March 1996 Amendment 1, 20 June 1997
Time Compliance Technical Orders – Preparation
NOTE: Entries marked with an asterisk (*) will have to be manually entered and tagged in SGML files until the specification and its associated DTD and FOSI have been updated to incorporate the changes. The rescission date and statement will continue to appear in paragraph 3 of SGML-tagged TCTO files until the DTD and FOSI are updated.
Amendment 1 Delete entirely.
2.2.2 Change “AFM 67-1” to “AFMAN 23-110.”
3.5.2g Add new line: “g. Rescission Date (see 3.5.2.6.1)” Renumber following paragraphs to “h” through “l”.
3.5.2.4 Change 1st sentence to read: “…supplement thereto (see 3.6) provided by the acquiring activity on an AFMC Form 873 (see 6.5).”
3.5.2.5 Change 1st sentence to read: “…acquiring activity on an AFMC Form 873 (see 6.5).”
TM-86-01N 1 April 2009 19
3.5.2.6 Change 1st sentence to read: “…acquiring activity on an AFMC Form 873 (see 6.5).” Change last sentence to read: : “The year, month, and day shall be in the YYYYMMDD format (see Figures 1 through 6).”
3.5.2.6.1 (Added) “Rescission Date. The contractor shall enter the TCTO rescission date in the upper right corner of the first page immediately below the TCTO issue date. The rescission date will be specified on the AFMC Form 873 (see 6.5). The date will be in the YYYYMMDD format.”
3.5.2.8 Add to the end of the paragraph: “See TO 00-5-15 for additional guidance.”
3.5.2.9.1d Change to read: “…reinstating and establishing a new rescission date for rescinded TO…”
3.5.2.9.4 Change “AFMC/AFCC” to “AFMC/AFCA/AFSPC”
3.5.3.3 Change “proofing” to “verification” (4 places)Change last sentence to read: “…waived, the office symbol, e-mail address and Defense Switched Network (DSN) phone number of the approving official shall…”
3.5.5.3 Replace “a” through “d” with the following:
a. (Added) Routine Safety Inspection Organizational/Intermediate Level TCTOs. “Not later than (#) days after receipt of this TCTO. Affected system/equipment shall be removed from service if this TCTO is not ac-complished within the specified number of days, or 60 days prior to the TCTO rescission date, whichever comes first. The specified number of days for accomplishment shall be provided on the AFMC Form 873 (see 6.5).
b. Routine Action, Organizational/Intermediate Level, Safety TCTO. "Not later than ____ days after receipt of (this TCTO) (kits) (parts) (special tools). Failure to accomplish this TCTO by the preceding specified number of days, or 60 days prior to the TCTO rescission date, whichever comes first, shall automatically re-strict operations or shall be justification for withdrawing affected system/equipment from service until com-pliance is accomplished. The specified number of days for accomplishment shall be provided on an AFMC Form 873 (see 6.5).
c. Routine Action, Organizational/Intermediate Level TCTO. Organizational/Intermediate level TCTOs hav-ing a compliance period in terms of days shall read: "Not later than ____ days after receipt of (this TCTO) (kits) (parts) (special tools). Failure to accomplish the work by expiration of the compliance period, or 60 days prior to the TCTO rescission date, whichever comes first, shall be justification for withdrawing the af-fected system/equipment from service until compliance is accomplished. The specified number of days and requirements for accomplishment shall be provided on an AFMC Form 873 (see 6.5).
d. Routine Action, Organizational/Intermediate Level, Based Upon Maintenance Practice. When the time period for accomplishment cannot be specified as a certain number of days after receipt of the TCTO, kits, parts or special tools, the TCTO may specify compliance at the time a known maintenance event occurs, such as "At the time of removal from Emergency War Order (EWO) status (or During scheduled modernization ac-tion). If not complied with by (date), or 60 days prior to the TCTO rescission date, whichever comes first, the system/equipment shall be removed from active service until compliance with the TCTO is accomplished.
The preceding phrase is an example of the type to be used and may be expanded or worded to the individual requirement as needed.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .