Attachment 4 CDRLS.pdf
PDF 1 MB Posted
- Attached to
- Smart Multi Functional Color Display (SMFCD) Federal contract opportunity
- Solicitation number
- FA855220R0002
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Approved Redacted JA.pdf | ||
| FA855220R0002_______0001.pdf | ||
| FA855220R0002_______0002.pdf | ||
| Attachment 2 QASP.pdf | ||
| Attachment 5 LXXX.pdf | ||
| Attachment 1 PWS.pdf | ||
| FA855220R0002.pdf | ||
| Attachment 3 GFP.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACT DATA REQUIREMENTS LIST (CDRL)
(1 Data Item)
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
A TDP _____ TM ______ OTHER MGMT
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
Smart Multi-Functional Color Display FD2060-19-30175 Raytheon
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP
A001 Status Report
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
TOTAL PRICE
DI-MGMT-80368A PWS Para 4.3, 4.4, 4.5, 4.14 AFLCMC/WIUBB
7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION LT REQUIRED MTHLY See Blk 16
a. ADDRESSEE
b. COPIES
8. APP CODE
C
11. AS OF DATE 13. DATE IF SUBSEQUENT SUBM.
Draft
Final N/A See Blk 16 See Blk 16 Reg Repro
16. REMARKS See Blk 16 for 1
BLK 9: Distribution authorized to U.S. Government Agencies and their contractors (Administrative or Operational use) (12 Aug 2019). Other request for this document shall be referred to AFLCMC/WIUBB.
BLKs 11-13: The initial report is due the 15th of the month after contract award and each month thereafter on the 15th of the month. If the 15th falls on a holiday/weekend, the report is due the next business day. The Contractor’s report shall be complete and accurate.
BLK 14: Submit a digital copy in Microsoft® Office® or an Adobe® Portable Document Format (PDF) format.
Email Addresses: jennifer.strickland.1@us.af.mil; amanda.ragan@us.af.mil;
madeline.valdes.1@us.af.mil email Addresses
15. TOTAL
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
Jennifer Strickland 12 Aug 19
20 Nov 2019
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page _1_ of _1_ Pages APD PE v1.00 mailto:jennifer.strickland.1@us.af.mil mailto:amanda.ragan@us.af.mil mailto:madeline.valdes.1@us.af.mil
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
A TDP _____ TM ______ OTHER MGMT
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
Smart Multi-Functional Color Display FD2060-19-30175 Raytheon
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP
A002 Integrated Program Management Report (IPMR) Integrated Master Schedule
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
TOTAL PRICE
DI-MGMT-81861A/T PWS Para 4.4 AFLCMC/WIUBB
7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION LT REQUIRED See Blk 16 See Blk 16
a. ADDRESSEE
b. COPIES
8. APP CODE
C
11. AS OF DATE 13. DATE IF SUBSEQUENT SUBM.
Draft
Final A See Blk 16 See Blk 16 Reg Repro
16. REMARKS See Blk 16 for 1 1
BLK 4: DID is tailored as follows, only Format 6 is required.
BLKs 8, 10-13: The initial report is due the 15th of the month after contract award and each month thereafter on the 15th of the month. If the 15th falls on a holiday/weekend, the report is due the next business day. If the IMS is revised or disapproved by the Government, the Contractor shall have five (5) working days to resubmit. Sub-task revisions are due as changes occur.
BLK 9: Distribution authorized to U.S. Government Agencies and their contractors (Administrative or Operational use) (12 Aug 2019). Other request for this document shall be referred to AFLCMC/WIUBB.
BLK 14: Submit a digital copy in Microsoft® Office® or an Adobe® Portable Document Format (PDF) format.
15. TOTAL ▬▬▬▬► 1 1
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page _1_ of _1_ Pages APD PE v1.00 mailto:jennifer.strickland.1@us.af.mil mailto:william.walton.2@us.af.mil
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
A TDP _____ TM ______ OTHER MISC
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
Smart Multi-Functional Color Display FD2060-19-30175 Raytheon
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP
A003 Maintenance Data Collection Record (MDCR) Off Equipment Maintenance
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
TOTAL PRICE
DI-MISC-81371 PWS Para 4.12, 4.12.13 AFLCMC/WIUBB
7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION LT REQUIRED See Blk 16 See Blk 16
a. ADDRESSEE
b. COPIES
8. APP CODE
C
11. AS OF DATE 13. DATE IF SUBSEQUENT SUBM.
Draft
Final shall be referred to AFLCMC/WIUBB.
BLKs 10-13: The initial report is due the 15th of the first full month after contract award and each month thereafter on the 15th of the month. If the 15th falls on a holiday/weekend, the report is due the next business day.
BLK 14: Submit a digital copy in Microsoft® Office® or an Adobe® Portable Document Format (PDF) format.
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page _1_ of _1_ Pages APD PE v1.00 mailto:jennifer.strickland.1@us.af.mil
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
A TDP _____ TM ______ OTHER ADMN
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
Smart Multi-Functional Color Display FD2060-19-30175 Raytheon
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP
A004 Conference Agenda
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
TOTAL PRICE
DI-ADMN-81249B PWS Para 4.7; 4.7.1; 4.7.2, 4.19.2, 4.19.3 AFLCMC/WIUBB
7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
LT REQUIRED See Blk 16 See Blk 16
a. ADDRESSEE
b. COPIES
8. APP CODE
C
11. AS OF DATE 13. DATE IF SUBSEQUENT SUBM.
Draft Final
A See Blk 16 See Blk 16 Reg Repro
16. REMARKS See Blk 16 for 1 1
(Administrative or Operational use) (12 Aug 19). Other request for this document shall be referred to AFLCMC/WIUBB.
BLKs 8, 10-13: The Contractor shall prepare a draft agenda to be submitted ten (10) workdays prior to any meeting. The Government will have five (5) working days to approve or disapprove draft. The Contractor shall have two (2) working days to resubmit draft if changes were deemed necessary by the Government.
BLK 14: Submit a digital copy in Microsoft® Office® or an Adobe® Portable Document Format (PDF) format.
Jennifer Strickland 12 Aug 19
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page _1_ of _1_ Pages APD PE v1.00 mailto:jennifer.strickland.1@us.af.mil
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
A TDP _____ TM ______ OTHER ADMN
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
Smart Multi-Functional Color Display FD2060-19-30175 Raytheon
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP
A005 Conference Minutes
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
TOTAL PRICE
DI-ADMN-81250B PWS Para 4.7; 4.7.1; 4.7.2, 4.19.2, 4.19.3 AFLCMC/WIUBB
7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION LT REQUIRED See Blk 16 See Blk 16
a. ADDRESSEE
b. COPIES
8. APP CODE
C
11. AS OF DATE 13. DATE IF SUBSEQUENT SUBM.
Draft
Final shall be referred to AFLCMC/WIUBB.
BLKs 8, 10-13: The Contractor shall provide draft conference minutes ten (10) working days after the conference, meeting or review. The Government will have five
(5) working days to approve or disapprove draft. The Contractor shall have five (5) working days to resubmit draft if changes were deemed necessary by the Government.
BLK 14: Submit a digital copy in Microsoft® Office® or an Adobe® Portable Document Format (PDF) format.
Jennifer Strickland 12 Aug 2019
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page _1_ of _1_ Pages APD PE v1.00 mailto:jennifer.strickland.1@us.af.mil
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
A TDP _____ TM ______ OTHER ADMN
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
Smart Multi-Functional Color Display FD2060-19-30175 Raytheon
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP
A006 Presentation Material
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
TOTAL PRICE
DI-ADMN-81373 PWS Para 4.7, 4.7.1, 4.7.2, 4.19.2, 4.19.3 AFLCMC/WIUBB
7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
LT REQUIRED See Blk 16 See Blk 16
a. ADDRESSEE
b. COPIES
8. APP CODE
C
11. AS OF DATE 13. DATE IF SUBSEQUENT SUBM.
Draft Final shall be referred to AFLCMC/WIUBB.
BLKs 8, 10-13: The Contractor shall provide draft agenda and draft presentation materials ten (10) working days prior to scheduled presentation. The Government will have five (5) working days to approve or disapprove draft. The Contractor shall have two (2) working days to resubmit draft if changes were deemed necessary by the Government.
BLK 14: Submit a digital copy in Microsoft® Office® or an Adobe® Portable Document Format (PDF) format.
Email Addresses: jennifer.strickland.1@us.af.mil; william.walton.2@us.af.mil;
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page _1_ of _1_ Pages APD PE v1.00 mailto:jennifer.strickland.1@us.af.mil
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
A TDP _____ TM ______ OTHER FNCL
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
Smart Multi-Functional Color Display FD2060-19-30175 Raytheon
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP
A007 Funds & Man-Hour Expenditure Report
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
TOTAL PRICE
DI-FNCL-80331A PWS Para 4.6 AFLCMC/WIUBB
7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION LT REQUIRED See Blk 16 See Blk 16
a. ADDRESSEE
b. COPIES
8. APP CODE
C
11. AS OF DATE 13. DATE IF SUBSEQUENT SUBM.
Draft
Final shall be referred to AFLCMC/WIUBB.
BLKs 10-13: The initial report is due the 15th of the month after contract award and each month thereafter on the 15th of the month. If the 15th falls on a holiday/weekend, the report is due the next business day. The Contractor’s report shall be complete and accurate.
BLK 14: Submit a digital copy in Microsoft® Office® or an Adobe® Portable Document Format (PDF) format.
15. TOTAL ▬▬▬▬► 1
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page _1_ of _1_ Pages APD PE v1.00 mailto:jennifer.strickland.1@us.af.mil
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
A TDP _____ TM ______ OTHER QCIC
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
Smart Multi-Functional Color Display FD2060-19-30175 Raytheon
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP
A008 Quality Assessment Report
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
TOTAL PRICE
DI-QCIC-81187 PWS Para 5.8 AFLCMC/WIUBB
7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION LT REQUIRED See Blk 16 See Blk 16
a. ADDRESSEE
b. COPIES
8. APP CODE
C
11. AS OF DATE 13. DATE IF SUBSEQUENT SUBM.
Draft
Final shall be referred to AFLCMC/WIUBB.
BLKs 10-13: The initial plan is due the 15th of the month after contract award and any revisions/changes should be reported as they occur. Quality assurance/Control inspections should also be reported as they occur.
BLK 14: Submit a digital copy in Microsoft® Office® or an Adobe® Portable Document Format (PDF) format.
15. TOTAL ▬▬▬▬► 1
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page _1_ of _1_ Pages APD PE v1.00 mailto:jennifer.strickland.1@us.af.mil
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
A TDP TM X OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
SMFCD (TDSE) Software Upgrade on the HH-60G Helicopter 1H-60-XXXX
FD2060-19-30175 Raytheon
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP
A009 Technical Manual Contract Requirements, TMCR TM-86-01
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
TOTAL PRICE
See Blk 16 PWS Para 4.19, 4.19.1 - 4.19.3 AFLCMC/WIUBC
7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION DD REQUIRED See Blk 16 See Blk 16
a. ADDRESSEE
b. COPIES
8. APP CODE
See Blk 16
11. AS OF DATE 13. DATE IF SUBSEQUENT SUBM.
Draft
Final See Blk 16 See Blk 16 See Blk 16 Reg Repro
16. REMARKS AFLCMC/WIUBC 1 1
Block 4: General and specific technical manual requirements, see attached TM-86-01
Block 7: Submit final DD250 via WAWF to collectively account for data previously submitted to FA8552
Block 8: Approval in accordance with TM-86-01, see section 2
Block 9: Distribution statement to TOs will be required and provided by AFLCMC/WIUBB prior delivery to data
Block 10 through 14: See section 2 of attached TM-86-01
235 BYRON ST,
Suite 19A
ROBINS AFB GA
31098-1622
SEE BLOCK 16
1 1
Wilden Gonzalez 9/10/2019
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page _1_ of _1_ Pages APD PE v1.00
TM-86-01Q 27 Oct 2017 1-01: AF TMSS Linear TMs/ S1000D/IETM
Air Force Technical Manual Contract Requirements (TMCR)
For
Installation of Smart Multi-Function Color Display (SMFCD) Tactical
Situational Enhancement (TDSE) Software Upgrade on HH-60G Helicopters
Attachment TO CDRL Sequence Number Exhibit
Request for Proposal/Contract
Date
________________H039___________________
TMCR Number
WILDEN GONZALEZ 4 September 2019
AFLCMC/WIUBC TOMA DATE
DICKY HUNT 4 September 2019
AFLCMC/WIUBC, FMM DATE
MICHAEL A. COLLINS 4 September 2019
AFLCMC/WIUBC SUSTAINMENT CHIEF DATE
SECTION 1. TECHNICAL ORDER (TO) PROGRAM REQUIREMENTS
1. TMCR Tailoring. This TMCR has been tailored by the program office, including the associated tables, matrices and Specification/Standard Interface Records (SIRs). The Contractor may propose and submit, in writing, additional tailoring to the Technical Order Manager Agency/Agent (TOMA), Flight
Manaul Manager (FMM), Government Program Manager (PM), and Procuring Contracting Officer
(PCO) for consideration. The tailored TMCR shall be attached to the Contract Data Requirements List
(CDRL) for Technical Order (TO) delivery, and shall be included in the proposal as a separate exhibit, referenced in the proposal Statement Of Work (SOW). Proposals shall be compatible with the
(Installation of Smart Multi-Function Color Display (SMFCD) Tactical Situational Enhancement
(TDSE) Software Upgrade on HH-60G Helicopters) and this TMCR. The Air Force (AF) TO
Acquisition procedures, including procedures for tailoring this document, are found in TO 00-5-3, AF
Technical Order Life Cycle Management, located at http://www.tinker.af.mil/Home/TechnicalOrders.aspx. A copy may also be obtained from the Program
TO Manager. Any terms or procedures found in this document may be researched there.
2. TO Program Scope. The Contractor shall develop and deliver technical manuals in accordance with
(IAW) this TMCR, the Technical Order Life Cycle Management Plan (TOLCMP), Attachment 5, the attached functionality requirements (Attachment 7), and the supplied Business Rules (BRs) (Attachment
8) that supports the (Installation of Smart Multi-Function Color Display (SMFCD) Tactical
Situational Enhancement (TDSE) Software Upgrade on HH-60G Helicopters) requirements for technically usable manuals concurrent with the program’s strategy. The Contractor may recommend additional Section 2 tailoring to propose new TO types (Table 1), source data and TO updates (Table 2) required to support the (Installation of Smart Multi-Function Color Display (SMFCD) Tactical
Situational Enhancement (TDSE) Software Upgrade on HH-60G Helicopters) program’s objectives.
The Contractor shall also develop and deliver Preliminary Technical Orders (PTOs) if required.
3. S1000D Technical Manual Content and Product Plan. The Contractor shall develop and deliver a
Technical Manual Content and Product Plan IAW the requirements specified within this TMCR. This plan shall be developed in the Contractor’s format and will specify the development of new S1000D
Interactive Electronic Technical Manual(s) (IETM) requirements incorporating preliminary functionality requirements (Attachment 7) and all applicable business rule requirements (Attachment 8). For the purposes of this contractual document, the term IETM is considered synonymous with the S1000D term
Interactive Electronic Technical Publication (IETP). The plan shall also detail the total technical content coverage for each system, subsystem, equipment, and major components including a preliminary Data
Management Requirement List (DMRL), listing all Data Modules (DMs) and Publication Modules
(PMs) to be developed in support of the (Installation of Smart Multi-Function Color Display
(SMFCD) Tactical Situational Enhancement (TDSE) Software Upgrade on HH-60G Helicopters) program and a List of Applicable Publications if the DMs are to be a part of more than one Technical
Publication or IETM. The DMRL shall also reference the proposed DM schema type each module is written against. The plan shall document the solution architecture requirements necessary for IETM development, to include solution diagrams, solution test cases, and applicable testing documentation.
3.1. Additional Content Information. Problems regarding requirements, interpretation, and application shall be identified within the plan. Conflicts between standards and guidance documents shall be highlighted. An explanation or initial demonstration of how the technical content information will be rendered on the display device and an overview of how the user will access the technical information shall be provided on new DM’s developed. The Contractor shall propose opportunities for data (text, graphics, other media) re-use across data types (including training data), weapons system/equipment configurations. The plan shall include a list of re-use objects with future http://www.tinker.af.mil/Home/TechnicalOrders.aspx potential to be used across DoD, as well as those items that are unique to the system addressed in this IETM. The Contractor shall also detail their approach to managing the relationship between content and weapon system/equipment applicability.
3.2. Product Coverage. The Contractor shall include external and internal links and references within the plan. Additionally, the plan shall include the use of Commercial-Off-The-Shelf (COTS) and/or other TOs listed within Section 2, Table 2 of this TMCR, and other manuals as applicable.
3.3. Alternative Recommendations. The Contractor shall propose, within the plan, alternative recommendations for certain technical manual types that may not readily conform to the provided functionality requirements and proposed program BRs. Additionally, the Contractor shall propose alterations and alternative IETM constructs for paper-based requirements to better optimize page output and minimize print cost. Alterations will be in compliance with AF TMSS requirements.
4. Commercial Manuals. Contractors shall recommend the use of existing commercial manuals to the maximum extent possible without impairing program support objectives. All proposed commercial manuals are subject to Government review and Technical Content Manager (TCM) approval, IAW MIL-
PRF-32216, Performance Specification: Evaluation Of Commercial Off-The-Shelf (COTS) Manuals And
Preparation Of Supplemental Data. Contractors shall use the Data Item Description (DID) DI-TMSS-
80067C, Technical Manual (TM) Contractor Furnished Aeronautical Equipment or Contractor
Furnished Equipment (CFAE/CFE) Notices, to provide recommendation data. A copy is available through ASSIST at http://quicksearch.dla.mil/qsSearch.aspx.
4.1. All commercial manuals shall be delivered with either unlimited data rights or as a minimum, Government Purpose License, to allow the AF the ability to electronically store, print, distribute, update and decollate the commercial manual to allow for printing. Commercial manuals shall be delivered as Portable Document Format (PDF) unless otherwise specified.
4.2. Approved Commercial-Off-The-Shelf (COTS) Manuals shall be delivered with an Identifying
TO Publication Sheet (ITPS), IAW MIL-PRF-32216. All PDF files of commercial data shall be non-password protected to allow the AF to decollate the manual for printing.
4.3. Government activities will use MIL-DTL-7700A, Evaluation of Commercial Off-The-Shelf
(COTS) Manuals and Preparation of Supplemental Data, as a guide for review and acceptance of all recommended commercial manuals, and MIL-DTL-7700H, Detail Specification: Flight Manuals, Performance Data Appendix, Mission Crew Manual, Supplemental Manual, and Abbreviated Flight
Crew Checklists, as an additional guide for commercial Flight Manuals.
4.4. If the proposed COTS data is found to be insufficient after review by the Government, the
Contractor shall prepare supplemental data for the COTS manual as required IAW Military Standard
(MIL-STD)-38784A. If the COTS data cannot be supplemented sufficiently, the Contractor may be tasked to develop new TO data IAW the applicable TMSS listed in Section 2, Table 1.
5. Technical Manual Specifications and Standards (TMSS) Tailoring. The contractor shall develop all new TOs IAW most current version of applicable TMSS for the type manual being developed and comply with the Specification/Standard Interface Records (SIRS) provided within Section 3. Tailoring must not change or delete mandatory requirements which are part of the Document Type Definition
(DTD) located in Section 2, Table 1. NOTE: TMSS requirements marked “(F)” are specifically for Air
Force use. Comply with all unmarked and “(F)” TMSS requirements as modified by the tailoring options in each TMSS. Refer to https://techdata.wpafb.af.mil/tmss/index.html for the TMSS website.
6. Subsequent TO/Data Requirements. When new TO requirements are identified, the Contractor shall notify the Government utilizing DI-TMSS-80067C, Technical Manual (TM) Contractor Furnished
Aeronautical Equipment or Contractor Furnished Equipment (CFAE/CFE) Notices, or approved http://quicksearch.dla.mil/qsSearch.aspx https://techdata.wpafb.af.mil/tmss/index.html
Contractor formats. This process shall require Government review and approval of recommended additional requirements prior to developing additional data. When approved, the Contractor shall incorporate the requirements within the Technical Manual Content and Product Plan where applicable.
7. TO Development. Contractors shall propose TO development practices and procedures that ensure TOs and data are compatible with this TMCR, the Enhanced Technical Information Management System
(ETIMS), and the Interactive Electronic Technical Manual (IETM). In addition, TOs shall be written to the
Reading Grade Level (RGL) of nine or to the capability of the target audience for which they are intended as specified by the TOMA in support of the (Installation of Smart Multi-Function Color
Display (SMFCD) Tactical Situational Enhancement (TDSE) Software Upgrade on HH-60G
Helicopters) operations and maintenance concepts.
7.1. TOs shall include required illustration (graphics) files in an approved graphics exchange format. All delivered graphics shall conform to the approved graphic creation and format guidelines listed in Attachment 1, Graphics Format Guidelines. The contractor shall develop and deliver
Encapsulated PostScript (EPS) formats for graphics unless specified by the TOMA or FMM.
7.2 New IETM TO data shall be developed IAW ASD/AIA S1000D, International Specification for
Technical Publications Utilizing a Common Source Database, Version 4.1 and MIL-STD-3048, Air
Force Business Rules for the Implementation of S1000D. For S1000D, this includes program tailored Functionality Requirements (Attachment 7) and Project Business Rules Exhange (BREX)
(Attachment 8) when implemented. The Government tailored functionality requirements and
Business Rule Decision Points for MIL-STD-3048 are included in the SIR found in Section 3 of this document. All delivered graphics shall conform to the approved graphic creation and format guidelines listed in Attachment 1, Graphics Format Guidelines.
7.3. Page-oriented Military Specification (MIL-SPEC) TOs shall be formatted with text (Times
New Roman font), graphics (Arial font), and delivered according to the TMSS specified in Section
2, Table 1. The Contractor shall develop according to the DTDs referenced in the appendix to MIL-
STD-38784A and each applicable military detail specification (MIL-DTL).
8. TO Numbering. Contractors shall notify the Government, in writing, of manuals which require TO numbers. TO numbers are not required for manuals to be used exclusively by the Contractor’s own personnel. Requests for new TO numbers shall be submitted to the TOMA utilizing the TO numbering worksheet (Attachment 2, Request for Technical Order Number).
9. Data Rights. Contractors shall comply with 10 U.S.C. 2320 and cognizant Defense Federal
Acquisition Regulation Supplement (DFARS) provisions and clauses in providing Unlimited Rights for all source data, TO publications, and TO updates prepared specifically for the contract. Government rights in data are specified in the DFARS, 252.227-7013, Rights in Technical Data, Noncommercial
Items, 252.227-7014, Rights in Noncommercial Computer Software and Noncommercial Computer
Software Documentation, and 252.227-7015, Technical Data-Commercial Items. The Government shall be given Unlimited Rights for all Government-funded business rules (tailoring and application methods and procedures) and documented business processes developed under the contract for the purpose of TO development. For all data delivered to the Government with other than Unlimited Rights, the
Contractor shall assert their data rights IAW DFARS 252.227-7017, Identification and Assertion of Use, Release, or Disclosure Restrictions. The Contractor shall pass through and enforce all requirements in this TMCR to all sub-Contractors. Government data rights shall extend to the common source database, transformation style sheets, and other tools or products used to author or display technical data.
10. Classification, Distribution, Destruction, Disclosure, Export Control Notices, and Cyber Security.
Contractors shall recommend the correct markings and controls for classified and restricted distribution data and TOs IAW the program’s Security Classification Guide (SCG) and Department of Defense
Manual (DODM) 5200.01, Department of Defense Instruction (DODI) 5230.24, Department of Defense
Directive (DODD) 5230.25, Air Force Instruction (AFI) 16-1404, and MIL-STD-38784A (available at http://www.e-publishing.af.mil/ or https://assist.dla.mil/online/start/index.cfm). The markings and notices shall be reviewed during In-Process Reviews (IPR). The Contractor shall also apply policy andprocedures for Cyber Security Protection IAW AFI 33-200, Information Assurance (IA)
Management, AFMAN 17-1301, Computer Security (COMPUSEC), MPTO 00-33B-5008, Remanence
Security for Information Systems and AFI 61-201, Management of Scientific and Technical Information
(STINFO),. NOTE: Distribution limitations will be determined on a case-by-case basis as TOs are developed, dependent upon TO content.
11. TO Quality. Contractor proposals shall describe how the Government will be allowed to interact with the Contractor’s TO development team. The Contractors shall ensure prepared TOs are: a) technically accurate and safe; b) written to a scope and depth of coverage to support the operations and maintenance concepts; c) properly classified and marked with export control and distribution limitation statements. The Contractor shall maintain a Technical Manual Quality Assurance (TMQA) Program
Plan for this effort. The TMQA Program Plan shall be available for review at the TO Guidance
Conference. The TMQA Program Plan shall be sufficiently detailed to support TO certification to include actual performance of procedures or desk-top analysis for non-procedural data. Simulation
(walk-through/talk-through) should be reserved for those procedures which would activate explosive devices or present a hazard to personnel or equipment.
12. Initial Technical Order Guidance Conference (TOGC). Working through the TOMA, the
Contractor shall co-host and participate in a TO guidance conference for this effort. The TOGC will be held within 60 calendar days after contract award. The Technical Manual Schedule and Status will be formalized at this conference. The Contractor shall present a briefing on their interpretation of the basic contract, SOW/Performance Work Statement (PWS), CDRLs, (DIDs), MIL-SPEC, MIL-STD, SIRs, this document and the planned preparation and delivery of the TOs and related data. The contractor shall also provide their S1000D Technical Manual Content and Product Plan for review and approval along with a detailed schedule for the production and delivery of the required IETM changes.
13. In-Process Reviews (Paper TOs). The Contractor shall participate and co-chair In-Process Reviews
(IPRs) of the data developed for this project. In-Process Reviews ensure that data being developed as part of this effort is adequate and accurate and IAW contract requirements, cited specifications and paragraph 13.1 below. The Contractor shall support IPRs with technical writers, engineers and QA personnel. IPRs will be held IAW TO 00-5-3 or as defined by the program office. IPRs typically consist of a 40%, 80%, Pre-publication and Final Review. During the IPRs the Contractor will be responsible to maintain a master markup of the document being reviewed and document comments per paragraph 13.2. The Contractor shall develop meeting minutes after each review documenting all approved changes and concurrent agreements for Government review and approval. This master markup will be made available at the next scheduled review. A copy of the markup will be provided to the TOMA or designated individual at the conclusion of the review. The Contractor shall ensure all comments from previous IPRs have been incorporated prior to the next scheduled IPR. With prior approval of the TOMA or TCM, IPRs may be combined.
13.1. TO Evaluation Requirements. During the TO development process, the contractor shall be evaluated utilizing the TO Review Evaluation Guide (Attachment 3) to ensure technical data is at the necessary completion level. The contractor shall be evaluated on a pass or fail rating as follows:
a. One Failure (or two at the discretion of the PM) – Contractor will be given an opportunity to correct deficiencies and resubmit source data for re-evaluation.
http://www.e-publishing.af.mil/ https://assist.dla.mil/online/start/index.cfm
b. Third failure – Contractor will be issued a PAR by the USG Program Manager (PM) along with further guidance and corrective actions.
c. If the contractor shows no improvement or receives another PAR, the USG will take appropriate actions through the Contracting Office.
13.2. TO Deficiencies, Findings, Comments and/or Errors. An AFTO Form 158s (Attachment 4) will be completed for each TO identifying deficiencies, findings, comments, and or errors during the IPR and shall be delivered to the Government for approval along with the minutes from the IPR. The contractor shall incorporate and deliver corrected copies upon next IPR.
13.3. In-Process Reviews (IETM). The Contractor shall plan, schedule, co-host and participate in three IPR levels (50%, 75% and 100%) of completion (completion levels criteria to be developed and agreed upon at the TO Guidance conference) for newly required IETM data modules. These three events can be held concurrent with the paper TO IPRs at the discretion of the TOMA. The offeror shall disposition and clear all comments resulting from each IPR prior to conducting the next
IPR. The contractor may propose alternate IPRs at the TO Guidance Conference to optimize the review of IETM content. All alternate IPRs shall be approved in writing by the contracting officer and TOMA. With prior approval of the TOMA or TCM, IPRs may be combined with the paper version.
13.4. Technical Interchange Meetings (TIMs): The Contractor shall schedule and conduct TIMs as necessary in the performance of this task. The TIMs shall be scheduled when there is a need for technical interchange between the Government and the contractor. The content of the meeting may include the discussion of any information that has impact upon the task activities, including documentation contents or format.
13.5. TO Delivery Requirements for In-Process Reviews. TO data shall be technically edited and reviewed according to the TMQA Program Plan. Manuscript (handwritten) data is not acceptable for any data to be reviewed. The TMQA Program Plan checklists shall be available for review by the Government during the IPRs. IPRs subsequent to the 50% initial review may be accomplished using the approved HH-60G IETM viewing presentation system (Maintenance Data Digital Viewer
(MDDV)) and as specified within the Government provided IPR checklist. Delivery requirements are contained in Section 2, Table 3 of the TMCR. Paper TOs delivered shall be marked with a watermark identifying the level of effort of the data (i.e.. 40%, 80%, Verification, etc,.) on the title page along with a stamped issue date of delivery.
14. TO (Paper) Certification. The Contractor shall certify that new TO procedures and data developed to support the program are accurate, adequate, current, safe, and usable for their intended purpose. The
Government may witness the certification activities. The Contractor shall incorporate comments generated by the certification process into the TOs prior to submitting the TOs for verification. At the completion of the certification, the Contractor shall submit a letter to the TOMA/TCM through the
Government PM stating that certification has been completed, the certification method used, and that any deficiencies identified during the process have been corrected. The Contractor will ensure all necessary changes and corrections to affected manuals are accomplished in time to meet contract delivery schedule requirements. The contractor shall levy certification requirements on vendors and subcontractors. The Contractor shall notify the Government at least 180 days prior to the need date of any Government Furnished Information/Government Furnished Equipment (GFI/GFE) required to perform certification tasks. TO 00-5-1, “AF Technical Order System” and 00-5-3 “AF Technical, Methods and Procedures, Technical Order Life Cycle Management and shall be referenced for additional information on TO Certification requirements.
14.1. The Contractor shall propose opportunities to perform TO certification activities in conjunction with Government verification IAW TO 00-5-3, where applicable.
15. IETM (Digital) Certification Requirements. The Contractor shall produce and implement a method for performing and documenting the certification (first verification) of all ASD/AIA S1000D
Specification, Version 4.1, and MIL-STD-3048A compliant IETM Data Modules (DM) ensuring they are safe, current, accurate, adequate, concurrent with the (Installation of Smart Multi-Function Color
Display (SMFCD) Tactical Situational Enhancement (TDSE) Software Upgrade on HH-60G
Helicopters) system configuration and technically usable for the intended purposes. This certification methodology shall be documented in an IETM Certification Plan and delivered to the Government.
Certification shall be completed prior to the Government performing verification of the IETM. At the completion of the IETM certification, the Contractor shall submit a letter to the TOMA/TCM through the Government PM stating that certification has been completed, the certification method used, and any deficiencies identified during the process have been corrected.
16. Verification Support. The Contractor shall support Government verification activities for both paper and IETM as required by the TOMA and the program Technical Order Life Cycle Verification
Plan (TOLCVP), refer to attachment 6. Contractor verification support will consist of on station technical writing and engineering support. The Contractor shall maintain a master mark-up of the document and record minute items during the Government verification process. The Contractor shall also support all post verification reviews and ensure availability until 100% task verification is attained by the Government.
16.1. Verification (second verification) of IETM data modules require unique processes and procedures to verify the content. Verification results can be incorporated using traditional pre-publication review methods or updated in real-time during the verification. The Contractor shall provide technical support and common source database maintenance personnel required for changes resulting from verification (if applicable). Verification of Electronic Technical Manuals (ETM) and
Interactive Electronic Technical Manuals (IETM) S1000D based TOs must be performed on the
Maintenance Data Digital Viewer (MDDV) electronic viewing device or e-tools designated for use.
17. TO Prepublication Reviews (PPR). PPRs are examinations of TOs that ensure incorporation of agreed upon changes from previous reviews, to ensure the manual meets style and format requirements, and met verification activities. The Contractor shall prepare and deliver copies of TOs and TO updates in MIL-SPEC compliance for the PPR as shown in the delivery matrix, Table 3. The TOs for PPR shall be approved by the Contractor’s QA, be in compliance with the MIL-SPECs/STDs, and incorporate all verification comments and corrections approved by the TOMA and program management office representative. The TOMA may waive the PPR depending on number and complexity of changes from verification.
18. Technical Data Assessment (TDA). The Contractor shall submit in-work samples of each specified
TO type deliverable to the Government for specification and standardization compliance review. TDA’s may be accomplished using organic TO sustainment environments (ETIMS, FrameMaker, ITEM etc.,) with the assistance of TOMA. The TO Manager, will determine the TDA requirements for each TO type.
18.1. S1000D TO data. The contractor shall submit S1000D XML tagged DMs, all layered BREX and all referenced graphics for assessment of newly developed DMs. These files will be assessed using the TMSS S1000D Validation Tool prior to the verification event. The validation tool will parse/validate each data module to confirm all submitted DMs are S1000D compliant. The DMs will be authored in XML format using S1000D issue 4.1 schemas, in, accordance with MIL-STD-3048A
USAF business rules exchange (BREX) and validated against the applicable schema. The schemas may be obtained from http://www.s1000d.org. Once assessed, the DMs will be loaded into the
Common Source Data Base (CSDB) for viewing in the MDDV or e-tools designated for use.
18.2. Error Resolution. Errors found during the TDA shall be addressed and completed prior to each
IPR. Additional TDAs may be necessary based on the amount of errors found during the initial TDA.
Successful TDAs in no way relieves the Contractor from correcting errors found during future reviews.
19. TO Delivery. TO file delivery requirements are located in Section 2, Table 3, of this document.
Contractors shall propose practices and procedures for secure access to or delivery of digital TO files, including those for Preliminary TOs (PTOs), source data, reproduction masters, and program support data. TO file delivery formats shall be according to applicable CDRLs, the tailored TM Delivery
Requirements Matrices included in Section 2, and for graphics, (refer to Attachment 1) of this document.
NOTE: Paper only TO delivery is not acceptable for final delivery of TOs. EXCEPTION: For
Commercial Manuals not available digitally.TO file delivery requirements are located in Section 2 Table
3 of this document.
19.1. Interactive Electronic Technical Manuals (IETM). IETM delivery of DMs shall be according to the Section 2, Tables 1 and 2 of this document.
19.2. S1000D Source Files. The Contractor shall parse and deliver all necessary files to properly generate and view the data in the approved MDDV viewer or produce the desired presentation to the user. This may include all DMs, database files, BREX, cascading style sheets (CSS), conversion scripts (such as Java or Perl), graphics, XML, viewer software, referenced HTML/PDF files, native source data files, process and training documentation, etc.
20. TO and Source Data Maintenance. Contractors shall maintain accuracy, currency and configuration of TO’s and PTOs source data, to include GFI, throughout the contract period of performance.
Maintenance includes preparation of TOs, PTOs and source data updates to incorporate corrections, equipment configuration changes, and maintenance and operational concept changes. The requirement is to update to the latest release of paper TO changes until the acceptance of the Verification minutes and closure of ALL action items. Contractors shall establish a Technical Order Distribution Office
(TODO) account in accordance with TO 00-5-1, AF Technical Order System, and assign a TODO to receive the latest issued TOs through ETIMS. Additionally, the Contractor shall ensure the accuracy, currency, and configuration of applicable data provided by their sub-Contractors as it effects the technical baseline. NOTE: Contractors will protect GFI provided for the purposes of TO development
IAW DFARS 252.227-7025, Limitations on the Use or Disclosure of Government Furnished
Information Marked with Restrictive Legends.
20.1. (T) In order to maintain accuracy, currency and configuration of Air Force TOs, Contractors must have a TODO account. If an account has not been established, the Contractor must establish a
TODO account upon contract award by processing an AFTO Form 43, USAF Technical Order
Distribution Office (TODO) Assignment or Change Request in accordance with TO 00-5-1. The
AFTO Form 43 can be downloaded at http://www.e-publishing.af.mil/ or alternatively, prospective contractor TODOs may download and use the pdf version of the AFTO Form 43 at https://techdata.wpafb.af.mil/toprac/forms.htm. All versions of the form include detailed completion instructions.
21. Schedules. The Contractor shall develop and maintain an…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .