FA855213R31131.pdf
PDF 509 KB Posted
- Solicitation number
- FA8552-13-R-31131
About this file
Solicitation - FA8552-13-R-31131
View the file
Other files
| File | Type | Posted |
|---|---|---|
| JA_SIGNED.pdf | ||
| FA855213R31131______0002.pdf | ||
| FA855213R31131______0001.pdf | ||
| PWS.doc | DOC document | |
| TH1H_DLM_Work_Spec_Signed.pdf | ||
| CDRLs_A001_A007.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STANDARD FORM 1447 (2/2012)
Prescribed by GSA FAR (48 CFR) 53.215-1(d)
4. SOLICITATION NUMBER
FA8552-13-R-31131
6.SOLICITATION ISSUE DATE
8. THIS ACQUISITION IS UNRESTRICTED OR SET ASIDE: % FOR
SMALL BUSINESS WOMEN-OWNED SMALL BUSINESS (WOSB)
ELIGIBLE UNDER THE WOSB PROGRAM
HUBZONE SMALL
BUSINESS EDWOSB
SERVICE-DISABLED VETERAN-
OWNED SMALL BUSINESS NAICS CODE: 336411
8(A) SIZE STANDARD: 1,500
DATE SIGNED
28. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)
26. AWARD OF CONTRACT: YOUR OFFER ON SOLICITATION NUMBER
SHOWN IN BLOCK 4 INCLUDING ANY ADDITIONS OR CHANGES WHICH
ARE SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
ROUTINE
Subject to the terms and conditions stated herein, the Contractor agrees to hold its offered prices firm for 120 days.
SEE LINE ITEM SCHEDULE
22.
AMOUNT
16. AUTHORITY FOR USING OTHER THAN 10 USC 2304 41 USC 253
FULL AND OPEN COMPETITION (c) (1 ) (c) ( )
DATE SIGNED
27. SIGNATURE OF OFFEROR/CONTRACTOR
20.
UNIT
21.
UNIT PRICE
19.
QUANTITY
13. CONTRACTOR OFFEROR CODE FACILITY CODE
11. IF OFFER IS ACCEPTED BY THE GOVERNMENT WITHIN * ___ CALENDAR DAYS (60 CALENDAR
DAYS UNLESS OFFEROR INSERTS A DIFFERENT PERIOD) FROM THE DATE SET FORTH IN BLK 9
ABOVE, THE CONTRACTOR AGREES TO HOLD ITS OFFERED PRICES FIRM FOR THE ITEMS
SOLICITED HEREIN AND TO ACCEPT ANY RESULTING CONTRACT SUBJECT TO THE TERMS AND
CONDITIONS STATED HEREIN. *120
RATING
DO: A1
3. AWARD/EFFECTIVE DATE
FA8552
2. CONTRACT NO.
X
CHECK IF REMITTANCE IS DIFFERENT
AND PUT SUCH ADDRESS IN OFFER
17.
ITEM NO.
12. ADMINISTERED BY CODE
Total
SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK: 14 EFT:T
SCD:B
NAME AND TITLE OF SIGNER (TYPE OR PRINT) NAME OF CONTRACTING OFFICER
24. AWARD AMOUNT (FOR GOVT USE ONLY)
23. ACCOUNTING AND APPROPRIATION DATA
SEE SCHEDULE
5. SOLICITATION TYPE
SEALED BIDS NEGOTIATED
(IFB) (RFP)
15. PROMPT PAY DISCOUNT
25. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN 1
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND DELIVER ALL ITEMS SETFORTH
OR OTHERWISE IDENTIFIED ABOVE AND ON ANY CONTINUATION SHEETS SUBJECT
THE TERMS AND CONDITIONS SPECIFIED HEREIN.
10. ITEMS TO BE PURCHASED (BRIEF DESCRIPTION)
SUPPLIES SERVICES Aircraft Manufacturing
9.
Offers will be received at the issuing office until the date and time specified below. Late offers are subject to late proposal provisions incorporated herein. All offers are subject to provisions, representations, certifications, and specifications as are attached or incorporated by reference.
6-SEP-2013 4:30PM
X
18.
SCHEDULE OF SUPPLIES/SERVICES
14. PAYMENT WILL BE MADE BY CODE
(SEE ESP CLAUSE 252.232-7003.)
X
7. ISSUED BY CODE
SOF/PR - ROTARY WING & AVIONICS, AFLCMC/WIKAB
235 BYRON ST STE 19A
BLDG 300 CML PHN 478 926 7227
ROBINS AFB GA 31098-1670
BUYER: Todd J. Stimus/GRUKB Todd.Stimus@robins.af.mil Phone: (478) 926- 2374 Fax: (478) 926-3360 No Collect Calls
X
1. THIS CONTRACT IS A RATED ORDER
UNDER DPAS (15 CFR 350)SOLICITATION/CONTRACT
BIDDER/OFFEROR TO COMPLETE BLOCKS 11, 13, 15, 21, 22, & 27.
JSUY
SF 1447 (rev 2/2012) BACK
NO RESPONSE FOR THE REASONS CHECKED
TYPE OR PRINT NAME AND TITLE OF SIGNER
SIGNATURENAME AND ADDRESS OF FIRM (Include Zip Code)
WE DO NOT DESIRE TO BE RETAINED ON THE MAILING LIST FOR FUTURE PROCUREMENT OF THE TYPE OF
ITEMS INVOLVED
WE DO
OTHER (Specify)
CANNOT COMPLY WITH SPECIFICATIONS
CANNOT COMPLY WITH SPECIFICATIONS CANNOT MEET DELIVERY REQUIREMENT
FOLD
FOLD
FOLD
FOLD
SOLICITATION NO. FA855213R31131
DUE: 6 SEP 2013 4:30 PM
FROM: AFFIX
STAMP
HERE
TO:
ATTN: Todd J Stimus/GRUKB
SOF/PR - ROTARY WING & AVIONICS, AFLCMC/WIKAB
235 BYRON ST STE 19A
BLDG 300 CML PHN 478 926 7227
ROBINS AFB GA 31098-1670
Request for Proposal FA8552-13-R-31131
PART I - THE SCHEDULE
SECTION B
SUPPLIES OR SERVICES AND PRICES/COSTS
NOTE TO CONTRACTOR: This is a solicitation for a requirements contract. Delivery or performance shall be made only as authorized by orders issued in accordance with the ordering clause. The Contractor shall furnish to the Government, when and if ordered, services specified in this Schedule up to and including the "maximum" amount.
Period of Contract: The effective date for ordering under this contract is from the date of award through one year thereafter or until all options are exercised. Performance shall continue through completion of all orders properly issued hereunder.
Preparation and Induction of Aircraft
Item No.
Firm Fixed Price Best Estimated Qty
U/I Unit Price Amount
2 EA
Preparation and Induction of Aircraft IAW Sections 3.1 and 3.2 of the Work Specification Associated Document(s) Line Item(s)
FD20601331131 0001
Priority: R ROUTINE
Limitations of Liability: High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring AS9100 9100 15JAN2009 Revision C
Class I ODS Substance Application/Use Quantity None none Type / Ship To Quantity (U/I) *ARO Each
Individual Order _ Req No / Pri
Required Delivery
2 EA *120 Calendar Days
Proposed Delivery
2 EA
Tear Down & Inspection
Item No.
Firm Fixed Price Best Estimated Qty
U/I Unit Price Amount
2 EA
Tear Down & Inspection IAW Sections 3.3 of the Work Specification Associated Document(s) Line Item(s)
FD20601331131 0002
Priority: R ROUTINE
Limitations of Liability: High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring AS9100 9100 15JAN2009 Revision C
Class I ODS Substance Application/Use Quantity None none Type / Ship To Quantity (U/I) *ARO Each
Individual Order _ Req No / Pri
Required Delivery
2 EA *120 Calendar Days
Proposed Delivery
2 EA
NOTE: The following item number should be priced on both a Cost Plus Fixed Fee (0003AA) and a Firm Fixed Priced basis (0003AB). The resulting award will be on either 0003AA or 0003AB. Once a decision has been made to award on a Cost Plus Fixed Fee or Firm Fixed Price, the same pricing arrangement will be applied to all options if exercised. The proposal should identify all additional terms and conditions associated with each pricing arrangement.
Program Depot Maintenance & Repair
Labor Item No.
Best Estimated Qty
U/I
Program Depot Maintenance & Repair
Labor Program Depot Maintenance & Repair IAW Section 3.4 of the Work Specification Associated Document(s) Line Item(s)
FD20601331131 0003
Priority: R ROUTINE
Limitations of Liability: High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring AS9100 9100 15JAN2009 Revision C
Class I ODS Substance Application/Use Quantity None none Type / Ship To Quantity (U/I) *ARO Each
Individual Order _ Req No / Pri
Required Delivery
2 EA *120 Calendar Days
Proposed Delivery
2 EA
Program Depot Maintenance & Repair
Labor Item No.
0003AA
Cost Plus Fixed Fee Best Estimated Qty
U/I Estimated Cost Fixed Fee Est Total Cost
2 EA
Program Depot Maintenance & Repair IAW Section 3.4 of the Work Specification Associated Document(s) Line Item(s)
FD20601331131 0003
Priority: R ROUTINE
Limitations of Liability: High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
Program Depot Maintenance & Repair
Labor AS9100 9100 15JAN2009 Revision C
Class I ODS Substance Application/Use Quantity None none Type / Ship To Quantity (U/I) *ARO Each
Individual Order _ Req No / Pri
Required Delivery
2 EA *120 Calendar Days
Proposed Delivery
2 EA
Program Depot Maintenance & Repair
Labor Item No.
0003AB
Firm Fixed Price Best Estimated Qty
U/I Unit Price Amount
2 EA
Program Depot Maintenance & Repair IAW Section 3.4 of the Work Specification Associated Document(s) Line Item(s)
FD20601331131 0003
Priority: R ROUTINE
Limitations of Liability: High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring AS9100 9100 15JAN2009 Revision C
Class I ODS Substance Application/Use Quantity None none Type / Ship To Quantity (U/I) *ARO Each
Individual Order _ Req No / Pri
Required Delivery
2 EA *120 Calendar Days
Proposed
Program Depot Maintenance & Repair
Labor
2 EA
NOTE: The following item number should be priced on both a Cost Plus Fixed Fee (0004AA) and a Firm Fixed Priced basis (0004AB). The resulting award will be on either 0004AA or 0004AB. Once a decision has been made to award on a Cost Plus Fixed Fee or Firm Fixed Price, the same pricing arrangement will be applied to all options if exercised. The proposal should identify all additional terms and conditions associated with each pricing arrangement.
Program Depot Maintenance & Repair
Material Item No.
Best Estimated Qty
U/I
2 EA
Program Depot Maintenance & Repair IAW Section 3.4 of the Work Specification Associated Document(s) Line Item(s)
FD20601331131 0004
Priority: R ROUTINE
Limitations of Liability: High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring AS9100 9100 15JAN2009 Revision C
Class I ODS Substance Application/Use Quantity None none Type / Ship To Quantity (U/I) *ARO Each
Individual Order _ Req No / Pri
Required Delivery
2 EA *120 Calendar Days
Proposed
Program Depot Maintenance & Repair
Material Item No.
0004AA
Cost Plus Fixed Fee Best Estimated Qty
U/I Estimated Cost Fixed Fee Est Total Cost
2 EA
Program Depot Maintenance & Repair IAW Section 3.4 of the Work Specification Associated Document(s) Line Item(s)
FD20601331131 0004
Priority: R ROUTINE
Limitations of Liability: High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring AS9100 9100 15JAN2009 Revision C
Class I ODS Substance Application/Use Quantity None none Type / Ship To Quantity (U/I) *ARO Each
Individual Order _ Req No / Pri
Required Delivery
2 EA *120 Calendar Days
Proposed Delivery
2 EA
Program Depot Maintenance & Repair
Material Item No.
0004AB
Firm Fixed Price Best Estimated Qty
U/I Unit Price Amount
2 EA
Program Depot Maintenance & Repair IAW Section 3.4 of the Work Specification Associated Document(s) Line Item(s)
FD20601331131 0004
Priority: R ROUTINE
Limitations of Liability: High Value Item
Program Depot Maintenance & Repair
Material
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring AS9100 9100 15JAN2009 Revision C
Class I ODS Substance Application/Use Quantity None none Type / Ship To Quantity (U/I) *ARO Each
Individual Order _ Req No / Pri
Required Delivery
2 EA *120 Calendar Days
Proposed Delivery
2 EA
Preparation and Delivery of Aircraft
Item No.
Firm Fixed Price Best Estimated Qty
U/I Unit Price Amount
2 EA
Preparation and Delivery of Aircraft IAW Sections 3.5 and 3.6 of the Work Specification Associated Document(s) Line Item(s)
FD20601331131 0005
Priority: R ROUTINE
Limitations of Liability: High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring AS9100 9100 15JAN2009 Revision C
Class I ODS Substance Application/Use Quantity None none
Preparation and Delivery of Aircraft
Type / Ship To Quantity (U/I) *ARO Each Individual Order
_ Req No / Pri
Required Delivery
2 EA *120 Calendar Days
Proposed Delivery
2 EA
Travel and Per Diem
Item No.
Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost
1 LO
Travel and Per Diem IAW Section 4.15 of the PWS Travel will be IAW FAR 31.205-46 as required on individual orders and authorized by the PCO Associated Document(s) Line Item(s)
FD20601331131 0006
Priority: R ROUTINE
Limitations of Liability: High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring AS9100 9100 15JAN2009 Revision C
Class I ODS Substance Application/Use Quantity None none Type / Ship To Quantity (U/I) *ARO Each
Individual Order _ Req No / Pri
Required Delivery
1 LO *120 Calendar Days
Proposed
1 LO
Contractor Depot Level Field Team
Item No.
Firm Fixed Price Best Estimated Qty
U/I Unit Price Amount
1 DA To be Negotiated To be Negotiated
Contractor Depot Level Field Team (The composition of the Team is to be negotiated prior to award) IAW Section 4.17 of the Work Specification Associated Document(s) Line Item(s)
FD20601331131 0007
Priority: R ROUTINE
Limitations of Liability: High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring AS9100 9100 15JAN2009 Revision C
Class I ODS Substance Application/Use Quantity None none Type / Ship To Quantity (U/I) *ARO Each
Individual Order _ Req No / Pri
Required Delivery
1 DA *120 Calendar Days
Proposed Delivery
1 DA
Drop in Depot Level Maintenance
Item No.
Best Estimated Qty
U/I
1 LO
Drop in Depot Level Maintenance IAW Section 4.17 of the PWS Associated Document(s) Line Item(s)
FD20601331131 0008
Drop in Depot Level Maintenance
Limitations of Liability: High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring AS9100 9100 15JAN2009 Revision C
Class I ODS Substance Application/Use Quantity None none
Drop in Maintenance
Material Item No.
0008AA
Cost Reimbursement - No Fee Best Estimated Qty
U/I Est Unit Cost Total Estimated Cost
1 LO To be Negotiated To be Negotiated
Drop in Maintenance - Material Associated Document(s) Line Item(s)
FD20601331131 0001
Priority: R ROUTINE
Limitations of Liability: High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring AS9100 9100 15JAN2009 Revision C
Class I ODS Substance Application/Use Quantity None none Type / Ship To Quantity (U/I) *ARO Each
Individual Order _ Req No / Pri
Required Delivery
1 LO *120 Calendar Days
Proposed
Drop in Maintenance
Labor Item No.
0008AB
Time & Material Best Estimated Qty
U/I Estimated Amount Ceiling Price
1 LO To be Negotiated To be Negotiated
Drop in Maintenance - Labor Associated Document(s) Line Item(s)
FD20601331131 0001
Priority: R ROUTINE
Limitations of Liability: High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring AS9100 9100 15JAN2009 Revision C
Class I ODS Substance Application/Use Quantity None none Type / Ship To Quantity (U/I) *ARO Each
Individual Order _ Req No / Pri
Required Delivery
1 LO *120 Calendar Days
Proposed Delivery
1 LO
Engineering Support Services - Reach back to the OEM Capability
Item No.
Cost Plus Fixed Fee Best Estimated Qty
U/I Estimated Cost Fixed Fee Est Total Cost
2 EA
Engineering Support Services - Reach back to the OEM Capability IAW Section 4.22 of the PWS Associated Document(s) Line Item(s)
FD20601331131 0009
Engineering Support Services - Reach back to the OEM Capability
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring AS9100 9100 15JAN2009 Revision C
Class I ODS Substance Application/Use Quantity None none Type / Ship To Quantity (U/I) *ARO Prior
Approval by PM and/or PCO
_ Req No / Pri
Required Delivery
1 EA *120 Calendar Days
Proposed Delivery
1 EA
Over & Above
Labor Item No.
Time & Material Best Estimated Qty
U/I Estimated Amount Ceiling Price
2 EA To be Negotiated To be Negotiated
Over & Above - Labor
IAW DFARS 252.217-7028
Associated Document(s) Line Item(s)
FD20601331131 0010
Priority: R ROUTINE
Limitations of Liability: High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring AS9100 9100 15JAN2009 Revision C
Class I ODS Substance Application/Use Quantity
Over & Above
Labor Type / Ship To Quantity (U/I) *ARO Prior
Approval by PM and/or PCO
_ Req No / Pri
Required Delivery
1 EA *120 Calendar Days
Proposed Delivery
1 EA
Over & Above
Material Item No.
Cost Reimbursement - No Fee Best Estimated Qty
U/I Est Unit Cost Total Estimated Cost
2 EA To be Negotiated To be Negotiated
Over & Above - Material
IAW DFARS 252.217-7028
Associated Document(s) Line Item(s)
FD20601331131 0001
Priority: R ROUTINE
Limitations of Liability: High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring AS9100 9100 15JAN2009 Revision C
Class I ODS Substance Application/Use Quantity None none Type / Ship To Quantity (U/I) *ARO Prior
Approval by PM and/or PCO
_ Req No / Pri
Required Delivery
2 EA *120 Calendar Days
Proposed
Data
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount
1 LO
Data Associated Document(s) Line Item(s)
FD20601331131 0012
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring AS9100 9100 15JAN2009 Revision C
Data
Conference Agenda Item No.
0012AA
Firm Fixed Price Quantity U/I Unit Price Amount 1 LO Not Separately Priced Not Separately Priced
Associated with LI: 0012 Data IAW DD1423 Exhibit A001 Authority: DI-ADMN-81249A PWS Paragraph 4.1
Associated Document(s) Line Item(s)
FD20601331131 0012
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring AS9100 9100 15JAN2009 Revision C
Type / Ship To Quantity (U/I) *ARO IAW DD
FORM 1423
_ Req No / Pri
Required
Proposed Delivery
1 LO
Data
Conference Minutes Item No.
0012AB
Firm Fixed Price Quantity U/I Unit Price Amount 1 LO Not Separately Priced Not Separately Priced
Associated with LI: 0012 Data IAW DD1423 Exhibit A002 Authority: DI-ADMN-81250A PWS Paragraph 4.1
Associated Document(s) Line Item(s)
FD20601331131 0012
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring AS9100 9100 15JAN2009 Revision C
Type / Ship To Quantity (U/I) *ARO IAW DD
FORM 1423
_ Req No / Pri
Required Delivery
1 LO
Proposed Delivery
1 LO
Data
Presentation Material Item No.
0012AC
Firm Fixed Price Quantity U/I Unit Price Amount 1 LO Not Separately Priced Not Separately Priced
Associated with LI: 0012 Data IAW DD1423 Exhibit A003 Authority: DI-ADMN-81373 PWS Paragraph 4.1
Associated Document(s) Line Item(s)
FD20601331131 0012
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring AS9100 9100 15JAN2009 Revision C
Type / Ship To Quantity (U/I) *ARO IAW DD
FORM 1423
_ Req No / Pri
Required Delivery
1 LO
Proposed Delivery
1 LO
Data
Technical Report Studies-Services Item No.
0012AD
Firm Fixed Price Quantity U/I Unit Price Amount 1 LO Not Separately Priced Not Separately Priced
Associated with LI: 0012 Data IAW DD1423 Exhibit A004 Authority: DI-MISC-80508B PWS Paragraph 4.1.1
FD20601331131 0012
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring AS9100 9100 15JAN2009 Revision C
Type / Ship To Quantity (U/I) *ARO IAW DD
FORM 1423
_ Req No / Pri
Required
Proposed Delivery
1 LO
Data
Status Report Item No.
0012AE
Firm Fixed Price Quantity U/I Unit Price Amount 1 LO Not Separately Priced Not Separately Priced
Associated with LI: 0012 Data IAW DD1423 Exhibit A005 Authority: DI-MGMT-80368A PWS Paragraph 4.2 and 4.15
Associated Document(s) Line Item(s)
FD20601331131 0012
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring AS9100 9100 15JAN2009 Revision C
Type / Ship To Quantity (U/I) *ARO IAW DD
FORM 1423
_ Req No / Pri
Required Delivery
1 LO
Proposed Delivery
1 LO
Data
Accident/Incident Reports Item No.
0012AF
Firm Fixed Price Quantity U/I Unit Price Amount 1 LO Not Separately Priced Not Separately Priced
Associated with LI: 0012 Data IAW DD1423 Exhibit A006 Authority: DI-SAFT-81563/T PWS Paragraph 4.10.2
FD20601331131 0012
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring AS9100 9100 15JAN2009 Revision C
Type / Ship To Quantity (U/I) *ARO IAW DD
FORM 1423
_ Req No / Pri
Required Delivery
1 LO
Proposed Delivery
1 LO
OPTION I: The 12 month period immediately following the Basic period. Option may be exercised whole or in part, and from time to time, on or before the last day of the basic period. Note to Contractor: An option is exercised at the time the Government deposits written notification to the contractor.
Preparation and Induction of Aircraft
Item No.
Firm Fixed Price Best Estimated Qty
U/I Unit Price Amount
3 EA
Preparation and Induction of Aircraft IAW Sections 3.1 and 3.2 of the Work Specification Associated Document(s) Line Item(s)
FD20601331131 0001
Priority: R ROUTINE
Limitations of Liability: High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring AS9100 9100 15JAN2009 Revision C
Class I ODS Substance Application/Use Quantity None none Type / Ship To Quantity (U/I) *ARO Each
Individual Order _ Req No / Pri
Required Delivery
3 EA *120 Calendar Days
Proposed Delivery
3 EA
Tear Down & Inspection
Item No.
Firm Fixed Price Best Estimated Qty
U/I Unit Price Amount
3 EA
Tear Down & Inspection IAW Sections 3.3 of the Work Specification Associated Document(s) Line Item(s)
FD20601331131 0002
Priority: R ROUTINE
Limitations of Liability: High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring AS9100 9100 15JAN2009 Revision C
Class I ODS Substance Application/Use Quantity None none Type / Ship To Quantity (U/I) *ARO Each
Individual Order _ Req No / Pri
Required Delivery
3 EA *120 Calendar Days
Proposed Delivery
3 EA
NOTE: The following item number should be priced on both a Cost Plus Fixed Fee (1003AA) and a Firm Fixed Priced basis (1003AB). The resulting award will be on either 1003AA or 1003AB. Once a decision has been made to award on a Cost Plus Fixed Fee or Firm Fixed Price, the same pricing arrangement will be applied to all options if exercised. The proposal should identify all additional terms and conditions associated with each pricing arrangement.
Program Depot Maintenance & Repair
Labor Item No.
Best Estimated Qty
U/I
3 EA
Program Depot Maintenance & Repair IAW Section 3.4 of the Work Specification Associated Document(s) Line Item(s)
FD20601331131 0003
Priority: R ROUTINE
Limitations of Liability: High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring AS9100 9100 15JAN2009 Revision C
Class I ODS Substance Application/Use Quantity None none Type / Ship To Quantity (U/I) *ARO Each
Individual Order _ Req No / Pri
Required Delivery
3 EA *120 Calendar Days
Proposed Delivery
3 EA
Program Depot Maintenance & Repair
Labor Item No.
1003AA
Cost Plus Fixed Fee Best Estimated Qty
U/I Estimated Cost Fixed Fee Est Total Cost
3 EA
Program Depot Maintenance & Repair IAW Section 3.4 of the Work Specification Associated Document(s) Line Item(s)
FD20601331131 0003
Program Depot Maintenance & Repair
Labor
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring AS9100 9100 15JAN2009 Revision C
Class I ODS Substance Application/Use Quantity None none Type / Ship To Quantity (U/I) *ARO Each
Individual Order _ Req No / Pri
Required Delivery
3 EA *120 Calendar Days
Proposed Delivery
3 EA
Program Depot Maintenance & Repair
Labor Item No.
1003AB
Firm Fixed Price Best Estimated Qty
U/I Unit Price Amount
3 EA
Program Depot Maintenance & Repair IAW Section 3.4 of the Work Specification Associated Document(s) Line Item(s)
FD20601331131 0003
Priority: R ROUTINE
Limitations of Liability: High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring AS9100 9100 15JAN2009 Revision C
Class I ODS Substance Application/Use Quantity
Program Depot Maintenance & Repair
Labor Type / Ship To Quantity (U/I) *ARO Each
Individual Order _ Req No / Pri
Required Delivery
3 EA *120 Calendar Days
Proposed Delivery
3 EA
NOTE: The following item number should be priced on both a Cost Plus Fixed Fee (1004AA) and a Firm Fixed Priced basis (1004AB). The resulting award will be on either 1004AA or 1004AB. Once a decision has been made to award on a Cost Plus Fixed Fee or Firm Fixed Price, the same pricing arrangement will be applied to all options if exercised. The proposal should identify all additional terms and conditions associated with each pricing arrangement.
Program Depot Maintenance & Repair
Material Item No.
Best Estimated Qty
U/I
3 EA
Program Depot Maintenance & Repair IAW Section 3.4 of the Work Specification Associated Document(s) Line Item(s)
FD20601331131 0004
Priority: R ROUTINE
Limitations of Liability: High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring AS9100 9100 15JAN2009 Revision C
Class I ODS Substance Application/Use Quantity None none Type / Ship To Quantity (U/I) *ARO Each
Individual Order _ Req No / Pri
Required
3 EA *120 Calendar Days
Program Depot Maintenance & Repair
Material Proposed Delivery
3 EA
Program Depot Maintenance & Repair
Material Item No.
1004AA
Cost Plus Fixed Fee Best Estimated Qty
U/I Estimated Cost Fixed Fee Est Total Cost
3 EA
Program Depot Maintenance & Repair IAW Section 3.4 of the Work Specification Associated Document(s) Line Item(s)
FD20601331131 0004
Priority: R ROUTINE
Limitations of Liability: High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring AS9100 9100 15JAN2009 Revision C
Class I ODS Substance Application/Use Quantity None none Type / Ship To Quantity (U/I) *ARO Each
Individual Order _ Req No / Pri
Required Delivery
3 EA *120 Calendar Days
Proposed Delivery
3 EA
Program Depot Maintenance & Repair
Material Item No.
1004AB
Firm Fixed Price Best Estimated Qty
U/I Unit Price Amount
Program Depot Maintenance & Repair
Material
3 EA
Program Depot Maintenance & Repair IAW Section 3.4 of the Work Specification Associated Document(s) Line Item(s)
FD20601331131 0004
Priority: R ROUTINE
Limitations of Liability: High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring AS9100 9100 15JAN2009 Revision C
Class I ODS Substance Application/Use Quantity None none Type / Ship To Quantity (U/I) *ARO Each
Individual Order _ Req No / Pri
Required Delivery
3 EA *120 Calendar Days
Proposed Delivery
3 EA
Preparation and Delivery of Aircraft
Item No.
Firm Fixed Price Best Estimated Qty
U/I Unit Price Amount
3 EA
Preparation and Delivery of Aircraft IAW Sections 3.5 and 3.6 of the Work Specification Associated Document(s) Line Item(s)
FD20601331131 0005
Priority: R ROUTINE
Limitations of Liability: High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required
Preparation and Delivery of Aircraft
Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring AS9100 9100 15JAN2009 Revision C
Class I ODS Substance Application/Use Quantity None none Type / Ship To Quantity (U/I) *ARO Each
Individual Order _ Req No / Pri
Required Delivery
3 EA *120 Calendar Days
Proposed Delivery
3 EA
Travel and Per Diem
Item No.
Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost
1 LO
Travel and Per Diem IAW Section 4.15 of the PWS Travel will be IAW FAR 31.205-46 as required on individual orders and authorized by the PCO Associated Document(s) Line Item(s)
FD20601331131 0006
Priority: R ROUTINE
Limitations of Liability: High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring AS9100 9100 15JAN2009 Revision C
Class I ODS Substance Application/Use Quantity None none Type / Ship To Quantity (U/I) *ARO Each
Individual Order _ Req No / Pri
Required
Travel and Per Diem
1 LO *120 Calendar Days
Proposed Delivery
1 LO
Contractor Depot Level Field Team
Item No.
Firm Fixed Price Best Estimated Qty
U/I Unit Price Amount
1 DA To be Negotiated To be Negotiated
Contractor Depot Level Field Team (The composition of the Team is to be negotiated prior to award) IAW Section 4.17 of the Work Specification Associated Document(s) Line Item(s)
FD20601331131 0007
Priority: R ROUTINE
Limitations of Liability: High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring AS9100 9100 15JAN2009 Revision C
Class I ODS Substance Application/Use Quantity None none Type / Ship To Quantity (U/I) *ARO Each
Individual Order _ Req No / Pri
Required Delivery
1 DA *120 Calendar Days
Proposed
1 DA
Drop in Depot Level Maintenance
Item No.
Best Estimated Qty
U/I
1 LO
Drop in Depot Level Maintenance IAW Section 4.17 of the PWS Associated Document(s) Line Item(s)
FD20601331131 0008
Priority: R ROUTINE
Limitations of Liability: High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring AS9100 9100 15JAN2009 Revision C
Class I ODS Substance Application/Use Quantity None none
Drop in Maintenance
Material Item No.
1008AA
Cost Reimbursement - No Fee Best Estimated Qty
U/I Est Unit Cost Total Estimated Cost
1 LO To be Negotiated To be Negotiated
Drop in Maintenance - Material Associated Document(s) Line Item(s)
FD20601331131 0001
Priority: R ROUTINE
Limitations of Liability: High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring AS9100 9100 15JAN2009 Revision C
Class I ODS Substance Application/Use Quantity
Drop in Maintenance
Material None none Type / Ship To Quantity (U/I) *ARO Each
Individual Order _ Req No / Pri
Required Delivery
1 LO *120 Calendar Days
Proposed Delivery
1 LO
Drop in Maintenance
Labor Item No.
1008AB
Time & Material Best Estimated Qty
U/I Estimated Amount Ceiling Price
1 LO To be Negotiated To be Negotiated
Drop in Maintenance - Labor Associated Document(s) Line Item(s)
FD20601331131 0001
Priority: R ROUTINE
Limitations of Liability: High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring AS9100 9100 15JAN2009 Revision C
Class I ODS Substance Application/Use Quantity None none Type / Ship To Quantity (U/I) *ARO Each
Individual Order _ Req No / Pri
Required Delivery
1 LO *120 Calendar Days
Proposed Delivery
1 LO
Engineering Support Services - Reach back to the OEM Capability
Item No.
Engineering Support Services - Reach back to the OEM Capability
Cost Plus Fixed Fee Best Estimated Qty
U/I Estimated Cost Fixed Fee Est Total Cost
3 EA
Engineering Support Services - Reach back to the OEM Capability IAW Section 4.22 of the PWS Associated Document(s) Line Item(s)
FD20601331131 0009
Priority: R ROUTINE
Limitations of Liability: High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring AS9100 9100 15JAN2009 Revision C
Class I ODS Substance Application/Use Quantity None none Type / Ship To Quantity (U/I) *ARO Prior
Approval by PM and/or PCO
_ Req No / Pri
Required Delivery
3 EA *120 Calendar Days
Proposed Delivery
3 EA
Over & Above
Labor Item No.
Time & Material Best Estimated Qty
U/I Estimated Amount Ceiling Price
3 EA To be Negotiated To be Negotiated
Over & Above - Labor
IAW DFARS 252.217-7028
Associated Document(s) Line Item(s)
FD20601331131 0010
Over & Above
Labor
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring AS9100 9100 15JAN2009 Revision C
Class I ODS Substance Application/Use Quantity None none Type / Ship To Quantity (U/I) *ARO Prior
Approval by PM and/or PCO
_ Req No / Pri
Required Delivery
3 EA *120 Calendar Days
Proposed Delivery
3 EA
Over & Above
Material Item No.
Cost Reimbursement - No Fee Best Estimated Qty
U/I Est Unit Cost Total Estimated Cost
3 EA To be Negotiated To be Negotiated
Over & Above - Material
IAW DFARS 252.217-7028
Associated Document(s) Line Item(s)
FD20601331131 0001
Priority: R ROUTINE
Limitations of Liability: High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring AS9100 9100 15JAN2009 Revision C
Class I ODS Substance Application/Use Quantity None none Type / Ship To Quantity (U/I) *ARO Prior
Approval by PM and/or PCO
Over & Above
Material Required Delivery
3 EA *120 Calendar Days
Proposed Delivery
3 EA
Data
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount
1 LO
Data Associated Document(s) Line Item(s)
FD20601331131 0012
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring AS9100 9100 15JAN2009 Revision C
Data
Conference Agenda Item No.
1012AA
Firm Fixed Price Quantity U/I Unit Price Amount 1 LO Not Separately Priced Not Separately Priced
Associated with LI: 0012 Data IAW DD1423 Exhibit A001 Authority: DI-ADMN-81249A PWS Paragraph 4.1
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring AS9100 9100 15JAN2009 Revision C
Type / Ship To Quantity (U/I) *ARO IAW DD
FORM 1423
_ Req No / Pri
Required Delivery
1 LO
Proposed Delivery
1 LO
Data
Conference Minutes Item No.
1012AB
Firm Fixed Price Quantity U/I Unit Price Amount 1 LO Not Separately Priced Not Separately Priced
Associated with LI: 0012 Data IAW DD1423 Exhibit A002 Authority: DI-ADMN-81250A PWS Paragraph 4.1
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring AS9100 9100 15JAN2009 Revision C
Type / Ship To Quantity (U/I) *ARO IAW DD
FORM 1423
_ Req No / Pri
Required Delivery
1 LO
Proposed Delivery
1 LO
Data
Presentation Material Item No.
1012AC
Firm Fixed Price Quantity U/I Unit Price Amount
Data
Presentation Material 1 LO Not Separately Priced Not Separately Priced
Associated with LI: 0012 Data IAW DD1423 Exhibit A003 Authority: DI-ADMN-81373 PWS Paragraph 4.1
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring AS9100 9100 15JAN2009 Revision C
Type / Ship To Quantity (U/I) *ARO IAW DD
FORM 1423
_ Req No / Pri
Required Delivery
1 LO
Proposed Delivery
1 LO
Data
Technical Report Studies-Services Item No.
1012AD
Firm Fixed Price Quantity U/I Unit Price Amount 1 LO Not Separately Priced Not Separately Priced
Associated with LI: 0012 Data IAW DD1423 Exhibit A004
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
AS9100 9100 15JAN2009 Revision C
Type / Ship To Quantity (U/I) *ARO IAW DD
FORM 1423
_ Req No / Pri
Required Delivery
1 LO
Proposed Delivery
1 LO
Data
Status Report Item No.
1012AE
Firm Fixed Price Quantity U/I Unit Price Amount 1 LO Not Separately Priced Not Separately Priced
Associated with LI: 0012 Data IAW DD1423 Exhibit A005 Authority: DI-MGMT-80368A PWS Paragraph 4.2 and 4.15
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring AS9100 9100 15JAN2009 Revision C
Type / Ship To Quantity (U/I) *ARO IAW DD
FORM 1423
_ Req No / Pri
Required Delivery
1 LO
Proposed Delivery
1 LO
Data
Accident/Incident Reports Item No.
1012AF
Firm Fixed Price Quantity U/I Unit Price Amount 1 LO Not Separately Priced Not Separately Priced
Associated with LI: 0012
Data
Accident/Incident Reports Data IAW DD1423 Exhibit A006 Authority: DI-SAFT-81563/T PWS Paragraph 4.10.2
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring AS9100 9100 15JAN2009 Revision C
Type / Ship To Quantity (U/I) *ARO IAW DD
FORM 1423
_ Req No / Pri
Required Delivery
1 LO
Proposed Delivery
1 LO
OPTION II: The 12 month period immediately following the Option I period. Option may be exercised whole or in part, and from time to time, on or before the last day of the Option I period. Note to Contractor:
An option is exercised at the time the Government deposits written notification to the contractor.
Preparation and Induction of Aircraft
Item No.
Firm Fixed Price Best Estimated Qty
U/I Unit Price Amount
4 EA
Preparation and Induction of Aircraft IAW Sections 3.1 and 3.2 of the Work Specification Associated Document(s) Line Item(s)
FD20601331131 0001
Priority: R ROUTINE
Limitations of Liability: High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Class I ODS Substance Application/Use Quantity None none Type / Ship To Quantity (U/I) *ARO Each
Individual Order _ Req No / Pri
Required Delivery
4 EA *120 Calendar Days
Proposed Delivery
4 EA
Tear Down & Inspection
Item No.
Firm Fixed Price Best Estimated Qty
U/I Unit Price Amount
4 EA
Tear Down & Inspection IAW Sections 3.3 of the Work Specification Associated Document(s) Line Item(s)
FD20601331131 0002
Priority: R ROUTINE
Limitations of Liability: High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring AS9100 9100 15JAN2009 Revision C
Class I ODS Substance Application/Use Quantity None none Type / Ship To Quantity (U/I) *ARO Each
Individual Order _ Req No / Pri
Required Delivery
4 EA *120 Calendar Days
Proposed
4 EA
NOTE: The following item number should be priced on both a Cost Plus Fixed Fee (2003AA) and a Firm Fixed Priced basis (2003AB). The resulting award will be on either 2003AA or 2003AB. Once a decision has been made to award on a Cost Plus Fixed Fee or Firm Fixed Price, the same pricing arrangement will be applied to all options if exercised. The proposal should identify all additional terms and conditions associated with each pricing arrangement.
Program Depot Maintenance & Repair
Labor Item No.
Best Estimated Qty
U/I
4 EA
Program Depot Maintenance & Repair IAW Section 3.4 of the Work Specification Associated Document(s) Line Item(s)
FD20601331131 0003
Priority: R ROUTINE
Limitations of Liability: High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring AS9100 9100 15JAN2009 Revision C
Class I ODS Substance Application/Use Quantity None none Type / Ship To Quantity (U/I) *ARO Each
Individual Order _ Req No / Pri
Required Delivery
4 EA *120 Calendar Days
Proposed Delivery
4 EA
Program Depot Maintenance & Repair
Labor Item No.
2003AA
Cost Plus Fixed Fee Best Estimated Qty
U/I Estimated Cost Fixed Fee Est Total Cost
Program Depot Maintenance & Repair
Labor
4 EA
Program Depot Maintenance & Repair IAW Section 3.4 of the Work Specification Associated Document(s) Line Item(s)
FD20601331131 0003
Priority: R ROUTINE
Limitations of Liability: High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring AS9100 9100 15JAN2009 Revision C
Class I ODS Substance Application/Use Quantity None none Type / Ship To Quantity (U/I) *ARO Each
Individual Order _ Req No / Pri
Required Delivery
4 EA *120 Calendar Days
Proposed Delivery
4 EA
Program Depot Maintenance & Repair
Labor Item No.
2003AB
Firm Fixed Price Best Estimated Qty
U/I Unit Price Amount
4 EA
Program Depot Maintenance & Repair IAW Section 3.4 of the Work Specification Associated Document(s) Line Item(s)
FD20601331131 0003
Priority: R ROUTINE
Limitations of Liability: High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required
Program Depot Maintenance & Repair
Labor Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring AS9100 9100 15JAN2009 Revision C
Class I ODS Substance Application/Use Quantity None none Type / Ship To Quantity (U/I) *ARO Each
Individual Order _ Req No / Pri
Required Delivery
4 EA *120 Calendar Days
Proposed Delivery
4 EA
NOTE: The following item number should be priced on both a Cost Plus Fixed Fee (2004AA) and a Firm Fixed Priced basis (2004AB). The resulting award will be on either 2004AA or 2004AB. Once a decision has been made to award on a Cost Plus Fixed Fee or Firm Fixed Price, the same pricing arrangement will be applied to all options if exercised.