FA855213R31131______0002.pdf
PDF 362 KB Posted
- Solicitation number
- FA8552-13-R-31131
About this file
Amendment 0002
View the file
Other files
| File | Type | Posted |
|---|---|---|
| JA_SIGNED.pdf | ||
| FA855213R31131______0001.pdf | ||
| PWS.doc | DOC document | |
| TH1H_DLM_Work_Spec_Signed.pdf | ||
| CDRLs_A001_A007.pdf | ||
| FA855213R31131.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
JSUY
2. AMENDMENT/MODIFICATION NO.
FA8552-13-R-31131-0002
3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO.
FD20601331131
5. PROJECT NO (If applicable)
6. ISSUED BY CODE
SOF/PR - ROTARY WING & AVIONICS, AFLCMC/WIKAB
235 BYRON ST STE 19A
BLDG 300 CML PHN 478 926 7227
ROBINS AFB GA 31098-1670
BUYER: Todd J. Stimus/GRUKB Todd.Stimus@robins.af.mil Phone: (478) 926- 2374 Fax: (478) 926-3360 No Collect Calls
7. ADMINISTERED BY (If other than item 6) CODEFA8552
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
CODE
X
9A. AMENDMENT OF SOLICITATION NO.
FA855213R31131
9B. DATED (SEE ITEM 11)
7-AUG-2013
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods. ( a ) By completing Items 8 and 15, and returning copies of the amendment; ( b ) By acknowledging receipt of this amendment on each copy of the offer submitted; or ( c ) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified. 13-SEP-2013 4:30 PM
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return 1 copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
ROUTINE
15A. NAME AND TITLE OF SIGNER (Type or print)
15B. CONTRACTOR/OFFEROR
BY ________________________________________________________
(Signature of person authorized to sign)
15C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16B. UNITED STATES OF AMERICA
BY ____________________________________________________
(Signature of Contracting Officer)
16C. DATE SIGNED
FACILITY CODE
NSN 7540-01-152-8070
PREVIOUS EDITION UNUSABLE
30-105 STANDARD FORM 30 (REV. 10-83)
PRESCRIBED BY GSA
FAR (48 CFR) 53.243
X
X X
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
Amendment/Modification FA8552-13-R-31131-0002
Continuation of block 14. DESCRIPTION OF AMENDMENT/MODIFICATION
The Purpose of this amendment is to:
A. Extend submission of proposals date as follows:
FROM: 06 SEP 2013 4:30 PM (Eastern Time)
TO: 13 SEP 2013 4:30 PM (Eastern Time)
B. All other terms and conditions remain unchanged.
Request for Proposal FA8552-13-R-31131-0002
PART I - THE SCHEDULE
SECTION B
SUPPLIES OR SERVICES AND PRICES/COSTS
NOTE TO CONTRACTOR: This is a solicitation for a requirements contract. Delivery or performance shall be made only as authorized by orders issued in accordance with the ordering clause. The Contractor shall furnish to the Government, when and if ordered, services specified in this Schedule up to and including the "maximum" amount.
Period of Contract: The effective date for ordering under this contract is from the date of award through one year thereafter or until all options are exercised. Performance shall continue through completion of all orders properly issued hereunder.
Preparation and Induction of Aircraft
Item No.
Firm Fixed Price Best Estimated Qty
U/I Unit Price Amount
2 EA
Preparation and Induction of Aircraft IAW Sections 3.1 and 3.2 of the Work Specification Priority: R ROUTINE
Limitations of Liability: High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring AS9100 9100 15JAN2009 Revision C Class I ODS Substance Application/Use Quantity None none Type / Ship To Quantity (U/I) *ARO Each
Individual Order _ Req No / Pri
Required Delivery
2 EA *120 Calendar Days
Proposed Delivery
2 EA
Tear Down & Inspection
Item No.
Tear Down & Inspection
Firm Fixed Price Best Estimated Qty
U/I Unit Price Amount
2 EA
Tear Down & Inspection IAW Sections 3.3 of the Work Specification Priority: R ROUTINE
Limitations of Liability: High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring AS9100 9100 15JAN2009 Revision C Class I ODS Substance Application/Use Quantity None none Type / Ship To Quantity (U/I) *ARO Each
Individual Order _ Req No / Pri
Required Delivery
2 EA *120 Calendar Days
Proposed Delivery
2 EA
NOTE: The following item number should be priced on both a Cost Plus Fixed Fee (0003AA) and a Firm Fixed Priced basis (0003AB). The resulting award will be on either 0003AA or 0003AB. Once a decision has been made to award on a Cost Plus Fixed Fee or Firm Fixed Price, the same pricing arrangement will be applied to all options if exercised. The proposal should identify all additional terms and conditions associated with each pricing arrangement.
Program Depot Maintenance & Repair
Labor Item No.
Best Estimated Qty
U/I
2 EA
Program Depot Maintenance & Repair IAW Section 3.4 of the Work Specification Priority: R ROUTINE
Limitations of Liability: High Value Item
Program Depot Maintenance & Repair
Labor
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring AS9100 9100 15JAN2009 Revision C Class I ODS Substance Application/Use Quantity None none Type / Ship To Quantity (U/I) *ARO Each Individual
Order _ Req No / Pri
Required Delivery
2 EA *120 Calendar Days
Proposed Delivery
2 EA
Program Depot Maintenance & Repair
Labor Item No.
0003AA
Cost Plus Fixed Fee Best Estimated Qty
U/I Estimated Cost Fixed Fee Est Total Cost
2 EA
Program Depot Maintenance & Repair IAW Section 3.4 of the Work Specification Priority: R ROUTINE
Limitations of Liability: High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring AS9100 9100 15JAN2009 Revision C Class I ODS Substance Application/Use Quantity None none Type / Ship To Quantity (U/I) *ARO Each Individual
Order _ Req No / Pri
Required Delivery
2 EA *120 Calendar Days
Program Depot Maintenance & Repair
Labor Proposed Delivery
2 EA
Program Depot Maintenance & Repair
Labor Item No.
0003AB
Firm Fixed Price Best Estimated Qty
U/I Unit Price Amount
2 EA
Program Depot Maintenance & Repair IAW Section 3.4 of the Work Specification Priority: R ROUTINE
Limitations of Liability: High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring AS9100 9100 15JAN2009 Revision C Class I ODS Substance Application/Use Quantity None none Type / Ship To Quantity (U/I) *ARO Each Individual
Order _ Req No / Pri
Required Delivery
2 EA *120 Calendar Days
Proposed Delivery
2 EA
NOTE: The following item number should be priced on both a Cost Plus Fixed Fee (0004AA) and a Firm Fixed Priced basis (0004AB). The resulting award will be on either 0004AA or 0004AB. Once a decision has been made to award on a Cost Plus Fixed Fee or Firm Fixed Price, the same pricing arrangement will be applied to all options if exercised. The proposal should identify all additional terms and conditions associated with each pricing arrangement.
Program Depot Maintenance & Repair
Material
Program Depot Maintenance & Repair
Material Best Estimated Qty
U/I
2 EA
Program Depot Maintenance & Repair IAW Section 3.4 of the Work Specification Priority: R ROUTINE
Limitations of Liability: High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring AS9100 9100 15JAN2009 Revision C Class I ODS Substance Application/Use Quantity None none Type / Ship To Quantity (U/I) *ARO Each Individual
Order _ Req No / Pri
Required Delivery
2 EA *120 Calendar Days
Proposed Delivery
2 EA
Program Depot Maintenance & Repair
Material Item No.
0004AA
Cost Plus Fixed Fee Best Estimated Qty
U/I Estimated Cost Fixed Fee Est Total Cost
2 EA
Program Depot Maintenance & Repair IAW Section 3.4 of the Work Specification Priority: R ROUTINE
Limitations of Liability: High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring AS9100 9100 15JAN2009 Revision C Class I ODS Substance Application/Use Quantity
Program Depot Maintenance & Repair
Material None none Type / Ship To Quantity (U/I) *ARO Each Individual
Order _ Req No / Pri
Required Delivery
2 EA *120 Calendar Days
Proposed Delivery
2 EA
Program Depot Maintenance & Repair
Material Item No.
0004AB
Firm Fixed Price Best Estimated Qty
U/I Unit Price Amount
2 EA
Program Depot Maintenance & Repair IAW Section 3.4 of the Work Specification Priority: R ROUTINE
Limitations of Liability: High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring AS9100 9100 15JAN2009 Revision C Class I ODS Substance Application/Use Quantity None none Type / Ship To Quantity (U/I) *ARO Each Individual
Order _ Req No / Pri
Required Delivery
2 EA *120 Calendar Days
Proposed Delivery
2 EA
Preparation and Delivery of Aircraft
Preparation and Delivery of Aircraft
Firm Fixed Price Best Estimated Qty
U/I Unit Price Amount
2 EA
Preparation and Delivery of Aircraft IAW Sections 3.5 and 3.6 of the Work Specification Priority: R ROUTINE
Limitations of Liability: High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring AS9100 9100 15JAN2009 Revision C Class I ODS Substance Application/Use Quantity None none Type / Ship To Quantity (U/I) *ARO Each Individual
Order _ Req No / Pri
Required Delivery
2 EA *120 Calendar Days
Proposed Delivery
2 EA
Travel and Per Diem
Item No.
Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost
1 LO
Travel and Per Diem IAW Section 4.15 of the PWS Travel will be IAW FAR 31.205-46 as required on individual orders and authorized by the PCO Priority: R ROUTINE
Limitations of Liability: High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
Travel and Per Diem
Class I ODS Substance Application/Use Quantity None none Type / Ship To Quantity (U/I) *ARO Each
Individual Order _ Req No / Pri
Required Delivery
1 LO *120 Calendar Days
Proposed Delivery
1 LO
Contractor Depot Level Field Team
Item No.
Time & Material Best Estimated Qty
U/I Unit Price Ceiling Price
1 LO To be Negotiated To be Negotiated
Contractor Depot Level Field Team (The composition of the Team is to be negotiated prior to award) IAW Section 4.17 of the PWS Priority: R ROUTINE
Limitations of Liability: High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring AS9100 9100 15JAN2009 Revision C Class I ODS Substance Application/Use Quantity None none Type / Ship To Quantity (U/I) *ARO Each
Individual Order _ Req No / Pri
Required Delivery
1 LO *120 Calendar Days
Proposed
1 LO
Drop in Depot Level Maintenance
Item No.
Best Estimated Qty
U/I
1 LO
Drop in Depot Level Maintenance IAW Section 4.17 of the PWS Priority: R ROUTINE
Limitations of Liability: High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring AS9100 9100 15JAN2009 Revision C Class I ODS Substance Application/Use Quantity None none
Drop in Maintenance
Material Item No.
0008AA
Cost Reimbursement - No Fee Best Estimated Qty
U/I Est Unit Cost Total Estimated Cost
1 LO To be Negotiated To be Negotiated
Drop in Maintenance - Material Priority: R ROUTINE
Limitations of Liability: High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring AS9100 9100 15JAN2009 Revision C Class I ODS Substance Application/Use Quantity None none Type / Ship To Quantity (U/I) *ARO Each
Individual Order _ Req No / Pri
Required
1 LO *120 Calendar Days
Drop in Maintenance
Material Proposed Delivery
1 LO
Drop in Maintenance
Labor Item No.
0008AB
Time & Material Best Estimated Qty
U/I Estimated Amount Ceiling Price
1 LO To be Negotiated To be Negotiated
Drop in Maintenance - Labor Priority: R ROUTINE
Limitations of Liability: High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring AS9100 9100 15JAN2009 Revision C Class I ODS Substance Application/Use Quantity None none Type / Ship To Quantity (U/I) *ARO Each
Individual Order _ Req No / Pri
Required Delivery
1 LO *120 Calendar Days
Proposed Delivery
1 LO
Engineering Support Services - Reach back to the OEM Capability
Item No.
Cost Plus Fixed Fee Best Estimated Qty
U/I Estimated Cost Fixed Fee Est Total Cost
1 LO
Engineering Support Services - Reach back to the OEM Capability IAW Section 4.22 of the PWS
Engineering Support Services - Reach back to the OEM Capability
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring AS9100 9100 15JAN2009 Revision C Class I ODS Substance Application/Use Quantity None none Type / Ship To Quantity (U/I) *ARO Prior
Approval by ACO and/or PCO
_ Req No / Pri
Required Delivery
1 LO *120 Calendar Days
Proposed Delivery
1 LO
Over & Above
Labor Item No.
Time & Material Best Estimated Qty
U/I Estimated Amount Ceiling Price
1 LO To be Negotiated To be Negotiated
Over & Above - Labor
IAW DFARS 252.217-7028
Priority: R ROUTINE
Limitations of Liability: High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring AS9100 9100 15JAN2009 Revision C Class I ODS Substance Application/Use Quantity None none Type / Ship To Quantity (U/I) *ARO Prior
Approval by ACO and/or PCO
_ Req No / Pri
Required
Over & Above
Labor Proposed Delivery
1 LO
Over & Above
Material Item No.
Cost Reimbursement - No Fee Best Estimated Qty
U/I Est Unit Cost Total Estimated Cost
1 LO To be Negotiated To be Negotiated
Over & Above - Material
IAW DFARS 252.217-7028
Priority: R ROUTINE
Limitations of Liability: High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring AS9100 9100 15JAN2009 Revision C Class I ODS Substance Application/Use Quantity None none Type / Ship To Quantity (U/I) *ARO Prior
Approval by ACO and/or PCO
_ Req No / Pri
Required Delivery
1 LO *120 Calendar Days
Proposed Delivery
1 LO
Data
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount
1 LO
Data
Limitations of Liability: Other Than High Value Item
Data
Inspection: Destination Acceptance: Destination Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring AS9100 9100 15JAN2009 Revision C
Data
Conference Agenda Item No.
0012AA
Firm Fixed Price Quantity U/I Unit Price Amount 1 LO Not Separately Priced Not Separately Priced
Associated with LI: 0012 Data IAW DD1423 Exhibit A001 Authority: DI-ADMN-81249A PWS Paragraph 4.1
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring AS9100 9100 15JAN2009 Revision C Type / Ship To Quantity (U/I) *ARO IAW DD
FORM 1423
_ Req No / Pri
Required Delivery
1 LO
Proposed Delivery
1 LO
Data
Conference Minutes Item No.
0012AB
Firm Fixed Price Quantity U/I Unit Price Amount 1 LO Not Separately Priced Not Separately Priced
Associated with LI: 0012 Data IAW DD1423 Exhibit A002 Authority: DI-ADMN-81250A
PWS Paragraph 4.1
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring AS9100 9100 15JAN2009 Revision C Type / Ship To Quantity (U/I) *ARO IAW DD
FORM 1423
_ Req No / Pri
Required Delivery
1 LO
Proposed Delivery
1 LO
Data
Presentation Material Item No.
0012AC
Firm Fixed Price Quantity U/I Unit Price Amount 1 LO Not Separately Priced Not Separately Priced
Associated with LI: 0012 Data IAW DD1423 Exhibit A003 Authority: DI-ADMN-81373 PWS Paragraph 4.1
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring AS9100 9100 15JAN2009 Revision C Type / Ship To Quantity (U/I) *ARO IAW DD
FORM 1423
_ Req No / Pri
Required Delivery
1 LO
Proposed
Data
Technical Report Studies-Services Item No.
0012AD
Firm Fixed Price Quantity U/I Unit Price Amount 1 LO Not Separately Priced Not Separately Priced
Associated with LI: 0012 Data IAW DD1423 Exhibit A004 Authority: DI-MISC-80508B PWS Paragraph 4.1.1
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring AS9100 9100 15JAN2009 Revision C Type / Ship To Quantity (U/I) *ARO IAW DD
FORM 1423
_ Req No / Pri
Required Delivery
1 LO
Proposed Delivery
1 LO
Data
Status Report Item No.
0012AE
Firm Fixed Price Quantity U/I Unit Price Amount 1 LO Not Separately Priced Not Separately Priced
Associated with LI: 0012 Data IAW DD1423 Exhibit A005 Authority: DI-MGMT-80368A PWS Paragraph 4.2 and 4.15
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
AS9100 9100 15JAN2009 Revision C Type / Ship To Quantity (U/I) *ARO IAW DD
FORM 1423
_ Req No / Pri
Required Delivery
1 LO
Proposed Delivery
1 LO
Data
Accident/Incident Reports Item No.
0012AF
Firm Fixed Price Quantity U/I Unit Price Amount 1 LO Not Separately Priced Not Separately Priced
Associated with LI: 0012 Data IAW DD1423 Exhibit A006 Authority: DI-SAFT-81563/T PWS Paragraph 4.10.2
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring AS9100 9100 15JAN2009 Revision C Type / Ship To Quantity (U/I) *ARO IAW DD
FORM 1423
_ Req No / Pri
Required Delivery
1 LO
Proposed Delivery
1 LO
OPTION I: The 12 month period immediately following the Basic period. Option may be exercised whole or in part, and from time to time, on or before the last day of the basic period. Note to Contractor: An option is exercised at the time the Government deposits written notification to the contractor.
Preparation and Induction of Aircraft
Item No.
Firm Fixed Price Best Estimated Qty
U/I Unit Price Amount
Preparation and Induction of Aircraft
3 EA
Preparation and Induction of Aircraft IAW Sections 3.1 and 3.2 of the Work Specification Priority: R ROUTINE
Limitations of Liability: High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring AS9100 9100 15JAN2009 Revision C Class I ODS Substance Application/Use Quantity None none Type / Ship To Quantity (U/I) *ARO Each
Individual Order _ Req No / Pri
Required Delivery
3 EA *120 Calendar Days
Proposed Delivery
3 EA
Tear Down & Inspection
Item No.
Firm Fixed Price Best Estimated Qty
U/I Unit Price Amount
3 EA
Tear Down & Inspection IAW Sections 3.3 of the Work Specification Priority: R ROUTINE
Limitations of Liability: High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
None none Type / Ship To Quantity (U/I) *ARO Each
Individual Order _ Req No / Pri
Required Delivery
3 EA *120 Calendar Days
Proposed Delivery
3 EA
NOTE: The following item number should be priced on both a Cost Plus Fixed Fee (1003AA) and a Firm Fixed Priced basis (1003AB). The resulting award will be on either 1003AA or 1003AB. Once a decision has been made to award on a Cost Plus Fixed Fee or Firm Fixed Price, the same pricing arrangement will be applied to all options if exercised. The proposal should identify all additional terms and conditions associated with each pricing arrangement.
Program Depot Maintenance & Repair
Labor Item No.
Best Estimated Qty
U/I
3 EA
Program Depot Maintenance & Repair IAW Section 3.4 of the Work Specification Priority: R ROUTINE
Limitations of Liability: High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring AS9100 9100 15JAN2009 Revision C Class I ODS Substance Application/Use Quantity None none Type / Ship To Quantity (U/I) *ARO Each Individual
Order _ Req No / Pri
Required Delivery
3 EA *120 Calendar Days
Proposed
3 EA
Program Depot Maintenance & Repair
Labor Item No.
1003AA
Cost Plus Fixed Fee Best Estimated Qty
U/I Estimated Cost Fixed Fee Est Total Cost
3 EA
Program Depot Maintenance & Repair IAW Section 3.4 of the Work Specification Priority: R ROUTINE
Limitations of Liability: High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring AS9100 9100 15JAN2009 Revision C Class I ODS Substance Application/Use Quantity None none Type / Ship To Quantity (U/I) *ARO Each Individual
Order _ Req No / Pri
Required Delivery
3 EA *120 Calendar Days
Proposed Delivery
3 EA
Program Depot Maintenance & Repair
Labor Item No.
1003AB
Firm Fixed Price Best Estimated Qty
U/I Unit Price Amount
3 EA
Program Depot Maintenance & Repair IAW Section 3.4 of the Work Specification Priority: R ROUTINE
Limitations of Liability: High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Program Depot Maintenance & Repair
Labor Title Number Date Tailoring AS9100 9100 15JAN2009 Revision C Class I ODS Substance Application/Use Quantity None none Type / Ship To Quantity (U/I) *ARO Each Individual
Order _ Req No / Pri
Required Delivery
3 EA *120 Calendar Days
Proposed Delivery
3 EA
NOTE: The following item number should be priced on both a Cost Plus Fixed Fee (1004AA) and a Firm Fixed Priced basis (1004AB). The resulting award will be on either 1004AA or 1004AB. Once a decision has been made to award on a Cost Plus Fixed Fee or Firm Fixed Price, the same pricing arrangement will be applied to all options if exercised. The proposal should identify all additional terms and conditions associated with each pricing arrangement.
Program Depot Maintenance & Repair
Material Item No.
Best Estimated Qty
U/I
3 EA
Program Depot Maintenance & Repair IAW Section 3.4 of the Work Specification Priority: R ROUTINE
Limitations of Liability: High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring AS9100 9100 15JAN2009 Revision C Class I ODS Substance Application/Use Quantity None none Type / Ship To Quantity (U/I) *ARO Each Individual
Order _ Req No / Pri
Required
3 EA *120 Calendar Days
Program Depot Maintenance & Repair
Material Proposed Delivery
3 EA
Program Depot Maintenance & Repair
Material Item No.
1004AA
Cost Plus Fixed Fee Best Estimated Qty
U/I Estimated Cost Fixed Fee Est Total Cost
3 EA
Program Depot Maintenance & Repair IAW Section 3.4 of the Work Specification Priority: R ROUTINE
Limitations of Liability: High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring AS9100 9100 15JAN2009 Revision C Class I ODS Substance Application/Use Quantity None none Type / Ship To Quantity (U/I) *ARO Each Individual
Order _ Req No / Pri
Required Delivery
3 EA *120 Calendar Days
Proposed Delivery
3 EA
Program Depot Maintenance & Repair
Material Item No.
1004AB
Firm Fixed Price Best Estimated Qty
U/I Unit Price Amount
3 EA
Program Depot Maintenance & Repair IAW Section 3.4 of the Work Specification
Program Depot Maintenance & Repair
Material
Limitations of Liability: High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring AS9100 9100 15JAN2009 Revision C Class I ODS Substance Application/Use Quantity None none Type / Ship To Quantity (U/I) *ARO Each Individual
Order _ Req No / Pri
Required Delivery
3 EA *120 Calendar Days
Proposed Delivery
3 EA
Preparation and Delivery of Aircraft
Item No.
Firm Fixed Price Best Estimated Qty
U/I Unit Price Amount
3 EA
Preparation and Delivery of Aircraft IAW Sections 3.5 and 3.6 of the Work Specification Priority: R ROUTINE
Limitations of Liability: High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring AS9100 9100 15JAN2009 Revision C Class I ODS Substance Application/Use Quantity None none Type / Ship To Quantity (U/I) *ARO Each Individual
Order _ Req No / Pri
Required
Preparation and Delivery of Aircraft
3 EA *120 Calendar Days
Proposed Delivery
3 EA
Travel and Per Diem
Item No.
Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost
1 LO
Travel and Per Diem IAW Section 4.15 of the PWS Travel will be IAW FAR 31.205-46 as required on individual orders and authorized by the PCO Priority: R ROUTINE
Limitations of Liability: High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring AS9100 9100 15JAN2009 Revision C Class I ODS Substance Application/Use Quantity None none Type / Ship To Quantity (U/I) *ARO Each
Individual Order _ Req No / Pri
Required Delivery
1 LO *120 Calendar Days
Proposed Delivery
1 LO
Contractor Depot Level Field Team
Item No.
Time & Material Best Estimated
U/I Unit Price Ceiling Price
Contractor Depot Level Field Team
1 LO To be Negotiated To be Negotiated
Contractor Depot Level Field Team (The composition of the Team is to be negotiated prior to award) IAW Section 4.17 of the PWS Priority: R ROUTINE
Limitations of Liability: High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring AS9100 9100 15JAN2009 Revision C Class I ODS Substance Application/Use Quantity None none Type / Ship To Quantity (U/I) *ARO Each
Individual Order _ Req No / Pri
Required Delivery
1 LO *120 Calendar Days
Proposed Delivery
1 LO
Drop in Depot Level Maintenance
Item No.
Best Estimated Qty
U/I
1 LO
Drop in Depot Level Maintenance IAW Section 4.17 of the PWS Priority: R ROUTINE
Limitations of Liability: High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring AS9100 9100 15JAN2009 Revision C Class I ODS Substance Application/Use Quantity None none
Drop in Maintenance
Material Item No.
1008AA
Cost Reimbursement - No Fee Best Estimated Qty
U/I Est Unit Cost Total Estimated Cost
1 LO To be Negotiated To be Negotiated
Drop in Maintenance - Material Priority: R ROUTINE
Limitations of Liability: High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring AS9100 9100 15JAN2009 Revision C Class I ODS Substance Application/Use Quantity None none Type / Ship To Quantity (U/I) *ARO Each
Individual Order _ Req No / Pri
Required Delivery
1 LO *120 Calendar Days
Proposed Delivery
1 LO
Drop in Maintenance
Labor Item No.
1008AB
Time & Material Best Estimated Qty
U/I Estimated Amount Ceiling Price
1 LO To be Negotiated To be Negotiated
Drop in Maintenance - Labor Priority: R ROUTINE
Limitations of Liability: High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
Drop in Maintenance
Labor None none Type / Ship To Quantity (U/I) *ARO Each
Individual Order _ Req No / Pri
Required Delivery
1 LO *120 Calendar Days
Proposed Delivery
1 LO
Engineering Support Services - Reach back to the OEM Capability
Item No.
Cost Plus Fixed Fee Best Estimated Qty
U/I Estimated Cost Fixed Fee Est Total Cost
1 LO
Engineering Support Services - Reach back to the OEM Capability IAW Section 4.22 of the PWS Priority: R ROUTINE
Limitations of Liability: High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring AS9100 9100 15JAN2009 Revision C Class I ODS Substance Application/Use Quantity None none Type / Ship To Quantity (U/I) *ARO Prior
Approval by ACO and/or PCO
_ Req No / Pri
Required Delivery
1 LO *120 Calendar Days
Proposed Delivery
1 LO
Over & Above
Labor
Over & Above
Labor Time & Material Best Estimated Qty
U/I Estimated Amount Ceiling Price
1 LO To be Negotiated To be Negotiated
Over & Above - Labor
IAW DFARS 252.217-7028
Priority: R ROUTINE
Limitations of Liability: High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring AS9100 9100 15JAN2009 Revision C Class I ODS Substance Application/Use Quantity None none Type / Ship To Quantity (U/I) *ARO Prior
Approval by ACO and/or PCO
_ Req No / Pri
Required Delivery
1 LO *120 Calendar Days
Proposed Delivery
1 LO
Over & Above
Material Item No.
Cost Reimbursement - No Fee Best Estimated Qty
U/I Est Unit Cost Total Estimated Cost
1 LO To be Negotiated To be Negotiated
Over & Above - Material
IAW DFARS 252.217-7028
Priority: R ROUTINE
Limitations of Liability: High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
Over & Above
Material None none Type / Ship To Quantity (U/I) *ARO Prior
Approval by ACO and/or PCO
_ Req No / Pri
Required Delivery
1 LO *120 Calendar Days
Proposed Delivery
1 LO
Data
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount
1 LO
Data Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring AS9100 9100 15JAN2009 Revision C
Data
Conference Agenda Item No.
1012AA
Firm Fixed Price Quantity U/I Unit Price Amount 1 LO Not Separately Priced Not Separately Priced
Associated with LI: 0012 Data IAW DD1423 Exhibit A001 Authority: DI-ADMN-81249A PWS Paragraph 4.1
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A
Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring AS9100 9100 15JAN2009 Revision C Type / Ship To Quantity (U/I) *ARO IAW DD
FORM 1423
_ Req No / Pri
Required Delivery
1 LO
Proposed Delivery
1 LO
Data
Conference Minutes Item No.
1012AB
Firm Fixed Price Quantity U/I Unit Price Amount 1 LO Not Separately Priced Not Separately Priced
Associated with LI: 0012 Data IAW DD1423 Exhibit A002 Authority: DI-ADMN-81250A PWS Paragraph 4.1
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring AS9100 9100 15JAN2009 Revision C Type / Ship To Quantity (U/I) *ARO IAW DD
FORM 1423
_ Req No / Pri
Required Delivery
1 LO
Proposed Delivery
1 LO
Data
Presentation Material Item No.
1012AC
Firm Fixed Price Quantity U/I Unit Price Amount 1 LO Not Separately Priced Not Separately Priced
Data
Presentation Material Associated with LI: 0012 Data IAW DD1423 Exhibit A003 Authority: DI-ADMN-81373 PWS Paragraph 4.1
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring AS9100 9100 15JAN2009 Revision C Type / Ship To Quantity (U/I) *ARO IAW DD
FORM 1423
_ Req No / Pri
Required Delivery
1 LO
Proposed Delivery
1 LO
Data
Technical Report Studies-Services Item No.
1012AD
Firm Fixed Price Quantity U/I Unit Price Amount 1 LO Not Separately Priced Not Separately Priced
Associated with LI: 0012 Data IAW DD1423 Exhibit A004 Authority: DI-MISC-80508B PWS Paragraph 4.1.1
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring AS9100 9100 15JAN2009 Revision C Type / Ship To Quantity (U/I) *ARO IAW DD
FORM 1423
_ Req No / Pri
Required
1 LO
Proposed Delivery
1 LO
Data
Status Report Item No.
1012AE
Firm Fixed Price Quantity U/I Unit Price Amount 1 LO Not Separately Priced Not Separately Priced
Associated with LI: 0012 Data IAW DD1423 Exhibit A005 Authority: DI-MGMT-80368A PWS Paragraph 4.2 and 4.15
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring AS9100 9100 15JAN2009 Revision C Type / Ship To Quantity (U/I) *ARO IAW DD
FORM 1423
_ Req No / Pri
Required Delivery
1 LO
Proposed Delivery
1 LO
Data
Accident/Incident Reports Item No.
1012AF
Firm Fixed Price Quantity U/I Unit Price Amount 1 LO Not Separately Priced Not Separately Priced
Associated with LI: 0012 Data IAW DD1423 Exhibit A006 Authority: DI-SAFT-81563/T PWS Paragraph 4.10.2
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring AS9100 9100 15JAN2009 Revision C Type / Ship To Quantity (U/I) *ARO IAW DD
FORM 1423
_ Req No / Pri
Required Delivery
1 LO
Proposed Delivery
1 LO
OPTION II: The 12 month period immediately following the Option I period. Option may be exercised whole or in part, and from time to time, on or before the last day of the Option I period. Note to Contractor:
An option is exercised at the time the Government deposits written notification to the contractor.
Preparation and Induction of Aircraft
Item No.
Firm Fixed Price Best Estimated Qty
U/I Unit Price Amount
4 EA
Preparation and Induction of Aircraft IAW Sections 3.1 and 3.2 of the Work Specification Priority: R ROUTINE
Limitations of Liability: High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring AS9100 9100 15JAN2009 Revision C Class I ODS Substance Application/Use Quantity None none Type / Ship To Quantity (U/I) *ARO Each
Individual Order _ Req No / Pri
Required Delivery
4 EA *120 Calendar Days
Proposed
4 EA
Tear Down & Inspection
Item No.
Firm Fixed Price Best Estimated Qty
U/I Unit Price Amount
4 EA
Tear Down & Inspection IAW Sections 3.3 of the Work Specification Priority: R ROUTINE
Limitations of Liability: High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring AS9100 9100 15JAN2009 Revision C Class I ODS Substance Application/Use Quantity None none Type / Ship To Quantity (U/I) *ARO Each
Individual Order _ Req No / Pri
Required Delivery
4 EA *120 Calendar Days
Proposed Delivery
4 EA
NOTE: The following item number should be priced on both a Cost Plus Fixed Fee (2003AA) and a Firm Fixed Priced basis (2003AB). The resulting award will be on either 2003AA or 2003AB. Once a decision has been made to award on a Cost Plus Fixed Fee or Firm Fixed Price, the same pricing arrangement will be applied to all options if exercised. The proposal should identify all additional terms and conditions associated with each pricing arrangement.
Program Depot Maintenance & Repair
Labor Item No.
Best Estimated Qty
U/I
Program Depot Maintenance & Repair
Labor Program Depot Maintenance & Repair IAW Section 3.4 of the Work Specification Priority: R ROUTINE
Limitations of Liability: High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring AS9100 9100 15JAN2009 Revision C Class I ODS Substance Application/Use Quantity None none Type / Ship To Quantity (U/I) *ARO Each Individual
Order _ Req No / Pri
Required Delivery
4 EA *120 Calendar Days
Proposed Delivery
4 EA
Program Depot Maintenance & Repair
Labor Item No.
2003AA
Cost Plus Fixed Fee Best Estimated Qty
U/I Estimated Cost Fixed Fee Est Total Cost
4 EA
Program Depot Maintenance & Repair IAW Section 3.4 of the Work Specification Priority: R ROUTINE
Limitations of Liability: High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring AS9100 9100 15JAN2009 Revision C Class I ODS Substance Application/Use Quantity None none Type / Ship To Quantity (U/I) *ARO Each Individual
Order _ Req No / Pri
Program Depot Maintenance & Repair
Labor Required Delivery
4 EA *120 Calendar Days
Proposed Delivery
4 EA
Program Depot Maintenance & Repair
Labor Item No.
2003AB
Firm Fixed Price Best Estimated Qty
U/I Unit Price Amount
4 EA
Program Depot Maintenance & Repair IAW Section 3.4 of the Work Specification Priority: R ROUTINE
Limitations of Liability: High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring AS9100 9100 15JAN2009 Revision C Class I ODS Substance Application/Use Quantity None none Type / Ship To Quantity (U/I) *ARO Each Individual
Order _ Req No / Pri
Required Delivery
4 EA *120 Calendar Days
Proposed Delivery
4 EA
NOTE: The following item number should be priced on both a Cost Plus Fixed Fee (2004AA) and a Firm Fixed Priced basis (2004AB). The resulting award will be on either 2004AA or 2004AB. Once a decision has been made to award on a Cost Plus Fixed Fee or Firm Fixed Price, the same pricing arrangement will be applied to all options if exercised. The proposal should identify all additional terms and conditions associated with each pricing arrangement.
Program Depot Maintenance & Repair
Material Item No.
Best Estimated Qty
U/I
4 EA
Program Depot Maintenance & Repair IAW Section 3.4 of the Work Specification Priority: R ROUTINE
Limitations of Liability: High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring AS9100 9100 15JUL2009 Revision C Class I ODS Substance Application/Use Quantity None none Type / Ship To Quantity (U/I) *ARO Each Individual
Order _ Req No / Pri
Required Delivery
4 EA *120 Calendar Days
Proposed Delivery
4 EA
Program Depot Maintenance & Repair
Material Item No.
2004AA
Cost Plus Fixed Fee Best Estimated Qty
U/I Estimated Cost Fixed Fee Est Total Cost
4 EA
Program Depot Maintenance & Repair IAW Section 3.4 of the Work Specification Priority: R ROUTINE
Limitations of Liability: High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required
The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Program Depot Maintenance & Repair
Material Title Number Date Tailoring AS9100 9100 15JUL2009 Revision C Class I ODS Substance Application/Use Quantity None none Type / Ship To Quantity (U/I) *ARO Each Individual
Order _ Req No / Pri
Required Delivery
4 EA *120 Calendar Days
Proposed Delivery
4 EA
Program Depot Maintenance & Repair
Material Item No.
2004AB
Firm Fixed Price Best Estimated Qty
U/I Unit Price Amount
4 EA
Program Depot Maintenance & Repair IAW Section 3.4 of the Work Specification Priority: R ROUTINE
Limitations of Liability: High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring AS9100 9100 15JUL2009 Revision C Class I ODS Substance Application/Use Quantity None none Type / Ship To Quantity (U/I) *ARO Each Individual