FA855213R31131______0001.pdf

PDF 363 KB Posted

Attached to
Depot Level Maintenance (DLM) for the TH-1H Aircraft
Solicitation number
FA8552-13-R-31131
Issued by

About this file

Amendment to original solicitation

View the file

Other files

File Type Posted
JA_SIGNED.pdf PDF
FA855213R31131______0002.pdf PDF
PWS.doc DOC document
TH1H_DLM_Work_Spec_Signed.pdf PDF
CDRLs_A001_A007.pdf PDF
FA855213R31131.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

JSUY

2. AMENDMENT/MODIFICATION NO.

FA8552-13-R-31131-0001

3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO.

FD20601331131

5. PROJECT NO (If applicable)

6. ISSUED BY CODE

SOF/PR - ROTARY WING & AVIONICS, AFLCMC/WIKAB

235 BYRON ST STE 19A

BLDG 300 CML PHN 478 926 7227

ROBINS AFB GA 31098-1670

BUYER: Todd J. Stimus/GRUKB Todd.Stimus@robins.af.mil Phone: (478) 926- 2374 Fax: (478) 926-3360 No Collect Calls

7. ADMINISTERED BY (If other than item 6) CODEFA8552

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

CODE

X

9A. AMENDMENT OF SOLICITATION NO.

FA855213R31131

9B. DATED (SEE ITEM 11)

7-AUG-2013

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods. ( a ) By completing Items 8 and 15, and returning copies of the amendment; ( b ) By acknowledging receipt of this amendment on each copy of the offer submitted; or ( c ) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return 1 copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

ROUTINE

15A. NAME AND TITLE OF SIGNER (Type or print)

15B. CONTRACTOR/OFFEROR

BY ________________________________________________________

(Signature of person authorized to sign)

15C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16B. UNITED STATES OF AMERICA

BY ____________________________________________________

(Signature of Contracting Officer)

16C. DATE SIGNED

FACILITY CODE

NSN 7540-01-152-8070

PREVIOUS EDITION UNUSABLE

30-105 STANDARD FORM 30 (REV. 10-83)

PRESCRIBED BY GSA

FAR (48 CFR) 53.243

X

X X

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

Amendment/Modification FA8552-13-R-31131-0001

Continuation of block 14. DESCRIPTION OF AMENDMENT/MODIFICATION

The purpose of this amendment is to:

A. Replace Schedule B in the original Solicitation FA8552-13-R-31131 as denoted in Schedule B below.

B. Correct an inadvertant error relating to the referenced Appendix G in the Performance Work Statement (PWS) in Paragraph 4.12. The Appendix is changed as follows:

FROM: Appendix G TO: Appendix F

C. As stated in block 11 on page 1, the closing date is not extended

D. All other terms and conditions remain unchanged.

Request for Proposal FA8552-13-R-31131-0001

PART I - THE SCHEDULE

SECTION B

SUPPLIES OR SERVICES AND PRICES/COSTS

NOTE TO CONTRACTOR: This is a solicitation for a requirements contract. Delivery or performance shall be made only as authorized by orders issued in accordance with the ordering clause. The Contractor shall furnish to the Government, when and if ordered, services specified in this Schedule up to and including the "maximum" amount.

Period of Contract: The effective date for ordering under this contract is from the date of award through one year thereafter or until all options are exercised. Performance shall continue through completion of all orders properly issued hereunder.

Preparation and Induction of Aircraft

Item No.

Firm Fixed Price Best Estimated Qty

U/I Unit Price Amount

2 EA

Preparation and Induction of Aircraft IAW Sections 3.1 and 3.2 of the Work Specification Priority: R ROUTINE

Limitations of Liability: High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring AS9100 9100 15JAN2009 Revision C Class I ODS Substance Application/Use Quantity None none Type / Ship To Quantity (U/I) *ARO Each

Individual Order _ Req No / Pri

Required Delivery

2 EA *120 Calendar Days

Proposed Delivery

2 EA

Tear Down & Inspection

Item No.

Tear Down & Inspection

Firm Fixed Price Best Estimated Qty

U/I Unit Price Amount

2 EA

Tear Down & Inspection IAW Sections 3.3 of the Work Specification Priority: R ROUTINE

Limitations of Liability: High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring AS9100 9100 15JAN2009 Revision C Class I ODS Substance Application/Use Quantity None none Type / Ship To Quantity (U/I) *ARO Each

Individual Order _ Req No / Pri

Required Delivery

2 EA *120 Calendar Days

Proposed Delivery

2 EA

NOTE: The following item number should be priced on both a Cost Plus Fixed Fee (0003AA) and a Firm Fixed Priced basis (0003AB). The resulting award will be on either 0003AA or 0003AB. Once a decision has been made to award on a Cost Plus Fixed Fee or Firm Fixed Price, the same pricing arrangement will be applied to all options if exercised. The proposal should identify all additional terms and conditions associated with each pricing arrangement.

Program Depot Maintenance & Repair

Labor Item No.

Best Estimated Qty

U/I

2 EA

Program Depot Maintenance & Repair IAW Section 3.4 of the Work Specification Priority: R ROUTINE

Limitations of Liability: High Value Item

Program Depot Maintenance & Repair

Labor

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring AS9100 9100 15JAN2009 Revision C Class I ODS Substance Application/Use Quantity None none Type / Ship To Quantity (U/I) *ARO Each Individual

Order _ Req No / Pri

Required Delivery

2 EA *120 Calendar Days

Proposed Delivery

2 EA

Program Depot Maintenance & Repair

Labor Item No.

0003AA

Cost Plus Fixed Fee Best Estimated Qty

U/I Estimated Cost Fixed Fee Est Total Cost

2 EA

Program Depot Maintenance & Repair IAW Section 3.4 of the Work Specification Priority: R ROUTINE

Limitations of Liability: High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring AS9100 9100 15JAN2009 Revision C Class I ODS Substance Application/Use Quantity None none Type / Ship To Quantity (U/I) *ARO Each Individual

Order _ Req No / Pri

Required Delivery

2 EA *120 Calendar Days

Program Depot Maintenance & Repair

Labor Proposed Delivery

2 EA

Program Depot Maintenance & Repair

Labor Item No.

0003AB

Firm Fixed Price Best Estimated Qty

U/I Unit Price Amount

2 EA

Program Depot Maintenance & Repair IAW Section 3.4 of the Work Specification Priority: R ROUTINE

Limitations of Liability: High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring AS9100 9100 15JAN2009 Revision C Class I ODS Substance Application/Use Quantity None none Type / Ship To Quantity (U/I) *ARO Each Individual

Order _ Req No / Pri

Required Delivery

2 EA *120 Calendar Days

Proposed Delivery

2 EA

NOTE: The following item number should be priced on both a Cost Plus Fixed Fee (0004AA) and a Firm Fixed Priced basis (0004AB). The resulting award will be on either 0004AA or 0004AB. Once a decision has been made to award on a Cost Plus Fixed Fee or Firm Fixed Price, the same pricing arrangement will be applied to all options if exercised. The proposal should identify all additional terms and conditions associated with each pricing arrangement.

Program Depot Maintenance & Repair

Material

Program Depot Maintenance & Repair

Material Best Estimated Qty

U/I

2 EA

Program Depot Maintenance & Repair IAW Section 3.4 of the Work Specification Priority: R ROUTINE

Limitations of Liability: High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring AS9100 9100 15JAN2009 Revision C Class I ODS Substance Application/Use Quantity None none Type / Ship To Quantity (U/I) *ARO Each Individual

Order _ Req No / Pri

Required Delivery

2 EA *120 Calendar Days

Proposed Delivery

2 EA

Program Depot Maintenance & Repair

Material Item No.

0004AA

Cost Plus Fixed Fee Best Estimated Qty

U/I Estimated Cost Fixed Fee Est Total Cost

2 EA

Program Depot Maintenance & Repair IAW Section 3.4 of the Work Specification Priority: R ROUTINE

Limitations of Liability: High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring AS9100 9100 15JAN2009 Revision C Class I ODS Substance Application/Use Quantity

Program Depot Maintenance & Repair

Material None none Type / Ship To Quantity (U/I) *ARO Each Individual

Order _ Req No / Pri

Required Delivery

2 EA *120 Calendar Days

Proposed Delivery

2 EA

Program Depot Maintenance & Repair

Material Item No.

0004AB

Firm Fixed Price Best Estimated Qty

U/I Unit Price Amount

2 EA

Program Depot Maintenance & Repair IAW Section 3.4 of the Work Specification Priority: R ROUTINE

Limitations of Liability: High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring AS9100 9100 15JAN2009 Revision C Class I ODS Substance Application/Use Quantity None none Type / Ship To Quantity (U/I) *ARO Each Individual

Order _ Req No / Pri

Required Delivery

2 EA *120 Calendar Days

Proposed Delivery

2 EA

Preparation and Delivery of Aircraft

Preparation and Delivery of Aircraft

Firm Fixed Price Best Estimated Qty

U/I Unit Price Amount

2 EA

Preparation and Delivery of Aircraft IAW Sections 3.5 and 3.6 of the Work Specification Priority: R ROUTINE

Limitations of Liability: High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring AS9100 9100 15JAN2009 Revision C Class I ODS Substance Application/Use Quantity None none Type / Ship To Quantity (U/I) *ARO Each Individual

Order _ Req No / Pri

Required Delivery

2 EA *120 Calendar Days

Proposed Delivery

2 EA

Travel and Per Diem

Item No.

Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost

1 LO

Travel and Per Diem IAW Section 4.15 of the PWS Travel will be IAW FAR 31.205-46 as required on individual orders and authorized by the PCO Priority: R ROUTINE

Limitations of Liability: High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

Travel and Per Diem

Class I ODS Substance Application/Use Quantity None none Type / Ship To Quantity (U/I) *ARO Each

Individual Order _ Req No / Pri

Required Delivery

1 LO *120 Calendar Days

Proposed Delivery

1 LO

Contractor Depot Level Field Team

Item No.

Time & Material Best Estimated Qty

U/I Unit Price Ceiling Price

1 LO To be Negotiated To be Negotiated

Contractor Depot Level Field Team (The composition of the Team is to be negotiated prior to award) IAW Section 4.17 of the PWS Priority: R ROUTINE

Limitations of Liability: High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring AS9100 9100 15JAN2009 Revision C Class I ODS Substance Application/Use Quantity None none Type / Ship To Quantity (U/I) *ARO Each

Individual Order _ Req No / Pri

Required Delivery

1 LO *120 Calendar Days

Proposed

1 LO

Drop in Depot Level Maintenance

Item No.

Best Estimated Qty

U/I

1 LO

Drop in Depot Level Maintenance IAW Section 4.17 of the PWS Priority: R ROUTINE

Limitations of Liability: High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring AS9100 9100 15JAN2009 Revision C Class I ODS Substance Application/Use Quantity None none

Drop in Maintenance

Material Item No.

0008AA

Cost Reimbursement - No Fee Best Estimated Qty

U/I Est Unit Cost Total Estimated Cost

1 LO To be Negotiated To be Negotiated

Drop in Maintenance - Material Priority: R ROUTINE

Limitations of Liability: High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring AS9100 9100 15JAN2009 Revision C Class I ODS Substance Application/Use Quantity None none Type / Ship To Quantity (U/I) *ARO Each

Individual Order _ Req No / Pri

Required

1 LO *120 Calendar Days

Drop in Maintenance

Material Proposed Delivery

1 LO

Drop in Maintenance

Labor Item No.

0008AB

Time & Material Best Estimated Qty

U/I Estimated Amount Ceiling Price

1 LO To be Negotiated To be Negotiated

Drop in Maintenance - Labor Priority: R ROUTINE

Limitations of Liability: High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring AS9100 9100 15JAN2009 Revision C Class I ODS Substance Application/Use Quantity None none Type / Ship To Quantity (U/I) *ARO Each

Individual Order _ Req No / Pri

Required Delivery

1 LO *120 Calendar Days

Proposed Delivery

1 LO

Engineering Support Services - Reach back to the OEM Capability

Item No.

Cost Plus Fixed Fee Best Estimated Qty

U/I Estimated Cost Fixed Fee Est Total Cost

1 LO

Engineering Support Services - Reach back to the OEM Capability IAW Section 4.22 of the PWS Priority: ## ROUTINE

Engineering Support Services - Reach back to the OEM Capability

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring AS9100 9100 15JAN2009 Revision C Class I ODS Substance Application/Use Quantity None none Type / Ship To Quantity (U/I) *ARO Prior

Approval by ACO and/or PCO

_ Req No / Pri

Required Delivery

1 LO *120 Calendar Days

Proposed Delivery

1 LO

Over & Above

Labor Item No.

Time & Material Best Estimated Qty

U/I Estimated Amount Ceiling Price

1 LO To be Negotiated To be Negotiated

Over & Above - Labor

IAW DFARS 252.217-7028

Priority: R ROUTINE

Limitations of Liability: High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring AS9100 9100 15JAN2009 Revision C Class I ODS Substance Application/Use Quantity None none Type / Ship To Quantity (U/I) *ARO Prior

Approval by ACO and/or PCO

_ Req No / Pri

Required

Over & Above

Labor Proposed Delivery

1 LO

Over & Above

Material Item No.

Cost Reimbursement - No Fee Best Estimated Qty

U/I Est Unit Cost Total Estimated Cost

1 LO To be Negotiated To be Negotiated

Over & Above - Material

IAW DFARS 252.217-7028

Priority: R ROUTINE

Limitations of Liability: High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring AS9100 9100 15JAN2009 Revision C Class I ODS Substance Application/Use Quantity None none Type / Ship To Quantity (U/I) *ARO Prior

Approval by ACO and/or PCO

_ Req No / Pri

Required Delivery

1 LO *120 Calendar Days

Proposed Delivery

1 LO

Data

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

1 LO

Data

Limitations of Liability: Other Than High Value Item

Data

Inspection: Destination Acceptance: Destination Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring AS9100 9100 15JAN2009 Revision C

Data

Conference Agenda Item No.

0012AA

Firm Fixed Price Quantity U/I Unit Price Amount 1 LO Not Separately Priced Not Separately Priced

Associated with LI: 0012 Data IAW DD1423 Exhibit A001 Authority: DI-ADMN-81249A PWS Paragraph 4.1

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring AS9100 9100 15JAN2009 Revision C Type / Ship To Quantity (U/I) *ARO IAW DD

FORM 1423

_ Req No / Pri

Required Delivery

1 LO

Proposed Delivery

1 LO

Data

Conference Minutes Item No.

0012AB

Firm Fixed Price Quantity U/I Unit Price Amount 1 LO Not Separately Priced Not Separately Priced

Associated with LI: 0012 Data IAW DD1423 Exhibit A002 Authority: DI-ADMN-81250A

PWS Paragraph 4.1

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring AS9100 9100 15JAN2009 Revision C Type / Ship To Quantity (U/I) *ARO IAW DD

FORM 1423

_ Req No / Pri

Required Delivery

1 LO

Proposed Delivery

1 LO

Data

Presentation Material Item No.

0012AC

Firm Fixed Price Quantity U/I Unit Price Amount 1 LO Not Separately Priced Not Separately Priced

Associated with LI: 0012 Data IAW DD1423 Exhibit A003 Authority: DI-ADMN-81373 PWS Paragraph 4.1

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring AS9100 9100 15JAN2009 Revision C Type / Ship To Quantity (U/I) *ARO IAW DD

FORM 1423

_ Req No / Pri

Required Delivery

1 LO

Proposed

Data

Technical Report Studies-Services Item No.

0012AD

Firm Fixed Price Quantity U/I Unit Price Amount 1 LO Not Separately Priced Not Separately Priced

Associated with LI: 0012 Data IAW DD1423 Exhibit A004 Authority: DI-MISC-80508B PWS Paragraph 4.1.1

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring AS9100 9100 15JAN2009 Revision C Type / Ship To Quantity (U/I) *ARO IAW DD

FORM 1423

_ Req No / Pri

Required Delivery

1 LO

Proposed Delivery

1 LO

Data

Status Report Item No.

0012AE

Firm Fixed Price Quantity U/I Unit Price Amount 1 LO Not Separately Priced Not Separately Priced

Associated with LI: 0012 Data IAW DD1423 Exhibit A005 Authority: DI-MGMT-80368A PWS Paragraph 4.2 and 4.15

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

AS9100 9100 15JAN2009 Revision C Type / Ship To Quantity (U/I) *ARO IAW DD

FORM 1423

_ Req No / Pri

Required Delivery

1 LO

Proposed Delivery

1 LO

Data

Accident/Incident Reports Item No.

0012AF

Firm Fixed Price Quantity U/I Unit Price Amount 1 LO Not Separately Priced Not Separately Priced

Associated with LI: 0012 Data IAW DD1423 Exhibit A006 Authority: DI-SAFT-81563/T PWS Paragraph 4.10.2

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring AS9100 9100 15JAN2009 Revision C Type / Ship To Quantity (U/I) *ARO IAW DD

FORM 1423

_ Req No / Pri

Required Delivery

1 LO

Proposed Delivery

1 LO

OPTION I: The 12 month period immediately following the Basic period. Option may be exercised whole or in part, and from time to time, on or before the last day of the basic period. Note to Contractor: An option is exercised at the time the Government deposits written notification to the contractor.

Preparation and Induction of Aircraft

Item No.

Firm Fixed Price Best Estimated Qty

U/I Unit Price Amount

Preparation and Induction of Aircraft

3 EA

Preparation and Induction of Aircraft IAW Sections 3.1 and 3.2 of the Work Specification Priority: R ROUTINE

Limitations of Liability: High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring AS9100 9100 15JAN2009 Revision C Class I ODS Substance Application/Use Quantity None none Type / Ship To Quantity (U/I) *ARO Each

Individual Order _ Req No / Pri

Required Delivery

3 EA *120 Calendar Days

Proposed Delivery

3 EA

Tear Down & Inspection

Item No.

Firm Fixed Price Best Estimated Qty

U/I Unit Price Amount

3 EA

Tear Down & Inspection IAW Sections 3.3 of the Work Specification Priority: R ROUTINE

Limitations of Liability: High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

None none Type / Ship To Quantity (U/I) *ARO Each

Individual Order _ Req No / Pri

Required Delivery

3 EA *120 Calendar Days

Proposed Delivery

3 EA

NOTE: The following item number should be priced on both a Cost Plus Fixed Fee (1003AA) and a Firm Fixed Priced basis (1003AB). The resulting award will be on either 1003AA or 1003AB. Once a decision has been made to award on a Cost Plus Fixed Fee or Firm Fixed Price, the same pricing arrangement will be applied to all options if exercised. The proposal should identify all additional terms and conditions associated with each pricing arrangement.

Program Depot Maintenance & Repair

Labor Item No.

Best Estimated Qty

U/I

3 EA

Program Depot Maintenance & Repair IAW Section 3.4 of the Work Specification Priority: R ROUTINE

Limitations of Liability: High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring AS9100 9100 15JAN2009 Revision C Class I ODS Substance Application/Use Quantity None none Type / Ship To Quantity (U/I) *ARO Each Individual

Order _ Req No / Pri

Required Delivery

3 EA *120 Calendar Days

Proposed

3 EA

Program Depot Maintenance & Repair

Labor Item No.

1003AA

Cost Plus Fixed Fee Best Estimated Qty

U/I Estimated Cost Fixed Fee Est Total Cost

3 EA

Program Depot Maintenance & Repair IAW Section 3.4 of the Work Specification Priority: R ROUTINE

Limitations of Liability: High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring AS9100 9100 15JAN2009 Revision C Class I ODS Substance Application/Use Quantity None none Type / Ship To Quantity (U/I) *ARO Each Individual

Order _ Req No / Pri

Required Delivery

3 EA *120 Calendar Days

Proposed Delivery

3 EA

Program Depot Maintenance & Repair

Labor Item No.

1003AB

Firm Fixed Price Best Estimated Qty

U/I Unit Price Amount

3 EA

Program Depot Maintenance & Repair IAW Section 3.4 of the Work Specification Priority: R ROUTINE

Limitations of Liability: High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Program Depot Maintenance & Repair

Labor Title Number Date Tailoring AS9100 9100 15JAN2009 Revision C Class I ODS Substance Application/Use Quantity None none Type / Ship To Quantity (U/I) *ARO Each Individual

Order _ Req No / Pri

Required Delivery

3 EA *120 Calendar Days

Proposed Delivery

3 EA

NOTE: The following item number should be priced on both a Cost Plus Fixed Fee (1004AA) and a Firm Fixed Priced basis (1004AB). The resulting award will be on either 1004AA or 1004AB. Once a decision has been made to award on a Cost Plus Fixed Fee or Firm Fixed Price, the same pricing arrangement will be applied to all options if exercised. The proposal should identify all additional terms and conditions associated with each pricing arrangement.

Program Depot Maintenance & Repair

Material Item No.

Best Estimated Qty

U/I

3 EA

Program Depot Maintenance & Repair IAW Section 3.4 of the Work Specification Priority: R ROUTINE

Limitations of Liability: High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring AS9100 9100 15JAN2009 Revision C Class I ODS Substance Application/Use Quantity None none Type / Ship To Quantity (U/I) *ARO Each Individual

Order _ Req No / Pri

Required

3 EA *120 Calendar Days

Program Depot Maintenance & Repair

Material Proposed Delivery

3 EA

Program Depot Maintenance & Repair

Material Item No.

1004AA

Cost Plus Fixed Fee Best Estimated Qty

U/I Estimated Cost Fixed Fee Est Total Cost

3 EA

Program Depot Maintenance & Repair IAW Section 3.4 of the Work Specification Priority: R ROUTINE

Limitations of Liability: High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring AS9100 9100 15JAN2009 Revision C Class I ODS Substance Application/Use Quantity None none Type / Ship To Quantity (U/I) *ARO Each Individual

Order _ Req No / Pri

Required Delivery

3 EA *120 Calendar Days

Proposed Delivery

3 EA

Program Depot Maintenance & Repair

Material Item No.

1004AB

Firm Fixed Price Best Estimated Qty

U/I Unit Price Amount

3 EA

Program Depot Maintenance & Repair IAW Section 3.4 of the Work Specification

Program Depot Maintenance & Repair

Material

Limitations of Liability: High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring AS9100 9100 15JAN2009 Revision C Class I ODS Substance Application/Use Quantity None none Type / Ship To Quantity (U/I) *ARO Each Individual

Order _ Req No / Pri

Required Delivery

3 EA *120 Calendar Days

Proposed Delivery

3 EA

Preparation and Delivery of Aircraft

Item No.

Firm Fixed Price Best Estimated Qty

U/I Unit Price Amount

3 EA

Preparation and Delivery of Aircraft IAW Sections 3.5 and 3.6 of the Work Specification Priority: R ROUTINE

Limitations of Liability: High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring AS9100 9100 15JAN2009 Revision C Class I ODS Substance Application/Use Quantity None none Type / Ship To Quantity (U/I) *ARO Each Individual

Order _ Req No / Pri

Required

Preparation and Delivery of Aircraft

3 EA *120 Calendar Days

Proposed Delivery

3 EA

Travel and Per Diem

Item No.

Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost

1 LO

Travel and Per Diem IAW Section 4.15 of the PWS Travel will be IAW FAR 31.205-46 as required on individual orders and authorized by the PCO Priority: R ROUTINE

Limitations of Liability: High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring AS9100 9100 15JAN2009 Revision C Class I ODS Substance Application/Use Quantity None none Type / Ship To Quantity (U/I) *ARO Each

Individual Order _ Req No / Pri

Required Delivery

1 LO *120 Calendar Days

Proposed Delivery

1 LO

Contractor Depot Level Field Team

Item No.

Time & Material Best Estimated

U/I Unit Price Ceiling Price

Contractor Depot Level Field Team

1 LO To be Negotiated To be Negotiated

Contractor Depot Level Field Team (The composition of the Team is to be negotiated prior to award) IAW Section 4.17 of the PWS Priority: R ROUTINE

Limitations of Liability: High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring AS9100 9100 15JAN2009 Revision C Class I ODS Substance Application/Use Quantity None none Type / Ship To Quantity (U/I) *ARO Each

Individual Order _ Req No / Pri

Required Delivery

1 LO *120 Calendar Days

Proposed Delivery

1 LO

Drop in Depot Level Maintenance

Item No.

Best Estimated Qty

U/I

1 LO

Drop in Depot Level Maintenance IAW Section 4.17 of the PWS Priority: R ROUTINE

Limitations of Liability: High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring AS9100 9100 15JAN2009 Revision C Class I ODS Substance Application/Use Quantity None none

Drop in Maintenance

Material Item No.

1008AA

Cost Reimbursement - No Fee Best Estimated Qty

U/I Est Unit Cost Total Estimated Cost

1 LO To be Negotiated To be Negotiated

Drop in Maintenance - Material Priority: R ROUTINE

Limitations of Liability: High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring AS9100 9100 15JAN2009 Revision C Class I ODS Substance Application/Use Quantity None none Type / Ship To Quantity (U/I) *ARO Each

Individual Order _ Req No / Pri

Required Delivery

1 LO *120 Calendar Days

Proposed Delivery

1 LO

Drop in Maintenance

Labor Item No.

1008AB

Time & Material Best Estimated Qty

U/I Estimated Amount Ceiling Price

1 LO To be Negotiated To be Negotiated

Drop in Maintenance - Labor Priority: R ROUTINE

Limitations of Liability: High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

Drop in Maintenance

Labor None none Type / Ship To Quantity (U/I) *ARO Each

Individual Order _ Req No / Pri

Required Delivery

1 LO *120 Calendar Days

Proposed Delivery

1 LO

Engineering Support Services - Reach back to the OEM Capability

Item No.

Cost Plus Fixed Fee Best Estimated Qty

U/I Estimated Cost Fixed Fee Est Total Cost

1 LO

Engineering Support Services - Reach back to the OEM Capability IAW Section 4.22 of the PWS Priority: R ROUTINE

Limitations of Liability: High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring AS9100 9100 15JAN2009 Revision C Class I ODS Substance Application/Use Quantity None none Type / Ship To Quantity (U/I) *ARO Prior

Approval by ACO and/or PCO

_ Req No / Pri

Required Delivery

1 LO *120 Calendar Days

Proposed Delivery

1 LO

Over & Above

Labor

Over & Above

Labor Time & Material Best Estimated Qty

U/I Estimated Amount Ceiling Price

1 LO To be Negotiated To be Negotiated

Over & Above - Labor

IAW DFARS 252.217-7028

Priority: R ROUTINE

Limitations of Liability: High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring AS9100 9100 15JAN2009 Revision C Class I ODS Substance Application/Use Quantity None none Type / Ship To Quantity (U/I) *ARO Prior

Approval by ACO and/or PCO

_ Req No / Pri

Required Delivery

1 LO *120 Calendar Days

Proposed Delivery

1 LO

Over & Above

Material Item No.

Cost Reimbursement - No Fee Best Estimated Qty

U/I Est Unit Cost Total Estimated Cost

1 LO To be Negotiated To be Negotiated

Over & Above - Material

IAW DFARS 252.217-7028

Priority: R ROUTINE

Limitations of Liability: High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

Over & Above

Material None none Type / Ship To Quantity (U/I) *ARO Prior

Approval by ACO and/or PCO

_ Req No / Pri

Required Delivery

1 LO *120 Calendar Days

Proposed Delivery

1 LO

Data

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

1 LO

Data Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring AS9100 9100 15JAN2009 Revision C

Data

Conference Agenda Item No.

1012AA

Firm Fixed Price Quantity U/I Unit Price Amount 1 LO Not Separately Priced Not Separately Priced

Associated with LI: 0012 Data IAW DD1423 Exhibit A001 Authority: DI-ADMN-81249A PWS Paragraph 4.1

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A

Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring AS9100 9100 15JAN2009 Revision C Type / Ship To Quantity (U/I) *ARO IAW DD

FORM 1423

_ Req No / Pri

Required Delivery

1 LO

Proposed Delivery

1 LO

Data

Conference Minutes Item No.

1012AB

Firm Fixed Price Quantity U/I Unit Price Amount 1 LO Not Separately Priced Not Separately Priced

Associated with LI: 0012 Data IAW DD1423 Exhibit A002 Authority: DI-ADMN-81250A PWS Paragraph 4.1

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring AS9100 9100 15JAN2009 Revision C Type / Ship To Quantity (U/I) *ARO IAW DD

FORM 1423

_ Req No / Pri

Required Delivery

1 LO

Proposed Delivery

1 LO

Data

Presentation Material Item No.

1012AC

Firm Fixed Price Quantity U/I Unit Price Amount 1 LO Not Separately Priced Not Separately Priced

Data

Presentation Material Associated with LI: 0012 Data IAW DD1423 Exhibit A003 Authority: DI-ADMN-81373 PWS Paragraph 4.1

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring AS9100 9100 15JAN2009 Revision C Type / Ship To Quantity (U/I) *ARO IAW DD

FORM 1423

_ Req No / Pri

Required Delivery

1 LO

Proposed Delivery

1 LO

Data

Technical Report Studies-Services Item No.

1012AD

Firm Fixed Price Quantity U/I Unit Price Amount 1 LO Not Separately Priced Not Separately Priced

Associated with LI: 0012 Data IAW DD1423 Exhibit A004 Authority: DI-MISC-80508B PWS Paragraph 4.1.1

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring AS9100 9100 15JAN2009 Revision C Type / Ship To Quantity (U/I) *ARO IAW DD

FORM 1423

_ Req No / Pri

Required

1 LO

Proposed Delivery

1 LO

Data

Status Report Item No.

1012AE

Firm Fixed Price Quantity U/I Unit Price Amount 1 LO Not Separately Priced Not Separately Priced

Associated with LI: 0012 Data IAW DD1423 Exhibit A005 Authority: DI-MGMT-80368A PWS Paragraph 4.2 and 4.15

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring AS9100 9100 15JAN2009 Revision C Type / Ship To Quantity (U/I) *ARO IAW DD

FORM 1423

_ Req No / Pri

Required Delivery

1 LO

Proposed Delivery

1 LO

Data

Accident/Incident Reports Item No.

1012AF

Firm Fixed Price Quantity U/I Unit Price Amount 1 LO Not Separately Priced Not Separately Priced

Associated with LI: 0012 Data IAW DD1423 Exhibit A006 Authority: DI-SAFT-81563/T PWS Paragraph 4.10.2

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring AS9100 9100 15JAN2009 Revision C Type / Ship To Quantity (U/I) *ARO IAW DD

FORM 1423

_ Req No / Pri

Required Delivery

1 LO

Proposed Delivery

1 LO

OPTION II: The 12 month period immediately following the Option I period. Option may be exercised whole or in part, and from time to time, on or before the last day of the Option I period. Note to Contractor:

An option is exercised at the time the Government deposits written notification to the contractor.

Preparation and Induction of Aircraft

Item No.

Firm Fixed Price Best Estimated Qty

U/I Unit Price Amount

4 EA

Preparation and Induction of Aircraft IAW Sections 3.1 and 3.2 of the Work Specification Priority: R ROUTINE

Limitations of Liability: High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring AS9100 9100 15JAN2009 Revision C Class I ODS Substance Application/Use Quantity None none Type / Ship To Quantity (U/I) *ARO Each

Individual Order _ Req No / Pri

Required Delivery

4 EA *120 Calendar Days

Proposed

4 EA

Tear Down & Inspection

Item No.

Firm Fixed Price Best Estimated Qty

U/I Unit Price Amount

4 EA

Tear Down & Inspection IAW Sections 3.3 of the Work Specification Priority: R ROUTINE

Limitations of Liability: High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring AS9100 9100 15JAN2009 Revision C Class I ODS Substance Application/Use Quantity None none Type / Ship To Quantity (U/I) *ARO Each

Individual Order _ Req No / Pri

Required Delivery

4 EA *120 Calendar Days

Proposed Delivery

4 EA

NOTE: The following item number should be priced on both a Cost Plus Fixed Fee (2003AA) and a Firm Fixed Priced basis (2003AB). The resulting award will be on either 2003AA or 2003AB. Once a decision has been made to award on a Cost Plus Fixed Fee or Firm Fixed Price, the same pricing arrangement will be applied to all options if exercised. The proposal should identify all additional terms and conditions associated with each pricing arrangement.

Program Depot Maintenance & Repair

Labor Item No.

Best Estimated Qty

U/I

Program Depot Maintenance & Repair

Labor Program Depot Maintenance & Repair IAW Section 3.4 of the Work Specification Priority: R ROUTINE

Limitations of Liability: High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring AS9100 9100 15JAN2009 Revision C Class I ODS Substance Application/Use Quantity None none Type / Ship To Quantity (U/I) *ARO Each Individual

Order _ Req No / Pri

Required Delivery

4 EA *120 Calendar Days

Proposed Delivery

4 EA

Program Depot Maintenance & Repair

Labor Item No.

2003AA

Cost Plus Fixed Fee Best Estimated Qty

U/I Estimated Cost Fixed Fee Est Total Cost

4 EA

Program Depot Maintenance & Repair IAW Section 3.4 of the Work Specification Priority: R ROUTINE

Limitations of Liability: High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring AS9100 9100 15JAN2009 Revision C Class I ODS Substance Application/Use Quantity None none Type / Ship To Quantity (U/I) *ARO Each Individual

Order _ Req No / Pri

Program Depot Maintenance & Repair

Labor Required Delivery

4 EA *120 Calendar Days

Proposed Delivery

4 EA

Program Depot Maintenance & Repair

Labor Item No.

2003AB

Firm Fixed Price Best Estimated Qty

U/I Unit Price Amount

4 EA

Program Depot Maintenance & Repair IAW Section 3.4 of the Work Specification Priority: R ROUTINE

Limitations of Liability: High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring AS9100 9100 15JAN2009 Revision C Class I ODS Substance Application/Use Quantity None none Type / Ship To Quantity (U/I) *ARO Each Individual

Order _ Req No / Pri

Required Delivery

4 EA *120 Calendar Days

Proposed Delivery

4 EA

NOTE: The following item number should be priced on both a Cost Plus Fixed Fee (2004AA) and a Firm Fixed Priced basis (2004AB). The resulting award will be on either 2004AA or 2004AB. Once a decision has been made to award on a Cost Plus Fixed Fee or Firm Fixed Price, the same pricing arrangement will be applied to all options if exercised. The proposal should identify all additional terms and conditions associated with each pricing arrangement.

Program Depot Maintenance & Repair

Material Item No.

Best Estimated Qty

U/I

4 EA

Program Depot Maintenance & Repair IAW Section 3.4 of the Work Specification Priority: R ROUTINE

Limitations of Liability: High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring AS9100 9100 15JUL2009 Revision C Class I ODS Substance Application/Use Quantity None none Type / Ship To Quantity (U/I) *ARO Each Individual

Order _ Req No / Pri

Required Delivery

4 EA *120 Calendar Days

Proposed Delivery

4 EA

Program Depot Maintenance & Repair

Material Item No.

2004AA

Cost Plus Fixed Fee Best Estimated Qty

U/I Estimated Cost Fixed Fee Est Total Cost

4 EA

Program Depot Maintenance & Repair IAW Section 3.4 of the Work Specification Priority: R ROUTINE

Limitations of Liability: High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required

The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Program Depot Maintenance & Repair

Material Title Number Date Tailoring AS9100 9100 15JUL2009 Revision C Class I ODS Substance Application/Use Quantity None none Type / Ship To Quantity (U/I) *ARO Each Individual

Order _ Req No / Pri

Required Delivery

4 EA *120 Calendar Days

Proposed Delivery

4 EA

Program Depot Maintenance & Repair

Material Item No.

2004AB

Firm Fixed Price Best Estimated Qty

U/I Unit Price Amount

4 EA

Program Depot Maintenance & Repair IAW Section 3.4 of the Work Specification Priority: R ROUTINE

Limitations of Liability: High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .