FA853917R00250001.pdf

PDF 23 KB Posted

Attached to
Repair of the Ehanced Traffic Collision Avoidance System (ETCAS)
Solicitation number
FA8539-17-R-0025
Issued by

About this file

Amendment 0001 to solicitation FA8539-17-R-0025

View the file

Other files

File Type Posted
17_00776_PWS_REVISED.pdf PDF
FA853917R0025.pdf PDF
2215659_CDRL1_REPORT.pdf PDF
2220771_TRNSPDATA_REPORT.pdf PDF
2218930_PKGRQMT_REPORT.pdf PDF
Attachment_1_FD20601700776.pdf PDF
QASP.pdf PDF
PWS.pdf PDF
2215659_CDRL1_REPORT.pdf PDF
PWS.docx DOCX document
2218930_PKGRQMT_REPORT.pdf PDF
FA853917R0025.pdf PDF
Attachment_1_FD20601700776.pdf PDF
17-00776_QASP_ETCAS_-_PCO_PM_CPR_FD_signed.pdf PDF
2220771_TRNSPDATA_REPORT.pdf PDF
Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE Page 1

2. AMENDMENT/MODIFICATION NO.

FA8539-17-R-0025-0001

3. EFFECTIVE DATE

4. REQUISITION/PURCHASE REQ. NO.

FD20601700776

5. PROJECT NO (If applicable)

6. ISSUED BY CODE

COMMUNICATION & NAVIGATION, AFSC/PZABA

235 BYRON ST STE 19A

BLDG 300 CML PHN 478 926 7456

ROBINS AFB GA 31098-1670

BUYER: Ashton L. Tilley/PZABA ashton.tilley@us.af.mil Phone: (478) 926- 2802 Fax: (000) 000-0000 No Collect Calls

7. ADMINISTERED BY (If other than item 6) CODEFA8539

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

CODE

X

9A. AMENDMENT OF SOLICITATION NO.

FA853917R0025

9B. DATED (SEE ITEM 11)

16-AUG-2017

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods. ( a ) By completing Items 8 and 15, and returning copies of the amendment; ( b ) By acknowledging receipt of this amendment on each copy of the offer submitted; or ( c ) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return 1 copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

ROUTINE

SEE PAGES 2-3 HEREIN

15A. NAME AND TITLE OF SIGNER (Type or print)

15B. CONTRACTOR/OFFEROR

BY ________________________________________________________

(Signature of person authorized to sign)

15C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16B. UNITED STATES OF AMERICA

BY ____________________________________________________

(Signature of Contracting Officer)

16C. DATE SIGNED

FACILITY CODE

NSN 7540-01-152-8070

PREVIOUS EDITION UNUSABLE

30-105 STANDARD FORM 30 (REV. 10-83)

PRESCRIBED BY GSA

FAR (48 CFR) 53.243

X

X X

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

Continuation of block 14. DESCRIPTION OF AMENDMENT/MODIFICATION

The purpose of this amendment is to 1) replace the PWS and to 2) change sections L and M in clause 52.212-1, and 3) delete CAGE code "5Z1H3".

1) Replace the current PWS with the updated PWS dated 22 August 17. Reference paragraph 4.0 and paragraph 6.1. See attachment.

2) Change the following information in 52.212-1 (paragraph b):

FROM:

C. Volume II, Written Technical Proposal

1. General: The written technical proposal shall be clear, concise, and include all the information required by this provision insufficient detail for effective evaluation. The proposal should not simply rephrase or restate the Government’s requirements, but rather shall provide convincing rationale to address how the offeror intends to meet these requirements. Offerors shall assume the Government has no prior knowledge of their capabilities, work processes, facilities, and experience and will base its evaluation on the information presented in the offeror’s technical proposal.

2. Format and Specific Content: The following information shall be provided in the written technical proposal and will be evaluated to assess technical acceptability in accordance with Section M, Evaluation Basis for Award. The written technical proposal shall address each of the following subfactors to describe the offeror’s proposed approach to performing the requirements set forth in the Performancebased Work Statement (PWS).

Subfactor: This subfactor is met when the offeror has provided acceptable detailed narrative discussions and supporting documentation for Turn Around Time (TAT) analysis to demonstrate the offeror’s technical approach will meet the TAT metrics required by PWS 4.3.

TO:

C. Volume II, Written Technical Proposal

1. General: The written technical proposal shall be clear, concise, and include all the information required by this provision insufficient detail for effective evaluation. The proposal should not simply rephrase or restate the Government’s requirements, but rather shall provide convincing rationale to address how the offeror intends to meet these requirements. Offerors shall assume the Government has no prior knowledge of their capabilities, work processes, facilities, and experience and will base its evaluation on the information presented in the offeror’s technical proposal.

2. Format and Specific Content: The following information shall be provided in the written technical proposal and will be evaluated to assess technical acceptability in accordance with Section M, Evaluation Basis for Award. The written technical proposal shall address each of the following subfactors to describe the offeror’s proposed approach to performing the requirements set forth in the Performance-based Work Statement (PWS).

Subfactor: The offeror’s written technical proposal shall provide detailed narrative with supporting documentation, such as (but not limited to) initial diagnostic test procedures, removal/replacement procedures of defective components, final verification procedures, and associated timeframes for these activities to demonstrate that the offeror’s technical

Amendment/Modification FA8539-17-R-0025-0001 approach will meet the Turn Around Time (TAT) metrics required by Performance-based Work Statement (PWS) paragraph 4.3.

3) Change the following information in 52.212-1 (paragraph g):

FROM:

B. Volume II, Technical Factor

1. General: Each offerors written technical proposal shall be evaluated, based on the subfactors below, to determine if the offeror provides a sound, compliant approach that meets the requirements of the PWS and demonstrates a thorough knowledge and understanding of those requirements. The technical proposal addresses each of the following subfactors in sufficient detail.

Subfactor: This subfactor is met when the offeror has provided acceptable detailed narrative discussions and supporting documentation for Turn Around Time (TAT) analysis to demonstrate the offeror’s technical approach will meet the TAT metrics required by PWS 4.3

TO:

B. Volume II, Technical Factor

1. General: Each offerors written technical proposal shall be evaluated, based on the subfactors below, to determine if the offeror provides a sound, compliant approach that meets the requirements of the PWS and demonstrates a thorough knowledge and understanding of those requirements. The technical proposal addresses each of the following subfactors in sufficient detail.

Subfactor: This subfactor is met when the offerors written technical proposal has provided acceptable detailed narrative with supporting documentation, such as (but not limited to) initial diagnostic test procedures, removal/replacement procedures of defective components, final verification procedures, and associated timeframes for these activities to demonstrate the offerors technical approach will meet the Turn Around Time (TAT) metrics required by Performance-based Work Statement (PWS) paragraph 4.3.

4) Delete all references to CAGE Code "5Z1H3" on the CLINS associated within this solicitation.

5) All other terms and conditions remain unchanged.

LIST OF DOCUMENTS, EXHIBITS OR ATTACHMENTS

Form Number Description/File Name Date Number of Pages N/A 17_00776_PWS_REVISED.pdf

PWS

22AUG2017 13

File details come from the government source that posted it. Updated .