FA8538-21-R-0001_0002.pdf
PDF 342 KB Posted
- Attached to
- Air Data Processor (ADP) Repair Federal contract opportunity
- Solicitation number
- FA8538-21-R-0001
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| PWS_30 Sept 2021_Rev 1.pdf | ||
| Attachments_FA8538-21-R-0001.pdf | ||
| FA8538-21-R-0001.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
JS
2. AMENDMENT/MODIFICATION NO.
FA8538-21-R-0001-0002
3. EFFECTIVE DATE
4. REQUISITION/PURCHASE REQ. NO.
FD20602100038
5. PROJECT NO (If applicable)
6. ISSUED BY CODE
F-15, C-130, & C-5, AFSC/PZAAB
235 BYRON ST STE 19A
BLDG 300 CML PHN 478 926 3980
ROBINS AFB GA 31098-1670
BUYER: Phillip B. Russell/AFSC/PZAAB phillip.russell.9@us.af.mil Phone: (478) 926- 4741
7. ADMINISTERED BY (If other than item 6) CODEFA8538
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
CODE
X
9A. AMENDMENT OF SOLICITATION NO.
FA853821R0001
9B. DATED (SEE ITEM 11)
22-JAN-2021
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods. ( a ) By completing Items 8 and 15, and returning copies of the amendment; ( b ) By acknowledging receipt of this amendment on each copy of the offer submitted; or ( c ) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified. 19-NOV-2021 4:00 PM
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return 1 copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
ROUTINE
15A. NAME AND TITLE OF SIGNER (Type or print)
15B. CONTRACTOR/OFFEROR
BY ________________________________________________________
(Signature of person authorized to sign)
15C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16B. UNITED STATES OF AMERICA
BY ____________________________________________________
(Signature of Contracting Officer)
16C. DATE SIGNED
FACILITY CODE
NSN 7540-01-152-8070
PREVIOUS EDITION UNUSABLE
30-105 STANDARD FORM 30 (REV. 10-83)
PRESCRIBED BY GSA
FAR (48 CFR) 53.243
X
X X
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
Continuation of block 14. DESCRIPTION OF AMENDMENT/MODIFICATION
The purpose of this amendment is to: Add a Cost Reimbursable No Fee (CRNF) Travel CLIN, and Clauses related to Cost Reimbursement; Delete in its entirety PWS dated 07 April 2020, and replace with PWS dated 30 September 2021 Revision 1; and Incorporate DFARS Clause 252.223-7999, Ensuring Adequate COVID-19 Safety Protocols for Federal Contractors (Deviation 2021-O0009).
1. CLINs X001, X002, X003, X004, X005, X006, X007, and X008 remain unchanged, as shown in Section B below.
2. CLIN X009 has been changed:
FROM: DATA
TO: TRAVEL and PER DEIM, Cost Reimbursement No Fee (CRNF)
3. DATA CLINs are hereby renumbered, as shown in Section B
FROM: X009, X009AA, X009AB, X009AC, X009AD, X009AE, X009AF, and X009AG TO: X010, X010AA, X010AB, X010AC, X010AD, X010AE, X010AF, and X010AG
4. Performance Work Based Statement (PWS) dated 07 April 2020 is hereby deleted in its entirety, and replaced with PWS dated 30 September 2021, Revision 004.
5. DFARS Clause 252.223-7999, Ensuring Adequate COVID-19 Safety Protocols for Federal Contractors (Deviation 2021-O0009) is hereby incorporated, as shown in Section I below.
6. Cost Reimbursement Clauses 52.246-5; 52.242-15; 52.216-7; 52.216-11; 52.217-9;
52.228-7; 52.232-20; 52.233-3; 52.242-1; 52.242-4; 252.242-7004; 52.243-2;
52.249-6; 52.249-14; are hereby incorporated, as shown in Section E, F, and I below.
7. All other terms and conditions shall remain the same
PART I - THE SCHEDULE
SECTION B
SUPPLIES OR SERVICES AND PRICES/COSTS
THIS IS A REQUIREMENTS CONTRACT WITH A BASIC YEAR AND SIX (6) ONE-YEAR ORDERING PERIODS.
NOTE: IN ACORRDANCE WITH 52.217-9, ORDERING PERIODS FIVE (5) AND SIX (6) SHALL BE EXERICSED 60 DAYS
PRIOR TO THE EXPIRATION OF ORDERING PERIOD FOUR (4)
ALL QUANTITIES IN SCHEDULE ARE BEST ESTIMATED QUANTITIES (BEQ): The best estimated quantities (BEQ) represent the best estimated annual quantity for each contract line item but the BEQ is only an estimate.
This contract is a Direct Sales Partnership Agreement between the contractor and Warner Robins Air Logistics Complex to enter into a Public Private Partnership (PPP) Project in support of the Air Data Processor (ADP) applicable to the F-15E Aircraft.
GOVERNMENT PROPERTY FURNISHED FOR REPAIR (JUN 2004)
(IAW FAR 16.503((c))
Failure of the Government to furnish such items in the amounts or quantities described in the Schedule as "estimated" or "maximum" will not entitle the contractor to any equitable adjustment in price under the Government Property clause of the contract.
Pursuant to the Government Property Clause herein, the Government shall furnish the item(s) of property listed in the attached Government-Furnished Property (GFP) list from contract FA8538-15-D-0001 to the contractor for use in performance of this contract. Upon completion of this contract, the Contractor shall obtain disposition instructions from the Government Property Administrator of the activity having responsibility for administration of the contract.
BASIC CONTRACT PERIOD: Date of Award through 12 months.
REPAIR - ADP
Item No.
Firm Fixed Price Best Estimated Qty
U/I Unit Price
60 EA
NSN: 6610-01-432-8459 FX
PROCESSOR,FLIGHT IN
Repair IAW PWS Dated 07 April 2020 Manufacturer Part Number 64547 2118952-5 Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Wide Area Work Flow (WAWF) Quality Assurance: Standard Inspection
Transportation From Continental United States CONUS (CONUS) Sources
TYPE / SHIP TO CODE F.O.B.
A SW3119 DESTINATION
Type / Ship To PACRN Mark For
A SW3119 PAA
Type / Ship To Quantity (U/I) *ARO Funded Order or Reparable Assets, Whichever is Later
Req No / Pri
Required Delivery
A SW3119 60 EA *21 Calendar Days
Proposed Delivery
A SW3119 60 EA
OVER AND ABOVE (O&A)
Item No.
Firm Fixed Price Quantity U/I Amount 1 LO To be Negotiated
OVER
OVER AND ABOVE
IAW PWS PARA 4.4.2
Priority: R ROUTINE
* OVER AND ABOVE IAW PWS PARA 4.4.2
BEST ECONOMICAL REPAIR (BER)
Item No.
Firm Fixed Price Quantity U/I Unit Price
1 EA
NSN: 6610-01-432-8459 FX
PROCESSOR, FLIGHT IN
BEYOND ECONOMIC REPAIR (BER)
IAW PWS PARA 4.4.1
Manufacturer Part Number 64547 2118952-5
BEYOND ECONOMIC REPAIR (BER) IAW PWS PARA 4.4.1
MAINTENANCE AND CAPABILITY
Firm Fixed Price Quantity U/I Unit Price Amount
12 MO
MAINTENANCE AND CAPABILITY
IAW PWS Paragraph 4.3 Priority: R ROUTINE
Limitations of Liability: High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Wide Area Work Flow (WAWF) Quality Assurance: Standard Inspection
Pricing and Billing Note: The contractor will be pricing CLIN 0004 as the total amount per year, however, the contractor will be authorized to bill CLIN 0004 in 12 approximately equal payments on a monthly basis.
ENGINEERING SERVICES
Firm Fixed Price Quantity U/I Unit Price Amount
1 LO
ENGINEERING SERVICES
IAW PWS Paragraph 4.6 Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Wide Area Work Flow (WAWF) Quality Assurance: Standard Inspection
INTELLECTUAL PROPERTY AGREEMENT
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount
1 LO
INTELLECTUAL
INTELLECTUAL PROPERTY
USE OF INTELLECTUAL PROPERTY DURING THE LIFE OF THE CONTRACT IN ACCORDANCE WITH THE ATTACHED TECHNOLOGY
LICENSE AGREEMENT.
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Wide Area Work Flow (WAWF) Quality Assurance: Standard Inspection
INTELLECTUAL PROPERTY will be funded on the first delivery order issued for the Basic and each Ordering Period.
GFP TEST EQUIPMENT
Firm Fixed Price Quantity U/I Unit Price Amount
1 LO
GFP
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Wide Area Work Flow (WAWF) Quality Assurance: Standard Inspection Class I ODS Substance Application/Use Quantity none
GFP will be funded on the first delivery order issued for the Basic and each Ordering Period.
CONTRACTOR MANAGEMENT REPORT
Firm Fixed Price Quantity U/I Unit Price Amount
1 LO
KTR MGMT RPT
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Wide Area Work Flow (WAWF) Quality Assurance: Standard Inspection
ANNUAL REQUIREMENT
Contractor Manpower Reporting will be funded on the first delivery order issued for the Basic and each Ordering Period year.
TRAVEL and PER DIEM
BASIC CONTRACT PERIOD
Item No.
Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost
1 LO
TRAVEL AS APPROVED IN ADVANCE BY CONTRACTING OFFICER.
TRAVEL IN SUPPORT OF CLIN 0001. TRAVEL REIMBURSED IAW FAR 31.2 and pursuant to the terms of the Performance Based Work Statement, Dated 30 September 2021 Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Wide Area Work Flow Applies Quality Assurance: Standard Inspection
DATA
IAW DD FORM 1423-1
Item No.
Firm Fixed Price
DATA
DATA IAW DD FORM 1423-1
CONFERENCE MINUTES
PMR Meeting Minutes Item No.
0010AA
Firm Fixed Price Quantity U/I Unit Price Amount 1 LO Not Separately Priced Not Separately Priced
DATA
CONTRACT DATA REQUIREMENTS LIST (CDRL)
EXHIBIT A, ELIN A001
CONFERENCE MINUTES
PMR Meeting Minutes
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Wide Area Work Flow (WAWF) Quality Assurance: Inspection IAW DD 1423-1
Delivery IAW DD Form 1423-1
TEST PLAN
0010AB
Firm Fixed Price Quantity U/I Unit Price Amount 1 LO Not Separately Priced Not Separately Priced
DATA
CONTRACT DATA REQUIREMENTS LIST (CDRL)
EXHIBIT A, ELIN A002
TEST PLAN
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Wide Area Work Flow (WAWF)
ENGINEERING CHANGE PROPOSAL (ECP)
Item No.
0010AC
Firm Fixed Price Quantity U/I Unit Price Amount 1 LO Not Separately Priced Not Separately Priced
DATA
CONTRACT DATA REQUIREMENTS LIST (CDRL)
EXHIBIT A, ELIN A003
ENGINEERING CHANGE PROPOSAL (ECP)
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Wide Area Work Flow (WAWF)
OBSOLESCENCE ALERT NOTICE
0010AD
Firm Fixed Price Quantity U/I Unit Price Amount 1 LO Not Separately Priced Not Separately Priced
DATA
CONTRACT DATA REQUIREMENTS LIST (CDRL)
EXHIBIT A, ELIN A004
OBSOLESCENCE ALERT NOTICE
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Wide Area Work Flow (WAWF)
RISK MANAGEMENT FRAMEWORK PACKAGE DELIVERABLES
RMF Package Item No.
0010AE
Firm Fixed Price Quantity U/I Unit Price Amount 1 LO Not Separately Priced Not Separately Priced
DATA
CONTRACT DATA REQUIREMENTS LIST (CDRL)
EXHIBIT A, ELIN A005
RISK MANAGEMENT FRAMEWORK PACKAGE DELIVERABLES
RMF Package
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Wide Area Work Flow (WAWF)
RISK MANAGEMENT FRAMEWORK PACKAGE DELIVERABLES
RMF Project Plan Item No.
0010AF
Firm Fixed Price Quantity U/I Unit Price Amount 1 LO Not Separately Priced Not Separately Priced
DATA
CONTRACT DATA REQUIREMENTS LIST (CDRL)
EXHIBIT A, ELIN A006
RISK MANAGEMENT FRAMEWORK PACKAGE DELIVERABLES
RMF Project Plan
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Wide Area Work Flow (WAWF)
VULNERABILITY SCAN COMPLIANCE REPORT
VSC Report Item No.
0010AG
Firm Fixed Price Quantity U/I Unit Price Amount 1 LO Not Separately Priced Not Separately Priced
DATA
CONTRACT DATA REQUIREMENTS LIST (CDRL)
EXHIBIT A, ELIN A007
VULNERABILITY SCAN COMPLIANCE REPORT
VSC Report
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Wide Area Work Flow (WAWF)
ORDERING PERIOD 1: THE 12 MONTH PERIOD IMMEDIATELY FOLLOWING THE BASIC CONTRACT PERIOD.
REPAIR - ADP
Item No.
Firm Fixed Price Best Estimated Qty
U/I Unit Price
60 EA
NSN: 6610-01-432-8459 FX
PROCESSOR,FLIGHT IN
Repair IAW PWS Dated 07 April 2020 Manufacturer Part Number 64547 2118952-5 Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Wide Area Work Flow (WAWF)
REPAIR - ADP
Transportation From Continental United States CONUS (CONUS) Sources
TYPE / SHIP TO CODE F.O.B.
A SW3119 DESTINATION
Type / Ship To PACRN Mark For
A SW3119 PAA
Type / Ship To Quantity (U/I) *ARO Funded Order or Reparable Assets, Whichever is Later
Req No / Pri
Required Delivery
A SW3119 60 EA *21 Calendar Days
Proposed Delivery
A SW3119 60 EA
OVER AND ABOVE (O&A)
Item No.
Firm Fixed Price Quantity U/I Amount 1 LO To be Negotiated
OVER
OVER AND ABOVE
IAW PWS PARA 4.4.2
Firm Fixed Price Quantity U/I Unit Price
1 EA
NSN: 6610-01-432-8459 FX
PROCESSOR, FLIGHT IN
BEYOND ECONOMIC REPAIR (BER)
IAW PWS PARA 4.4.1
Manufacturer Part Number 64547 2118952-5
Firm Fixed Price Quantity U/I Unit Price Amount
12 MO
MAINTENANCE AND CAPABILITY
IAW PWS Paragraph 4.3 Priority: R ROUTINE
Limitations of Liability: High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Wide Area Work Flow (WAWF) Quality Assurance: Standard Inspection
Pricing and Billing Note: The contractor will be pricing CLIN 0004 as the total amount per year, however, the contractor will be authorized to bill CLIN 0004 in 12 approximately equal payments on a monthly basis.
Firm Fixed Price Quantity U/I Unit Price Amount
1 LO
ENGINEERING SERVICES
IAW PWS Paragraph 4.6 Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Wide Area Work Flow (WAWF) Quality Assurance: Standard Inspection
INTELLECTUAL PROPERTY AGREEMENT
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount
INTELLECTUAL PROPERTY AGREEMENT
INTELLECTUAL
INTELLECTUAL PROPERTY
USE OF INTELLECTUAL PROPERTY DURING THE LIFE OF THE CONTRACT IN ACCORDANCE WITH THE ATTACHED TECHNOLOGY
LICENSE AGREEMENT.
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Wide Area Work Flow (WAWF)
INTELLECTUAL PROPERTY will be funded on the first delivery order issued for the Basic and each Ordering Period.
Firm Fixed Price Quantity U/I Unit Price Amount
1 LO
GFP
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Wide Area Work Flow (WAWF) Quality Assurance: Standard Inspection Class I ODS Substance Application/Use Quantity
Firm Fixed Price Quantity U/I Unit Price Amount
1 LO
KTR MGMT RPT
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination
CONTRACTOR MANAGEMENT REPORT
Quality Assurance: Standard Inspection
ANNUAL REQUIREMENT
Contractor Manpower Reporting will be funded on the first delivery order issued for the Basic and each Ordering
CONTRACT PERIOD 1
Item No.
Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost
1 LO
TRAVEL AS APPROVED IN ADVANCE BY CONTRACTING OFFICER.
TRAVEL IN SUPPORT OF CLIN 1001. TRAVEL REIMBURSED IAW FAR 31.2 and pursuant to the terms of the Performance Based Work Statement, Dated 30 September 2021 Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Wide Area Work Flow Applies Quality Assurance: Standard Inspection
DATA
IAW DD FORM 1423-1
Item No.
Firm Fixed Price
DATA
DATA IAW DD FORM 1423-1
Priority: R ROUTINE
CONFERENCE MINUTES
PMR Meeting Minutes Item No.
1010AA
Firm Fixed Price Quantity U/I Unit Price Amount 1 LO Not Separately Priced Not Separately Priced
DATA
CONTRACT DATA REQUIREMENTS LIST (CDRL)
EXHIBIT A, ELIN A001
CONFERENCE MINUTES
PMR Meeting Minutes
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Wide Area Work Flow (WAWF)
1010AB
Firm Fixed Price Quantity U/I Unit Price Amount 1 LO Not Separately Priced Not Separately Priced
DATA
CONTRACT DATA REQUIREMENTS LIST (CDRL)
EXHIBIT A, ELIN A002
TEST PLAN
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Wide Area Work Flow (WAWF)
ENGINEERING CHANGE PROPOSAL (ECP)
1010AC
Firm Fixed Price Quantity U/I Unit Price Amount 1 LO Not Separately Priced Not Separately Priced
DATA
CONTRACT DATA REQUIREMENTS LIST (CDRL)
EXHIBIT A, ELIN A003
ENGINEERING CHANGE PROPOSAL (ECP)
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Wide Area Work Flow (WAWF)
1010AD
Firm Fixed Price Quantity U/I Unit Price Amount 1 LO Not Separately Priced Not Separately Priced
DATA
CONTRACT DATA REQUIREMENTS LIST (CDRL)
EXHIBIT A, ELIN A004
OBSOLESCENCE ALERT NOTICE
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Wide Area Work Flow (WAWF)
RMF Package Item No.
1010AE
Firm Fixed Price Quantity U/I Unit Price Amount 1 LO Not Separately Priced Not Separately Priced
DATA
CONTRACT DATA REQUIREMENTS LIST (CDRL)
EXHIBIT A, ELIN A005
RISK MANAGEMENT FRAMEWORK PACKAGE DELIVERABLES
RMF Package
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination
Item No.
1010AF
Firm Fixed Price Quantity U/I Unit Price Amount 1 LO Not Separately Priced Not Separately Priced
DATA
CONTRACT DATA REQUIREMENTS LIST (CDRL)
EXHIBIT A, ELIN A006
RISK MANAGEMENT FRAMEWORK PACKAGE DELIVERABLES
RMF Project Plan
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Wide Area Work Flow (WAWF)
VULNERABILITY SCAN COMPLIANCE REPORT
VSC Report Item No.
1010AG
Firm Fixed Price Quantity U/I Unit Price Amount 1 LO Not Separately Priced Not Separately Priced
DATA
CONTRACT DATA REQUIREMENTS LIST (CDRL)
EXHIBIT A, ELIN A007
VULNERABILITY SCAN COMPLIANCE REPORT
VSC Report
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination
ORDERING PERIOD 2: THE 12 MONTH PERIOD IMMEDIATELY FOLLOWING ORDERING PERIOD 1.
Item No.
Firm Fixed Price Best Estimated Qty
U/I Unit Price
60 EA
NSN: 6610-01-432-8459 FX
PROCESSOR,FLIGHT IN
Repair IAW PWS Dated 07 April 2020 Manufacturer Part Number 64547 2118952-5 Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Wide Area Work Flow (WAWF) Quality Assurance: Standard Inspection
Transportation From Continental United States CONUS (CONUS) Sources
TYPE / SHIP TO CODE F.O.B.
A SW3119 DESTINATION
Type / Ship To PACRN Mark For
A SW3119 PAA
Type / Ship To Quantity (U/I) *ARO Funded Order or Reparable Assets, Whichever is Later
Req No / Pri
Required Delivery
A SW3119 60 EA *21 Calendar Days
Proposed Delivery
A SW3119 60 EA
OVER AND ABOVE (O&A)
Item No.
Firm Fixed Price Quantity U/I Amount 1 LO To be Negotiated
OVER AND ABOVE (O&A)
OVER
OVER AND ABOVE
IAW PWS PARA 4.4.2
Firm Fixed Price Quantity U/I Unit Price
1 EA
NSN: 6610-01-432-8459 FX
PROCESSOR, FLIGHT IN
BEYOND ECONOMIC REPAIR (BER)
IAW PWS PARA 4.4.1
Manufacturer Part Number 64547 2118952-5
Firm Fixed Price Quantity U/I Unit Price Amount
12 MO
MAINTENANCE AND CAPABILITY
IAW PWS Paragraph 4.3 Priority: R ROUTINE
Limitations of Liability: High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Wide Area Work Flow (WAWF) Quality Assurance: Standard Inspection
Pricing and Billing Note: The contractor will be pricing CLIN 0004 as the total amount per year, however, the contractor will be authorized to bill CLIN 0004 in 12 approximately equal payments on a monthly basis.
Firm Fixed Price Quantity U/I Unit Price Amount
1 LO
ENGINEERING SERVICES
IAW PWS Paragraph 4.6 Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Wide Area Work Flow (WAWF) Quality Assurance: Standard Inspection
INTELLECTUAL PROPERTY AGREEMENT
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount
1 LO
INTELLECTUAL
INTELLECTUAL PROPERTY
USE OF INTELLECTUAL PROPERTY DURING THE LIFE OF THE CONTRACT IN ACCORDANCE WITH THE ATTACHED TECHNOLOGY
LICENSE AGREEMENT.
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Wide Area Work Flow (WAWF)
INTELLECTUAL PROPERTY will be funded on the first delivery order issued for the Basic and each Ordering Period.
Firm Fixed Price Quantity U/I Unit Price Amount
1 LO
GFP
GFP TEST EQUIPMENT
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Wide Area Work Flow (WAWF) Quality Assurance: Standard Inspection Class I ODS Substance Application/Use Quantity
Firm Fixed Price Quantity U/I Unit Price Amount
1 LO
KTR MGMT RPT
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Wide Area Work Flow (WAWF) Quality Assurance: Standard Inspection
ANNUAL REQUIREMENT
Contractor Manpower Reporting will be funded on the first delivery order issued for the Basic and each Ordering
CONTRACT PERIOD 2
Item No.
Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost
1 LO
TRAVEL AS APPROVED IN ADVANCE BY CONTRACTING OFFICER.
TRAVEL IN SUPPORT OF CLIN 2001. TRAVEL REIMBURSED IAW FAR 31.2 and pursuant to the terms of the Performance Based Work Statement, Dated 30 September 2021 Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Wide Area Work Flow Applies
DATA
IAW DD FORM 1423-1
Item No.
Firm Fixed Price
DATA
DATA IAW DD FORM 1423-1
Priority: R ROUTINE
CONFERENCE MINUTES
PMR Meeting Minutes Item No.
2010AA
Firm Fixed Price Quantity U/I Unit Price Amount 1 LO Not Separately Priced Not Separately Priced
DATA
CONTRACT DATA REQUIREMENTS LIST (CDRL)
EXHIBIT A, ELIN A001
CONFERENCE MINUTES
PMR Meeting Minutes
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Wide Area Work Flow (WAWF)
2010AB
Firm Fixed Price Quantity U/I Unit Price Amount 1 LO Not Separately Priced Not Separately Priced
DATA
CONTRACT DATA REQUIREMENTS LIST (CDRL)
EXHIBIT A, ELIN A002
TEST PLAN
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Wide Area Work Flow (WAWF)
2010AC
Firm Fixed Price Quantity U/I Unit Price Amount 1 LO Not Separately Priced Not Separately Priced
DATA
CONTRACT DATA REQUIREMENTS LIST (CDRL)
EXHIBIT A, ELIN A003
ENGINEERING CHANGE PROPOSAL (ECP)
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Wide Area Work Flow (WAWF)
2010AD
Firm Fixed Price Quantity U/I Unit Price Amount 1 LO Not Separately Priced Not Separately Priced
DATA
CONTRACT DATA REQUIREMENTS LIST (CDRL)
EXHIBIT A, ELIN A004
OBSOLESCENCE ALERT NOTICE
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination
Item No.
2010AE
Firm Fixed Price Quantity U/I Unit Price Amount 1 LO Not Separately Priced Not Separately Priced
DATA
CONTRACT DATA REQUIREMENTS LIST (CDRL)
EXHIBIT A, ELIN A005
RISK MANAGEMENT FRAMEWORK PACKAGE DELIVERABLES
RMF Package
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Wide Area Work Flow (WAWF)
Item No.
2010AF
Firm Fixed Price Quantity U/I Unit Price Amount 1 LO Not Separately Priced Not Separately Priced
DATA
CONTRACT DATA REQUIREMENTS LIST (CDRL)
EXHIBIT A, ELIN A006
RISK MANAGEMENT FRAMEWORK PACKAGE DELIVERABLES
RMF Project Plan
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination
Item No.
2010AG
Firm Fixed Price Quantity U/I Unit Price Amount 1 LO Not Separately Priced Not Separately Priced
DATA
CONTRACT DATA REQUIREMENTS LIST (CDRL)
EXHIBIT A, ELIN A007
VULNERABILITY SCAN COMPLIANCE REPORT
VSC Report
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Wide Area Work Flow (WAWF)
ORDERING PERIOD 3: THE 12 MONTH PERIOD IMMEDIATELY FOLLOWING ORDERING PERIOD 2.
Item No.
Firm Fixed Price Best Estimated Qty
U/I Unit Price
60 EA
NSN: 6610-01-432-8459 FX
PROCESSOR,FLIGHT IN
Repair IAW PWS Dated 07 April 2020 Manufacturer Part Number 64547 2118952-5 Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination
REPAIR - ADP
Transportation From Continental United States CONUS (CONUS) Sources
TYPE / SHIP TO CODE F.O.B.
A SW3119 DESTINATION
Type / Ship To PACRN Mark For
A SW3119 PAA
Type / Ship To Quantity (U/I) *ARO Funded Order or Reparable Assets, Whichever is Later
Req No / Pri
Required Delivery
A SW3119 60 EA *21 Calendar Days
Proposed Delivery
A SW3119 60 EA
OVER AND ABOVE (O&A)
Item No.
Firm Fixed Price Quantity U/I Amount 1 LO To be Negotiated
OVER
OVER AND ABOVE
IAW PWS PARA 4.4.2
Firm Fixed Price Quantity U/I Unit Price
1 EA
NSN: 6610-01-432-8459 FX
PROCESSOR, FLIGHT IN
BEYOND ECONOMIC REPAIR (BER)
IAW PWS PARA 4.4.1
Manufacturer Part Number
Firm Fixed Price Quantity U/I Unit Price Amount
12 MO
MAINTENANCE AND CAPABILITY
IAW PWS Paragraph 4.3 Priority: R ROUTINE
Limitations of Liability: High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Wide Area Work Flow (WAWF) Quality Assurance: Standard Inspection
Pricing and Billing Note: The contractor will be pricing CLIN 0004 as the total amount per year, however, the contractor will be authorized to bill CLIN 0004 in 12 approximately equal payments on a monthly basis.
Firm Fixed Price Quantity U/I Unit Price Amount
1 LO
ENGINEERING SERVICES
IAW PWS Paragraph 4.6 Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Wide Area Work Flow (WAWF) Quality Assurance: Standard Inspection
INTELLECTUAL PROPERTY AGREEMENT
Item No.
Firm Fixed Price
INTELLECTUAL PROPERTY AGREEMENT
INTELLECTUAL
INTELLECTUAL PROPERTY
USE OF INTELLECTUAL PROPERTY DURING THE LIFE OF THE CONTRACT IN ACCORDANCE WITH THE ATTACHED TECHNOLOGY
LICENSE AGREEMENT.
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Wide Area Work Flow (WAWF)
INTELLECTUAL PROPERTY will be funded on the first delivery order issued for the Basic and each Ordering Period.
Firm Fixed Price Quantity U/I Unit Price Amount
1 LO
GFP
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Wide Area Work Flow (WAWF) Quality Assurance: Standard Inspection Class I ODS Substance Application/Use Quantity
Firm Fixed Price Quantity U/I Unit Price Amount
1 LO
KTR MGMT RPT
Limitations of Liability: Other Than High Value Item
Inspection: Destination
CONTRACTOR MANAGEMENT REPORT
Quality Assurance: Standard Inspection
ANNUAL REQUIREMENT
Contractor Manpower Reporting will be funded on the first delivery order issued for the Basic and each Ordering
CONTRACT PERIOD 3
Item No.
Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost
1 LO
TRAVEL AS APPROVED IN ADVANCE BY CONTRACTING OFFICER.
TRAVEL IN SUPPORT OF CLIN 3001. TRAVEL REIMBURSED IAW FAR 31.2 and pursuant to the terms of the Performance Based Work Statement, Dated 30 September 2021 Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Wide Area Work Flow Applies Quality Assurance: Standard Inspection
DATA
IAW DD FORM 1423-1
Item No.
Firm Fixed Price
DATA
DATA IAW DD FORM 1423-1
Priority: R ROUTINE
CONFERENCE MINUTES
PMR Meeting Minutes Item No.
3010AA
Firm Fixed Price Quantity U/I Unit Price Amount 1 LO Not Separately Priced Not Separately Priced
DATA
CONTRACT DATA REQUIREMENTS LIST (CDRL)
EXHIBIT A, ELIN A001
CONFERENCE MINUTES
PMR Meeting Minutes
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Wide Area Work Flow (WAWF)
3010AB
Firm Fixed Price Quantity U/I Unit Price Amount 1 LO Not Separately Priced Not Separately Priced
DATA
CONTRACT DATA REQUIREMENTS LIST (CDRL)
EXHIBIT A, ELIN A002
TEST PLAN
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Wide Area Work Flow (WAWF)
3010AC
Firm Fixed Price Quantity U/I Unit Price Amount 1 LO Not Separately Priced Not Separately Priced
DATA
CONTRACT DATA REQUIREMENTS LIST (CDRL)
EXHIBIT A, ELIN A003
ENGINEERING CHANGE PROPOSAL (ECP)
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Wide Area Work Flow (WAWF)
3010AD
Firm Fixed Price Quantity U/I Unit Price Amount 1 LO Not Separately Priced Not Separately Priced
DATA
CONTRACT DATA REQUIREMENTS LIST (CDRL)
EXHIBIT A, ELIN A004
OBSOLESCENCE ALERT NOTICE
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Wide Area Work Flow (WAWF)
Item No.
3010AE
Firm Fixed Price Quantity U/I Unit Price Amount 1 LO Not Separately Priced Not Separately Priced
DATA
CONTRACT DATA REQUIREMENTS LIST (CDRL)
EXHIBIT A, ELIN A005
RISK MANAGEMENT FRAMEWORK PACKAGE DELIVERABLES
RMF Package
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination
Item No.
3010AF
Firm Fixed Price Quantity U/I Unit Price Amount 1 LO Not Separately Priced Not Separately Priced
DATA
CONTRACT DATA REQUIREMENTS LIST (CDRL)
EXHIBIT A, ELIN A006
RISK MANAGEMENT FRAMEWORK PACKAGE DELIVERABLES
RMF Project Plan
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Wide Area Work Flow (WAWF)
Item No.
3010AG
Firm Fixed Price Quantity U/I Unit Price Amount 1 LO Not Separately Priced Not Separately Priced
DATA
CONTRACT DATA REQUIREMENTS LIST (CDRL)
EXHIBIT A, ELIN A007
VULNERABILITY SCAN COMPLIANCE REPORT
VSC Report
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination
ORDERING PERIOD 4: THE 12 MONTH PERIOD IMMEDIATELY FOLLOWING ORDERING PERIOD 3.
Item No.
Firm Fixed Price Best Estimated Qty
U/I Unit Price
60 EA
NSN: 6610-01-432-8459 FX
PROCESSOR,FLIGHT IN
Repair IAW PWS Dated 07 April 2020 Manufacturer Part Number 64547 2118952-5 Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Wide Area Work Flow (WAWF) Quality Assurance: Standard Inspection
Transportation From Continental United States CONUS (CONUS) Sources
TYPE / SHIP TO CODE F.O.B.
A SW3119 DESTINATION
Type / Ship To PACRN Mark For
A SW3119 PAA
Type / Ship To Quantity (U/I) *ARO Funded Order or Reparable Assets, Whichever is Later
Req No / Pri
Required Delivery
A SW3119 60 EA *21 Calendar Days
Proposed Delivery
A SW3119 60 EA
OVER AND ABOVE (O&A)
Item No.
Firm Fixed Price Quantity U/I Amount 1 LO To be Negotiated
OVER AND ABOVE (O&A)
OVER
OVER AND ABOVE
IAW PWS PARA 4.4.2
Firm Fixed Price Quantity U/I Unit Price
1 EA
NSN: 6610-01-432-8459 FX
PROCESSOR, FLIGHT IN
BEYOND ECONOMIC REPAIR (BER)
IAW PWS PARA 4.4.1
Manufacturer Part Number 64547 2118952-5
Firm Fixed Price Quantity U/I Unit Price Amount
12 MO
MAINTENANCE AND CAPABILITY
IAW PWS Paragraph 4.3 Priority: R ROUTINE
Limitations of Liability: High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Wide Area Work Flow (WAWF) Quality Assurance: Standard Inspection
Pricing and Billing Note: The contractor will be pricing CLIN 0004 as the total amount per year, however, the contractor will be authorized to bill CLIN 0004 in 12 approximately equal payments on a monthly basis.
Firm Fixed Price Quantity U/I Unit Price Amount
1 LO
ENGINEERING SERVICES
IAW PWS Paragraph 4.6 Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Wide Area Work Flow (WAWF) Quality Assurance: Standard Inspection
INTELLECTUAL PROPERTY AGREEMENT
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount
1 LO
INTELLECTUAL
INTELLECTUAL PROPERTY
USE OF INTELLECTUAL PROPERTY DURING THE LIFE OF THE CONTRACT IN ACCORDANCE WITH THE ATTACHED TECHNOLOGY
LICENSE AGREEMENT.
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Wide Area Work Flow (WAWF)
INTELLECTUAL PROPERTY will be funded on the first delivery order issued for the Basic and each Ordering Period.
Firm Fixed Price Quantity U/I Unit Price Amount
1 LO
GFP
GFP TEST EQUIPMENT
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Wide Area Work Flow (WAWF) Quality Assurance: Standard Inspection Class I ODS Substance Application/Use Quantity
Firm Fixed Price Quantity U/I Unit Price Amount
1 LO
KTR MGMT RPT
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Wide Area Work Flow (WAWF) Quality Assurance: Standard Inspection
ANNUAL REQUIREMENT
Contractor Manpower Reporting will be funded on the first delivery order issued for the Basic and each Ordering
CONTRACT PERIOD 4
Item No.
Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost
1 LO
TRAVEL AS APPROVED IN ADVANCE BY CONTRACTING OFFICER.
TRAVEL IN SUPPORT OF CLIN 4001. TRAVEL REIMBURSED IAW FAR 31.2 and pursuant to the terms of the Performance Based Work Statement, Dated 30 September 2021 Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Wide Area Work Flow Applies
DATA
IAW DD FORM 1423-1
Item No.
Firm Fixed Price
DATA
DATA IAW DD FORM 1423-1
Priority: R ROUTINE
CONFERENCE MINUTES
PMR Meeting Minutes Item No.
4010AA
Firm Fixed Price Quantity U/I Unit Price Amount 1 LO Not Separately Priced Not Separately Priced
DATA
CONTRACT DATA REQUIREMENTS LIST (CDRL)
EXHIBIT A, ELIN A001
CONFERENCE MINUTES
PMR Meeting Minutes
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Wide Area Work Flow (WAWF)
4010AB
Firm Fixed Price Quantity U/I Unit Price Amount 1 LO Not Separately Priced Not Separately Priced
DATA
CONTRACT DATA REQUIREMENTS LIST (CDRL)
EXHIBIT A, ELIN A002
TEST PLAN
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Wide Area Work Flow (WAWF)
4010AC
Firm Fixed Price Quantity U/I Unit Price Amount 1 LO Not Separately Priced Not Separately Priced
DATA
CONTRACT DATA REQUIREMENTS LIST (CDRL)
EXHIBIT A, ELIN A003
ENGINEERING CHANGE PROPOSAL (ECP)
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Wide Area Work Flow (WAWF)
4010AD
Firm Fixed Price Quantity U/I Unit Price Amount 1 LO Not Separately Priced Not Separately Priced
DATA
CONTRACT DATA REQUIREMENTS LIST (CDRL)
EXHIBIT A, ELIN A004
OBSOLESCENCE ALERT NOTICE
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination
Item No.
4010AE
Firm Fixed Price Quantity U/I Unit Price Amount 1 LO Not Separately Priced Not Separately Priced
DATA
CONTRACT DATA REQUIREMENTS LIST (CDRL)
EXHIBIT A, ELIN A005
RISK MANAGEMENT FRAMEWORK PACKAGE DELIVERABLES
RMF Package
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Wide Area Work Flow (WAWF)
Item No.
4010AF
Firm Fixed Price Quantity U/I Unit Price Amount 1 LO Not Separately Priced Not Separately Priced
DATA
CONTRACT DATA REQUIREMENTS LIST (CDRL)
EXHIBIT A, ELIN A006
RISK MANAGEMENT FRAMEWORK PACKAGE DELIVERABLES
RMF Project Plan
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination
Item No.
4010AG
Firm Fixed Price Quantity U/I Unit Price Amount 1 LO Not Separately Priced Not Separately Priced
DATA
CONTRACT DATA REQUIREMENTS LIST (CDRL)
EXHIBIT A, ELIN A007
VULNERABILITY SCAN COMPLIANCE REPORT
VSC Report
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Wide Area Work Flow (WAWF)
ORDERING PERIOD 5. THE 12 MONTH PERIOD IMMEDIATELY FOLLOWING ORDERING PERIOD 4. ORDERING PERIOD 5 AND 6 WILL BE EXERCISED 60 DAYS PRIOR TO THE EXPIRATION OF ORDERING PERIOD 4.
REPAIR - ADP
Item No.
Firm Fixed Price Best Estimated Qty
U/I Unit Price
60 EA
NSN: 6610-01-432-8459 FX
PROCESSOR,FLIGHT IN
Repair IAW PWS Dated 07 April 2020 Manufacturer Part Number 64547 2118952-5 Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination
REPAIR - ADP
Quality Assurance: Standard Inspection
Transportation From Continental United States CONUS (CONUS) Sources
TYPE / SHIP TO CODE F.O.B.
A SW3119 DESTINATION
Type / Ship To PACRN Mark For
A SW3119 PAA
Type / Ship To Quantity (U/I) *ARO Funded Order or Reparable Assets, Whichever is Later
Req No / Pri
Required Delivery
A SW3119 60 EA *21 Calendar Days
Proposed Delivery
A SW3119 60 EA
OVER AND ABOVE (O&A)
Item No.
Firm Fixed Price Quantity U/I Amount 1 LO To be Negotiated
OVER
OVER AND ABOVE
IAW PWS PARA 4.4.2
Firm Fixed Price Quantity U/I Unit Price
1 EA
NSN: 6610-01-432-8459 FX
PROCESSOR, FLIGHT IN
BEYOND ECONOMIC REPAIR (BER)
IAW PWS PARA 4.4.1
Manufacturer Part Number
Firm Fixed Price Quantity U/I Unit Price Amount
12 MO
MAINTENANCE AND CAPABILITY
IAW PWS Paragraph 4.3 Priority: R ROUTINE
Limitations of Liability: High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Wide Area Work Flow (WAWF) Quality Assurance: Standard Inspection
Pricing and Billing Note: The contractor will be pricing CLIN 0004 as the total amount per year, however, the contractor will be authorized to bill CLIN 0004 in 12 approximately equal payments on a monthly basis.
Firm Fixed Price Quantity U/I Unit Price Amount
1 LO
ENGINEERING SERVICES
IAW PWS Paragraph 4.6 Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Wide Area Work Flow (WAWF) Quality Assurance: Standard Inspection
INTELLECTUAL PROPERTY AGREEMENT
Item No.
Firm Fixed Price
INTELLECTUAL PROPERTY AGREEMENT
1 LO
INTELLECTUAL
INTELLECTUAL PROPERTY
USE OF INTELLECTUAL PROPERTY DURING THE LIFE OF THE CONTRACT IN ACCORDANCE WITH THE ATTACHED TECHNOLOGY
LICENSE AGREEMENT.
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Wide Area Work Flow (WAWF)
INTELLECTUAL PROPERTY will be funded on the first delivery order issued for the Basic and each Ordering Period.
Firm Fixed Price Quantity U/I Unit Price Amount
1 LO
GFP
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Wide Area Work Flow (WAWF) Quality Assurance: Standard Inspection Class I ODS Substance Application/Use Quantity
Firm Fixed Price Quantity U/I Unit Price Amount
1 LO
KTR MGMT RPT
CONTRACTOR MANAGEMENT REPORT
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Wide Area Work Flow (WAWF) Quality Assurance: Standard Inspection
ANNUAL REQUIREMENT
Contractor Manpower Reporting will be funded on the first delivery order issued for the Basic and each Ordering
CONTRACT PERIOD 5
Item No.
Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost
1 LO
TRAVEL AS APPROVED IN ADVANCE BY CONTRACTING OFFICER.
TRAVEL IN SUPPORT OF CLIN 5001. TRAVEL REIMBURSED IAW FAR 31.2 and pursuant to the terms of the Performance Based Work Statement, Dated 30 September 2021 Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Wide Area Work Flow Applies Quality Assurance: Standard Inspection
DATA
IAW DD FORM 1423-1
Item No.
Firm Fixed Price
DATA
DATA IAW DD FORM 1423-1
Priority: R ROUTINE
CONFERENCE MINUTES
PMR Meeting Minutes Item No.
5010AA
Firm Fixed Price Quantity U/I Unit Price Amount 1 LO Not Separately Priced Not Separately Priced
DATA
CONTRACT DATA REQUIREMENTS LIST (CDRL)
CONFERENCE MINUTES
PMR Meeting Minutes
EXHIBIT A, ELIN A001
CONFERENCE MINUTES
PMR Meeting Minutes
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Wide Area Work Flow (WAWF)
5010AB
Firm Fixed Price Quantity U/I Unit Price Amount 1 LO Not Separately Priced Not Separately Priced
DATA
CONTRACT DATA REQUIREMENTS LIST (CDRL)
EXHIBIT A, ELIN A002
TEST PLAN
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Wide Area Work Flow (WAWF)
5010AC
Firm Fixed Price Quantity U/I Unit Price Amount 1 LO Not Separately Priced Not Separately Priced
DATA
EXHIBIT A, ELIN A003
ENGINEERING CHANGE PROPOSAL (ECP)
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Wide Area Work Flow (WAWF)
5010AD
Firm Fixed Price Quantity U/I Unit Price Amount 1 LO Not Separately Priced Not Separately Priced
DATA
CONTRACT DATA REQUIREMENTS LIST (CDRL)
EXHIBIT A, ELIN A004
OBSOLESCENCE ALERT NOTICE
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Wide Area Work Flow (WAWF)
Item No.
5010AE
Firm Fixed Price Quantity U/I Unit Price Amount 1 LO Not Separately Priced Not Separately Priced
DATA
CONTRACT DATA REQUIREMENTS LIST (CDRL)
EXHIBIT A, ELIN A005
RISK MANAGEMENT FRAMEWORK PACKAGE DELIVERABLES
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Wide Area Work Flow (WAWF)
Item No.
5010AF
Firm Fixed Price Quantity U/I Unit Price Amount 1 LO Not Separately Priced Not Separately Priced
DATA
CONTRACT DATA REQUIREMENTS LIST (CDRL)
EXHIBIT A, ELIN A006
RISK MANAGEMENT FRAMEWORK PACKAGE DELIVERABLES
RMF Project Plan
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Wide Area Work Flow (WAWF)
Item No.
5010AG
Firm Fixed Price Quantity U/I Unit Price Amount 1 LO Not Separately Priced Not Separately Priced
DATA
CONTRACT DATA REQUIREMENTS LIST (CDRL)
EXHIBIT A, ELIN A007
VULNERABILITY SCAN COMPLIANCE REPORT
VSC Report
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Wide Area Work Flow (WAWF)
ORDERING PERIOD 6. THE 12 MONTH PERIOD IMMEDIATELY FOLLOWING ORDERING PERIOD 5.
Item No.
Firm Fixed Price Best Estimated Qty
U/I Unit Price
60 EA
NSN: 6610-01-432-8459 FX
PROCESSOR,FLIGHT IN
Repair IAW PWS Dated 07 April 2020 Manufacturer Part Number 64547 2118952-5 Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Wide Area Work Flow (WAWF) Quality Assurance: Standard Inspection
Transportation From Continental United States CONUS (CONUS) Sources
TYPE / SHIP TO CODE F.O.B.
A SW3119 DESTINATION
Type / Ship To PACRN Mark For
A SW3119 PAA
Type / Ship To Quantity (U/I) *ARO Funded Order or Reparable Assets, Whichever is Later
Req No / Pri
Required Delivery
A SW3119 60 EA *21 Calendar Days
Proposed Delivery
A SW3119 60 EA
OVER AND ABOVE (O&A)
Item No.
Firm Fixed Price Quantity U/I Amount 1 LO To be Negotiated
OVER
OVER AND ABOVE
IAW PWS PARA 4.4.2
Firm Fixed Price Quantity U/I Unit Price
1 EA
NSN: 6610-01-432-8459 FX
PROCESSOR, FLIGHT IN
BEYOND ECONOMIC REPAIR (BER)
IAW PWS PARA 4.4.1
Manufacturer Part Number 64547 2118952-5
Firm Fixed Price Quantity U/I Unit Price Amount
12 MO
MAINTENANCE AND CAPABILITY
IAW PWS Paragraph 4.3 Priority: R ROUTINE
Limitations of Liability: High Value Item
Inspection: Destination Acceptance: Destination
Pricing and Billing Note: The contractor will be pricing CLIN 0004 as the total amount per year, however, the contractor will be authorized to bill CLIN 0004 in 12 approximately equal payments on a monthly basis.
Firm Fixed Price Quantity U/I Unit Price Amount
1 LO
ENGINEERING SERVICES
IAW PWS Paragraph 4.6 Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Wide Area Work Flow (WAWF) Quality Assurance: Standard Inspection
INTELLECTUAL PROPERTY AGREEMENT
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount
1 LO
INTELLECTUAL
INTELLECTUAL PROPERTY
USE OF INTELLECTUAL PROPERTY DURING THE LIFE OF THE CONTRACT IN ACCORDANCE WITH THE ATTACHED TECHNOLOGY
LICENSE AGREEMENT.
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Wide Area Work Flow (WAWF)
INTELLECTUAL PROPERTY will be funded on the first delivery order issued for the Basic and each Ordering Period.
Firm Fixed Price
GFP TEST EQUIPMENT
1 LO
GFP
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Wide Area Work Flow (WAWF) Quality Assurance: Standard Inspection Class I ODS Substance Application/Use Quantity
Firm Fixed Price Quantity U/I Unit Price Amount
1 LO
KTR MGMT RPT
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Wide Area Work Flow (WAWF) Quality Assurance: Standard Inspection
ANNUAL REQUIREMENT
Contractor Manpower Reporting will be funded on the first delivery order issued for the Basic and each Ordering
CONTRACT PERIOD 6
Item No.
Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost
1 LO
TRAVEL AS APPROVED IN ADVANCE BY CONTRACTING OFFICER.
TRAVEL IN SUPPORT OF CLIN 6001. TRAVEL REIMBURSED IAW FAR 31.2 and pursuant to the terms of the Performance Based Work Statement, Dated 30 September 2021
TRAVEL and PER DIEM
CONTRACT PERIOD 6
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Wide Area Work Flow Applies Quality Assurance: Standard Inspection
DATA
IAW DD FORM 1423-1
Item No.
Firm Fixed Price
DATA
DATA IAW DD FORM 1423-1
Priority: R ROUTINE
CONFERENCE MINUTES
PMR Meeting Minutes Item No.
6010AA
Firm Fixed Price Quantity U/I Unit Price Amount 1 LO Not Separately Priced Not Separately Priced
DATA
CONTRACT DATA REQUIREMENTS LIST (CDRL)
EXHIBIT A, ELIN A001
CONFERENCE MINUTES
PMR Meeting Minutes
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Wide Area Work Flow (WAWF)
6010AB
Firm Fixed Price
1 LO Not Separately Priced Not Separately Priced
TEST PLAN
DATA
CONTRACT DATA REQUIREMENTS LIST (CDRL)
EXHIBIT A, ELIN A002
TEST PLAN
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Wide Area Work Flow (WAWF)
6010AC
Firm Fixed Price Quantity U/I Unit Price Amount 1 LO Not Separately Priced Not Separately Priced
DATA
CONTRACT DATA REQUIREMENTS LIST (CDRL)
EXHIBIT A, ELIN A003
ENGINEERING CHANGE PROPOSAL (ECP)
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Wide Area Work Flow (WAWF)
6010AD
Firm Fixed Price Quantity U/I Unit Price Amount 1 LO Not Separately Priced Not Separately Priced
DATA
OBSOLESCENCE ALERT NOTICE
EXHIBIT A, ELIN A004
OBSOLESCENCE ALERT NOTICE
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Wide Area Work Flow (WAWF)
Item No.
6010AE
Firm Fixed Price Quantity U/I Unit Price Amount 1 LO Not Separately Priced Not Separately Priced
DATA
CONTRACT DATA REQUIREMENTS LIST (CDRL)
EXHIBIT A, ELIN A005
RISK MANAGEMENT FRAMEWORK PACKAGE DELIVERABLES
RMF Package
Priority: R ROUTINE
Limi…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .