FA8538-21-R-0001.pdf

PDF 853 KB Posted

Attached to
Air Data Processor (ADP) Repair Federal contract opportunity
Solicitation number
FA8538-21-R-0001
Issued by
Department of the Air Force Materiel Command Air Force Sustainment Center

View the file

Other files for this federal contract opportunity

Other files attached to Air Data Processor (ADP) Repair, newest first.
File Type Posted
PWS_30 Sept 2021_Rev 1.pdf PDF
FA8538-21-R-0001_0002.pdf PDF
Attachments_FA8538-21-R-0001.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 1447 (REV. 8/2016)

PREVIOUS EDITION NOT USABLE Prescribed by GSA - FAR (48 CFR) 53.214(d)

23. ACCOUNTING AND APPROPRIATION DATA

SEE SCHEDULE

24. TOTAL AWARD AMOUNT (For Government Use Only)

TELEPHONE NUMBER

UNIQUE ENTITY

IDENTIFIER

CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN OFFER

NO COLLECT CALLS

4. SOLICITATION NUMBER

FA8538-21-R-0001

6.SOLICITATION ISSUE DATE

8. THIS ACQUISITION IS UNRESTRICTED OR SET ASIDE: % FOR

SMALL BUSINESS WOMEN-OWNED SMALL BUSINESS (WOSB)

ELIGIBLE UNDER THE WOSB PROGRAM

HUBZONE SMALL

BUSINESS EDWOSB

SERVICE-DISABLED VETERAN-

OWNED SMALL BUSINESS NAICS: 811219

8(A) SIZE STANDARD: $22.00

DATE SIGNED

28. UNITED STATES OF AMERICA (Signature of Contracting Officer)

26. AWARD OF CONTRACT: YOUR OFFER ON SOLICITATION NUMBER

SHOWN IN BLOCK 4 INCLUDING ANY ADDITIONS OR CHANGES WHICH

ARE SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:

ROUTINE

Subject to the terms and conditions stated herein, the Contractor agrees to hold its offered prices firm for 120 days.

SEE LINE ITEM SCHEDULE

22.

AMOUNT

16. AUTHORITY FOR USING OTHER THAN 10 USC 2304 41 USC 253

FULL AND OPEN COMPETITION (c) (1 ) (c) ( )

DATE SIGNED

27. SIGNATURE OF OFFEROR/CONTRACTOR

20.

UNIT

21.

UNIT PRICE

19.

QUANTITY

13. CONTRACTOR OFFEROR CODE FACILITY CODE

11. IF OFFER IS ACCEPTED BY THE GOVERNMENT WITHIN * ___ CALENDAR DAYS (60 CALENDAR

DAYS UNLESS OFFEROR INSERTS A DIFFERENT PERIOD) FROM THE DATE SET FORTH IN BLOCK 9

ABOVE, THE CONTRACTOR AGREES TO HOLD ITS OFFERED PRICES FIRM FOR THE ITEMS

SOLICITED HEREIN AND TO ACCEPT ANY RESULTING CONTRACT SUBJECT TO THE TERMS AND

CONDITIONS STATED HEREIN. *120

RATING

DO: A1

3. AWARD/EFFECTIVE DATE

FA8538

2. CONTRACT NUMBER

X

17.

ITEM NUMBER

12. ADMINISTERED BY CODE

Total

SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK: 14

SCD:C

NAME AND TITLE OF SIGNER (Type or Print) NAME OF CONTRACTING OFFICER

5. SOLICITATION TYPE

SEALED BIDS NEGOTIATED

(IFB) (RFP)

15. PROMPT PAYMENT DISCOUNT

25. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN 1

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND DELIVER ALL ITEMS SETFORTH

OR OTHERWISE IDENTIFIED ABOVE AND ON ANY CONTINUATION SHEETS SUBJECT

THE TERMS AND CONDITIONS SPECIFIED HEREIN.

10. ITEMS TO BE PURCHASED (Brief Description)

SUPPLIES SERVICES Other Electronic and Precision Equipment Repair and Maintenance

9. (Agency Use)

Offers will be received at the issuing office until the date and time specified below. All official United States Postal Service mail and classified material will be delivered to the address shown in block 7. Deliver all parcels to: AFSC/PZAAB, ATTN: Buyer named above, 480 RICHARD RAY

BLVD, BLDG 301 EW, ROOM E31, ROBINS AFB GA 31098-1813.

8-MAR-2021 4:00PM

X

18.

SCHEDULE OF SUPPLIES/SERVICES

14. PAYMENT WILL BE MADE BY CODE

(SEE ESP CLAUSE 252.232-7003.)

X

7. ISSUED BY CODE

F-15, C-130, & SOF-FW, AFSC/PZAAB

235 BYRON ST STE 19A

BLDG 300 CML PHN 478 926 3980

ROBINS AFB GA 31098-1670

BUYER: Phillip B. Russell/PZAAB phillip.russell.9@us.af.mil Phone: (478) 926- 4741

X

1. THIS CONTRACT IS A RATED ORDER

UNDER DPAS (15 CFR 700)SOLICITATION/CONTRACT

BIDDER/OFFEROR TO COMPLETE BLOCKS 11, 13, 15, 21, 22, & 27.

J

STANDARD FORM 1447 (REV. 8/2016) BACK

NO RESPONSE FOR REASONS CHECKED

TYPE OR PRINT NAME AND TITLE OF SIGNER

SIGNATURENAME AND ADDRESS OF FIRM (Include Zip Code)

WE DO NOT DESIRE TO BE RETAINED ON THE MAILING LIST FOR FUTURE PROCUREMENT OF THE TYPE OF

ITEMS INVOLVED

WE DO

OTHER (Specify)

UNABLE TO IDENTIFY THE ITEM(S)

CANNOT COMPLY WITH SPECIFICATIONS CANNOT MEET DELIVERY REQUIREMENT

DO NOT REGULARILY MANUFACTURE OR SELL THE TYPE

OF ITEMS INVOLVED

DATE AND LOCAL TIME 8 MAR 2021 4:00 PM

SOLICITATION NUMBER FA853821R0001

FROM: AFFIX

STAMP

HERE

TO:

ATTN: Phillip B Russell/PZAAB

F-15, C-130, & SOF-FW, AFSC/PZAAB

235 BYRON ST STE 19A

BLDG 300 CML PHN 478 926 3980

ROBINS AFB GA 31098-1670

FA8538-21-R-0001

PART I - THE SCHEDULE

SECTION B

SUPPLIES OR SERVICES AND PRICES/COSTS

THIS IS A REQUIREMENTS CONTRACT WITH A BASIC CONTRACT PERIOD OF TWELVE (12)

MONTHS AND SIX (6) ORDERING PERIODS OF TWELVE (12) MONTHS EACH.

ALL QUANTITIES IN SCHEDULE ARE BEST ESTIMATED QUANTITIES (BEQ): The best estimated quantities (BEQ) represent the best estimated annual quantity for each contract line item but the BEQ is only an estimate.

This is a follow-on contract in support of the Public/Private Partnership (PPP), also known as the Direct Sales Partnership Agreement (DSPA), which began September 2003, between Honeywell Defense & Space Electronic Systems, the OEM and owner of the Intellectual Property herein, and the Warner Robins Air Logistics Complex supporting repair and service of the Air Data Processor (ADP) applicable to the F-15E Aircraft.

SPECIAL INSTRUCTIONS APPLICABLE TO GFP FOR REPAIR REQUIREMENTS CONTRACTS:

In accordance with FAR 16.503(c), this is to advise that failure of the Government to furnish Government property items in the amounts or quantities described in the Schedule as "estimated" of "maximum" will not entitle the contractor to any equitable adjustment in price under the Government Property clause of the contract.

PRICING OF PERFORMANCE UNDER OPTION TO EXTEND SERVICES:

Should the contract be extended IAW 52.217-8, the pricing applicable for the extension will be based on the rates effective on the last day of the last negotiated ordering period just preceding the extension period.

BASIC CONTRACT PERIOD: Date of Award through 12 months.

REPAIR - ADP

Item No.

Firm Fixed Price Best Estimated Qty

U/I Unit Price

60 EA

NSN: 6610-01-432-8459 FX

PROCESSOR,FLIGHT IN

Repair IAW PWS Dated 07 April 2020 Manufacturer Part Number

REPAIR - ADP

64547 2118952-5 Associated Document(s) Line Item(s)

FD20602100038 0001

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Wide Area Work Flow (WAWF) Quality Assurance: Standard Inspection

Transportation From Continental United States CONUS (CONUS) Sources

TYPE / SHIP TO CODE F.O.B.

A SW3119 DESTINATION

Type / Ship To PACRN Mark For

A SW3119 PAA

Type / Ship To Quantity (U/I) *ARO Funded Order or Reparable Assets, Whichever is Later

Req No / Pri

Required Delivery

A SW3119 60 EA *21 Calendar Days

Proposed Delivery

A SW3119 60 EA

OVER AND ABOVE (O&A)

Item No.

Firm Fixed Price Quantity U/I Amount 1 LO To be Negotiated

OVER

OVER AND ABOVE

IAW PWS PARA 4.4.2

Priority: R ROUTINE

* OVER AND ABOVE IAW PWS PARA 4.4.2

BEST ECONOMICAL REPAIR (BER)

Item No.

Firm Fixed Price Quantity U/I Unit Price

BEST ECONOMICAL REPAIR (BER)

1 EA

NSN: 6610-01-432-8459 FX

PROCESSOR, FLIGHT IN

BEYOND ECONOMIC REPAIR (BER)

IAW PWS PARA 4.4.1

Manufacturer Part Number 64547 2118952-5

BEYOND ECONOMIC REPAIR (BER) IAW PWS PARA 4.4.1

MAINTENANCE AND CAPABILITY

Firm Fixed Price Quantity U/I Unit Price Amount

12 MO

MAINTENANCE AND CAPABILITY

IAW PWS Paragraph 4.3 Associated Document(s) Line Item(s)

FD20602100038 0004

Priority: R ROUTINE

Limitations of Liability: High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Wide Area Work Flow (WAWF) Quality Assurance: Standard Inspection

Pricing and Billing Note: The contractor will be pricing CLIN 0004 as the total amount per year, however, the contractor will be authorized to bill CLIN 0004 in 12 approximately equal payments on a monthly basis.

ENGINEERING SERVICES

Firm Fixed Price Quantity U/I Unit Price Amount

1 LO

ENGINEERING SERVICES

IAW PWS Paragraph 4.6 Associated Document(s) Line Item(s)

FD20602100038 0005

ENGINEERING SERVICES

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Wide Area Work Flow (WAWF) Quality Assurance: Standard Inspection

INTELLECTUAL PROPERTY AGREEMENT

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

1 LO

INTELLECTUAL

INTELLECTUAL PROPERTY

USE OF INTELLECTUAL PROPERTY DURING THE LIFE OF THE CONTRACT IN ACCORDANCE WITH THE

ATTACHED TECHNOLOGY LICENSE AGREEMENT.

Associated Document(s) Line Item(s)

FD20602100038 0006

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Wide Area Work Flow (WAWF) Quality Assurance: Standard Inspection

INTELLECTUAL PROPERTY will be funded on the first delivery order issued for the Basic and each Ordering Period.

GFP TEST EQUIPMENT

Firm Fixed Price Quantity U/I Unit Price Amount

1 LO

GFP

Associated Document(s) Line Item(s)

FD20602100038 0007

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Wide Area Work Flow (WAWF) Quality Assurance: Standard Inspection Class I ODS Substance Application/Use Quantity none

GFP will be funded on the first delivery order issued for the Basic and each Ordering Period.

CONTRACTOR MANAGEMENT REPORT

Firm Fixed Price Quantity U/I Unit Price Amount

1 LO

KTR MGMT RPT

Associated Document(s) Line Item(s)

FD20602100038 0008

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Wide Area Work Flow (WAWF) Quality Assurance: Standard Inspection

ANNUAL REQUIREMENT

Contractor Manpower Reporting will be funded on the first delivery order issued for the Basic and each Ordering Period year.

DATA

IAW DD FORM 1423-1

Item No.

Firm Fixed Price

DATA

DATA IAW DD FORM 1423-1

Associated Document(s) Line Item(s)

FD20602100038 0009

Priority: R ROUTINE

CONFERENCE MINUTES

PMR Meeting Minutes Item No.

0009AA

Firm Fixed Price Quantity U/I Unit Price Amount 1 LO Not Separately Priced Not Separately Priced

DATA

CONTRACT DATA REQUIREMENTS LIST (CDRL)

EXHIBIT A, ELIN A001

CONFERENCE MINUTES

PMR Meeting Minutes

Associated Document(s) Line Item(s)

FD20602100038 0009

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Wide Area Work Flow (WAWF) Quality Assurance: Inspection IAW DD 1423-1

Delivery IAW DD Form 1423-1

TEST PLAN

0009AB

Firm Fixed Price Quantity U/I Unit Price Amount 1 LO Not Separately Priced Not Separately Priced

DATA

CONTRACT DATA REQUIREMENTS LIST (CDRL)

EXHIBIT A, ELIN A002

TEST PLAN

Associated Document(s) Line Item(s)

FD20602100038 0009

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Wide Area Work Flow (WAWF)

ENGINEERING CHANGE PROPOSAL (ECP)

0009AC

Firm Fixed Price Quantity U/I Unit Price Amount 1 LO Not Separately Priced Not Separately Priced

DATA

CONTRACT DATA REQUIREMENTS LIST (CDRL)

EXHIBIT A, ELIN A003

ENGINEERING CHANGE PROPOSAL (ECP)

Associated Document(s) Line Item(s)

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Wide Area Work Flow (WAWF)

OBSOLESCENCE ALERT NOTICE

0009AD

Firm Fixed Price Quantity U/I Unit Price Amount 1 LO Not Separately Priced Not Separately Priced

DATA

CONTRACT DATA REQUIREMENTS LIST (CDRL)

EXHIBIT A, ELIN A004

OBSOLESCENCE ALERT NOTICE

Associated Document(s) Line Item(s)

FD20602100038 0009

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Wide Area Work Flow (WAWF)

RISK MANAGEMENT FRAMEWORK PACKAGE DELIVERABLES

RMF Package Item No.

0009AE

Firm Fixed Price Quantity U/I Unit Price Amount 1 LO Not Separately Priced Not Separately Priced

DATA

CONTRACT DATA REQUIREMENTS LIST (CDRL)

EXHIBIT A, ELIN A005

RISK MANAGEMENT FRAMEWORK PACKAGE DELIVERABLES

RMF Package

Associated Document(s) Line Item(s)

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Wide Area Work Flow (WAWF)

RMF Project Plan Item No.

0009AF

Firm Fixed Price Quantity U/I Unit Price Amount 1 LO Not Separately Priced Not Separately Priced

DATA

CONTRACT DATA REQUIREMENTS LIST (CDRL)

EXHIBIT A, ELIN A006

RISK MANAGEMENT FRAMEWORK PACKAGE DELIVERABLES

RMF Project Plan

Associated Document(s) Line Item(s)

FD20602100038 0009

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Wide Area Work Flow (WAWF)

VULNERABILITY SCAN COMPLIANCE REPORT

VSC Report Item No.

0009AG

Firm Fixed Price Quantity U/I Unit Price Amount 1 LO Not Separately Priced Not Separately Priced

DATA

CONTRACT DATA REQUIREMENTS LIST (CDRL)

EXHIBIT A, ELIN A007

VULNERABILITY SCAN COMPLIANCE REPORT

VSC Report

Associated Document(s) Line Item(s)

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Wide Area Work Flow (WAWF)

ORDERING PERIOD I: THE 12 MONTH PERIOD IMMEDIATELY FOLLOWING THE BASIC

CONTRACT PERIOD.

REPAIR - ADP

Item No.

Firm Fixed Price Best Estimated Qty

U/I Unit Price

60 EA

NSN: 6610-01-432-8459 FX

PROCESSOR,FLIGHT IN

Repair IAW PWS Dated 07 April 2020 Manufacturer Part Number 64547 2118952-5 Associated Document(s) Line Item(s)

FD20602100038 0001

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Wide Area Work Flow (WAWF) Quality Assurance: Standard Inspection

Transportation From Continental United States CONUS (CONUS) Sources

TYPE / SHIP TO CODE F.O.B.

A SW3119 DESTINATION

Type / Ship To PACRN Mark For

A SW3119 PAA

Type / Ship To Quantity (U/I) *ARO Funded

Order or Reparable Assets, Whichever is Later

Req No / Pri

Required Delivery

A SW3119 60 EA *21 Calendar Days

Proposed Delivery

A SW3119 60 EA

OVER AND ABOVE (O&A)

Item No.

Firm Fixed Price Quantity U/I Amount 1 LO To be Negotiated

OVER

OVER AND ABOVE

IAW PWS PARA 4.4.2

Firm Fixed Price Quantity U/I Unit Price

1 EA

NSN: 6610-01-432-8459 FX

PROCESSOR, FLIGHT IN

BEYOND ECONOMIC REPAIR (BER)

IAW PWS PARA 4.4.1

Manufacturer Part Number 64547 2118952-5

Firm Fixed Price Quantity U/I Unit Price Amount

12 MO

MAINTENANCE AND CAPABILITY

IAW PWS Paragraph 4.3 Associated Document(s) Line Item(s)

FD20602100038 0004

Priority: R ROUTINE

Limitations of Liability: High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Wide Area Work Flow (WAWF)

MAINTENANCE AND CAPABILITY

Quality Assurance: Standard Inspection

Pricing and Billing Note: The contractor will be pricing CLIN 0004 as the total amount per year, Firm Fixed Price Quantity U/I Unit Price Amount

1 LO

ENGINEERING SERVICES

IAW PWS Paragraph 4.6 Associated Document(s) Line Item(s)

FD20602100038 0005

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Wide Area Work Flow (WAWF) Quality Assurance: Standard Inspection

INTELLECTUAL PROPERTY AGREEMENT

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

1 LO

INTELLECTUAL

INTELLECTUAL PROPERTY

USE OF INTELLECTUAL PROPERTY DURING THE LIFE OF THE CONTRACT IN ACCORDANCE WITH THE

ATTACHED TECHNOLOGY LICENSE AGREEMENT.

Associated Document(s) Line Item(s)

FD20602100038 0006

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Wide Area Work Flow (WAWF) Quality Assurance: Standard Inspection

GFP TEST EQUIPMENT

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

1 LO

GFP

Associated Document(s) Line Item(s)

FD20602100038 0007

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Wide Area Work Flow (WAWF) Quality Assurance: Standard Inspection Class I ODS Substance Application/Use Quantity

Firm Fixed Price Quantity U/I Unit Price Amount

1 LO

KTR MGMT RPT

Associated Document(s) Line Item(s)

FD20602100038 0008

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Wide Area Work Flow (WAWF) Quality Assurance: Standard Inspection

ANNUAL REQUIREMENT

Contractor Manpower Reporting will be funded on the first delivery order issued for the Basic and each

Item No.

Firm Fixed Price

DATA

DATA IAW DD FORM 1423-1

DATA

IAW DD FORM 1423-1

FD20602100038 0009

Priority: R ROUTINE

CONFERENCE MINUTES

PMR Meeting Minutes Item No.

1009AA

Firm Fixed Price Quantity U/I Unit Price Amount 1 LO Not Separately Priced Not Separately Priced

DATA

CONTRACT DATA REQUIREMENTS LIST (CDRL)

EXHIBIT A, ELIN A001

CONFERENCE MINUTES

PMR Meeting Minutes

Associated Document(s) Line Item(s)

FD20602100038 0009

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Wide Area Work Flow (WAWF)

1009AB

Firm Fixed Price Quantity U/I Unit Price Amount 1 LO Not Separately Priced Not Separately Priced

DATA

CONTRACT DATA REQUIREMENTS LIST (CDRL)

EXHIBIT A, ELIN A002

TEST PLAN

Associated Document(s) Line Item(s)

FD20602100038 0009

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination

1009AC

Firm Fixed Price Quantity U/I Unit Price Amount 1 LO Not Separately Priced Not Separately Priced

DATA

CONTRACT DATA REQUIREMENTS LIST (CDRL)

EXHIBIT A, ELIN A003

ENGINEERING CHANGE PROPOSAL (ECP)

Associated Document(s) Line Item(s)

FD20602100038 0009

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Wide Area Work Flow (WAWF)

1009AD

Firm Fixed Price Quantity U/I Unit Price Amount 1 LO Not Separately Priced Not Separately Priced

DATA

CONTRACT DATA REQUIREMENTS LIST (CDRL)

EXHIBIT A, ELIN A004

OBSOLESCENCE ALERT NOTICE

Associated Document(s) Line Item(s)

FD20602100038 0009

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination

Item No.

1009AE

Firm Fixed Price Quantity U/I Unit Price Amount 1 LO Not Separately Priced Not Separately Priced

DATA

CONTRACT DATA REQUIREMENTS LIST (CDRL)

EXHIBIT A, ELIN A005

RISK MANAGEMENT FRAMEWORK PACKAGE DELIVERABLES

RMF Package

Associated Document(s) Line Item(s)

FD20602100038 0009

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Wide Area Work Flow (WAWF)

Item No.

1009AF

Firm Fixed Price Quantity U/I Unit Price Amount 1 LO Not Separately Priced Not Separately Priced

DATA

CONTRACT DATA REQUIREMENTS LIST (CDRL)

EXHIBIT A, ELIN A006

RISK MANAGEMENT FRAMEWORK PACKAGE DELIVERABLES

RMF Project Plan

Associated Document(s) Line Item(s)

FD20602100038 0009

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination

Item No.

1009AG

Firm Fixed Price Quantity U/I Unit Price Amount 1 LO Not Separately Priced Not Separately Priced

DATA

CONTRACT DATA REQUIREMENTS LIST (CDRL)

EXHIBIT A, ELIN A007

VULNERABILITY SCAN COMPLIANCE REPORT

VSC Report

Associated Document(s) Line Item(s)

FD20602100038 0009

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Wide Area Work Flow (WAWF)

ORDERING PERIOD II: THE 12 MONTH PERIOD IMMEDIATELY FOLLOWING ORDERING PERIOD

I.

REPAIR - ADP

Item No.

Firm Fixed Price Best Estimated Qty

U/I Unit Price

60 EA

NSN: 6610-01-432-8459 FX

PROCESSOR,FLIGHT IN

Repair IAW PWS Dated 07 April 2020 Manufacturer Part Number 64547 2118952-5 Associated Document(s) Line Item(s)

FD20602100038 0001

Limitations of Liability: Other Than High Value Item

REPAIR - ADP

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Wide Area Work Flow (WAWF) Quality Assurance: Standard Inspection

Transportation From Continental United States CONUS (CONUS) Sources

TYPE / SHIP TO CODE F.O.B.

A SW3119 DESTINATION

Type / Ship To PACRN Mark For

A SW3119 PAA

Type / Ship To Quantity (U/I) *ARO Funded Order or Reparable Assets, Whichever is Later

Req No / Pri

Required Delivery

A SW3119 60 EA *21 Calendar Days

Proposed Delivery

A SW3119 60 EA

OVER AND ABOVE (O&A)

Item No.

Firm Fixed Price Quantity U/I Amount 1 LO To be Negotiated

OVER

OVER AND ABOVE

IAW PWS PARA 4.4.2

Firm Fixed Price Quantity U/I Unit Price

1 EA

NSN: 6610-01-432-8459 FX

PROCESSOR, FLIGHT IN

BEYOND ECONOMIC REPAIR (BER)

IAW PWS PARA 4.4.1

Manufacturer Part Number 64547 2118952-5

Firm Fixed Price Quantity U/I Unit Price Amount

12 MO

MAINTENANCE AND CAPABILITY

IAW PWS Paragraph 4.3 Associated Document(s) Line Item(s)

FD20602100038 0004

Priority: R ROUTINE

Limitations of Liability: High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Wide Area Work Flow (WAWF) Quality Assurance: Standard Inspection

Pricing and Billing Note: The contractor will be pricing CLIN 0004 as the total amount per year, Firm Fixed Price Quantity U/I Unit Price Amount

1 LO

ENGINEERING SERVICES

IAW PWS Paragraph 4.6 Associated Document(s) Line Item(s)

FD20602100038 0005

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination

Quality Assurance: Standard Inspection

INTELLECTUAL PROPERTY AGREEMENT

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

1 LO

INTELLECTUAL

INTELLECTUAL PROPERTY

USE OF INTELLECTUAL PROPERTY DURING THE LIFE OF THE CONTRACT IN ACCORDANCE WITH THE

ATTACHED TECHNOLOGY LICENSE AGREEMENT.

Associated Document(s) Line Item(s)

FD20602100038 0006

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Wide Area Work Flow (WAWF) Quality Assurance: Standard Inspection

Firm Fixed Price Quantity U/I Unit Price Amount

1 LO

GFP

Associated Document(s) Line Item(s)

FD20602100038 0007

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Wide Area Work Flow (WAWF) Quality Assurance: Standard Inspection Class I ODS Substance Application/Use Quantity

Firm Fixed Price Quantity U/I Unit Price Amount

1 LO

CONTRACTOR MANAGEMENT REPORT

KTR MGMT RPT

Associated Document(s) Line Item(s)

FD20602100038 0008

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Wide Area Work Flow (WAWF) Quality Assurance: Standard Inspection

ANNUAL REQUIREMENT

Contractor Manpower Reporting will be funded on the first delivery order issued for the Basic and each

Item No.

Firm Fixed Price

DATA

DATA IAW DD FORM 1423-1

Associated Document(s) Line Item(s)

FD20602100038 0009

Priority: R ROUTINE

CONFERENCE MINUTES

PMR Meeting Minutes Item No.

2009AA

Firm Fixed Price Quantity U/I Unit Price Amount 1 LO Not Separately Priced Not Separately Priced

DATA

CONTRACT DATA REQUIREMENTS LIST (CDRL)

EXHIBIT A, ELIN A001

CONFERENCE MINUTES

PMR Meeting Minutes

Associated Document(s) Line Item(s)

FD20602100038 0009

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Wide Area Work Flow (WAWF)

2009AB

Firm Fixed Price Quantity U/I Unit Price Amount 1 LO Not Separately Priced Not Separately Priced

DATA

CONTRACT DATA REQUIREMENTS LIST (CDRL)

EXHIBIT A, ELIN A002

TEST PLAN

Associated Document(s) Line Item(s)

FD20602100038 0009

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Wide Area Work Flow (WAWF)

2009AC

Firm Fixed Price Quantity U/I Unit Price Amount 1 LO Not Separately Priced Not Separately Priced

DATA

CONTRACT DATA REQUIREMENTS LIST (CDRL)

EXHIBIT A, ELIN A003

ENGINEERING CHANGE PROPOSAL (ECP)

Associated Document(s) Line Item(s)

FD20602100038 0009

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Wide Area Work Flow (WAWF)

2009AD

Firm Fixed Price Quantity U/I Unit Price Amount 1 LO Not Separately Priced Not Separately Priced

DATA

CONTRACT DATA REQUIREMENTS LIST (CDRL)

EXHIBIT A, ELIN A004

OBSOLESCENCE ALERT NOTICE

Associated Document(s) Line Item(s)

FD20602100038 0009

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Wide Area Work Flow (WAWF)

Item No.

2009AE

Firm Fixed Price Quantity U/I Unit Price Amount 1 LO Not Separately Priced Not Separately Priced

DATA

CONTRACT DATA REQUIREMENTS LIST (CDRL)

EXHIBIT A, ELIN A005

RISK MANAGEMENT FRAMEWORK PACKAGE DELIVERABLES

RMF Package

Associated Document(s) Line Item(s)

FD20602100038 0009

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Wide Area Work Flow (WAWF)

Item No.

2009AF

Firm Fixed Price Quantity U/I Unit Price Amount 1 LO Not Separately Priced Not Separately Priced

DATA

CONTRACT DATA REQUIREMENTS LIST (CDRL)

EXHIBIT A, ELIN A006

RISK MANAGEMENT FRAMEWORK PACKAGE DELIVERABLES

RMF Project Plan

Associated Document(s) Line Item(s)

FD20602100038 0009

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Wide Area Work Flow (WAWF)

Item No.

2009AG

Firm Fixed Price Quantity U/I Unit Price Amount 1 LO Not Separately Priced Not Separately Priced

DATA

CONTRACT DATA REQUIREMENTS LIST (CDRL)

EXHIBIT A, ELIN A007

VULNERABILITY SCAN COMPLIANCE REPORT

VSC Report

Associated Document(s) Line Item(s)

FD20602100038 0009

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Wide Area Work Flow (WAWF)

ORDERING PERIOD III: THE 12 MONTH PERIOD IMMEDIATELY FOLLOWING ORDERING PERIOD

II.

REPAIR - ADP

Item No.

Firm Fixed Price Best Estimated Qty

U/I Unit Price

60 EA

NSN: 6610-01-432-8459 FX

PROCESSOR,FLIGHT IN

Repair IAW PWS Dated 07 April 2020 Manufacturer Part Number 64547 2118952-5 Associated Document(s) Line Item(s)

FD20602100038 0001

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Wide Area Work Flow (WAWF) Quality Assurance: Standard Inspection

Transportation From Continental United States CONUS (CONUS) Sources

TYPE / SHIP TO CODE F.O.B.

A SW3119 DESTINATION

Type / Ship To PACRN Mark For

A SW3119 PAA

Type / Ship To Quantity (U/I) *ARO Funded Order or Reparable Assets, Whichever is Later

Req No / Pri

Required Delivery

A SW3119 60 EA *21 Calendar Days

Proposed Delivery

A SW3119 60 EA

OVER AND ABOVE (O&A)

Item No.

Firm Fixed Price Quantity U/I Amount 1 LO To be Negotiated

OVER

OVER AND ABOVE (O&A)

OVER AND ABOVE

IAW PWS PARA 4.4.2

Firm Fixed Price Quantity U/I Unit Price

1 EA

NSN: 6610-01-432-8459 FX

PROCESSOR, FLIGHT IN

BEYOND ECONOMIC REPAIR (BER)

IAW PWS PARA 4.4.1

Manufacturer Part Number 64547 2118952-5

Firm Fixed Price Quantity U/I Unit Price Amount

12 MO

MAINTENANCE AND CAPABILITY

IAW PWS Paragraph 4.3 Associated Document(s) Line Item(s)

FD20602100038 0004

Priority: R ROUTINE

Limitations of Liability: High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Wide Area Work Flow (WAWF) Quality Assurance: Standard Inspection

Pricing and Billing Note: The contractor will be pricing CLIN 0004 as the total amount per year, Firm Fixed Price Quantity U/I Unit Price Amount

1 LO

ENGINEERING SERVICES

IAW PWS Paragraph 4.6 Associated Document(s) Line Item(s)

FD20602100038 0005

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Wide Area Work Flow (WAWF) Quality Assurance: Standard Inspection

INTELLECTUAL PROPERTY AGREEMENT

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

1 LO

INTELLECTUAL

INTELLECTUAL PROPERTY

USE OF INTELLECTUAL PROPERTY DURING THE LIFE OF THE CONTRACT IN ACCORDANCE WITH THE

ATTACHED TECHNOLOGY LICENSE AGREEMENT.

Associated Document(s) Line Item(s)

FD20602100038 0006

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Wide Area Work Flow (WAWF) Quality Assurance: Standard Inspection

Firm Fixed Price Quantity U/I Unit Price Amount

1 LO

GFP

GFP TEST EQUIPMENT

Associated Document(s) Line Item(s)

FD20602100038 0007

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Wide Area Work Flow (WAWF) Quality Assurance: Standard Inspection Class I ODS Substance Application/Use Quantity

Firm Fixed Price Quantity U/I Unit Price Amount

1 LO

KTR MGMT RPT

Associated Document(s) Line Item(s)

FD20602100038 0008

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Wide Area Work Flow (WAWF) Quality Assurance: Standard Inspection

ANNUAL REQUIREMENT

Contractor Manpower Reporting will be funded on the first delivery order issued for the Basic and each

Item No.

Firm Fixed Price

DATA

DATA IAW DD FORM 1423-1

Associated Document(s) Line Item(s)

CONFERENCE MINUTES

PMR Meeting Minutes Item No.

3009AA

Firm Fixed Price Quantity U/I Unit Price Amount 1 LO Not Separately Priced Not Separately Priced

DATA

CONTRACT DATA REQUIREMENTS LIST (CDRL)

EXHIBIT A, ELIN A001

CONFERENCE MINUTES

PMR Meeting Minutes

Associated Document(s) Line Item(s)

FD20602100038 0009

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Wide Area Work Flow (WAWF)

3009AB

Firm Fixed Price Quantity U/I Unit Price Amount 1 LO Not Separately Priced Not Separately Priced

DATA

CONTRACT DATA REQUIREMENTS LIST (CDRL)

EXHIBIT A, ELIN A002

TEST PLAN

Associated Document(s) Line Item(s)

FD20602100038 0009

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Wide Area Work Flow (WAWF)

ENGINEERING CHANGE PROPOSAL (ECP)

Item No.

3009AC

Firm Fixed Price Quantity U/I Unit Price Amount 1 LO Not Separately Priced Not Separately Priced

DATA

CONTRACT DATA REQUIREMENTS LIST (CDRL)

EXHIBIT A, ELIN A003

ENGINEERING CHANGE PROPOSAL (ECP)

Associated Document(s) Line Item(s)

FD20602100038 0009

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Wide Area Work Flow (WAWF)

3009AD

Firm Fixed Price Quantity U/I Unit Price Amount 1 LO Not Separately Priced Not Separately Priced

DATA

CONTRACT DATA REQUIREMENTS LIST (CDRL)

EXHIBIT A, ELIN A004

OBSOLESCENCE ALERT NOTICE

Associated Document(s) Line Item(s)

FD20602100038 0009

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Wide Area Work Flow (WAWF)

RISK MANAGEMENT FRAMEWORK PACKAGE DELIVERABLES

RMF Package Item No.

3009AE

Firm Fixed Price Quantity U/I Unit Price Amount 1 LO Not Separately Priced Not Separately Priced

DATA

CONTRACT DATA REQUIREMENTS LIST (CDRL)

EXHIBIT A, ELIN A005

RISK MANAGEMENT FRAMEWORK PACKAGE DELIVERABLES

RMF Package

Associated Document(s) Line Item(s)

FD20602100038 0009

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Wide Area Work Flow (WAWF)

Item No.

3009AF

Firm Fixed Price Quantity U/I Unit Price Amount 1 LO Not Separately Priced Not Separately Priced

DATA

CONTRACT DATA REQUIREMENTS LIST (CDRL)

EXHIBIT A, ELIN A006

RISK MANAGEMENT FRAMEWORK PACKAGE DELIVERABLES

RMF Project Plan

Associated Document(s) Line Item(s)

FD20602100038 0009

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Wide Area Work Flow (WAWF)

VULNERABILITY SCAN COMPLIANCE REPORT

VSC Report Item No.

3009AG

Firm Fixed Price Quantity U/I Unit Price Amount 1 LO Not Separately Priced Not Separately Priced

DATA

CONTRACT DATA REQUIREMENTS LIST (CDRL)

EXHIBIT A, ELIN A007

VULNERABILITY SCAN COMPLIANCE REPORT

VSC Report

Associated Document(s) Line Item(s)

FD20602100038 0009

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Wide Area Work Flow (WAWF)

ORDERING PERIOD IV: THE 12 MONTH PERIOD IMMEDIATELY FOLLOWING ORDERING PERIOD

III.

REPAIR - ADP

Item No.

Firm Fixed Price Best Estimated Qty

U/I Unit Price

60 EA

NSN: 6610-01-432-8459 FX

PROCESSOR,FLIGHT IN

Repair IAW PWS Dated 07 April 2020 Manufacturer Part Number 64547 2118952-5 Associated Document(s) Line Item(s)

FD20602100038 0001

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination

REPAIR - ADP

Transportation From Continental United States CONUS (CONUS) Sources

TYPE / SHIP TO CODE F.O.B.

A SW3119 DESTINATION

Type / Ship To PACRN Mark For

A SW3119 PAA

Type / Ship To Quantity (U/I) *ARO Funded Order or Reparable Assets, Whichever is Later

Req No / Pri

Required Delivery

A SW3119 60 EA *21 Calendar Days

Proposed Delivery

A SW3119 60 EA

OVER AND ABOVE (O&A)

Item No.

Firm Fixed Price Quantity U/I Amount 1 LO To be Negotiated

OVER

OVER AND ABOVE

IAW PWS PARA 4.4.2

Firm Fixed Price Quantity U/I Unit Price

1 EA

NSN: 6610-01-432-8459 FX

PROCESSOR, FLIGHT IN

BEYOND ECONOMIC REPAIR (BER)

IAW PWS PARA 4.4.1

Manufacturer Part Number 64547 2118952-5

Firm Fixed Price Quantity U/I Unit Price Amount

12 MO

MAINTENANCE AND CAPABILITY

IAW PWS Paragraph 4.3 Associated Document(s) Line Item(s)

FD20602100038 0004

Priority: R ROUTINE

Limitations of Liability: High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Wide Area Work Flow (WAWF) Quality Assurance: Standard Inspection

Pricing and Billing Note: The contractor will be pricing CLIN 0004 as the total amount per year, Firm Fixed Price Quantity U/I Unit Price Amount

1 LO

ENGINEERING SERVICES

IAW PWS Paragraph 4.6 Associated Document(s) Line Item(s)

FD20602100038 0005

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Wide Area Work Flow (WAWF) Quality Assurance: Standard Inspection

INTELLECTUAL PROPERTY AGREEMENT

Item No.

INTELLECTUAL PROPERTY AGREEMENT

Quantity U/I Unit Price Amount

1 LO

INTELLECTUAL

INTELLECTUAL PROPERTY

USE OF INTELLECTUAL PROPERTY DURING THE LIFE OF THE CONTRACT IN ACCORDANCE WITH THE

ATTACHED TECHNOLOGY LICENSE AGREEMENT.

Associated Document(s) Line Item(s)

FD20602100038 0006

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Wide Area Work Flow (WAWF) Quality Assurance: Standard Inspection

Firm Fixed Price Quantity U/I Unit Price Amount

1 LO

GFP

Associated Document(s) Line Item(s)

FD20602100038 0007

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Wide Area Work Flow (WAWF) Quality Assurance: Standard Inspection Class I ODS Substance Application/Use Quantity

Firm Fixed Price Quantity U/I Unit Price Amount

1 LO

KTR MGMT RPT

FD20602100038 0008

CONTRACTOR MANAGEMENT REPORT

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Wide Area Work Flow (WAWF) Quality Assurance: Standard Inspection

ANNUAL REQUIREMENT

Contractor Manpower Reporting will be funded on the first delivery order issued for the Basic and each

Item No.

Firm Fixed Price

DATA

DATA IAW DD FORM 1423-1

Associated Document(s) Line Item(s)

FD20602100038 0009

Priority: R ROUTINE

CONFERENCE MINUTES

PMR Meeting Minutes Item No.

4009AA

Firm Fixed Price Quantity U/I Unit Price Amount 1 LO Not Separately Priced Not Separately Priced

DATA

CONTRACT DATA REQUIREMENTS LIST (CDRL)

EXHIBIT A, ELIN A001

CONFERENCE MINUTES

PMR Meeting Minutes

Associated Document(s) Line Item(s)

FD20602100038 0009

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Wide Area Work Flow (WAWF)

TEST PLAN

Item No.

4009AB

Firm Fixed Price Quantity U/I Unit Price Amount 1 LO Not Separately Priced Not Separately Priced

DATA

CONTRACT DATA REQUIREMENTS LIST (CDRL)

EXHIBIT A, ELIN A002

TEST PLAN

Associated Document(s) Line Item(s)

FD20602100038 0009

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Wide Area Work Flow (WAWF)

4009AC

Firm Fixed Price Quantity U/I Unit Price Amount 1 LO Not Separately Priced Not Separately Priced

DATA

CONTRACT DATA REQUIREMENTS LIST (CDRL)

EXHIBIT A, ELIN A003

ENGINEERING CHANGE PROPOSAL (ECP)

Associated Document(s) Line Item(s)

FD20602100038 0009

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Wide Area Work Flow (WAWF)

OBSOLESCENCE ALERT NOTICE

Item No.

4009AD

Firm Fixed Price Quantity U/I Unit Price Amount 1 LO Not Separately Priced Not Separately Priced

DATA

CONTRACT DATA REQUIREMENTS LIST (CDRL)

EXHIBIT A, ELIN A004

OBSOLESCENCE ALERT NOTICE

Associated Document(s) Line Item(s)

FD20602100038 0009

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Wide Area Work Flow (WAWF)

Item No.

4009AE

Firm Fixed Price Quantity U/I Unit Price Amount 1 LO Not Separately Priced Not Separately Priced

DATA

CONTRACT DATA REQUIREMENTS LIST (CDRL)

EXHIBIT A, ELIN A005

RISK MANAGEMENT FRAMEWORK PACKAGE DELIVERABLES

RMF Package

Associated Document(s) Line Item(s)

FD20602100038 0009

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Wide Area Work Flow (WAWF)

RISK MANAGEMENT FRAMEWORK PACKAGE DELIVERABLES

RMF Project Plan Item No.

4009AF

Firm Fixed Price Quantity U/I Unit Price Amount 1 LO Not Separately Priced Not Separately Priced

DATA

CONTRACT DATA REQUIREMENTS LIST (CDRL)

EXHIBIT A, ELIN A006

RISK MANAGEMENT FRAMEWORK PACKAGE DELIVERABLES

RMF Project Plan

Associated Document(s) Line Item(s)

FD20602100038 0009

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Wide Area Work Flow (WAWF)

Item No.

4009AG

Firm Fixed Price Quantity U/I Unit Price Amount 1 LO Not Separately Priced Not Separately Priced

DATA

CONTRACT DATA REQUIREMENTS LIST (CDRL)

EXHIBIT A, ELIN A007

VULNERABILITY SCAN COMPLIANCE REPORT

VSC Report

Associated Document(s) Line Item(s)

FD20602100038 0009

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Wide Area Work Flow (WAWF)

ORDERING PERIOD V: THE 12 MONTH PERIOD IMMEDIATELY FOLLOWING ORDERING PERIOD

IV.

REPAIR - ADP

Item No.

Firm Fixed Price Best Estimated Qty

U/I Unit Price

60 EA

NSN: 6610-01-432-8459 FX

PROCESSOR,FLIGHT IN

Repair IAW PWS Dated 07 April 2020 Manufacturer Part Number 64547 2118952-5 Associated Document(s) Line Item(s)

FD20602100038 0001

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Wide Area Work Flow (WAWF) Quality Assurance: Standard Inspection

Transportation From Continental United States CONUS (CONUS) Sources

TYPE / SHIP TO CODE F.O.B.

A SW3119 DESTINATION

Type / Ship To PACRN Mark For

A SW3119 PAA

Type / Ship To Quantity (U/I) *ARO Funded Order or Reparable Assets, Whichever is Later

Req No / Pri

Required Delivery

A SW3119 60 EA *21 Calendar Days

Proposed Delivery

A SW3119 60 EA

OVER AND ABOVE (O&A)

Item No.

Firm Fixed Price Quantity U/I Amount 1 LO To be Negotiated

OVER

OVER AND ABOVE

OVER AND ABOVE (O&A)

IAW PWS PARA 4.4.2

Firm Fixed Price Quantity U/I Unit Price

1 EA

NSN: 6610-01-432-8459 FX

PROCESSOR, FLIGHT IN

BEYOND ECONOMIC REPAIR (BER)

IAW PWS PARA 4.4.1

Manufacturer Part Number 64547 2118952-5

Firm Fixed Price Quantity U/I Unit Price Amount

12 MO

MAINTENANCE AND CAPABILITY

IAW PWS Paragraph 4.3 Associated Document(s) Line Item(s)

FD20602100038 0004

Priority: R ROUTINE

Limitations of Liability: High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Wide Area Work Flow (WAWF) Quality Assurance: Standard Inspection

Pricing and Billing Note: The contractor will be pricing CLIN 0004 as the total amount per year, Firm Fixed Price Quantity U/I Unit Price Amount

1 LO

ENGINEERING SERVICES

IAW PWS Paragraph 4.6 Associated Document(s) Line Item(s)

FD20602100038 0005

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Wide Area Work Flow (WAWF) Quality Assurance: Standard Inspection

INTELLECTUAL PROPERTY AGREEMENT

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

1 LO

INTELLECTUAL

INTELLECTUAL PROPERTY

USE OF INTELLECTUAL PROPERTY DURING THE LIFE OF THE CONTRACT IN ACCORDANCE WITH THE

ATTACHED TECHNOLOGY LICENSE AGREEMENT.

Associated Document(s) Line Item(s)

FD20602100038 0006

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Wide Area Work Flow (WAWF) Quality Assurance: Standard Inspection

Firm Fixed Price Quantity U/I Unit Price Amount

1 LO

GFP

GFP TEST EQUIPMENT

FD20602100038 0007

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Wide Area Work Flow (WAWF) Quality Assurance: Standard Inspection Class I ODS Substance Application/Use Quantity

Firm Fixed Price Quantity U/I Unit Price Amount

1 LO

KTR MGMT RPT

Associated Document(s) Line Item(s)

FD20602100038 0008

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Wide Area Work Flow (WAWF) Quality Assurance: Standard Inspection

ANNUAL REQUIREMENT

Contractor Manpower Reporting will be funded on the first delivery order issued for the Basic and each

Item No.

Firm Fixed Price

DATA

DATA IAW DD FORM 1423-1

Associated Document(s) Line Item(s)

FD20602100038 0009

Priority: R ROUTINE

CONFERENCE MINUTES

PMR Meeting Minutes

5009AA

CONFERENCE MINUTES

PMR Meeting Minutes Firm Fixed Price Quantity U/I Unit Price Amount 1 LO Not Separately Priced Not Separately Priced

DATA

CONTRACT DATA REQUIREMENTS LIST (CDRL)

EXHIBIT A, ELIN A001

CONFERENCE MINUTES

PMR Meeting Minutes

Associated Document(s) Line Item(s)

FD20602100038 0009

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Wide Area Work Flow (WAWF)

5009AB

Firm Fixed Price Quantity U/I Unit Price Amount 1 LO Not Separately Priced Not Separately Priced

DATA

CONTRACT DATA REQUIREMENTS LIST (CDRL)

EXHIBIT A, ELIN A002

TEST PLAN

Associated Document(s) Line Item(s)

FD20602100038 0009

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Wide Area Work Flow (WAWF)

ENGINEERING CHANGE PROPOSAL (ECP)

Item No.

5009AC

Firm Fixed Price Quantity U/I Unit Price Amount 1 LO Not Separately Priced Not Separately Priced

DATA

CONTRACT DATA REQUIREMENTS LIST (CDRL)

EXHIBIT A, ELIN A003

ENGINEERING CHANGE PROPOSAL (ECP)

Associated Document(s) Line Item(s)

FD20602100038 0009

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Wide Area Work Flow (WAWF)

5009AD

Firm Fixed Price Quantity U/I Unit Price Amount 1 LO Not Separately Priced Not Separately Priced

DATA

CONTRACT DATA REQUIREMENTS LIST (CDRL)

EXHIBIT A, ELIN A004

OBSOLESCENCE ALERT NOTICE

Associated Document(s) Line Item(s)

FD20602100038 0009

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Wide Area Work Flow (WAWF)

RISK MANAGEMENT FRAMEWORK PACKAGE DELIVERABLES

RMF Package Item No.

5009AE

Firm Fixed Price Quantity U/I Unit Price Amount 1 LO Not Separately Priced Not Separately Priced

DATA

CONTRACT DATA REQUIREMENTS LIST (CDRL)

EXHIBIT A, ELIN A005

RISK MANAGEMENT FRAMEWORK PACKAGE DELIVERABLES

RMF Package

Associated Document(s) Line Item(s)

FD20602100038 0009

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Wide Area Work Flow (WAWF)

Item No.

5009AF

Firm Fixed Price Quantity U/I Unit Price Amount 1 LO Not Separately Priced Not Separately Priced

DATA

CONTRACT DATA REQUIREMENTS LIST (CDRL)

EXHIBIT A, ELIN A006

RISK MANAGEMENT FRAMEWORK PACKAGE DELIVERABLES

RMF Project Plan

Associated Document(s) Line Item(s)

FD20602100038 0009

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Wide Area Work Flow (WAWF)

VULNERABILITY SCAN COMPLIANCE REPORT

VSC Report Item No.

5009AG

Firm Fixed Price Quantity U/I Unit Price Amount 1 LO Not Separately Priced Not Separately Priced

DATA

CONTRACT DATA REQUIREMENTS LIST (CDRL)

EXHIBIT A, ELIN A007

VULNERABILITY SCAN COMPLIANCE REPORT

VSC Report

Associated Document(s) Line Item(s)

FD20602100038 0009

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Wide Area Work Flow (WAWF)

ORDERING PERIOD VI: THE 12 MONTH PERIOD IMMEDIATELY FOLLOWING ORDERING PERIOD

V.

REPAIR - ADP

Item No.

Firm Fixed Price Best Estimated Qty

U/I Unit Price

60 EA

NSN: 6610-01-432-8459 FX

PROCESSOR,FLIGHT IN

Repair IAW PWS Dated 07 April 2020 Manufacturer Part Number 64547 2118952-5 Associated Document(s) Line Item(s)

FD20602100038 0001

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination

REPAIR - ADP

Transportation From Continental United States CONUS (CONUS) Sources

TYPE / SHIP TO CODE F.O.B.

A SW3119 DESTINATION

Type / Ship To PACRN Mark For

A SW3119 PAA

Type / Ship To Quantity (U/I) *ARO Funded Order or Reparable Assets, Whichever is Later

Req No / Pri

Required Delivery

A SW3119 60 EA *21 Calendar Days

Proposed Delivery

A SW3119 60 EA

OVER AND ABOVE (O&A)

Item No.

Firm Fixed Price Quantity U/I Amount 1 LO To be Negotiated

OVER

OVER AND ABOVE

IAW PWS PARA 4.4.2

Firm Fixed Price Quantity U/I Unit Price

1 EA

NSN: 6610-01-432-8459 FX

PROCESSOR, FLIGHT IN

BEYOND ECONOMIC REPAIR (BER)

IAW PWS PARA 4.4.1

Manufacturer Part Number 64547 2118952-5

Firm Fixed Price Quantity U/I Unit Price Amount

12 MO

MAINTENANCE AND CAPABILITY

IAW PWS Paragraph 4.3 Associated Document(s) Line Item(s)

FD20602100038 0004

Priority: R ROUTINE

Limitations of Liability: High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Wide Area Work Flow (WAWF) Quality Assurance: Standard Inspection

Pricing and Billing Note: The contractor will be pricing CLIN 0004 as the total amount per year, Firm Fixed Price Quantity U/I Unit Price Amount

1 LO

ENGINEERING SERVICES

IAW PWS Paragraph 4.6 Associated Document(s) Line Item(s)

FD20602100038 0005

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Wide Area Work Flow (WAWF) Quality Assurance: Standard Inspection

INTELLECTUAL PROPERTY AGREEMENT

Item No.

INTELLECTUAL PROPERTY AGREEMENT

Quantity U/I Unit Price Amount

1 LO

INTELLECTUAL

INTELLECTUAL PROPERTY

USE OF INTELLECTUAL PROPERTY DURING THE LIFE OF THE CONTRACT IN ACCORDANCE WITH THE

ATTACHED TECHNOLOGY LICENSE AGREEMENT.

Associated Document(s) Line Item(s)

FD20602100038 0006

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Wide Area Work Flow (WAWF) Quality Assurance: Standard Inspection

Firm Fixed Price Quantity U/I Unit Price Amount

1 LO

GFP

Associated Document(s) Line Item(s)

FD20602100038 0007

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Wide Area Work Flow (WAWF) Quality Assurance: Standard Inspection Class I ODS Substance Application/Use Quantity

Firm Fixed Price Quantity U/I Unit Price Amount

1 LO

KTR MGMT RPT

FD20602100038 0008

CONTRACTOR MANAGEMENT REPORT

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Wide Area Work Flow (WAWF) Quality Assurance: Standard Inspection

ANNUAL REQUIREMENT

Contractor Manpower Reporting will be funded on the first delivery order issued for the Basic and each

Item No.

Firm Fixed Price

DATA

DATA IAW DD FORM 1423-1

Associated Document(s) Line Item(s)

FD20602100038 0009

Priority: R ROUTINE

CONFERENCE MINUTES

PMR Meeting Minutes Item No.

6009AA

Firm Fixed Price Quantity U/I Unit Price Amount 1 LO Not Separately Priced Not Separately Priced

DATA

CONTRACT DATA REQUIREMENTS LIST (CDRL)

EXHIBIT A, ELIN A001

CONFERENCE MINUTES

PMR Meeting Minutes

Associated Document(s) Line Item(s)

FD20602100038 0009

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Wide Area Work Flow (WAWF)

TEST PLAN

Item No.

6009AB

Firm Fixed Price Quantity U/I Unit Price Amount 1 LO Not Separately Priced Not Separately Priced

DATA

CONTRACT DATA REQUIREMENTS LIST (CDRL)

EXHIBIT A, ELIN A002

TEST PLAN

Associated Document(s) Line Item(s)

FD20602100038 0009

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Wide Area Work Flow (WAWF)

6009AC

Firm Fixed Price Quantity U/I Unit Price Amount 1 LO Not Separately Priced Not Separately Priced

DATA

CONTRACT DATA REQUIREMENTS LIST (CDRL)

EXHIBIT A, ELIN A003

ENGINEERING CHANGE PROPOSAL (ECP)

Associated Document(s) Line Item(s)

FD20602100038 0009

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Wide Area Work Flow (WAWF)

OBSOLESCENCE ALERT NOTICE

Item No.

6009AD

Firm Fixed Price Quantity U/I Unit Price Amount 1 LO Not Separately Priced Not Separately Priced

DATA

CONTRACT DATA REQUIREMENTS LIST (CDRL)

EXHIBIT A, ELIN A004

OBSOLESCENCE ALERT NOTICE

Associated Document(s) Line Item(s)

FD20602100038 0009

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .