Attachment_8_CDRLs_A001-A003.pdf
PDF 106 KB Posted
- Attached to
- C-130 Pressure Altimeter Repair Federal contract opportunity
- Solicitation number
- FA8538-17-Q-0001
About this file
Attachment 8 CDRLs A001-A003
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Pressure_Altimeter_Limited_SJ_Redacted.pdf | ||
| Attachment_11_Wage_Determinations.pdf | ||
| FA853817Q0001.pdf | ||
| Attachment_10_CDRL_A005.pdf | ||
| Attachment_3_Packaging_Requirements.pdf | ||
| Attachment_5_DD2875_SAAR.pdf | ||
| Attachment_6_Instructions_for_DD2875.pdf | ||
| Attachment_4_CAV_AF_SOW.pdf | ||
| Attachment_1_SGFP.pdf | ||
| Attachment_7_AF_Form_4394_User_Agreement_Statement.pdf | ||
| Attachment_9_CDRL_A004.pdf | ||
| Attachment_2_PWS.pdf |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACT DATA REQUIREMENTS LIST Form Approved OMB No. 0704-0188(1 Data Item)
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Executive Services Directorate (0704-0188).
Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT
A
C. CATEGORY
TDP TM OTHER X
D. SYSTEM / ITEM
C-130 / ALTIMETER
E. CONTRACT / PR NO.
FD20601600435
F. CONTRACTOR
1. DATA ITEM NO.
A001
2. TITLE OF DATA ITEM
Commercial Asset Visibility Air Force
3. SUBTITLE
CAVAF
4. AUTHORITY
DI-MGMT-81634C
(Data Acquisition Document No.) 5. CONTRACT REFERENCE
PWS para 4.8
6. REQUIRING OFFICE
FA8538
7. DD 250 REQ
LT
8. APP CODE
N/A
9. DIST STATEMENT
REQUIRED
A
10. FREQUENCY
See Block 16
11. AS OF DATE
See block 16
12. DATE OF FIRST
SUBMISSION
See block 16
13. DATE OF SUBSEQUENT
SUBMISSION
See block 16
a. ADDRESSEE
Draft Final
ReproReg
b. COPIES
14. DISTRIBUTION
16. REMARKS
Sostarich, Jonn WNAME: 05 MAY 2016DATE:
1. The contractor shall report End Item transactional data through electronic submission in CAV AF using the CAV AF web site or CICA XML IAW the referenced DID IAW and/or CAV AF CFM SOW. This information will be accessed by the program office PMS and by 420 SCMS/GUNAB-Robins in order to ascertain production status.
2. Transactions and data will be submitted by the contractor daily IAW CAV AF User Guide, Version 8.0.1 or higher.
The Contractor shall obtain a valid DOD PKI certificate to log into CAV AF. Each user shall be required to have an Identity Certificate only; an encryption certificate is not required.
3. Training will be provided by 420 SCMS/GUNAB-Robins, (478) 327-6603 or 6602.
4. This DD Form 1423-1 applies to Contractor Furnished Materiel (CFM) type contracts.
Block 7: Enter the applicable code as listed in DOD 5010.12-M, Chapter 3. (Enter LT for Letter of Transmittal if not separately priced or DD if separately priced.)
Block 10:
a. Contractor reporting requirements to CAV AF shall be accomplished daily and/or within 24 hours of a supply or maintenance action occurrence IAW Contractor Users Guide.
b. The method of communication from the contractor to the funding base will be mechanized using the CAV AF Online web site IAW CAV AF Contractor Users Guide.
Block 11: Data shall be current within 24 hours of last End Item maintenance occurrence.
Block 12: Date of first submission shall be within 24 hours following a supply or maintenance transaction after the contract award date and government training as specified in IAW CAV AF Users Guide.
Block 13: Same as remarks regarding Block 10 above.
COORDINATORS:
Kirkland, Ruth H 409 C130 / ENA 478-926-6379 / 468-6379 31 MAY 2016
15. TOTAL
G. PREPARED BY
Allen, Carl B
409 SCMS / GUMBB
478-327-3603
H. DATE
01 JUN 2016
I. APPROVED BY
//DIGITALLY SIGNED//
PINCKNEY.JOSEPH.M.JR.1031554574
409 SCMS / GUMB 478-926-7277 / 468-7277
J. DATE
01 JUN 2016
Page 1 of 3DD FORM 1423-1, FEB 2001 Version 3Generated by PRPS using Jasper Reports on 23 Aug 2016
PREVIOUS EDITION MAY BE USED.
A. CONTRACT LINE ITEM NO. B. EXHIBIT
A
C. CATEGORY
TDP TM OTHER X
D. SYSTEM / ITEM
C-130 / ALTIMETER
E. CONTRACT / PR NO.
FD20601600435
F. CONTRACTOR
1. DATA ITEM NO.
A002
2. TITLE OF DATA ITEM
Failure Summary and Analysis Report
3. SUBTITLE
Failure Report
4. AUTHORITY
DI-SESS-80255A
(Data Acquisition Document No.) 5. CONTRACT REFERENCE
PWS 4.10
6. REQUIRING OFFICE
409 SCMS/GUMBB
7. DD 250 REQ
LT
8. APP CODE
N/A
9. DIST STATEMENT
REQUIRED
A
10. FREQUENCY
QRTLY
11. AS OF DATE
See Blk 16
12. DATE OF FIRST
SUBMISSION
See Blk 16
13. DATE OF SUBSEQUENT
SUBMISSION
See Blk 16
a. ADDRESSEE
Draft Final
ReproReg
b. COPIES
14. DISTRIBUTION
16. REMARKS
Warren, Michele ANAME: 17 MAY 2016DATE:
In accordance with Performance-Based Work Statement (PWS), this report shall identify the summary of analysis and the repair action(s) taken. The report shall be provided quarterly. Contractor electronic format is acceptable.
An electronic copy shall be provided to the Program Manager. A paper copy of the report must also be provided to the address in Block 14a. However, the Contractor may forgo the provision of paper copy of this report by obtaining a waiver from the Program Manager. The waiver can be obtained via email with a statement that exempts the Contractor from providing a paper copy.
Block 12. The first submission of this report is due 45 days after the first quarter of performance. The performance period begins on the date of award of the ordr against the basic contract.
Block 13: Subsequent reports are due 45 days after the end of the quarter.
14A: michele.warren@us.af.mil
COORDINATORS:
Kirkland, Ruth H 409 C130 / ENA 478-926-6379 / 468-6379 31 MAY 2016
409 SCMS/GUMBB
Attn: Program Manager 235 Byron Street Robins AFB, GA 31098
0 1 0
0 1 015. TOTAL
G. PREPARED BY
Allen, Carl B
409 SCMS / GUMBB
478-327-3603
H. DATE
01 JUN 2016
I. APPROVED BY
//DIGITALLY SIGNED//
PINCKNEY.JOSEPH.M.JR.1031554574
409 SCMS / GUMB 478-926-7277 / 468-7277
J. DATE
01 JUN 2016
Page 2 of 3DD FORM 1423-1, FEB 2001 Version 3Generated by PRPS using Jasper Reports on 23 Aug 2016
A. CONTRACT LINE ITEM NO. B. EXHIBIT
A
C. CATEGORY
TDP TM OTHER X
D. SYSTEM / ITEM
C-130 / ALTIMETER
E. CONTRACT / PR NO.
FD20601600435
F. CONTRACTOR
1. DATA ITEM NO.
A003
2. TITLE OF DATA ITEM
Status Report
3. SUBTITLE
Status Report
4. AUTHORITY
DS-MGMT-80368A
(Data Acquisition Document No.) 5. CONTRACT REFERENCE
PWS 4.9
6. REQUIRING OFFICE
409 SCMS/GUMBB
7. DD 250 REQ
N/A
8. APP CODE
N/A
9. DIST STATEMENT
REQUIRED
N/A
10. FREQUENCY
MTHLY
11. AS OF DATE
See Blk 16
12. DATE OF FIRST
SUBMISSION
See Blk 16
13. DATE OF SUBSEQUENT
SUBMISSION
See Blk 16
a. ADDRESSEE
Draft Final
ReproReg
b. COPIES
14. DISTRIBUTION
16. REMARKS
Warren, Michele ANAME: 17 MAY 2016DATE:
Contractor electronic format is acceptable. However, report shall include the following as a minimum:
a) Identify each reparable item by contract number, delivery order number and CLIN
b) Identify each reparable item by National Stock Number (NSN)
c) Identify each reparable item by nomenclature
d) Quantity of each reparable item in-work
e) Quantity of each reparable item on-hand awaiting induct for maintenance
f) Quantity repaired per NSN on contract
g) Number of Deficiency Reports received for each reparable item
h) Quantity of Beyond Economical Repair (BER) for each reparable item on contract
i) Quantity of condemnations for each reparable item on contract
Block 12: The first report is due at the end of the month contract awarded.
Block 13: Subsequent reports are due at the end of each month.
An electronic copy shall be provided to the PM Michele Warren, michele.warren@us.af.mil and the PMS Carl Allen, carl.allen7@us.af.mil
COORDINATORS:
Kirkland, Ruth H 409 C130 / ENA 478-926-6379 / 468-6379 31 MAY 2016
15. TOTAL
G. PREPARED BY
Allen, Carl B
409 SCMS / GUMBB
478-327-3603
H. DATE
01 JUN 2016
I. APPROVED BY
//DIGITALLY SIGNED//
PINCKNEY.JOSEPH.M.JR.1031554574
409 SCMS / GUMB 478-926-7277 / 468-7277
J. DATE
01 JUN 2016
Page 3 of 3DD FORM 1423-1, FEB 2001 Version 3Generated by PRPS using Jasper Reports on 23 Aug 2016
File details come from the government source that posted it. Updated .