MAAS RFP_QA-Clarifications.docx
DOCX document 48 KB Posted
- Attached to
- Mobile Aircraft Arresting System (MAAS)
- Solicitation number
- FA8534-21-R-0009
View the file
Other files
Show all 29
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEPARTMENT OF THE AIR FORCE
AIR FORCE LIFE CYCLE MANAGEMENT CENTER
ROBINS AIR FORCE BASE GEORGIA
MEMORANDUM FOR MOBILE AIRCRACT ARRESTING SYSTEM
FROM: AFLCMC/WNKAC
235 Byron Street, Suite 19A Robins AFB, GA 31098-1670
SUBJECT: U.S Government (USG) Response to Questions/Clarification Requests on MAAS RFP.
The USG will use this working document to respond to questions and/or provide clarifcations on the request for proposal FA8534-21-R-0009 for the Mobile Aircraft Arresting System Source Selection.
Questions:
1. The Top Assembly 201018515 lists four (4) configurations (i.e. -10, -20, -30, and -40). Could the Government clarify which configuration Contractors should bid to?
Contractors should bid to a -10 configuration including a 28 tooth sprocket for the Top Assembly 201018515.
2. Could the Government provide the Missing Drawings for Rewind Clutch Assembly, 200037000? The Government has confirmed that the following Drawings were included in the drawing package release with the Offical RFP on 09 August 2020.
The requested drawings are listed below:
1. Pg 2 of the drawing package- 200037001_98752
2. Pg 3 of the drawing package- 200037002_98752
3. Pg 4 of the drawing package- 200037003_98752
4. Pg 5 of the drawing package- 200037004_98752
5. Pg 6 of the drawing package- 200037005_98752
6. Pg 7 of the drawing package- 200037006_98752
7. Pg 8 of the drawing package- 200037007_98752
3. Item 0001 on Page 3 of the solicitation is asking for QTY of 1 however on page 35 of the solicitation clause 52.209-4 is asking for QTY of 2. This clause also references both 270 days and 300 days. Can the government clarify?
In accordance with the AFMC Form 260, contractors will be required to produce one unit or qty of 1 to be delivered 300 calendar days from the contract date. The discrepancies in clause 52.209-4 will be addressed in RFP Amendment_02.
4. Page 6 of the solicitation is referring to GOVERNMENT APPROVAL/DISAPPROVAL TO BE PROVIDED WITHIN 45 DAYS AFTER RECEIPT OF TEST PROCEDURES. Test procedures or test report? Please clarify.
Government approval/ disapproval shall be provided within 45 days after receipt of the test report. This clarification will be addressed in RFP Amendment_02.
5. Section L- initial describes on base and off base rates as well as Labor Add-on Factors, however Attachment 03 Cost/Price Matrix does not have a place for these costs. Please advise.
The Government has updated/ revised Section L- Initial to remove language regarding On and Off Base rates as it was included in error. This labor is associated with drawing updates or changes that shall occur at the contractors location.
This clarification will be addressed in RFP Amendment_02.
Clarifications:
1. The Proposal response date has been extended by 15 calendar days.
From: 09 September 2021 by 5:00pm EST To: 24 September 2021 by 5:00pm EST
2. Package should be bid as FOB Origin
3. RFP Amendment_02 Addresses question 3 and 4 above as well as incorporating an updated Statement of Work (SOW), Section L- Initial, and CDRL Portfolio.
4. Section L- Proposal submission, Volumes I-IV shall be submitted as separate files or a PDF Portfolio. No physical binders are required for proposal submission.
Should you have any questions or concerns, please contact Kristen Campbell and/or Kelsey Wade via email at kristen.campbell.2@us.af.mil and kelsey.wade.1@us.af.mil.
image1.png
File details come from the government source that posted it. Updated .