Bomber Armament Tester (BAT) Federal contract opportunity
Solicitation number
FA8533-16-R-0001
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Robins Air Force Base

About this file

Updated BAT CLIN Structure

View the file

Other files for this federal contract opportunity

Other files attached to Bomber Armament Tester (BAT), newest first.
File Type Posted
Updated_BAT_NEWS_dated_4_May_16.pdf PDF
DD_Form_2345 _Militarily_Critical_Technical_Data_Agreement.pdf PDF
AFGSC_Industry-Day_Brief-18Feb15.pdf PDF
Bomber_Armament_Tester_Bidder's_Library-Notice_to_Industry.pdf PDF
BAT_Pre-Proposal_Teleconference_Slides.pdf PDF
Updated_BAT_NEWS_dated_21_Apr_16.pdf PDF
Updated_BAT_NEWS_dated_19_Apr_16_(2).pdf PDF
Updated_BAT_NEWS_dated_18_Apr_16.pdf PDF
Updated_BAT_NEWS_dated_15_Apr_16.pdf PDF
Atch_19_CDRL_General_Notes.pdf PDF
DRAFT_BAT_Section_L.pdf PDF
Atch_6_Transmittal_Letter.pdf PDF
Atch_4_Client_Authorization_Letter.pdf PDF
Atch_26_AFMC_260.pdf PDF
Atch_16_Contract_Data_Requirements_List_B00U-B018.pdf PDF
Atch_18_Contract_Data_Requirements_List_C001-C008.pdf PDF
Atch_1_Cross_Reference_Martix.pdf PDF
Atch_22_SGFP_BAT_GFP_Form.pdf PDF
Atch_3_Past_Performance_Information_for_Offerors.pdf PDF
DRAFT_BAT_Section_M.pdf PDF
Atch_21_RGFP_BAT_GFP_Form.pdf PDF
Atch_15_Contract_Data_Requirements_List_A001-A00G.pdf PDF
Atch_11_Total_Resources_Volume_WBS_Breakdown.xlsx XLSX spreadsheet
Atch_2_Electronic_Format_for_All_Proposal_Volumes.pdf PDF
Responses_to_Draft_RFP_Questions.pdf PDF
Atch_17_Contract_Data_Requirements_List_B001-B00T.pdf PDF
Atch_24_AFMC_807.pdf PDF
Updated_BAT_NEWS_dated_14_Apr_16.pdf PDF
Atch_7_Past_Performance_Questionnaire.pdf PDF
Atch_14_Performance_Specification_Rev9.pdf PDF
Atch_5_Consent_Form.pdf PDF
Atch_20_TMCR_for_Bomber_Armament_Test_Set.pdf PDF
RFP_Incentive_Language.pdf PDF
Updated_BAT_NEWS_dated_22Mar16.pdf PDF
Updated_BAT_NEWS_dated_21Mar16.pdf PDF
Updated_BAT_NEWS_dated_17Mar16.pdf PDF
Contractor_Briefing_of_BAT_Incentives.pdf PDF
Contract_Data_Requirements_List_C_Portfolio.pdf PDF
Contract_Data_Requirements_List_A_Portfolio.pdf PDF
DRAFT_BAT_Performance_Specification _dated_8_Mar__16 _Rev_9.pdf PDF
DRAFT_BAT_Section_L_-_As_of_5_Feb_16.pdf PDF
DRAFT_BAT_Performance_Specification _dated_26_Jan_16 _Rev_8.pdf PDF
DRAFT_FA8533-16-R-0001.pdf PDF
DRAFT_BAT_Statement_of_Work dated_21_Jan_16 _Rev_5.pdf PDF
Questions_and_Responses_ao_Jan_4_16.pptx PPTX presentation
DRFP_BAT_CDRLs_26_Jan_16.pdf PDF
Bomber_Armament_Tester_Bidder's_Library-Notice_to_Industry.pdf PDF
DRAFT_BAT_APPENDIX_C_as_of_30_Oct_15.pdf PDF
Updated_BAT_NEWS_dated_5_Feb_16.pdf PDF
DRAFT_BAT_Section_M_-_As_of_5_Feb_16.pdf PDF
Show all 50

Bomber Armament Tester (BAT) has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DRAFT BAT CLIN STRUCTURE

as of 9 Mar 16 (See Notes on Page 2)

CLIN SubCLIN Noun SOW Reference Contract

Type Qty Unit

Unit

Price

Target

Fee

Extended

Price

BASIC

0001 Engineering and Manufacturing Design

The Contractor shall design, develop, integrate, and test a common BAT Core Tester capable of testing all UUT TPSs listed in Appendix A of the SOW. During this increment, the Contractor shall also design, develop, integrate, and test all B‐2A TPSs, the SUU‐67 Pylon Wing Disconnects TPS for the B‐52H, and the MPRL TPS for the B‐1B.

Cost Incentive Para 4.0 CPIF 1 LO ‐$ ‐$ ‐$

0002 Data (CDRLs)

A001, A002, A003, etc… Various NSP 1 LO ‐$ ‐$

0003 EMD Schedule Incentives

The Contractor has the opportunity to earn schedule incentives at CDR, SVR, and PRR if the performance reviews are satisfactorily completed within the approved IMS timeframe. The system reviews must be scheduled and completed, with all action items closed and approved within 30 calendar days, to earn the full incentive amounts.

0003AA CDR Schedule Incentive (20%) Para. 4.1.4 FFP 1 LO ‐$ ‐$

0003AB SVR Schedule Incentive (30%) Para. 4.1.5 ‐ 4.1.5.7 FFP 1 LO ‐$ ‐$

0003AC PRR Schedule Incentive (50%) Para. 4.1.10 FFP 1 LO ‐$ ‐$

OPTION 1

0004 Production I Paras. 4.2.1 and 4.2.3

0004AA Production of BAT Systems (Core Testers and UUT TPSs) FPIS 10 EA ‐$ ‐$ ‐$ 0004AB Production of BAT Systems (Core Testers and UUT TPSs) FPIS 9 EA ‐$ ‐$ ‐$

0005 Data (CDRLs) Required During Production Various NSP 1 LO ‐$ ‐$

0006 Provisioning (As Ordered) FFP 1 LO ‐$ ‐$

0007 Familiarization Paras. 3.9.4/4.1.7 FFP 1 LO ‐$ ‐$

OPTION 2

1001 Engineering and Manufacturing Design

During this increment, the Contractor shall design, develop, integrate, and test all B‐1B TPSs listed in

Appendix A of the SOW, including incorporation of the MPRL TPS developed in Increment 1.

Cost Incentive Para 4.0 CPIF 1 LO ‐$ ‐$ ‐$

1002 Data (CDRLs)

A001, A002, A003, etc… Various NSP 1 LO ‐$ ‐$

1003 EMD Schedule Incentives

The Contractor has the opportunity to earn schedule incentives at CDR and PRR if the performance reviews are satisfactorily completed within the approved IMS timeframe. The system reviews must be scheduled and completed, with all action items closed and approved within 30 calendar days, to earn the full incentive amounts.

1003AA CDR Schedule Incentive (30%) Para. 4.1.4 FFP 1 LO ‐$ ‐$

1003AB PRR Schedule Incentive (70%) Para. 4.1.10 FFP 1 LO ‐$ ‐$

OPTION 3

1004 Production II Paras. 5.2.1 and 5.2.3

1004AA Production of BAT Systems (Core Testers and UUT TPSs) FPIS 17 EA ‐$ ‐$ ‐$ 1004AB Production of BAT Systems (Core Testers and UUT TPSs) FPIS 16 EA ‐$ ‐$ ‐$

1005 Data (CDRLs) Required During Production Various NSP 1 LO ‐$ ‐$

1006 Provisioning (As Ordered) FFP 1 LO ‐$ ‐$

1007 Familiarization Paras. 3.9.4/4.1.7 FFP 1 LO ‐$ ‐$

OPTION 4

2001 Engineering and Manufacturing Design

During this increment, the Contractor shall design, develop, integrate, and test all B‐52H TPSs listed in

Appendix A of the SOW, including incorporation of the SUU‐67 TPS developed in Increment 1.

Cost Incentive Para 4.0 CPIF 1 LO ‐$ ‐$ ‐$

2002 Data (CDRLs)

A001, A002, A003, etc… Various NSP 1 LO ‐$ ‐$

2003 EMD Schedule Incentives

The Contractor has the opportunity to earn schedule incentives at CDR and PRR if the performance reviews are satisfactorily completed within the approved IMS timeframe. The system reviews must be scheduled and completed, with all action items closed and approved within 30 calendar days, to earn the full incentive amounts.

2003AA CDR Schedule Incentive (30%) Para. 4.1.4 FFP 1 LO ‐$ ‐$

2003AB PRR Schedule Incentive (70%) Para. 4.1.10 FFP 1 LO ‐$ ‐$

OPTION 5

2004 Production III Paras. 5.2.1 and 5.2.3

2004AA Production of BAT Systems (Core Testers and UUT TPSs) FPIS 19 EA ‐$ ‐$ ‐$ 2004AB Production of BAT Systems (Core Testers and UUT TPSs) FPIS 19 EA ‐$ ‐$ ‐$

2005 Data (CDRLs) Required During Production Various NSP 1 LO ‐$ ‐$

2006 Provisioning (As Ordered) FFP 1 LO ‐$ ‐$

2007 Familiarization Paras. 3.9.4/4.1.7 FFP 1 LO ‐$ ‐$

(Option) Interim Contractor Support (ICS) OPTION 6 3001 Interim Contractor Support (Help Desk) Para. 6.2.1 FFP 1 LO ‐$ ‐$

3001AA ICS in Year Four (4) 3001AB ICS in Year Five (5) 3001AC ICS in Year Six (6) 3001AD ICS in Year Seven (7) 3001AE ICS in Year Eight (8) 3001AF ICS in Year Nine (9)

3002 Non‐Warranty Over‐and‐Above Repair TBN 1 LO ‐$ ‐$

4001 Engineering Change Proposal Para. 3.9.6.3 TBD 1 LO ‐$ ‐$

Contract‐Wide: Engineering Change Proprosal

Basic Period ‐ Increment 1 ‐ Engineering and Manufacturing Design of Core Tester, B‐2A UUT TPS, B‐1B MPRL UUT TPS, and B‐52 SUU‐67 UUT TPS

Option Period 1 ‐ Production B‐2A Core Tester and B‐2A UUT TPS

Option Period 2 ‐ Increment 2 ‐ B‐1B UUT TPS and Incorporation of B‐1B MPRL

Option Period 3 ‐ Production B‐1B Core Tester and B‐1B UUT TPS

Option Period 4 ‐ Increment 3 ‐ B‐52H UUT TPS and Incorporation of B‐52H SUU‐67

Option Period 5 ‐ Production B‐52 Core Tester and B‐52 UUT TPS

DRAFT VERSION ONLY

DRAFT BAT CLIN STRUCTURE

as of 9 Mar 16 (See Notes on Page 2)

NOTE 1:

The Government will determine completion of each review to be successful when accomplished IAW the applicable SOW Paragraph requirements after: 1) the successful completion of the technical review briefing, and 2) the resolution of all action items documented during the review. A formal notification of completion will be submitted by the Government Contracting Officer.

DRAFT VERSION ONLY