Updated_DRAFT_BAT_CLIN_Structure_(FBO_Version).pdf
PDF 96 KB Posted
- Attached to
- Bomber Armament Tester (BAT) Federal contract opportunity
- Solicitation number
- FA8533-16-R-0001
About this file
Updated BAT CLIN Structure
View the file
Other files for this federal contract opportunity
Show all 50
Bomber Armament Tester (BAT) has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DRAFT BAT CLIN STRUCTURE
as of 9 Mar 16 (See Notes on Page 2)
CLIN SubCLIN Noun SOW Reference Contract
Type Qty Unit
Unit
Price
Target
Fee
Extended
Price
BASIC
0001 Engineering and Manufacturing Design
The Contractor shall design, develop, integrate, and test a common BAT Core Tester capable of testing all UUT TPSs listed in Appendix A of the SOW. During this increment, the Contractor shall also design, develop, integrate, and test all B‐2A TPSs, the SUU‐67 Pylon Wing Disconnects TPS for the B‐52H, and the MPRL TPS for the B‐1B.
Cost Incentive Para 4.0 CPIF 1 LO ‐$ ‐$ ‐$
0002 Data (CDRLs)
A001, A002, A003, etc… Various NSP 1 LO ‐$ ‐$
0003 EMD Schedule Incentives
The Contractor has the opportunity to earn schedule incentives at CDR, SVR, and PRR if the performance reviews are satisfactorily completed within the approved IMS timeframe. The system reviews must be scheduled and completed, with all action items closed and approved within 30 calendar days, to earn the full incentive amounts.
0003AA CDR Schedule Incentive (20%) Para. 4.1.4 FFP 1 LO ‐$ ‐$
0003AB SVR Schedule Incentive (30%) Para. 4.1.5 ‐ 4.1.5.7 FFP 1 LO ‐$ ‐$
0003AC PRR Schedule Incentive (50%) Para. 4.1.10 FFP 1 LO ‐$ ‐$
OPTION 1
0004 Production I Paras. 4.2.1 and 4.2.3
0004AA Production of BAT Systems (Core Testers and UUT TPSs) FPIS 10 EA ‐$ ‐$ ‐$ 0004AB Production of BAT Systems (Core Testers and UUT TPSs) FPIS 9 EA ‐$ ‐$ ‐$
0005 Data (CDRLs) Required During Production Various NSP 1 LO ‐$ ‐$
0006 Provisioning (As Ordered) FFP 1 LO ‐$ ‐$
0007 Familiarization Paras. 3.9.4/4.1.7 FFP 1 LO ‐$ ‐$
OPTION 2
1001 Engineering and Manufacturing Design
During this increment, the Contractor shall design, develop, integrate, and test all B‐1B TPSs listed in
Appendix A of the SOW, including incorporation of the MPRL TPS developed in Increment 1.
Cost Incentive Para 4.0 CPIF 1 LO ‐$ ‐$ ‐$
1002 Data (CDRLs)
A001, A002, A003, etc… Various NSP 1 LO ‐$ ‐$
1003 EMD Schedule Incentives
The Contractor has the opportunity to earn schedule incentives at CDR and PRR if the performance reviews are satisfactorily completed within the approved IMS timeframe. The system reviews must be scheduled and completed, with all action items closed and approved within 30 calendar days, to earn the full incentive amounts.
1003AA CDR Schedule Incentive (30%) Para. 4.1.4 FFP 1 LO ‐$ ‐$
1003AB PRR Schedule Incentive (70%) Para. 4.1.10 FFP 1 LO ‐$ ‐$
OPTION 3
1004 Production II Paras. 5.2.1 and 5.2.3
1004AA Production of BAT Systems (Core Testers and UUT TPSs) FPIS 17 EA ‐$ ‐$ ‐$ 1004AB Production of BAT Systems (Core Testers and UUT TPSs) FPIS 16 EA ‐$ ‐$ ‐$
1005 Data (CDRLs) Required During Production Various NSP 1 LO ‐$ ‐$
1006 Provisioning (As Ordered) FFP 1 LO ‐$ ‐$
1007 Familiarization Paras. 3.9.4/4.1.7 FFP 1 LO ‐$ ‐$
OPTION 4
2001 Engineering and Manufacturing Design
During this increment, the Contractor shall design, develop, integrate, and test all B‐52H TPSs listed in
Appendix A of the SOW, including incorporation of the SUU‐67 TPS developed in Increment 1.
Cost Incentive Para 4.0 CPIF 1 LO ‐$ ‐$ ‐$
2002 Data (CDRLs)
A001, A002, A003, etc… Various NSP 1 LO ‐$ ‐$
2003 EMD Schedule Incentives
The Contractor has the opportunity to earn schedule incentives at CDR and PRR if the performance reviews are satisfactorily completed within the approved IMS timeframe. The system reviews must be scheduled and completed, with all action items closed and approved within 30 calendar days, to earn the full incentive amounts.
2003AA CDR Schedule Incentive (30%) Para. 4.1.4 FFP 1 LO ‐$ ‐$
2003AB PRR Schedule Incentive (70%) Para. 4.1.10 FFP 1 LO ‐$ ‐$
OPTION 5
2004 Production III Paras. 5.2.1 and 5.2.3
2004AA Production of BAT Systems (Core Testers and UUT TPSs) FPIS 19 EA ‐$ ‐$ ‐$ 2004AB Production of BAT Systems (Core Testers and UUT TPSs) FPIS 19 EA ‐$ ‐$ ‐$
2005 Data (CDRLs) Required During Production Various NSP 1 LO ‐$ ‐$
2006 Provisioning (As Ordered) FFP 1 LO ‐$ ‐$
2007 Familiarization Paras. 3.9.4/4.1.7 FFP 1 LO ‐$ ‐$
(Option) Interim Contractor Support (ICS) OPTION 6 3001 Interim Contractor Support (Help Desk) Para. 6.2.1 FFP 1 LO ‐$ ‐$
3001AA ICS in Year Four (4) 3001AB ICS in Year Five (5) 3001AC ICS in Year Six (6) 3001AD ICS in Year Seven (7) 3001AE ICS in Year Eight (8) 3001AF ICS in Year Nine (9)
3002 Non‐Warranty Over‐and‐Above Repair TBN 1 LO ‐$ ‐$
4001 Engineering Change Proposal Para. 3.9.6.3 TBD 1 LO ‐$ ‐$
Contract‐Wide: Engineering Change Proprosal
Basic Period ‐ Increment 1 ‐ Engineering and Manufacturing Design of Core Tester, B‐2A UUT TPS, B‐1B MPRL UUT TPS, and B‐52 SUU‐67 UUT TPS
Option Period 1 ‐ Production B‐2A Core Tester and B‐2A UUT TPS
Option Period 2 ‐ Increment 2 ‐ B‐1B UUT TPS and Incorporation of B‐1B MPRL
Option Period 3 ‐ Production B‐1B Core Tester and B‐1B UUT TPS
Option Period 4 ‐ Increment 3 ‐ B‐52H UUT TPS and Incorporation of B‐52H SUU‐67
Option Period 5 ‐ Production B‐52 Core Tester and B‐52 UUT TPS
DRAFT VERSION ONLY
DRAFT BAT CLIN STRUCTURE
as of 9 Mar 16 (See Notes on Page 2)
NOTE 1:
The Government will determine completion of each review to be successful when accomplished IAW the applicable SOW Paragraph requirements after: 1) the successful completion of the technical review briefing, and 2) the resolution of all action items documented during the review. A formal notification of completion will be submitted by the Government Contracting Officer.
DRAFT VERSION ONLY
File details come from the government source that posted it. Updated .