DRFP_BAT_CDRLs_26_Jan_16.pdf

PDF 14 MB Posted

Attached to
Bomber Armament Tester (BAT) Federal contract opportunity
Solicitation number
FA8533-16-R-0001
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Robins Air Force Base

About this file

Draft Contract Data Requirements Lists

View the file

Other files for this federal contract opportunity

Other files attached to Bomber Armament Tester (BAT), newest first.
File Type Posted
Question_and_Answer_-_Pre-Proposal_Conference.pdf PDF
AFGSC_Industry-Day_Brief-18Feb15.pdf PDF
Bomber_Armament_Tester_Bidder's_Library-Notice_to_Industry.pdf PDF
Updated_BAT_NEWS_dated_22_Apr_16.pdf PDF
BAT_Pre-Proposal_Teleconference_Slides.pdf PDF
Updated_BAT_NEWS_dated_19_Apr_16_(2).pdf PDF
Updated_BAT_NEWS_dated_15_Apr_16.pdf PDF
Atch_27_Form_158.pdf PDF
Atch_9_Excel_Price_Model.xlsx XLSX spreadsheet
FA8533-16-R-0001_(14_Apr16).pdf PDF
Atch_12_Excel_Cost_Model.xlsx XLSX spreadsheet
Atch_13_Bomber_Armament_Tester_Statement_of_Work_Rev7.pdf PDF
Atch_10_TEP_Example.xlsx XLSX spreadsheet
Atch_23_Appendix_C.pdf PDF
Atch_8_Relevancy_Assessment.pdf PDF
Atch_25_DD_Form_254.pdf PDF
Atch_16_Contract_Data_Requirements_List_B00U-B018.pdf PDF
Atch_18_Contract_Data_Requirements_List_C001-C008.pdf PDF
Atch_1_Cross_Reference_Martix.pdf PDF
Atch_22_SGFP_BAT_GFP_Form.pdf PDF
Atch_3_Past_Performance_Information_for_Offerors.pdf PDF
DRAFT_BAT_Section_M.pdf PDF
Atch_21_RGFP_BAT_GFP_Form.pdf PDF
Atch_15_Contract_Data_Requirements_List_A001-A00G.pdf PDF
Atch_11_Total_Resources_Volume_WBS_Breakdown.xlsx XLSX spreadsheet
Atch_2_Electronic_Format_for_All_Proposal_Volumes.pdf PDF
Responses_to_Draft_RFP_Questions.pdf PDF
Atch_17_Contract_Data_Requirements_List_B001-B00T.pdf PDF
Atch_24_AFMC_807.pdf PDF
Updated_BAT_NEWS_dated_14_Apr_16.pdf PDF
Atch_7_Past_Performance_Questionnaire.pdf PDF
Atch_14_Performance_Specification_Rev9.pdf PDF
Atch_5_Consent_Form.pdf PDF
Atch_20_TMCR_for_Bomber_Armament_Test_Set.pdf PDF
Updated_Contractor_Briefing_of_BAT_Incentives.pdf PDF
Updated_BAT_NEWS_dated_23_Mar_16.pdf PDF
Updated_BAT_NEWS_dated_22Mar16.pdf PDF
Updated_BAT_NEWS_dated_21Mar16.pdf PDF
Updated_BAT_NEWS_dated_17Mar16.pdf PDF
Contractor_Briefing_of_BAT_Incentives.pdf PDF
Updated_BAT_NEWS_dated_9_Mar_16.pdf PDF
Contract_Data_Requirements_List_B_Portfolio.pdf PDF
DRAFT_BAT_SOW_9_Mar_16_Rev_6.pdf PDF
Updated_DRAFT_BAT_CLIN_Structure_(FBO_Version).pdf PDF
Contract_Data_Requirements_List_A_Portfolio.pdf PDF
DRAFT_BAT_Section_M_-_As_of_5_Feb_16.pdf PDF
Questions_and_Responses.pptx PPTX presentation
Bomber_Armament_Tester_Bidder's_Library-Notice_to_Industry.pdf PDF
DRAFT_BAT_APPENDIX_C_as_of_30_Oct_15.pdf PDF
Updated_BAT_NEWS_dated_5_Feb_16.pdf PDF
Show all 50

Bomber Armament Tester (BAT) has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

For the best experience, open this PDF portfolio in

Acrobat X or Adobe Reader X, or later.

Get Adobe Reader Now!

http://www.adobe.com/go/reader

DD FORM 1423-1, FEB 2001

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

PREVIOUS EDITION MAY BE USED.

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

15. TOTAL

16. REMARKS

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

Page of Pages

16. REMARKS (Continued)

DD FORM 1423-1, FEB 2001 Page of Pages

INSTRUCTIONS FOR COMPLETING DD FORM 1423

(See DoD 5010.12-M for detailed instructions.)

FOR GOVERNMENT PERSONNEL

Item A. Self-explanatory.

Item B. Self-explanatory.

Item C. Mark (X) appropriate category: TDP - Technical Data Package;

TM - Technical Manual; Other - other category of data, such as "Provisioning,""Configuration Management," etc.

Item D. Enter name of system/item being acquired that data will support.

Item E. Self-explanatory (to be filled in after contract award).

Item F. Self-explanatory (to be filled in after contract award).

Item G. Signature of preparer of CDRL.

Item H. Date CDRL was prepared.

Item I. Signature of CDRL approval authority.

Item J. Date CDRL was approved.

Item 1. See DoD FAR Supplement Subpart 4.71 for proper numbering.

Item 2. Enter title as it appears on data acquisition document cited in Item 4.

Item 3. Enter subtitle of data item for further definition of data item (optional entry).

Item 4. Enter Data Item Description (DID) number, military specification number, or military standard number listed in DoD 5010.12-L (AMSDL), or one-time DID number, that defines data content and format requirements.

Item 5. Enter reference to tasking in contract that generates requirement for the data item (e.g., Statement of Work paragraph number).

Item 6. Enter technical office responsible for ensuring adequacy of the data item.

Item 7. Specify requirement for inspection/acceptance of the data item by the Government.

Item 8. Specify requirement for approval of a draft before preparation of the final data item.

Item 9. For technical data, specify requirement for contractor to mark the appropriate distribution statement on the data (ref. DoDD 5230.24).

Item 10. Specify number of times data items are to be delivered.

Item 11. Specify as-of date of data item, when applicable.

Item 12. Specify when first submittal is required.

Item 13. Specify when subsequent submittals are required, when applicable.

Item 14. Enter addressees and number of draft/final copies to be delivered to each addressee. Explain reproducible copies in Item 16.

Item 15. Enter total number of draft/final copies to be delivered.

Item 16. Use for additional/clarifying information for Items 1 through 15.

Examples are: Tailoring of documents cited in Item 4; Clarification of submittal dates in Items 12 and 13; Explanation of reproducible copies in Item 14.; Desired medium for delivery of the data item.

FOR THE CONTRACTOR

Item 17. Specify appropriate price group from one of the following groups of effort in developing estimated prices for each data item listed on the DD Form 1423.

a. Group I. Definition - Data which is not otherwise essential to the contractor's performance of the primary contracted effort (production, development, testing, and administration) but which is required by DD Form 1423.

Estimated Price - Costs to be included under Group I are those applicable to preparing and assembling the data item in conformance with Government requirements, and the administration and other expenses related to reproducing and delivering such data items to the Government.

b. Group II. Definition - Data which is essential to the performance of the primary contracted effort but the contractor is required to perform additional work to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, or quality of the data item.

Estimated Price - Costs to be included under Group II are those incurred over and above the cost of the essential data item without conforming to Government requirements, and the administrative and other expenses related to reproducing and delivering such data item to the Government.

c. Group III. Definition - Data which the contractor must develop for his internal use in performance of the primary contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, and quality of the data item.

Estimated Price - Costs to be included under Group III are the administrative and other expenses related to reproducing and

d. Group IV. Definition - Data which is developed by the contractor as part of his normal operating procedures and his effort in supplying these data to the Government is minimal.

Estimated Price - Group IV items should normally be shown on the DD Form 1423 at no cost.

Item 18. For each data item, enter an amount equal to that portion of the total price which is estimated to be attributable to the production or development for the Government of that item of data.

These estimated data prices shall be developed only from those costs which will be incurred as a direct result of the requirement to supply the data, over and above those costs which would otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any amount for rights in data. The Government's right to use the data shall be governed by the pertinent provisions of the contract.

DD FORM 1423-1 (BACK), FEB 2001

data_item: A001 title: Conference Agenda sub: N/A auth: DI-ADMN-81249A ref: Block 16 req_ofc: AFLCMC/WNA dd250: DD appcode:

dist: D freq: ASREQ asof: Block 16 firstsub: Block 16 subsub: Block 16 addressee1: AFLCMC/WNA draft1:

reg1:

repro1:

addressee2: 235 Byron St. Ste 19A draft2:

reg2:

repro2:

addressee3: Robins AFB, GA draft3:

reg3:

repro3:

addressee4: 31098-1669 draft4:

reg4:

repro4:

addressee5:

draft5:

reg5:

repro5:

addressee6: BAT Program Manager draft6:

reg6:

repro6:

addressee7: AFLCMC/WNA draft7:

reg7:

repro7:

addressee8: Digital draft8:

reg8: 1 repro8:

addressee9:

draft9:

reg9:

repro9:

addressee10: BAT Contracting Office draft10:

reg10:

repro10:

addressee11: AFLCMC/WNK draft11:

reg11:

repro11:

addressee12: Digital draft12:

reg12: 1 repro12:

addressee13:

draft13:

reg13:

repro13:

addressee14:

draft14:

reg14:

repro14:

addressee15:

draft15:

reg15:

repro15:

addressee16:

draft16:

reg16:

repro16:

addressee17:

draft17:

reg17:

repro17:

addressee18:

draft18:

reg18:

repro18:

addressee19:

draft19:

reg19:

repro19:

addressee20:

draft20:

reg20:

repro20:

addressee21:

draft21:

reg21:

repro21:

addressee22:

draft22:

reg22:

repro22:

addressee23:

draft23:

reg23:

repro23:

addressee24:

draft24:

reg24:

repro24:

addressee25:

draft25:

reg25:

repro25:

addressee26:

draft26:

reg26:

repro26:

addressee27:

draft27:

reg27:

repro27:

addressee28:

draft28:

reg28:

repro28:

addressee29:

draft29:

reg29:

repro29:

addressee30:

draft30:

reg30:

repro30:

addressee31:

draft31:

reg31:

repro31:

addressee32:

draft32:

reg32:

repro32:

addressee33:

draft33:

reg33:

repro33:

addressee34:

draft34:

reg34:

repro34:

addressee35:

draft35:

reg35:

repro35:

addressee36:

draft36:

reg36:

repro36:

addressee37:

draft37:

reg37:

repro37:

addressee38:

draft38:

reg38x:

repro38:

total_draft: 0 total_reg: 2 total_repro: 0 remarks: Block 5: SOW Paragraphs 3.1.1, 3.1.2, 3.1.3, 3.1.4, 3.8.3.1, 3.8.3.2, 3.8.3.3, 3.9.3.1, 3.9.6.1

Block 7: Wide Area Work Flow (WAWF) shall be utilized.

Blocks 11/12/13: The agenda shall be delivered a minimum of ten (10) working days prior to any conference meeting or review. The government shall respond within five (5) working days with comments.

Block 14: Delivery to Contracting shall be "W/O Enclosure".

Data shall be submitted electronically in Microsoft Office format. Contractor format is acceptable.

group:

total_price:

prep_name:

line_item: TBD exhibit: A xtdp: Off xtm: Off othercat: ADMN system: Bomber Armament Tester ctr_no: TBD contr: TBD remarksb:

Page2:

Reset:

2015-10-28T15:40:28-0400

FANG.DANIEL.CHRISTOPHER.1298788302

prep_date:

app_by:

2015-10-29T12:57:14-0400

SLAY.DIMITRA.R.1067927644

app_date: 29 Oct 2015

Page: 1 of_pages: 1 app: Adobe Professional 8.0

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the conformance with Government requirements, and the required to perform additional work to conform to Government without conforming to Government requirements, and the contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any data_item: A00A title: Notice of Revision (NOR) sub: N/A auth: DI-SESS-80642D ref: SOW 3.9.6.3 req_ofc: AFLCMC/WNAC dd250: LT appcode: A dist:

freq: ASREQ asof: See Blk 16 firstsub: See Blk 16 subsub: See Blk 16 addressee1: BAT Program Manager draft1:

reg1:

repro1:

addressee2: AFLCMC/WNAC draft2:

reg2:

repro2:

addressee3: 235 Byron St. Ste 19A draft3:

reg3:

repro3:

addressee4: Robins AFB, GA draft4:

reg4:

repro4:

addressee5: 31098-1669 draft5: 1 reg5: 1 repro5:

addressee6:

draft6:

reg6:

repro6:

addressee7: BAT Engineer draft7:

reg7:

repro7:

addressee8: AFLCMC/WNAEA draft8: 1 reg8: 1 repro8:

addressee9:

draft9:

reg9:

repro9:

addressee10: BAT Contracting Office draft10:

reg10:

repro10:

addressee11: AFLCMC/WNK draft11:

reg11:

repro11:

addressee12: Digital draft12: 1 reg12: 1 repro12:

addressee13:

draft13:

reg13:

repro13:

addressee14:

draft14:

reg14:

repro14:

addressee15:

draft15:

reg15:

repro15:

addressee16: Configuration Manager draft16:

reg16:

repro16:

addressee17: AFLCMC/WNACB draft17:

reg17: 1 repro17:

addressee18:

draft18:

reg18:

repro18:

addressee19:

draft19:

reg19:

repro19:

addressee20:

draft20:

reg20:

repro20:

addressee21:

draft21:

reg21:

repro21:

addressee22:

draft22:

reg22:

repro22:

addressee23:

draft23:

reg23:

repro23:

addressee24:

draft24:

reg24:

repro24:

addressee25:

draft25:

reg25:

repro25:

addressee26:

draft26:

reg26:

repro26:

addressee27:

draft27:

reg27:

repro27:

addressee28:

draft28:

reg28:

repro28:

addressee29:

draft29:

reg29:

repro29:

addressee30:

draft30:

reg30:

repro30:

addressee31:

draft31:

reg31:

repro31:

addressee32:

draft32:

reg32:

repro32:

addressee33:

draft33:

reg33:

repro33:

addressee34:

draft34:

reg34:

repro34:

addressee35:

draft35:

reg35:

repro35:

addressee36:

draft36:

reg36:

repro36:

addressee37:

draft37:

reg37:

repro37:

addressee38:

draft38:

reg38x:

repro38:

total_draft: 3 total_reg: 4 total_repro: 0 remarks: Block 7: Wide Area Workflow (WAWF) shall be utilized.

Blocks 11/12/13: The contractor shall submit NOR for any change(s) that deviate from the baseline established upon successful completion of physical configuration audit and validation/verification testing of the first preproduction station and each TPS. The contractor shall submit the NOR within twenty (20) working days of identification of the needed change(s). The government shall have ten (10) working days to review and comment and/or approve the NOR. Can be accomplish with DI-SESS-80639, Engineering Change Proposal (ECP).

Block 14: Data delivery to Contract Office shall be "W/O enclosure".

group:

total_price:

prep_name:

line_item: TBD exhibit: A xtdp: Off xtm: Off othercat: Configuration Management system: Bomber Armament Tester ctr_no: FD2060-15-91493 contr: TBD remarksb:

Page2:

Reset:

2015-10-28T16:12:54-0400

FANG.DANIEL.CHRISTOPHER.1298788302

prep_date:

app_by:

2015-11-02T14:52:15-0500

SLAY.DIMITRA.R.1067927644

app_date: 2 Nov 2015

Page:

of_pages:

app: Adobe Professional 8.0

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the conformance with Government requirements, and the required to perform additional work to conform to Government without conforming to Government requirements, and the contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any data_item: A00B title: Request For Variance (RFV) sub: N/A auth: DI-SESS-80640D ref: SOW para 3.9.6.7 req_ofc: AFLCMC/WNAC dd250: DD appcode: A dist: D freq: ASREQ asof: See Blk 16 firstsub: See Blk 16 subsub: See Blk 16 addressee1: Program Manager draft1:

reg1:

repro1:

addressee2: AFLCMC/WNAC draft2:

reg2:

repro2:

addressee3: 235 Byron St. Ste 19A draft3:

reg3:

repro3:

addressee4: Robins AFB, GA draft4:

reg4:

repro4:

addressee5: 31098-1669 draft5: 1 reg5: 1 repro5:

addressee6:

draft6:

reg6:

repro6:

addressee7: Engineer draft7:

reg7:

repro7:

addressee8: AFLCMC/WNAEA draft8: 1 reg8: 1 repro8:

addressee9:

draft9:

reg9:

repro9:

addressee10: Contracting draft10:

reg10:

repro10:

addressee11: AFLCMC/WNK draft11:

reg11:

repro11:

addressee12: Digital draft12: 1 reg12: 1 repro12:

addressee13:

draft13:

reg13:

repro13:

addressee14:

draft14:

reg14:

repro14:

addressee15:

draft15:

reg15:

repro15:

addressee16: Configuration Manager draft16:

reg16:

repro16:

addressee17: AFLCMC/WNACB draft17: 1 reg17: 1 repro17:

addressee18:

draft18:

reg18:

repro18:

addressee19:

draft19:

reg19:

repro19:

addressee20:

draft20:

reg20:

repro20:

addressee21:

draft21:

reg21:

repro21:

addressee22:

draft22:

reg22:

repro22:

addressee23:

draft23:

reg23:

repro23:

addressee24:

draft24:

reg24:

repro24:

addressee25:

draft25:

reg25:

repro25:

addressee26:

draft26:

reg26:

repro26:

addressee27:

draft27:

reg27:

repro27:

addressee28:

draft28:

reg28:

repro28:

addressee29:

draft29:

reg29:

repro29:

addressee30:

draft30:

reg30:

repro30:

addressee31:

draft31:

reg31:

repro31:

addressee32:

draft32:

reg32:

repro32:

addressee33:

draft33:

reg33:

repro33:

addressee34:

draft34:

reg34:

repro34:

addressee35:

draft35:

reg35:

repro35:

addressee36:

draft36:

reg36:

repro36:

addressee37:

draft37:

reg37:

repro37:

addressee38:

draft38:

reg38x:

repro38:

total_draft: 4 total_reg: 4 total_repro: 0 remarks:

Block 7: WAWF shall be utilized.

Blocks 11/12/13: The contractor shall submit RFV for any change(s) that deviate from the baseline established upon successful completion of physical configuration audit and validation/verification testing of the first preproduction station and each TPS. The contractor shall submit the RFV within twenty (20) working days of identification of the needed change(s). The government shall have ten (10) working days to review and comment and/or approve the RFV.

Block 14: Data delivery to Contract Office shall be "W/O enclosure".

group:

total_price:

prep_name:

line_item: TBD exhibit: A xtdp: Off xtm: Off othercat: Configuration Management system: Bomber Armament Tester ctr_no: FD2060-15-91493 contr: TBD remarksb:

Page2:

Reset:

2015-10-26T13:45:44-0400

HODGE.JAQUAN.D.1407713385

prep_date: 26 Oct 15 app_by:

2015-10-30T10:24:37-0400

SLAY.DIMITRA.R.1067927644

app_date: 30 Ocr 2015

Page:

of_pages:

app: Adobe Professional 8.0

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the conformance with Government requirements, and the required to perform additional work to conform to Government without conforming to Government requirements, and the contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any data_item: A00C title: Request for Nomenclature (DD Form 61) sub: N/A auth: DI-SESS-81254C (See Blk 16) ref: SOW 3.9.5.1, 3.9.6.2 req_ofc: AFLCMC/WNAC dd250: LT appcode: A (See Blk 16) dist: N/A freq: ONE/R asof: N/A firstsub: See Blk 16 subsub: See Blk 16 addressee1: AFLCMC/WNAC draft1:

reg1:

repro1:

addressee2: 235 Byron St. Ste 19A draft2:

reg2:

repro2:

addressee3: Robins AFB, GA draft3:

reg3:

repro3:

addressee4: 31098-1669 draft4:

reg4:

repro4:

addressee5:

draft5:

reg5:

repro5:

addressee6:

draft6:

reg6:

repro6:

addressee7: Digital draft7:

reg7: 1 repro7:

addressee8:

draft8:

reg8:

repro8:

addressee9:

draft9:

reg9:

repro9:

addressee10:

draft10:

reg10:

repro10:

addressee11:

draft11:

reg11:

repro11:

addressee12:

draft12:

reg12:

repro12:

addressee13:

draft13:

reg13:

repro13:

addressee14:

draft14:

reg14:

repro14:

addressee15:

draft15:

reg15:

repro15:

addressee16:

draft16:

reg16:

repro16:

addressee17:

draft17:

reg17:

repro17:

addressee18:

draft18:

reg18:

repro18:

addressee19:

draft19:

reg19:

repro19:

addressee20:

draft20:

reg20:

repro20:

addressee21:

draft21:

reg21:

repro21:

addressee22:

draft22:

reg22:

repro22:

addressee23:

draft23:

reg23:

repro23:

addressee24:

draft24:

reg24:

repro24:

addressee25:

draft25:

reg25:

repro25:

addressee26:

draft26:

reg26:

repro26:

addressee27:

draft27:

reg27:

repro27:

addressee28:

draft28:

reg28:

repro28:

addressee29:

draft29:

reg29:

repro29:

addressee30:

draft30:

reg30:

repro30:

addressee31:

draft31:

reg31:

repro31:

addressee32:

draft32:

reg32:

repro32:

addressee33:

draft33:

reg33:

repro33:

addressee34:

draft34:

reg34:

repro34:

addressee35:

draft35:

reg35:

repro35:

addressee36:

draft36:

reg36:

repro36:

addressee37:

draft37:

reg37:

repro37:

addressee38:

draft38:

reg38x:

repro38:

total_draft: 0 total_reg: 1 total_repro: 0 remarks: BLK 4. This DID satisfies requirements contained in MIL-DLT-18307. Request for nomenclature assignment shall be prepared in the Joint Electronics Type Designation Automated Systems (JETDAS) or Aeronautical & Support Equipment Type Designation Systems (ASETDS), as appropriate.

JETDAS web address: https://tdas7.apg.army.mil/JETDAS/ ASETDS web address: https://tdas7.apg.army.mil/ASetds/index.cfm?

MIL-STD-196 or MIL-HDBK-1812 apply, as appropriate, for completion of DD Form 61.

BLK 7. Acceptance/Rejection of the data item will be furnished within 90 calendar days after receipt of final submission by the designated JETDAS/ASETDS Submittal Review Point (SRP). Acceptance/rejection of data item is contingent on approval by the Department of Defense Control Point (DoDCP).

BLK 8. Allow 20 days for Government review. The Contractor shall incorporate any comments and return with 10 days after receipt of comments.

BLK 12, 13. Submittal shall be NLT 180 days after CDR. Subsequent submittals due NLT 60 days after the need for update becomes known.

BLK 14. Submittal shall be through JETDAS or ASETDS, as appropriate. The contractor shall send electronic notification including the IDE link to all recipients to indicate submittal of document for review.

group:

total_price:

prep_name: Armando Molina line_item:

exhibit: A xtdp: Off xtm: Off othercat: SESS system: Bomber Armament Test Set ctr_no: FD2060-15-91493 contr:

remarksb:

Page2:

Reset:

2015-01-06T15:15:16-0500

MOLINA.ARMANDO.1157451835

prep_date: 01/05/2015 app_by:

2016-01-19T17:31:55-0500

SLAY.DIMITRA.R.1067927644

app_date: 19 Jan 16

Page:

of_pages:

app: Adobe Professional 8.0

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the conformance with Government requirements, and the required to perform additional work to conform to Government without conforming to Government requirements, and the contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any data_item: A00D title: Logistics Product Data sub:

auth: DI-SESS-81758A/T ref: See Block 16 req_ofc: 406 SCMS/GULABA dd250: See Blk 16 appcode: See Blk 16 dist: See Blk 16 freq: ASREQ asof: N/A firstsub: See Blk 6 subsub: ASREQ addressee1: 235 Byron St.

draft1:

reg1:

repro1:

addressee2: Suite 19A draft2:

reg2:

repro2:

addressee3: Robins AFB GA draft3:

reg3:

repro3:

addressee4: 31098-1670 draft4:

reg4:

repro4:

addressee5:

draft5:

reg5:

repro5:

addressee6: 406SCMS/GULAB draft6:

reg6: 1 repro6:

addressee7:

draft7:

reg7:

repro7:

addressee8: BAT Program Manager draft8:

reg8:

repro8:

addressee9: AFLCMC/WNA draft9:

reg9: 1 repro9:

addressee10:

draft10:

reg10:

repro10:

addressee11: BAT ContractingOffice draft11:

reg11:

repro11:

addressee12: AFLCMC/WNK draft12:

reg12: 1 repro12:

addressee13:

draft13:

reg13:

repro13:

addressee14:

draft14:

reg14:

repro14:

addressee15:

draft15:

reg15:

repro15:

addressee16:

draft16:

reg16:

repro16:

addressee17:

draft17:

reg17:

repro17:

addressee18:

draft18:

reg18:

repro18:

addressee19:

draft19:

reg19:

repro19:

addressee20:

draft20:

reg20:

repro20:

addressee21:

draft21:

reg21:

repro21:

addressee22:

draft22:

reg22:

repro22:

addressee23:

draft23:

reg23:

repro23:

addressee24:

draft24:

reg24:

repro24:

addressee25:

draft25:

reg25:

repro25:

addressee26:

draft26:

reg26:

repro26:

addressee27:

draft27:

reg27:

repro27:

addressee28:

draft28:

reg28:

repro28:

addressee29:

draft29:

reg29:

repro29:

addressee30:

draft30:

reg30:

repro30:

addressee31:

draft31:

reg31:

repro31:

addressee32:

draft32:

reg32:

repro32:

addressee33:

draft33:

reg33:

repro33:

addressee34:

draft34:

reg34:

repro34:

addressee35:

draft35:

reg35:

repro35:

addressee36:

draft36:

reg36:

repro36:

addressee37:

draft37:

reg37:

repro37:

addressee38:

draft38:

reg38x:

repro38:

total_draft: 0 total_reg: 3 total_repro: 0 remarks: Block 5: BAT SOW paragraph 3.9.5, 4.1.10, 5.1.5, 6.1.5

A. The Prime Provisioning Activity (PPA) is identified in Block 14.

B. Specific summaries to be delivered on this contract are:

(1)_X__Provisioning Parts List (PPL) Top Down Sequence (2)____Short Form Provisioning Parts List (SFPPL) (3)_____Common and Bulk Items List (CBIL) (4)__X__Design Change Notices (DCN) (5)___X__Statement of Prior Submission (SPS) Hard Copy Only.

(6)__X___Long Lead Items List (LLIL) Select one of the following:

__LLIL-SAIP (Items recommended for Spares Acquisition Integrated with Production and not later than 165 days prior to Contractor’s order need date or as determined at the PGC).

_____LLIL-Interim Release (Items interim released by the contractor when interim release is authorized by the contract.

______LLIL-Recommended (Items recommended as LLIL).

C. Attachment: LMI Data Product Worksheet for Logistics Product Data.

D. Block 7: Acceptance/Rejection of the Logistics Product Data will be furnished within 90 calendar days after receipt by the PPA. Method of acceptance/rejection will be in accordance with contract requirements.

E. Block 8: Approval (written) is not required. However, the data item will be reviewed and accepted/rejected based on its conforming to the requirements of the DID within 90 days of receipt by the requiring office.

F. Block 9: Distribution statement _”D”__ applies.

(Continued on page 2) group:

total_price:

prep_name:

line_item: TBD exhibit: A xtdp: Off xtm: Off othercat: SESS system: Bomber Armament Tester ctr_no: TBD contr: TBD remarksb: G. Blocks 10, 11, 12, & 13:

(1) PPL, SFPPL, LLIL, CBIL: Date(s) to be reflected on the AFMC Form 718 (Atch 1 to the Initial Provisioning Performance Specification (IPPS)). See Paragraph 3.1 of the IPPS.

(2) DCN(s): See Paragraph 10 of the IPPS.

(3) SPS: When the IPPS is provided with the solicitation, an offeror’s SPS shall be as outlined by the solicitation. When the IPPS is furnished after award, the contractor shall furnish a SPS within thirty (30) days after receipt of the IPPS. See Paragraph 7 of the IPPS.

H. Logistics Product Data transmittal document will reflect, as a minimum, PCCN, SCC, PCC, Contract Number, Type Logistics Product Data, and Line Item Count.

I. Data element definitions will be in accordance with GEIA-HB-0007A and/or other data provided at the PGC by the PPA.

J. In the event Logistics Product Data submittal deliveries are to be made to a secured program specific electronic site (contractor or government), a transmittal notification will be concurrently forwarded to the PPA via email.

K. Block 12: Date of First Submission should be IAW AFMC Form 718

Page2: 2

Reset:

2015-12-08T17:11:35-0500

MCLEAN.FANNIE.M.1054790739

prep_date:

app_by:

2016-01-20T14:34:37-0500

SLAY.DIMITRA.R.1067927644

app_date: 15 Jan 16

Page: 1 of_pages: 2 app: Adobe Professional 8.0

DD Form 1423-1, SEP 97 (EG) (Computer Generated) PREVIOUS EDITIONS ARE OBSOLETE Page of Pages

C O N T R A C T D A T A R E Q U I R E M E N T S L I S T (1 Data I tem)

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY

D. SYSTEM/ITEM

Bomber Armament Test Set

E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM

Engineering Data for Provisioning (EDFP)

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.)

DI-SESS-81874

5. CONTRACT REFERENCE

SOW Para 3.9.5

6. REQUIRING OFFICE

406 SCMS/GULABA

7. DD250 REQ

See Block 16

9. DIST

STATEMENT

As Required

IAW AFMC Form 718

N/A

As Required

a. ADDRESSEE Draft

A. The Prime Provisioning Activity (PPA) is identified in Block 14 with an asterisk (*).

B. For PPLs/SFPPLs, one set of technical data (hard copy) will be provided to the PPA with the Logistics Product Data in PLISN sequence, annotated with PLISN, PCCN, SCC, PCC, CAGE and Part Number, with accompanying transmittal correspondence.

C. For PPLs/SFPPLs, one set of technical data (electronic or hardcopy) will be provided to DLIS (** Block 14), annotated with PLISN, PCCN, SCC, PCC, CAGE, and P/N, with accompanying transmittal correspondence (with a courtesy copy provided to the PPA) D. All transmittal correspondence will cite the applicable Contract Number, PCCN, and SCC. DLIS transmittal correspondence should cite 406SCMS/GULAB_ as the PPA and provide a courtesy copy to the PPA.

E. Block 7: Acceptance/Rejection of the technical data will be furnished within 90 calendar days after receipt by the PPA. Method of acceptance/rejection will be in accordance with contract requirements.

F. Block 8: Approval (written) is not required. However, the data item will be reviewed and accepted/rejected based on its conforming to the requirements of the DID within 90 days of receipt by the requiring office.

G. Block 9: Distribution statement __”D”___ applies.

H. Blocks 10, 12, & 13: Date(s) to be reflected on the AFMC Form 718 (Atch 1 to the Initial Provisioning Performance Specification (IPPS)). If complete sets are not provided, identify missing technical data and provide it 30 days prior to the Spares Provisioning Conference or as directed by the PPA. This applies to all non stock-listed items regardless of the type Logistics Product Data and SMR Code (source, maintenance, recoverability). Technical data is required for each support item appearing on all types of Logistics Product Data, first appearance only on each Logistics Product Data submission, unless directed otherwise by the PPA.

I. The prime contractor and all sub-vendors shall provide required data, translated to the English language, for the express purpose of identifying and cataloging items with a full description regardless of limited rights claims. Letters of refusal must clearly state reason(s) technical data is not being furnished to satisfy the data requirements levied and recommend alternate methods of furnishing required technical data to the PPA.

J. For DCNs, LLTILs, and CBILs, both sets of technical data will be provided to the PPA.

K. The contractor shall not assess developmental costs to the Government to furnish this technical data as EDFP, only cost necessary for reproduction and assemblage.

L. In the event EDFP submittal deliveries are to be made to a secured program specific electronic site (contractor or government), a transmittal notification will be concurrently forwarded to the PPA via email.

IF ROUTINE MAIL:

406SCMS/GULABA *1

235 Byron St.

Suite 19A

Robins AFB, GA

31098-1670

IF PRVT CARRIER:

638 Supply Chain *1 Management Group

406SCMS/GULABA

235 Byron St.

Suite 19A

Robins AFB, GA

31098-1670

IF HARD COPY TO:

DLIS-KPD PSO **1

74 Washington Ave., N, Suite 7

Battle Creek, MI

49037-3084

IF ELECTRONIC:

DLISPSO@dla.mil 1

15. TOTAL 2

G. PREPARED BY

FANNIE MCLEAN

H. DATE:

2 DEC 14

I. APPROVED BY J. DATE

1 1 mailto:DLISPSO@dla.mil

CONTRACT DATA REQUIREMENTS LIST

Form Approved

B. EXHIBIT

C. CATEGORY

E. CONTRACT/PR NO.

DI-SESS-81874

See Block 16

See Block 16

As Required

See Block 16

N/A

Draft

G. PREPARED BY

C O NT R AC T:

D AT A R E Q U I R E M E NT S L I S T:

Form Approved:

A CONTRACT LINE ITEM NO:

B EXHIBIT: A

C CATEGORY:

E CONTRACTPR NO:

F CONTRACTOR:

1 DATA ITEM NO: A00E

3 SUBTITLE:

5 CONTRACT REFERENCE SOW Para 395:

6 REQUIRING OFFICE 406 SCMSGULABA:

14 DISTRIBUTION12 DATE OF FIRST SUBMISSION IAW AFMC Form 718:

b COPIES:

11 AS OF DATE NA:

Final:

DraftIF ROUTINE MAIL:

RegIF ROUTINE MAIL:

ReproIF ROUTINE MAIL:

Draft406SCMSGULABA:

Repro1:

Draft235 Byron St:

1235 Byron St:

Repro235 Byron St:

DraftSuite 19A:

1Suite 19A:

ReproSuite 19A:

DraftRobins AFB GA:

1Robins AFB GA:

ReproRobins AFB GA:

Draft310981670:

1310981670:

Repro310981670:

31098167016 REMARKS A The Prime Provisioning Activity PPA is identified in Block 14 with an asterisk B For PPLsSFPPLs one set of technical data hard copy will be provided to the PPA with the Logistics Product Data in PLISN sequence annotated with PLISN PCCN SCC PCC CAGE and Part Number with accompanying transmittal correspondence C For PPLsSFPPLs one set of technical data electronic or hardcopy will be provided to DLIS Block 14 annotated with PLISN PCCN SCC PCC CAGE and PN with accompanying transmittal correspondence with a courtesy copy provided to the PPA D All transmittal correspondence will cite the applicable Contract Number PCCN and SCC DLIS transmittal correspondence should cite 406SCMSGULAB as the PPA and provide a courtesy copy to the PPA E Block 7 AcceptanceRejection of the technical data will be furnished within 90 calendar days after receipt by the PPA Method of acceptancerejection will be in accordance with contract requirements F Block 8 Approval written is not required However the data item will be reviewed and acceptedrejected based on its conforming to the requirements of the DID within 90 days of receipt by the requiring office G Block 9 Distribution statement D applies H Blocks 10 12 13 Dates to be reflected on the AFMC Form 718 Atch 1 to the Initial Provisioning Performance Specification IPPS If complete sets are not provided identify missing technical data and provide it 30 days prior to the Spares Provisioning Conference or as directed by the PPA This applies to all non stocklisted items regardless of the type Logistics Product Data and SMR Code source maintenance recoverability Technical data is required for each support item appearing on all types of Logistics Product Data first appearance only on each Logistics Product Data submission unless directed otherwise by the PPA I The prime contractor and all subvendors shall provide required data translated to the English language for the express purpose of identifying and cataloging items with a full description regardless of limited rights claims Letters of refusal must clearly state reasons technical data is not being furnished to satisfy the data requirements levied and recommend alternate methods of furnishing required technical data to the PPA J For DCNs LLTILs and CBILs both sets of technical data will be provided to the PPA K The contractor shall not assess developmental costs to the Government to furnish this technical data as EDFP only cost necessary for reproduction and assemblage L In the event EDFP submittal deliveries are to be made to a secured program specific electronic site contractor or government a transmittal notification will be concurrently forwarded to the PPA via email:

Draft16 REMARKS A The Prime Provisioning Activity PPA is identified in Block 14 with an asterisk B For PPLsSFPPLs one set of technical data hard copy will be provided to the PPA with the Logistics Product Data in PLISN sequence annotated with PLISN PCCN SCC PCC CAGE and Part Number with accompanying transmittal correspondence C For PPLsSFPPLs one set of technical data electronic or hardcopy will be provided to DLIS Block 14 annotated with PLISN PCCN SCC PCC CAGE and PN with accompanying transmittal correspondence with a courtesy copy provided to the PPA D All transmittal correspondence will cite the applicable Contract Number PCCN and SCC DLIS transmittal correspondence should cite 406SCMSGULAB as the PPA and provide a courtesy copy to the PPA E Block 7 AcceptanceRejection of the technical data will be furnished within 90 calendar days after receipt by the PPA Method of acceptancerejection will be in accordance with contract requirements F Block 8 Approval written is not required However the data item will be reviewed and acceptedrejected based on its conforming to the requirements of the DID within 90 days of receipt by the requiring office G Block 9 Distribution statement D applies H Blocks 10 12 13 Dates to be reflected on the AFMC Form 718 Atch 1 to the Initial Provisioning Performance Specification IPPS If complete sets are not provided identify missing technical data and provide it 30 days prior to the Spares Provisioning Conference or as directed by the PPA This applies to all non stocklisted items regardless of the type Logistics Product Data and SMR Code source maintenance recoverability Technical data is required for each support item appearing on all types of Logistics Product Data first appearance only on each Logistics Product Data submission unless directed otherwise by the PPA I The prime contractor and all subvendors shall provide required data translated to the English language for the express purpose of identifying and cataloging items with a full description regardless of limited rights claims Letters of refusal must clearly state reasons technical data is not being furnished to satisfy the data requirements levied and recommend alternate methods of furnishing required technical data to the PPA J For DCNs LLTILs and CBILs both sets of technical data will be provided to the PPA K The contractor shall not assess developmental costs to the Government to furnish this technical data as EDFP only cost necessary for reproduction and assemblage L In the event EDFP submittal deliveries are to be made to a secured program specific electronic site contractor or government a transmittal notification will be concurrently forwarded to the PPA via email:

116 REMARKS A The Prime Provisioning Activity PPA is identified in Block 14 with an asterisk B For PPLsSFPPLs one set of technical data hard copy will be provided to the PPA with the Logistics Product Data in PLISN sequence annotated with PLISN PCCN SCC PCC CAGE and Part Number with accompanying transmittal correspondence C For PPLsSFPPLs one set of technical data electronic or hardcopy will be provided to DLIS Block 14 annotated with PLISN PCCN SCC PCC CAGE and PN with accompanying transmittal correspondence with a courtesy copy provided to the PPA D All transmittal correspondence will cite the applicable Contract Number PCCN and SCC DLIS transmittal correspondence should cite 406SCMSGULAB as the PPA and provide a courtesy copy to the PPA E Block 7 AcceptanceRejection of the technical data will be furnished within 90 calendar days after receipt by the PPA Method of acceptancerejection will be in accordance with contract requirements F Block 8 Approval written is not required However the data item will be reviewed and acceptedrejected based on its conforming to the requirements of the DID within 90 days of receipt by the requiring office G Block 9 Distribution statement D applies H Blocks 10 12 13 Dates to be reflected on the AFMC Form 718 Atch 1 to the Initial Provisioning Performance Specification IPPS If complete sets are not provided identify missing technical data and provide it 30 days prior to the Spares Provisioning Conference or as directed by the PPA This applies to all non stocklisted items regardless of the type Logistics Product Data and SMR Code source maintenance recoverability Technical data is required for each support item appearing on all types of Logistics Product Data first appearance only on each Logistics Product Data submission unless directed otherwise by the PPA I The prime contractor and all subvendors shall provide required data translated to the English language for the express purpose of identifying and cataloging items with a full description regardless of limited rights claims Letters of refusal must clearly state reasons technical data is not being furnished to satisfy the data requirements levied and recommend alternate methods of furnishing required technical data to the PPA J For DCNs LLTILs and CBILs both sets of technical data will be provided to the PPA K The contractor shall not assess developmental costs to the Government to furnish this technical data as EDFP only cost necessary for reproduction and assemblage L In the event EDFP submittal deliveries are to be made to a secured program specific electronic site contractor or government a transmittal notification will be concurrently forwarded to the PPA via email:

Repro16 REMARKS A The Prime Provisioning Activity PPA is identified in Block 14 with an asterisk B For PPLsSFPPLs one set of technical data hard copy will be provided to the PPA with the Logistics Product Data in PLISN sequence annotated with PLISN PCCN SCC PCC CAGE and Part Number with accompanying transmittal correspondence C For PPLsSFPPLs one set of technical data electronic or hardcopy will be provided to DLIS Block 14 annotated with PLISN PCCN SCC PCC CAGE and PN with accompanying transmittal correspondence with a courtesy copy provided to the PPA D All transmittal correspondence will cite the applicable Contract Number PCCN and SCC DLIS transmittal correspondence should cite 406SCMSGULAB as the PPA and provide a courtesy copy to the PPA E Block 7 AcceptanceRejection of the technical data will be furnished within 90 calendar days after receipt by the PPA Method of acceptancerejection will be in accordance with contract requirements F Block 8 Approval written is not required However the data item will be reviewed and acceptedrejected based on its conforming to the requirements of the DID within 90 days of receipt by the requiring office G Block 9 Distribution statement D applies H Blocks 10 12 13 Dates to be reflected on the AFMC Form 718 Atch 1 to the Initial Provisioning Performance Specification IPPS If complete sets are not provided identify missing technical data and provide it 30 days prior to the Spares Provisioning Conference or as directed by the PPA This applies to all non stocklisted items regardless of the type Logistics Product Data and SMR Code source maintenance recoverability Technical data is required for each support item appearing on all types of Logistics Product Data first appearance only on each Logistics Product Data submission unless directed otherwise by the PPA I The prime contractor and all subvendors shall provide required data translated to the English language for the express purpose of identifying and cataloging items with a full description regardless of limited rights claims Letters of refusal must clearly state reasons technical data is not being furnished to satisfy the data requirements levied and recommend alternate methods of furnishing required technical data to the PPA J For DCNs LLTILs and CBILs both sets of technical data will be provided to the PPA K The contractor shall not assess developmental costs to the Government to furnish this technical data as EDFP only cost necessary for reproduction and assemblage L In the event EDFP submittal deliveries are to be made to a secured program specific electronic site contractor or government a transmittal notification will be concurrently forwarded to the PPA via email:

DraftIF PRVT CARRIER:

1IF PRVT CARRIER:

ReproIF PRVT CARRIER:

Draft638 Supply Chain:

Repro1_2:

DraftManagement Group:

1Management Group:

ReproManagement Group:

Draft406SCMSGULABA_2:

1406SCMSGULABA:

Repro406SCMSGULABA:

Draft235 Byron St_2:

1235 Byron St_2:

Repro235 Byron St_2:

DraftSuite 19A_2:

1Suite 19A_2:

ReproSuite 19A_2:

DraftRobins AFB GA_2:

1Robins AFB GA_2:

ReproRobins AFB GA_2:

Draft310981670_2:

1310981670_2:

Repro310981670_2:

31098167016 REMARKS A The Prime Provisioning Activity PPA is identified in Block 14 with an asterisk B For PPLsSFPPLs one set of technical data hard copy will be provided to the PPA with the Logistics Product Data in PLISN sequence annotated with PLISN PCCN SCC PCC CAGE and Part Number with accompanying transmittal correspondence C For PPLsSFPPLs one set of technical data electronic or hardcopy will be provided to DLIS Block 14 annotated with PLISN PCCN SCC PCC CAGE and PN with accompanying transmittal correspondence with a courtesy copy provided to the PPA D All transmittal correspondence will cite the applicable Contract Number PCCN and SCC DLIS transmittal correspondence should cite 406SCMSGULAB as the PPA and provide a courtesy copy to the PPA E Block 7 AcceptanceRejection of the technical data will be furnished within 90 calendar days after receipt by the PPA Method of acceptancerejection will be in accordance with contract requirements F Block 8 Approval written is not required However the data item will be reviewed and acceptedrejected based on its conforming to the requirements of the DID within 90 days of receipt by the requiring office G Block 9 Distribution statement D applies H Blocks 10 12 13 Dates to be reflected on the AFMC Form 718 Atch 1 to the Initial Provisioning Performance Specification IPPS If complete sets are not provided identify missing technical data and provide it 30 days prior to the Spares Provisioning Conference or as directed by the PPA This applies to all non stocklisted items regardless of the type Logistics Product Data and SMR Code source maintenance recoverability Technical data is required for each support item appearing on all types of Logistics Product Data first appearance only on each Logistics Product Data submission unless directed otherwise by the PPA I The prime contractor and all subvendors shall provide required data translated to the English language for the express purpose of identifying and cataloging items with a full description regardless of limited rights claims Letters of refusal must clearly state reasons technical data is not being furnished to satisfy the data requirements levied and recommend alternate methods of furnishing required technical data to the PPA J For DCNs LLTILs and CBILs both sets of technical data will be provided to the PPA K The contractor shall not assess developmental costs to the Government to furnish this technical data as EDFP only cost necessary for reproduction and assemblage L In the event EDFP submittal deliveries are to be made to a secured program specific electronic site contractor or government a transmittal notification will be concurrently forwarded to the PPA via email_2:

Draft16 REMARKS A The Prime Provisioning Activity PPA is identified in Block 14 with an asterisk B For PPLsSFPPLs one set of technical data hard copy will be provided to the PPA with the Logistics Product Data in PLISN sequence annotated with PLISN PCCN SCC PCC CAGE and Part Number with accompanying transmittal correspondence C For PPLsSFPPLs one set of technical data electronic or hardcopy will be provided to DLIS Block 14 annotated with PLISN PCCN SCC PCC CAGE and PN with accompanying transmittal correspondence with a courtesy copy provided to the PPA D All transmittal correspondence will cite the applicable Contract Number PCCN and SCC DLIS transmittal correspondence should cite 406SCMSGULAB as the PPA and provide a courtesy copy to the PPA E Block 7 AcceptanceRejection of the technical data will be furnished within 90 calendar days after receipt by the PPA Method of acceptancerejection will be in accordance with contract requirements F Block 8 Approval written is not required However the data item will be reviewed and acceptedrejected based on its conforming to the requirements of the DID within 90 days of receipt by the requiring office G Block 9 Distribution statement D applies H Blocks 10 12 13 Dates to be reflected on the AFMC Form 718 Atch 1 to the Initial Provisioning Performance Specification IPPS If complete sets are not provided identify missing technical data and provide it 30 days prior to the Spares Provisioning Conference or as directed by the PPA This applies to all non stocklisted items regardless of the type Logistics Product Data and SMR Code source maintenance recoverability Technical data is required for each support item appearing on all types of Logistics Product Data first appearance only on each Logistics Product Data submission unless directed otherwise by the PPA I The prime contractor and all subvendors shall provide required data translated to the English language for the express purpose of identifying and cataloging items with a full description regardless of limited rights claims Letters of refusal must clearly state reasons technical data is not being furnished to satisfy the data requirements levied and recommend alternate methods of furnishing required technical data to the PPA J For DCNs LLTILs and CBILs both sets of technical data will be provided to the PPA K The contractor shall not assess developmental costs to the Government to furnish this technical data as EDFP only cost necessary for reproduction and assemblage L In the event EDFP submittal deliveries are to be made to a secured program specific electronic site contractor or government a transmittal notification will be concurrently forwarded to the PPA via email_2:

116 REMARKS A The Prime Provisioning Activity PPA is identified in Block 14 with an asterisk B For PPLsSFPPLs one set of technical data hard copy will be provided to the PPA with the Logistics Product Data in PLISN sequence annotated with PLISN PCCN SCC PCC…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .