Questions_and_Responses.pptx

PPTX presentation 176 KB Posted

Attached to
Bomber Armament Tester (BAT) Federal contract opportunity
Solicitation number
FA8533-16-R-0001
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Robins Air Force Base

About this file

Responses to Industry from Pre-Solicitation Day 2

View the file

Other files for this federal contract opportunity

Other files attached to Bomber Armament Tester (BAT), newest first.
File Type Posted
AFGSC_Industry-Day_Brief-18Feb15.pdf PDF
Bomber_Armament_Tester_Bidder's_Library-Notice_to_Industry.pdf PDF
Updated_BAT_NEWS_dated_4_May_16.pdf PDF
DD_Form_2345 _Militarily_Critical_Technical_Data_Agreement.pdf PDF
BAT_Pre-Proposal_Teleconference_Slides.pdf PDF
Updated_BAT_NEWS_dated_21_Apr_16.pdf PDF
Updated_BAT_NEWS_dated_19_Apr_16_(2).pdf PDF
Updated_BAT_NEWS_dated_18_Apr_16.pdf PDF
Updated_BAT_NEWS_dated_15_Apr_16.pdf PDF
Atch_11_Total_Resources_Volume_WBS_Breakdown.xlsx XLSX spreadsheet
Atch_2_Electronic_Format_for_All_Proposal_Volumes.pdf PDF
Responses_to_Draft_RFP_Questions.pdf PDF
Atch_17_Contract_Data_Requirements_List_B001-B00T.pdf PDF
Atch_24_AFMC_807.pdf PDF
Updated_BAT_NEWS_dated_14_Apr_16.pdf PDF
Atch_7_Past_Performance_Questionnaire.pdf PDF
Atch_14_Performance_Specification_Rev9.pdf PDF
Atch_5_Consent_Form.pdf PDF
Atch_20_TMCR_for_Bomber_Armament_Test_Set.pdf PDF
Atch_16_Contract_Data_Requirements_List_B00U-B018.pdf PDF
Atch_18_Contract_Data_Requirements_List_C001-C008.pdf PDF
Atch_1_Cross_Reference_Martix.pdf PDF
Atch_22_SGFP_BAT_GFP_Form.pdf PDF
Atch_3_Past_Performance_Information_for_Offerors.pdf PDF
DRAFT_BAT_Section_M.pdf PDF
Atch_21_RGFP_BAT_GFP_Form.pdf PDF
Atch_15_Contract_Data_Requirements_List_A001-A00G.pdf PDF
Atch_19_CDRL_General_Notes.pdf PDF
DRAFT_BAT_Section_L.pdf PDF
Atch_6_Transmittal_Letter.pdf PDF
Atch_4_Client_Authorization_Letter.pdf PDF
Atch_26_AFMC_260.pdf PDF
Updated_BAT_NEWS_dated_22Mar16.pdf PDF
RFP_Incentive_Language.pdf PDF
Updated_BAT_NEWS_dated_21Mar16.pdf PDF
Updated_BAT_NEWS_dated_17Mar16.pdf PDF
Contractor_Briefing_of_BAT_Incentives.pdf PDF
Contract_Data_Requirements_List_A_Portfolio.pdf PDF
DRAFT_BAT_Performance_Specification _dated_8_Mar__16 _Rev_9.pdf PDF
Contract_Data_Requirements_List_C_Portfolio.pdf PDF
DRAFT_BAT_APPENDIX_C_as_of_30_Oct_15.pdf PDF
Updated_BAT_NEWS_dated_5_Feb_16.pdf PDF
DRFP_BAT_CDRLs_26_Jan_16.pdf PDF
Bomber_Armament_Tester_Bidder's_Library-Notice_to_Industry.pdf PDF
DRAFT_BAT_Section_L_-_As_of_5_Feb_16.pdf PDF
DRAFT_BAT_Performance_Specification _dated_26_Jan_16 _Rev_8.pdf PDF
DRAFT_FA8533-16-R-0001.pdf PDF
DRAFT_BAT_Statement_of_Work dated_21_Jan_16 _Rev_5.pdf PDF
Questions_and_Responses_ao_Jan_4_16.pptx PPTX presentation
DRAFT_BAT_Section_M_-_As_of_5_Feb_16.pdf PDF
Show all 50

Bomber Armament Tester (BAT) has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Question/Response QUESTION: B-1: When testing each arming solenoid in a non-release situation, for how long is the force applied to the solenoid?

RESPONSE: There is no set time. The technician applies a D-200 mechanical force gage long enough to ensure lanyard retention.

AFLCMC… Providing the Warfighter’s Edge

QUESTION: B-52H Unique Requirements, section 3.4.3.1.2, Conventional Rotary Launcher Functional Test.

What does CRL Common Core consist of?

Will these tests be performed on or off aircraft?

Is '1760 cable configuration' same as 'CRL 1760 ASI and Ejector Interface' ?

RESPONSE:

• The common core launcher consists of the IWIU, S/V LRU’s and MAU-12ejectors. Each ejector location has a 1760 interface connector for weaponumbilical. Increment 1.2 will introduce 2 TRU units that will provide highcapacity 28 VDC weapons power.
• The launcher will be tested in the backshop. The BAT should have thecapability to perform a launcher single station check while installed on theaircraft.
• The 1760 configuration is similar to the HSAB. A 1760 umbilical disconnectand a MAU-12 connector is present at each station. The HSAB and Launcherelectrical disconnect configurations are the same. The only difference is theplacement of the 1760 disconnect in relation to the MAU-12.

QUESTION: B-52H Unique Requirements, section 3.4.3.2, Wiring Tests.

Is "CSRL to B-52H Bomb Bay Disconnect" the same test as " CRL to B-52H Bomb Bay Disconnect"?

Is ICSMS Pylon (1760 Pylon) the same as Station 218 1760 Pylon?

Does "Non-Nuclear 218 Conventional to B-52H LH/RH Pylon Wing disconnects" test include 'A7184 Conventional Weapons Relay Panel' and 'AJCP' or are they separate TPSs?

RESPONSE:

Partially, new connectors are added for some signals related to the 2 launcher configurations. Increment 1.2 will include the addition of 2 TRU’s that will furnish high capacity 28 VDC weapon power.

Yes.

A7184 weapons panel is for gravity non-1760 weapons. The Alternate Jettison Control Panel (AJCP) is utilized for 1760 weapon jettison. The wing electrical disconnects are different for A7184 and 1760 system checkout. Yes, they are currently two separate TPSs.

QUESTION: B-52H Unique Requirements, section 3.4.3.3, Backshop Tests.

Is SP/HSAB configured for MIL-STD-1760?

Does the SP/HSAB test include IWIU and WRP or are they separate TPSs?

RESPONSE:

1. The SP/HSAB is configured for MIL-STD-1760.

2. The SP/HSAB can be configured for 1760 and Non-1760 weapons release.

Yes, they are currently two separate TPSs.

QUESTION: Need CSLU connector part numbers for J1-J12.

RESPONSE: J1: MS27656T21B35S

J2: MS27656T21B35SA
J3: MS27656T13B35P
J4: MS27656T21B35SB
J5: MS27656T13B35PA
J6: MS27656T23B35S
J7: MS27656T25B35PD
J8: MS27656T15B18P
J9: MS27656T23B53SC
J10: MS27656T23B53SB
J11: MS27656T23B53SA
J12: MS27656T23B53S

QUESTION: Per BAT Spec 3.4.2.3 “The BAT shall fault isolate to an LRU”. With the existing test set once the fault is located to the CWIU, the CWIU is removed from the launcher. Then isolating the fault to the SRU level is then performed on the bench. Need confirmation that this is still the procedure to follow?

RESPONSE: Yes that is still the procedure.

QUESTION: B-52: What UUTs are considered CRL Common Core?

RESPONSE: The IWIU, S/V Junction Box, and associated cabling/connectors. The TRUs added in increment 1.2 will be tested by weapons personnel with a load bank, however, the BAT shall test for the presence of DC power, with minimal load during test of the launcher.

QUESTION: 11B29-3-55-1 Figure 6-6 shows a 10-Carry SECBM Launcher schematic that uses a CSLU, PCA and T/R LRU.

BAT Specification Section 3.4.2.3 shows the Transformer Rectifier Unit and the CSLU LRU as components of the CBM launcher only and that the SECBM launcher uses the CWIU, PCA, Transformer and Power Supply LRU’s. Are there two configurations for the SECBM launcher or just the one that uses the CWIU, PCA, Transformer and Power Supply LRU’s?

RESPONSE: Just the one configuration that uses the CWIU, PCA, Transformer and Power Supply LRU’s.

QUESTION: Specification: Paragraph 3.1.20.8 (Data at Rest Encryption).

The paragraph states the “system shall encrypt all data at rest”. Does the exported data have to be encrypted? Under which accounts will decryption be allowed?

Do you need all data encrypted as soon as the data log is written (i.e. no longer being used by the tester)?

Can the system run unencrypted, then encrypt the data as it is powered off?

Per 3.3.10, What about data exported off the system (i.e. to a CD/DVD)? What is the “cyber compliant” requirement that is desired?

RESPONSE: The entire non-volatile storage media containing the BAT operating System, Test Executive, Test Program sets etc. shall be encrypted. There is no specific requirement to encrypt exported data at this time.

SAIC

Question/Response QUESTION: Is Performance Specification, paragraph 3.4.3.3, last bullet ( - Test CRL (LRUs) to include …) mean there are 3 TPSs’ involved (i.e. testing a CRL, testing an IWIU as a standalone UUT, testing an S/V Junction Box as a standalone UUT), OR testing the CRL with the IWIU and S/V Junction Box contained within the CRL, CRL IWIU, S/V Junction box

RESPONSE: Test of the CRL will include testing the assembled CRL, standalone test of the IWIU and S/V Junction Box.

QUESTION: Can they provide a mechanical drawing for the existing 750120-3 14in Ejector Rack Fixture or provide the dimensions for the area the ERF can occupy to safely mount it on the 28-Carry and 10-Carry launcher?

RESPONSE: Drawings for ERF, specifically 750120-1, 750120-3, PL750120-3, 750576-1, PL750577-1, 750577-1 will be provided in the next data release.