HP-SGNSC_QA _16_Oct_12.pdf

PDF 37 KB Posted

Attached to
High Purity Self-Generating Nitrogen Servicing Cart (HP-SGNSC) Federal contract opportunity
Solicitation number
FA8533-12-R-30143
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Robins Air Force Base

About this file

Questions and Answers dated 16 Oct 12 on RFP FA8533-12-R-30143

View the file

Other files for this federal contract opportunity

Other files attached to High Purity Self-Generating Nitrogen Servicing Cart (HP-SGNSC), newest first.
File Type Posted
HP-SGNSC_QA _25_Oct_12.pdf PDF
FA8533-12-R-30143-0003.pdf PDF
FA8533-12-R-30143-0002.pdf PDF
HP-SGNSC_QA _10_Oct_12.pdf PDF
FA8533-12-R-30143 _Amendment_0001.pdf PDF
B002_Conference_Agenda.pdf PDF
FA853312R30143_A005_Design_Data_and_Calculations.pdf PDF
FA853312R30143_Attachment2PPPQuestionnaire.doc DOC document
FA853312R30143.RTF RTF text file
FA853312R30143_C004_System_Safety_Hazard_Analysis_Report.pdf PDF
FA853312R30143_C002_Corrosion_Prevention_and_Control_Plan.pdf PDF
FA853312R30143_B006_Request_for_Deviation.pdf PDF
FA853312R30143_A006_Instructional_Media_Package.pdf PDF
FA853312R30143_E001_Logistics_Management_Information_Summary_Data_Products.pdf PDF
FA853312R30143_E004_Supplemental_Data_for_Provisioning.pdf PDF
FA853312R30143_Attachment3TransmittalLetter.doc DOC document
FA853312R30143_Attachment6QuantityRanges.doc DOC document
FA853312R30143_Attachment5ConsentForm.doc DOC document
FA853312R30143_A003_Production_Report.pdf PDF
FA853312R30143_AFMC_158.pdf PDF
FA853312R30143_E002_Supplemental_Data_for_Provisioning.pdf PDF
FA853312R30143_Attachment4ClientAuthorizationLtr.doc DOC document
FA853312R30143_D001_Technical_Manual_Contract_Requirements.pdf PDF
FA853312R30143_Attachment1FACTSSheet.doc DOC document
FA853312R30143_B001_Contractors_Progress_Status_and_Management_Report.pdf PDF
FA853312R30143_A002_Test_Inspection_Report.pdf PDF
FA853312R30143_C003_System_Safety_Program_Plan.pdf PDF
FA853312R30143_C001_Welding_Procedures.pdf PDF
FA853312R30143_A004_Technical_Report_Study_Services.pdf PDF
FA853312R30143_PD11WRGRVEA06.doc DOC document
FA853312R30143_B003_Conference_Minutes.pdf PDF
FA853312R30143_E003_Logistics_Management_Information_Summary_Data_Products.pdf PDF
FA853312R30143_A001_Test_Procedure.pdf PDF
FA853312R30143_B005_Notice_of_Revision.pdf PDF
FA853312R30143_Type_II_EDL.pdf PDF
FA853312R30143_Type_I_EDL.pdf PDF
FA853312R30143_SOW.doc DOC document
FA853312R30143_C005_Product_Base_Line_Index.pdf PDF
FA853312R30143_B004_Engineering_Change_Proposal.pdf PDF
Show all 39

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions and Answers Request For Proposal (RFP) FA8533-12-R-30143

High Purity-Self Generating Nitrogen Service Cart (HP-SGNSC) Program

16 October 2012

The following additional questions have been received in the AFLCMC/WNKBBB, Major Programs Contracting Office on the above High Purity-Self Generating Nitrogen Servicing Carts (HP-SGNSC) requirement. The questions as well as the applicable answers are provided below.

Question 1: Reference the Schedule of Contract Line Item Numbers (CLINs) in RFP FA8533- 12-R-30143:

A Should CLIN 0004AE identify ELIN B005 instead of B004?

B Should CLIN 0007AC identify ELIN E003 instead of E001?

C Should CLIN 0007AD identify ELIN E004 instead of E002?

Government’s Response: The answer is yes to the above questions. Note that CLINs 0007AA and 0007AB identify the electric HP-SGNSC unit and associated provisioning documents while CLINs 0007AC and 0007AD identify the diesel HP-SGNSC unit and associated provisioning documents. The provisioning documents require the same information for the electric as for the diesel unit.

Question 2: In RFP FA8533-12-R-30143 Preproduction Testing: CLINs 0001 and 0002, paragraph 6 states, "In the event production units are ordered or option periods are exercised prior to preproduction unit approval, the acquisition of materials or components for, or the commencement of production of, the balance of the contract quantity is at the sole risk of the contractor." Will additional delivery orders issued prior to preproduction unit approval be at the sole discretion of the Government or will [the contractor] have the option of not accepting the delivery order until receiving Government approval of our preproduction units (assuring [the contractor] can meet the 60 day delivery requirement without assuming undue risk)?

Government’s Response: Should the Government ever order production units prior to preproduction unit approval, the contractor will not have the option of not accepting the delivery order. All orders will be issued pursuant to the terms and conditions of the contract that results from RFP FA8533-12-R-30143.

Question 3: Reference PD11WRGRVEA06, paragraph 3.1: Inside the paragraph is the statement "The HPSGNSC shall be designed and constructed in accordance with all applicable European Union (EU) requirements in order to have the "CE" marking affixed (see 3.3.3.1)."

What and where is 3.3.3.1? The PD does not have this item.

Government’s Response: The reference to paragraph 3.3.3.1 was a typographical error. The correct reference is paragraph 3.34.4. See Revision 3 to the PD in Amendment 0003.

Question 4: Reference PD11WRGRVEA06, paragraph 4.8.4.7 Fungus Test: Called out is MIL- STD-810G, Method 508.5, Table 508.5-I (USA-Group). Is this really 508.6 as there is no 508.5?

Government’s Response: The correct reference is Method 508.6, Table 508.6-I. See Revision 3 to the PD in Amendment 0003.

Question 5: Reference PD11WRGRVEA06, paragraph 4.8.4.7 Fungus Test: This test is for 28 days. More recent fungus items are accomplished by analysis. Question: Does the Government want the 28-day test or is analysis sufficient?

Government’s Response: The 28-day test shall be conducted.

Question 6: Reference PD11WRGRVEA06, paragraph 4.8.4.10 Vibration forces test, and MIL- STD-810G, Method 514.5, Procedure II and Procedure I, Category 8: Is this really 514.6 since there is no 514.5 in Rev G of the Mil Standard?

Government’s Response: The correct reference is Method 514.6. See Revision 3 to the PD in Amendment 0003.

File details come from the government source that posted it. Updated .