FA8533-12-R-30143-0003.pdf

PDF 27 KB Posted

Attached to
High Purity Self-Generating Nitrogen Servicing Cart (HP-SGNSC) Federal contract opportunity
Solicitation number
FA8533-12-R-30143
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Robins Air Force Base

About this file

Amendment 0003 to RFP FA8533-12-R-30143

View the file

Other files for this federal contract opportunity

Other files attached to High Purity Self-Generating Nitrogen Servicing Cart (HP-SGNSC), newest first.
File Type Posted
HP-SGNSC_QA _25_Oct_12.pdf PDF
HP-SGNSC_QA _16_Oct_12.pdf PDF
FA8533-12-R-30143-0002.pdf PDF
HP-SGNSC_QA _10_Oct_12.pdf PDF
FA8533-12-R-30143 _Amendment_0001.pdf PDF
B002_Conference_Agenda.pdf PDF
FA853312R30143_A005_Design_Data_and_Calculations.pdf PDF
FA853312R30143_Attachment2PPPQuestionnaire.doc DOC document
FA853312R30143.RTF RTF text file
FA853312R30143_C004_System_Safety_Hazard_Analysis_Report.pdf PDF
FA853312R30143_C002_Corrosion_Prevention_and_Control_Plan.pdf PDF
FA853312R30143_B006_Request_for_Deviation.pdf PDF
FA853312R30143_A006_Instructional_Media_Package.pdf PDF
FA853312R30143_E001_Logistics_Management_Information_Summary_Data_Products.pdf PDF
FA853312R30143_E004_Supplemental_Data_for_Provisioning.pdf PDF
FA853312R30143_Attachment3TransmittalLetter.doc DOC document
FA853312R30143_Attachment6QuantityRanges.doc DOC document
FA853312R30143_Attachment5ConsentForm.doc DOC document
FA853312R30143_A003_Production_Report.pdf PDF
FA853312R30143_AFMC_158.pdf PDF
FA853312R30143_E002_Supplemental_Data_for_Provisioning.pdf PDF
FA853312R30143_E003_Logistics_Management_Information_Summary_Data_Products.pdf PDF
FA853312R30143_A001_Test_Procedure.pdf PDF
FA853312R30143_B005_Notice_of_Revision.pdf PDF
FA853312R30143_Type_II_EDL.pdf PDF
FA853312R30143_Type_I_EDL.pdf PDF
FA853312R30143_SOW.doc DOC document
FA853312R30143_C005_Product_Base_Line_Index.pdf PDF
FA853312R30143_B004_Engineering_Change_Proposal.pdf PDF
FA853312R30143_Attachment4ClientAuthorizationLtr.doc DOC document
FA853312R30143_D001_Technical_Manual_Contract_Requirements.pdf PDF
FA853312R30143_Attachment1FACTSSheet.doc DOC document
FA853312R30143_B001_Contractors_Progress_Status_and_Management_Report.pdf PDF
FA853312R30143_A002_Test_Inspection_Report.pdf PDF
FA853312R30143_C003_System_Safety_Program_Plan.pdf PDF
FA853312R30143_C001_Welding_Procedures.pdf PDF
FA853312R30143_A004_Technical_Report_Study_Services.pdf PDF
FA853312R30143_PD11WRGRVEA06.doc DOC document
FA853312R30143_B003_Conference_Minutes.pdf PDF
Show all 39

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE Page 1

2. AMENDMENT/MODIFICATION NO.

FA8533-12-R-30143-0003

3. EFFECTIVE DATE

4. REQUISITION/PURCHASE REQ. NO.

FD20601230143

5. PROJECT NO (If applicable)

6. ISSUED BY CODE

SUPPORT EQPT - MAJOR PROGRAMS, AFLCMC/WNKBBB

235 BYRON ST STE 19A

BLDG 300 CML PHN 478 222 1902

ROBINS AFB GA 31098-1670

BUYER: Patricia L. Farrell Patricia.Farrell@robins.af.mil Phone: (478) 222- 1906 Fax: (478) 222-1854 No Collect Calls

7. ADMINISTERED BY (If other than item 6) CODEFA8533

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

CODE

X

9A. AMENDMENT OF SOLICITATION NO.

FA853312R30143

9B. DATED (SEE ITEM 11)

14-SEP-2012

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods. ( a ) By completing Items 8 and 15, and returning copies of the amendment; ( b ) By acknowledging receipt of this amendment on each copy of the offer submitted; or ( c ) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return 1 copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

ROUTINE

15A. NAME AND TITLE OF SIGNER (Type or print)

15B. CONTRACTOR/OFFEROR

BY ________________________________________________________

(Signature of person authorized to sign)

15C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16B. UNITED STATES OF AMERICA

BY ____________________________________________________

(Signature of Contracting Officer)

16C. DATE SIGNED

FACILITY CODE

NSN 7540-01-152-8070

PREVIOUS EDITION UNUSABLE

30-105 STANDARD FORM 30 (REV. 10-83)

PRESCRIBED BY GSA

FAR (48 CFR) 53.243

X

X X

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

Patricia.Farrell Sticky Note Marked set by Patricia.Farrell

Patricia.Farrell Typewritten Text 16 Oct 12

Patricia.Farrell Typewritten Text

Patricia.Farrell Typewritten Text

Amendment/Modification FA8533-12-R-30143-0003

Continuation of block 14. DESCRIPTION OF AMENDMENT/MODIFICATION

1. The purpose of Amendment 0003 is to enact the following changes to RFP

FA8533-12-R-30143:

2. Reference Contract Line Item Number (CLIN) 0004AE in the Schedule of the RFP: the Exhibit Line Item Number (ELIN) was erroneously identified as B004. It is hereby corrected to B005 which reflects the "Notice of Revision."

3. Reference CLINs 0007AC and 0007AD in the Schedule of the RFP: The ELINs are hereby corrected to E003 and E004, respectively.

4. Incorporate Revision 3, dated 16 October 2012, to Purchase Description PD11WRGRVEA06 (attached).

5. The due date for receipt of proposals remains 12:00PM EST, 29 October 2012.

REVISION 3, dated 16 October 2012

TO

PD11WRGRVEA06

PURCHASE DESCRIPTION

HIGH PURITY-SELF GENERATING NITROGEN SERVICING CART

(HP-SGNSC), DATED 4 Sep 2012

1. PARAGRAPH 3.1 Design.

Change the following:

From: The HPSGNSC shall be designed and constructed in accordance with all applicable European Union (EU) requirements in order to have the “CE” marking affixed (see 3.3.3.1).

To: The HPSGNSC shall be designed and constructed in accordance with all applicable

European Union (EU) requirements in order to have the “CE” marking affixed (see 3.34.4).

2. PARAGRAPH 4.8.4.7 Fungus test.

From: The Fungus test shall be in accordance with MIL-STD-810, Method 508.5, Table 508.5-I (USA-Group).

To: The Fungus test shall be in accordance with MIL-STD-810, Method 508.6, Table 508.6-I

(US Test Fungus).

3. PARAGRAPH 4.8.4.10 Vibration forces test.

From: The HPSGNSC shall be tested in accordance with MIL-STD-810, Method 514.5, Procedure II and Procedure I, Category 8, for test duration of not less than eight hours each.

To: The HPSGNSC shall be tested in accordance with MIL-STD-810, Method 514.6, Procedure II and Procedure I, Category 8, for test duration of not less than eight hours each.

AFLCMC/WNZEA\16 October 2012

File details come from the government source that posted it. Updated .