FA8533-12-R-30143-0002.pdf
PDF 20 KB Posted
- Attached to
- High Purity Self-Generating Nitrogen Servicing Cart (HP-SGNSC) Federal contract opportunity
- Solicitation number
- FA8533-12-R-30143
About this file
Amendment 0002 to RFP FA8533-12-R-30143
View the file
Other files for this federal contract opportunity
Show all 39
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE Page 1
2. AMENDMENT/MODIFICATION NO.
FA8533-12-R-30143-0002
3. EFFECTIVE DATE
4. REQUISITION/PURCHASE REQ. NO.
FD20601230143
5. PROJECT NO (If applicable)
6. ISSUED BY CODE
SUPPORT EQPT - MAJOR PROGRAMS, AFLCMC/WNKBBB
235 BYRON ST STE 19A
BLDG 300 CML PHN 478 222 1902
ROBINS AFB GA 31098-1670
BUYER: Patricia L. Farrell Patricia.Farrell@robins.af.mil Phone: (478) 222- 1906 Fax: (478) 222-1854 No Collect Calls
7. ADMINISTERED BY (If other than item 6) CODEFA8533
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
CODE
X
9A. AMENDMENT OF SOLICITATION NO.
FA853312R30143
9B. DATED (SEE ITEM 11)
14-SEP-2012
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods. ( a ) By completing Items 8 and 15, and returning copies of the amendment; ( b ) By acknowledging receipt of this amendment on each copy of the offer submitted; or ( c ) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified. 29-OCT-2012 12:00 PM
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return 1 copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
ROUTINE
15A. NAME AND TITLE OF SIGNER (Type or print)
15B. CONTRACTOR/OFFEROR
BY ________________________________________________________
(Signature of person authorized to sign)
15C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16B. UNITED STATES OF AMERICA
BY ____________________________________________________
(Signature of Contracting Officer)
16C. DATE SIGNED
FACILITY CODE
NSN 7540-01-152-8070
PREVIOUS EDITION UNUSABLE
30-105 STANDARD FORM 30 (REV. 10-83)
PRESCRIBED BY GSA
FAR (48 CFR) 53.243
X
X X
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
Amendment/Modification FA8533-12-R-30143-0002
Continuation of block 14. DESCRIPTION OF AMENDMENT/MODIFICATION
1. The purpose of Amendment 0002 is to:
incorporate Revision 2, dated 10 October 2012, to Purchase Description PD11WRGRVEA06 (attached), and incorporate Revision 1, dated 10 October 2012, (attached) to the Statement of Work
2. Note that the due date for receipt of proposals has been changed
From: 12:00 PM EST on 16 October 2012 To: 12:00 PM EST on 29 October 2012
REVISION 2, dated 10 October 2012
TO
PD11WRGRVEA06
PURCHASE DESCRIPTION
HIGH PURITY-SELF GENERATING NITROGEN SERVICING CART
(HP-SGNSC), DATED 4 Sep 2012
1. NOTE: The weight requirement in paragraph 3.5, Weight, and the dimension requirement in paragraph 3.6, Size, are applicable to both Type I and Type II HP-SGNSC units.
2. PARAGRAPH 3.9 Nitrogen quality.
Change the following:
From: The HPSGNSC shall produce nitrogen per specified in A-A-59503A, Type I (gaseous), Grade A (99.5%), Class I (Oil-free).
To: The HPSGNSC shall produce nitrogen per specified in A-A-59503A, Type I (gaseous), Grade B (99.5%), Class I (Oil-free).
3. PARAGRAPH 4.3 Conformance inspection.
Change the following:
From: Conformance inspection shall include the examination indicated in 4.6 and the tests specified in 4.8.3, 4.8.6 (including subsequent paragraphs) and 4.8.21.
To: Conformance inspection shall include the examination indicated in 4.6 and the tests specified in 4.8.3, 4.8.6 (including subsequent paragraphs) and 4.8.20.
AFLCMC/WNZEA/10 October 2012
DISTRIBUTION STATEMENT A. Approved for public release: Distribution is unlimited.
23 July 2012
Statement of Work (SOW)
For The
HIGH PURITY SELF GENERATING NITROGEN SERVICING
CART
(HP-SGNSC)
Revision 1: 10 October 2012
Prepared by
SUPPORT EQUIPMENT AND VEHICLES DIVISION
AFLCMC/WNZ
ROBINS AFB GA 31098-1813
Paragraph 3.6.8 of the Statement of Work is hereby revised for the purpose of correcting the reference from PD paragraph 4.8.21 to paragraph 4.8.20.
3.6.8 Production acceptance procedure and report. The contractor shall test each production item in accordance with 4.8.3, 4.8.7 and 4.8.20 of the PD11WRGRVEA06 utilizing a subset of the pre-production test procedures. The contractor shall enclose an acceptance certificate for each production item indicating successful completion of production testing and certifying the production equipment has passed hydrostatic testing. (DI-NDTI-80809B, Test/Inspection Report)
File details come from the government source that posted it. Updated .