MHU A1 Power SOW.docx

DOCX document 49 KB Posted

Attached to
EWAAC IDIQ FOPR_ MHU 196/204 A1 Power Control Unit Effort
Solicitation number
FA8532-26-R-B000
Issued by

About this file

This is a Statement of Work (SOW) for the procurement and development of the MHU A1 Power Control Unit, prepared by AFLCMC/ROZ at Robins Air Force Base, Georgia, dated 16 June 2025. The MHU A1 Power Control Unit is a critical component that supplies power to the MHU-196/204 munitions trailer and its associated equipment, including the compressor, pump motor, and A2 Main Control Unit. The work is conducted under the EWAAC IDIQ contract (FA8532-26-R-B000) as a Delivery Order supporting a service life extension of legacy MHU-196/204 trailers that have been operational for 40 years.

The contractor must comply with applicable federal standards including MIL-STD-130N(1) for identification marking and FEDSTD313F for hazardous materials management. Key technical requirements include developing an access panel for the main CB2 circuit breaker that permits installation and removal without disturbing other internal components, and submitting this design via an Engineering Change Proposal (ECP) for approval prior to initial production. The contractor shall develop detailed test procedures, conduct initial production testing of five units in three phases at the contractor facility and Robins AFB, and submit a first production test report. Testing phases include developmental testing at the contractor facility, qualification testing using a MHU Interface Test Adapter at Robins AFB, and Initial Operational Test and Evaluation (IOT&E) on two MHU-196 trailers at a CONUS location, with each unit tested for a minimum of 10 hours. The contractor is responsible for all shipping costs and any rework required to restore failed units to serviceable condition while maintaining configuration integrity. All design changes must be submitted as ECPs with supporting documentation and safety impact statements. Data exchange shall utilize email and AF365 Teams primarily, with DoD SAFE as backup, and a single program manager must be designated as the Government's point of contact for all contractual matters.

View the file

Other files

File Type Posted
FOPR_MUH196204_PowerControlUnit_Amend03.pdf PDF
FOPR_MUH196204_PowerControlUnit_Amend02.pdf PDF
FOPR_MUH196204_PowerControlUnit_Amend01.pdf PDF
SPI 60244-45200-10.pdf PDF
Signed CDRL 003.pdf PDF
FOPR_MUH196204_PowerControlUnit.pdf PDF
afmc807.pdf PDF
Signed CDRL 005.pdf PDF
Signed CDRL 002.pdf PDF
SPI - FND165348L_A1 PN 60244-45100-10.pdf PDF
afmc260.pdf PDF
Ship to locations A-1 Power Supply.xlsx XLSX spreadsheet
SOWMHU A1 Power Control UnitFinal.June16.docx DOCX document
Signed CDRL 006.pdf PDF
Signed CDRL 004.pdf PDF
Signed CDRL 001.pdf PDF
Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CUI

16 June 2025

Statement of Work (SOW) for

MHU A1 Power Control Unit

Prepared by

AFLCMC/ROZ SUPPORT EQUIPMENT & VEHICLES

235 BYRON STREET

BLDG 300 WEST WING, BAY D, SUITE 27A

ROBINS AFB GA 31098-1813

THIS PAGE HAS BEEN INTENTIONALLY LEFT BLANK

TABLE OF CONTENTS

1. SCOPE 4

2. APPLICABLE DOCUMENTS 4

2.1 Government documents4
2.1.1 Specifications, standards, and handbooks4
2.1.2 Other Government documents, drawings, and publications4
2.2 Non-Government publications5
2.3 Order of precedence5

3. DEFINITIONS 6

4. REQUIREMENTS 6

4.1 Program management6
4.1.1 Data delivery and transfer6
4.1.2 Program manager6
4.1.3 Plant access6
4.1.4 Conferences and program reviews6
4.2 Systems engineering6
4.2.1 Environment, Safety, and Occupational Health (ESOH)6
4.2.1.1 Hazardous materials6

4.2.2 Access Panel………………………………………………………………7

4.3 Testing and evaluation7
4.3.1 Initial production test procedures7
4.3.2 Initial production testing7
4.3.3 Initial production test report7
4.3.4 Rework7
4.4 Configuration management8
4.4.1 Engineering Change Proposals (ECPs)8
4.4.1.1 Technical Data Package (TDP)8
4.4.2 Request for Variance (RFV)8

1. SCOPE

This document defines the tasks associated with the procurement of the MHU A1 Power Control Unit as described by Technical Data Package (TDP) 60244-45100-10 and 60544-45100-10 and is to be used in conjunction with the TDP. The MHU A1 Power Control Unit supplies power to the MHU-196/204 munitions trailer and its compressor, pump motor, and the A2 Main Control Unit.

2. APPLICABLE DOCUMENTS

The following documents are applicable to the SOW to the extent specified herein.

2.1 Government documents.

2.1.1 Specifications, standards, and handbooks. The following specifications, standards, and handbooks of the exact revision listed below form a part of this SOW to the extent specified herein.

FEDERAL STANDARDS

FED‑STD‑313F Material Safety Data, Transportation Data, and Disposal Data for Hazardous Materials Furnished to Government Activities

DEPARTMENT OF DEFENSE STANDARDS

MIL-STD-130N(1) Identification Marking of U.S. Military Property

2.1.2 Other Government documents, drawings, and publications.

DATA ITEM DESCRIPTIONS (DIDs)

DI-NDTI-80603ATest Procedure
DI-SESS-80639EEngineering Change Proposal (ECP)
DI-SESS-80640ERequest for Variance (RFV)
DI-SESS-80642ENotice of Revision (NOR)
DI-NDTI-80809BTest/Inspection Report

(Copies of these documents are available online at http://quicksearch.dla.mil/.)

DRAWINGS

Part Number

CAGE
Nomenclature
97597776N
98752
Product Data Specification
60244-45100-10
98752
Power Control Unit
60544-45100-10
98752
Power Control Unit

(Copies of drawings with ECO’s will be provided with the solicitation.)

2.2 Non-Government publications. The following documents of the exact revision listed below form a part of this document to the extent specified herein.

AMERICAN SOCIETY OF MECHANICAL ENGINEERS (ASME)

Y14.24-2012Types and Applications of Engineering Drawings
Y14.34-2018Associated Lists
Y14.35-2014Revision of Engineering Drawings and Associated Documents
Y14.41-2012Digital Product Definition Data Practices
Y14.47-2019Model Organization Practices
Y14.100-2017Engineering Drawing Practices

(Application for copies should be addressed to ASME, Two Park Avenue, New York NY 10016-5990, http://www.asme.org/.)

SAE International

GEIA HB-0007B Logistics Product Data Handbook

(Application for copies should be addressed to SAE International, Inc., 400 Commonwealth Drive, Warrendale PA 15096, http://www.sae.org/.)

2.3 Order of precedence. In the event of a conflict between the text of this document and the references cited herein, the text of this document takes precedence. Nothing in this document, however, supersedes applicable laws and regulations unless a specific exemption has been obtained.

3. DEFINITIONS

MHU-196 / 204 trailer. A type of munitions trailer that is self-powered with a heavy duty, U-shaped frame configuration and 40,000 pounds lift capacity used to transport and lift rotary launchers and bomb racks with conventional / nuclear munitions for B-1, B-2 & B-52 aircraft.

4. REQUIREMENTS

4.1 Program management.

4.1.1 Data delivery and transfer. To promote effective schedule management, email shall be utilized to the maximum extent possible for tasks identified in this SOW. Department of Defense (DoD) Secure Access File Exchange (SAFE) shall be the secondary (backup) electronic data exchange, located at https://safe.apps.mil/, and utilized when temporary circumstances do not permit use of AF365 Teams.

4.1.2 Program manager. The contractor shall identify to the Government and maintain a single point of contact (program manager) for all matters under this contract. The contractor shall also ensure that all program management personnel assigned to the program shall be available, as required, to meet program objectives.

4.1.3 Plant access. The contractor shall arrange for full access to applicable contractor facilities and offices by Government representatives conducting any business, making observations, or performing inspections required by public law or by clauses and regulations within this contract.

4.1.4 Conferences and program reviews. Throughout the Period of Performance (POP) of the contract, conferences, meetings, and technical or programmatic reviews may be supplemented with a virtual environment as directed by the Procuring Contracting Officer (PCO) if travel restrictions, safety measures, or other program specifics prevent or limit the number of in-person attendees. Virtual meetings can utilize, but shall not be limited to, AF365 Teams. The contractor shall adhere to any Federal, State, or local health and well-being regulations and guidelines for contractor-hosted in-person gatherings with Government personnel.

4.2 Systems engineering.

4.2.1 Environment, Safety, and Occupational Health (ESOH).

4.2.1.1 Hazardous materials. The TDP may contain hazardous materials reference such as finished specs and coating systems, and the contractor shall manage these hazardous materials, including those embedded in the system or used during operation or maintenance, as an element of the Systems Engineering process. The system shall not generate or use Class I or Class II Ozone Depleting Substances (ODS) during operation, maintenance, or disposal. The use of hexavalent chromium is also prohibited. The contractor shall list any hazardous materials to be delivered under this contract, including locations, quantities, and special handling and disposal procedures. This information shall be submitted in an ECP (Para 4.4.1).

4.2.2 Access Panel. The contractor shall develop an access panel to allow ease of maintenance for installing and removing the main CB2 circuit breaker. The access panel shall be designed to allow installation/removal of the circuit breaker without having to remove any other internal components. Access panel shall be secured with fasteners (screws with internal nut-plate design). Access panel proposal shall be submitted in an ECP and accepted by the program office prior to initial production readiness and testing.

4.3 Testing and evaluation.

4.3.1 Initial production test procedures. The contractor shall develop detailed test procedures for the initial production test at the contractor facility, which shall address all requirements identified in the drawing package and this SOW. The test procedures shall include but not limited to data record sheets, supporting charts or graphs, and identification of test instruments by manufacturer, model number, and serial number. IAW DD1423 ELIN A001 (DI-NDTI-80603A, Test Procedure)

4.3.2 Initial production testing. Initial production testing of five (5) production MHU A1 Power Control Units shall be completed in three (3) phases to ensure adequate and efficient production-representative articles for Initial Operational Test and Evaluation (IOT&E). This phase approach will also assist with the initial production base-line and increase the production rate to lead to Full-Rate Production (FRP) upon successful completion of IOT&E. The first phase of Developmental testing of five (5) initial production MHU A1 Power Control Units shall be completed at the contractor’s facility and witnessed by one or more Government representative(s). Upon successful completion, the contractor shall ship the quantity of five (5) initial production MHU A1 Power Control Units to Robins AFB for the second phase of initial production testing: Qualification Testing using a MHU Interface Test Adapter (ITA) within the 569th EXMG organization. If all five (5) initial production units successfully pass Qualification Testing, two (2) of the five (5) initial production units will be shipped by AFLCMC/ROZ to a continental United States (CONUS) location (to be determined) to be installed on two (2) MHU-196 trailers for the third phase of initial production testing: IOT&E. Each initial production unit shall be operationally tested for a minimum of 10 hours on each MHU-196 trailer. If both trailers with newly manufactured MHU A1 Power control units installed successfully pass IOT&E without failure, the Government shall approve the manufacture and shipment of additional units. The contractor shall be responsible for all shipping costs of the five (5) initial production MHU A1 Power Control Units to Robins AFB.

4.3.3 Initial production test report. The contractor shall submit a first production test report upon completion of the first production test at the contractor facility. The test report shall document all testing performed, including results of any unsuccessful test attempts. IAW DD1423 ELIN A002 (DI-NDTI-80809B, Test/Inspection Report)

4.3.4 Rework. In the event that any of the quantity of five (5) initial production MHU A1 Power Control Units fail under initial production testing at Robins AFB and/or field location, the failed MHU A1 Power Control Unit(s) and the remaining initial production units shall be shipped back to the contractor's facility within 60 calendar days for rework. The contractor shall be responsible for any rework necessary to meet the requirement and restore the initial production MHU A1 Power Control Units to a serviceable, "like new" condition while retaining configuration integrity. The contractor shall be responsible for all costs associated with shipping any failed initial production MHU A1 Power Control Units from Robins AFB and/or field location to the contractor's facility for rework and return shipping of all reworked initial production MHU A1 Power Control Units from the contractor’s facility back to Robins AFB for additional follow-up initial production testing.

4.4 Configuration management.

4.4.1 Engineering Change Proposals (ECPs). Notwithstanding any other provision in the contract, no contractor or subcontractor's change in design, fabrication, assembly, part, material, process, or source of supply shall be made to the TDP unless such change is submitted in writing by ECP and approved by the procuring activity. Any request for change shall be accompanied by complete documentation supporting the need for the change. A system safety impact statement shall be provided as part of the submittal; it shall quantify and qualify the system safety risk identified. A Notice of Revision (NOR) shall be submitted with each ECP. Should the Government approve an ECP, the contractor shall be responsible for submitting changes to the TOs to reflect the changes made in the ECP. IAW DD1423 ELIN A003 & A004 (DI-SESS-80639E, Engineering Change Proposal (ECP); DI-SESS-80642E, Notice of Revision (NOR))

4.4.1.1 Technical Data Package (TDP). The TDP (also known as the drawing package) forms a part of this SOW and constitutes the end item product drawings. The TDP is mandatory for use in design and building the MHU A1 Power Control Unit and no deviation from the drawings is permissible without prior approval of the procuring activity. Where tolerances could cumulatively result in incorrect fits, the contractor shall provide tolerances within those prescribed on the drawings to ensure correct fit, assembly, and operation of the MHU A1 Power Control Unit. If during the manufacturing process of initial production MHU A1 Power Control Units discrepancies are noted with the TDP, the contractor shall notify the procuring activity of such discrepancies. Any data prepared by the contractor or obtained from a vendor to support fabrication and manufacture of the MHU A1 Power Control Unit shall be made available, upon request, for inspection by the procuring activity. Any changes to the TDP shall be processed via approved ECP(s).

4.4.2 Request for Variance (RFV). The contractor shall prepare an RFV whenever a departure from the contractually-specified base line is proposed for a specific number of units or for a specific time. IAW DD1423 ELIN A005 (DI-SESS-80640E, Request for Variance (RFV))