About this file

This document contains a Contract Data Requirements List and notice of intent for a future solicitation. The Contract Data Requirements List requires test reports from the contractor for three ground power equipment items: a 72kW Ground Power Unit, 144kW Ground Power Unit, and 144kW Universal Load Bank. The reports must be submitted with each production unit.

The notice of intent is for a forthcoming solicitation seeking Indefinite Delivery/Indefinite Quantity contracts for the three ground power items listed above. The Air Force Materiel Command Lifecycle Management Center plans to award two separate multiple award IDIQ contracts with a 10 year period of performance. Group A will be for all three items on a full and open basis. Group B will be for just the 72kW Ground Power Unit and set aside for small businesses. First article testing will be required. The solicitation is expected to be released on October 15, 2021 with award by September 26, 2022. The opportunity is only open to U.S. contractors due to export restrictions.

View the file

Other files for this federal contract opportunity

Other files attached to Ground Power Modernization, newest first.
File Type Posted
GPM_JA_(400_Hz_Power_Cable_Assembly)_Redacted.pdf PDF
Question and Answer 6.docx DOCX document
FA8532-22-R-0001_0003.pdf PDF
Pre-Proposal Conference Follow-Up.docx DOCX document
Extraction from RFP Attachment 10_Columns A thru D only.xlsx XLSX spreadsheet
Pre-Proposal Conference Brief Re-upoload.pptx PPTX presentation
Pre-Proposal Conference Brief.pptx PPTX presentation
Question and Answer 4.docx DOCX document
FA8532-22-R-0001_0002.pdf PDF
RFP Attachment 5 - Relevancy Table - Revised.pdf PDF
RFP Attachment 10 - Price Spreadsheet - Revised.xlsx XLSX spreadsheet
Question and Answer 2.docx DOCX document
Statement of Work (SOW)_1 Sep 21.pdf PDF
L-900 Instructions to Offerors.pdf PDF
Ground Power Modernization Ordering Guide.pdf PDF
RFP Attachment 9 - GPU Engine Derating Calculation Worksheet.pdf PDF
D003_TM86-01R.pdf PDF
D004_TM86-01R.pdf PDF
D001.pdf PDF
C009.pdf PDF
C007.pdf PDF
F001.pdf PDF
E001.pdf PDF
C001.pdf PDF
B002.pdf PDF
A002.pdf PDF
C015.pdf PDF
200415485_98752_EDL.pdf PDF
FA8532-22-R-0001.pdf PDF
Pre-Proposal Conference.docx DOCX document
Packaging and Marking Requirements_AFMC 158.pdf PDF
RFP Attachment 1 - Past Performance Information (PPI) for Offerors.pdf PDF
RFP Attachment 7 - Past Performance Questionnaire.pdf PDF
M-900 Evaluation Basis for Award.pdf PDF
RFP Attachment 8 - Client Authorization Letter.pdf PDF
RFP Attachment 4 Instructions.docx DOCX document
RFP Attachment 2 - Oral Presentations for Discussions Slide Deck.pptx PPTX presentation
D001_TM86-01R.pdf PDF
E006.pdf PDF
E003.pdf PDF
D006.pdf PDF
E002.pdf PDF
B001.pdf PDF
D003.pdf PDF
C008.pdf PDF
C003.pdf PDF
2020111299_98752_InputCable.pdf PDF
RFP Attachment 10 - Price Spreadsheet.xlsx XLSX spreadsheet
RFP Attachment 6 - Subcontractor and Teaming Member Consent Form.pdf PDF
RFP Attachment 3 - List of Fill-In Clauses to be Completed.pdf PDF
Show all 50

Ground Power Modernization has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACT DATA REQUIREMENTS LIST Form Approved (1 Data Item) OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding thus burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget. Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

0004BK, 0012BB, X004AH,

X008AH

E TDP TM OTHER NDTI

D. SYSTEM ITEM E. CONTRACT/PR NO. F. CONTRACTOR

Ground Power Modernization FD2060-21-31511

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE

GROUP

E009 Test/Inspection Report Production Acceptance Test Report

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

TOTAL PRICE

DI-NDTI-80809B/T NOT 2 SOW para 3.6.3 AFLCMC/WNZ-SEV NSP

7. DD 250 REQ 9. DIST STATEMENT

REQUIRED

10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

LT AS REQ See BLK 16 b. COPIES

8. APP CODE D 11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION

a. ADDRESSEE DRAFT FINAL

N/A N/A AS REQ Reg Repro

16. REMARKS AFLCMC/ WNZ-

SEV 0 1 0

BLK 4: DI-NDTI-80809B is tailored as follows: A. Para 10.2.2: Delete in its entirety. B. Para 10.2.3.1: Delete in its entirety. C. Para 10.2.3.3: Delete in its entirety. D. Para 10.2.4: Delete in its entirety. E. Para 10.2.5: Delete in its entirety. F. Para 10.2.6.1: Delete in its entirety. G. Para 10.2.6.2: Delete in its entirety. H. Para 10.2.6.3: Delete in its entirety. I. Para 10.2.6.6: Delete in its entirety. J. Para 10.2.8: Delete in its entirety.

BLK 7: The PCO will issue approval outside iRAPT.

BLK 9: DISTRIBUTION STATEMENT D: Distribution authorized to the Department of Defense (DoD) and U.S. DoD Contractors only; Critical Technology; Export Controlled; 08 July 2021. Other requests shall be referred to AFLCMC/WNZ.

BLKs 10, 12 and 13: The contractor shall include a copy of the Production Acceptance Test Report for each production unit with each end item production unit pack-up data. The Government will have 20 days per report after receipt of the test report to approve or disapprove, and provide comments to the contractor. The contractor shall have 10 business days to incorporate Government comments and redeliver the report.

BLK 12: The contractor shall prepare and enclose a production acceptance test report for each production end item with the unit pack-up data.

BLK 14: Hard copy documents ONLY shall be provided with each end item production unit.

Digital documents submitted for approval shall be provided via electronic media utilizing standard Microsoft Office applications and submitted via email to the points of contact (POC) actual name, phone, and email provided by the Procuring activity at the time of contract award:

Support Equipment & Vehicles Division

ATTN: AFLCMC/WNZ-SEV

235 Byron Street, Suite 19A Robins AFB GA 31098-1813

Notification of submission shall be provided to the PCO via e-mail.

Support Equipment & Vehicles Division

ATTN: AFLCMC/WNK

235 Byron Street, Suite 19A Robins AFB GA 31098-1813

AFLCMC/WNK 0 1 0

15. Total 0 2 0

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

Relious Grant 07/26/2021

DD FORM 1423-1, Feb 2001 Previous editions are obsolete Page of Pages

9/02/2021

See BLK 16

2021-09-02T08:56:09-0400
HOGAN.JASON.H.1247029288

File details come from the government source that posted it. Updated .