E009.pdf
PDF 279 KB Posted
- Attached to
- Ground Power Modernization Federal contract opportunity
- Solicitation number
- FA8532-22-R-0001
About this file
This document contains a Contract Data Requirements List and notice of intent for a future solicitation. The Contract Data Requirements List requires test reports from the contractor for three ground power equipment items: a 72kW Ground Power Unit, 144kW Ground Power Unit, and 144kW Universal Load Bank. The reports must be submitted with each production unit.
The notice of intent is for a forthcoming solicitation seeking Indefinite Delivery/Indefinite Quantity contracts for the three ground power items listed above. The Air Force Materiel Command Lifecycle Management Center plans to award two separate multiple award IDIQ contracts with a 10 year period of performance. Group A will be for all three items on a full and open basis. Group B will be for just the 72kW Ground Power Unit and set aside for small businesses. First article testing will be required. The solicitation is expected to be released on October 15, 2021 with award by September 26, 2022. The opportunity is only open to U.S. contractors due to export restrictions.
View the file
Other files for this federal contract opportunity
Show all 50
Ground Power Modernization has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACT DATA REQUIREMENTS LIST Form Approved (1 Data Item) OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding thus burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget. Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
0004BK, 0012BB, X004AH,
X008AH
E TDP TM OTHER NDTI
D. SYSTEM ITEM E. CONTRACT/PR NO. F. CONTRACTOR
Ground Power Modernization FD2060-21-31511
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE
GROUP
E009 Test/Inspection Report Production Acceptance Test Report
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
TOTAL PRICE
DI-NDTI-80809B/T NOT 2 SOW para 3.6.3 AFLCMC/WNZ-SEV NSP
7. DD 250 REQ 9. DIST STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
LT AS REQ See BLK 16 b. COPIES
8. APP CODE D 11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE DRAFT FINAL
N/A N/A AS REQ Reg Repro
16. REMARKS AFLCMC/ WNZ-
SEV 0 1 0
BLK 4: DI-NDTI-80809B is tailored as follows: A. Para 10.2.2: Delete in its entirety. B. Para 10.2.3.1: Delete in its entirety. C. Para 10.2.3.3: Delete in its entirety. D. Para 10.2.4: Delete in its entirety. E. Para 10.2.5: Delete in its entirety. F. Para 10.2.6.1: Delete in its entirety. G. Para 10.2.6.2: Delete in its entirety. H. Para 10.2.6.3: Delete in its entirety. I. Para 10.2.6.6: Delete in its entirety. J. Para 10.2.8: Delete in its entirety.
BLK 7: The PCO will issue approval outside iRAPT.
BLK 9: DISTRIBUTION STATEMENT D: Distribution authorized to the Department of Defense (DoD) and U.S. DoD Contractors only; Critical Technology; Export Controlled; 08 July 2021. Other requests shall be referred to AFLCMC/WNZ.
BLKs 10, 12 and 13: The contractor shall include a copy of the Production Acceptance Test Report for each production unit with each end item production unit pack-up data. The Government will have 20 days per report after receipt of the test report to approve or disapprove, and provide comments to the contractor. The contractor shall have 10 business days to incorporate Government comments and redeliver the report.
BLK 12: The contractor shall prepare and enclose a production acceptance test report for each production end item with the unit pack-up data.
BLK 14: Hard copy documents ONLY shall be provided with each end item production unit.
Digital documents submitted for approval shall be provided via electronic media utilizing standard Microsoft Office applications and submitted via email to the points of contact (POC) actual name, phone, and email provided by the Procuring activity at the time of contract award:
Support Equipment & Vehicles Division
ATTN: AFLCMC/WNZ-SEV
235 Byron Street, Suite 19A Robins AFB GA 31098-1813
Notification of submission shall be provided to the PCO via e-mail.
Support Equipment & Vehicles Division
ATTN: AFLCMC/WNK
235 Byron Street, Suite 19A Robins AFB GA 31098-1813
AFLCMC/WNK 0 1 0
15. Total 0 2 0
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
Relious Grant 07/26/2021
DD FORM 1423-1, Feb 2001 Previous editions are obsolete Page of Pages
9/02/2021
See BLK 16
| 2021-09-02T08:56:09-0400 | |
| HOGAN.JASON.H.1247029288 |
File details come from the government source that posted it. Updated .