324_FA8525-24_R-0001_TES_RFP.pdf

PDF 4 MB Posted

Attached to
C5M TES- Technical Engineering Services Federal contract opportunity
Solicitation number
FA852524R0001
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center

About this file

This document is a Request for Proposals (RFP) for technical engineering services in support of the C-5M Super Galaxy aircraft. The contractor will provide sustaining engineering services, including engineering investigations and analyses, deficiency resolution concepts, and proof of concepts. Key areas of support include the Aircraft Structural Integrity Program (ASIP), Functional Systems Integrity Program (FSIP), Corrosion Prevention and Control Program (CPCP), and Technical Data Sustainment (TDS) to acquire historical technical data. The contract will have a 12-month base period with four 12-month option periods. Pricing terms include cost-plus-fixed-fee, firm-fixed-price, and cost reimbursement with no fee. The solicitation is issued by the Department of the Air Force Materiel Command Lifecycle Management Center.

View the file

Other files for this federal contract opportunity

Other files attached to C5M TES- Technical Engineering Services, newest first.
File Type Posted
Updated PWS November 2024.pdf PDF
13_FA8525-24-R-0001-0002 Amended TES RFP.pdf PDF
324_AFMC 807 TES FINAL.pdf PDF
324_Transportation_DD1653.pdf PDF
324_Packaging_Form158.pdf PDF
324_DD 254 TES 1.29.24.pdf PDF
324_C-5M TES Follow-On CDRL Package_April-10-2024.pdf PDF
324_GFP FA852524R0001_1.pdf PDF
324_TES PWS_ Mar 2024_Final.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 33 (REV. 9-97)

PREVIOUS EDITION NOT USABLE Prescribed by GSA – FAR (48 CFR) 53/214(c)

SOLICITATION, OFFER AND AWARD JSU 1. THIS CONTRACT IS A RATED ORDER

UNDER DPAS (15CFR 7900)

RATING

DO: A1

Page of Page

2. CONTRACT NO. 3. SOLICITATION NO.

FA8525-24-R-0001

4. TYPE OF SOLICITATION

SEALED BID (IFB)

NEGOTIATED (RFP)

7. ISSUED BY

C-5 GALAXY, AFLCMC/WLSKA

235 BYRON ST STE 19A

BLDG 300 CML PHN 478 926 7686

ROBINS AFB GA 31098-1670

BUYER: Alisha M. Foster/WLSK alisha.bradley@us.af.mil Phone: (478) 926- 5429) 000

FA8525 8. ADDRESS OFFER TO (If other than Item 7)

11. TABLE OF CONTENTS

(X) SEC. DESCRIPTON PAGE(S) (X) Sec. DESCRIPTION PAGE(S)

PART I - THE SCHEDULE PART II - CONTRACT CLAUSES

X A SOLICITATION/CONTRACT FORM

X B SUPPLIES OR SERVICES AND

C DESCRIPTION/SPECS/WORK STATEMENT

D PACKAGING AND MARKING

X E INPECTION AND ACCEPTANCE

X F DELIVERIES OR PERFORMANCE

X G CONTRACT ADMINISTRATION DATA

H SPECIAL CONTRACT REQUIREMENTS

X I CONTRACT CLAUSES

PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER

X J LIST OF ATTACHMENTS

X K REPRESENTATIONS, CERTIFICATIONS AND

OTHER STATEMENTS OF OFFERORS

PART IV - REPRESENTATIONS AND INSTRUCTIONS

X L INSTRS., CONDS., AND NOTICES TO OFFERORS

X M EVALUATION AND FACTORS FOR AWARD

OFFER (Must be fully completed by offeror)

24. ADMINISTERED BY (If other than Item 7) SCD:B 25. PAYMENT WILL BE MADE BY CODE

26. NAME OF CONTRACTING OFFICER (Type or print) 27. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

28. AWARD DATE

X

5. DATE ISSUED 6.REQUISITION/PURCHASE NO

NOTE: In sealed bid solicitations “offer” and “offeror” mean “bid” and “bidder”.

9. Sealed offers in original and copies for furnishing the supplies or services in the Schedule will be received at the place specified in Item 8, or if hand carried, in the depository located in until 3:30 (Hour) local time 8-NOV-2024 (Date).

CAUTION- LATE Submissions, Modifications, and Withdrawals: Section L, Provision No 52.214-7 or 52.215-1. All offers are subject to all terms and conditions contained in this section.

10. FOR INFORMATION

CALL:

A. NAME

Alisha M Bradley

B. TELEPHONE (NO COLLECT CALLS)

(478 ) 926 -5429

NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.

12. In compliance with the above, the undersigned agrees, if this offer is accepted within 90 calendar days (60 calendar days unless a different period is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.

13. DISCOUNT FOR PROMPT PAYMENT(See Section I, Clause No 52.232-8)

10 CALENDAR DAYS 20 CALENDAR DAYS 30 CALENDAR DAYS CALENDAR DAYS

14. ACKNOWLEDGEMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the SOLICITATION for offerors and related documents numbered and dated:

AMENDMENT NO. DATE AMENDMENT NO. DATE

15A. NAME AND

ADDRESS OF

OFFEROR

CODE FACILITY 16. NAME AND TITLE OF PERSON

AUTHORIZED TO SIGN OFFER (Type or print)

15B. TELEPHONE NO.

(Include Area Code)

15C.CHECK IF REMITTANCE ADDRESS

IS DIFFERENT FROM ABOVE-ENTER

SUCH ADDRESS IN SCHEDULE.

17. SIGNATURE 18. OFFER DATE

AWARD (To be completed by Government)

19. ACCEPTED AS TO ITEMS 20. AMOUNT

21. ACCOUNTING AND APPROPRIATION

SEE SCHEDULE

22. AUTHORITY FOR USING OTHER THAN FULL AND OPEN

COMPETITION

10 U.S.C. 2304 (c) ( 1 ) 41 U.S.C. 253 (c) X

23. SUBMIT INVOICES TO ADDRESS SHOWN IN

(4 copies unless otherwise specified)

ITEM

SOLICITATION

IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.

C. E-MAIL ADDRESS

alisha.bradley@us.af.mil

11 APRIL 2024

FA8525-24-R-0001

PART I - THE SCHEDULE

SECTION B

SUPPLIES OR SERVICES AND PRICES/COSTS

This solicitation is for engineering service support for the Lockheed Martin Aero (LMA) Technical Engineering contract for the C5M aircraft. The Contractor (independently and not as an agent of the Government) shall provde Support and Sustainment to the Government as identified in the solicitation and the attachments. Performance shall be in accordance with all provisions and specifications as stipulated herein.

Notice to Offeror(s)/Supplier(s): Funds are not presently available for this effort. No award will be made under this solicitation until funds are available. The Government reserves the right to cancel this solicitation, either before or after the closing date. In the event that the Government cancels this solicitation, the Government has no obligation to reimburse an offeror for any costs.

BASIC ORDERING PERIOD: 12 MONTHS

Aircraft Structural Integrity Program (ASIP)

Item No.

Cost Plus Fixed Fee Quantity U/I Estimated Cost Fixed Fee COM Total Estimated Cost

1 LO

R425

ASIP

Limitations of Liability: High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: WAWF Applies Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001:2015

ISO 9001-2008 2008 9001:2000

AS9100 9100

NATO AQAP AQAP 2070

Class I ODS Substance Application/Use Quantity

Aircraft Structural Integrity Program (ASIP)

None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Period of Performance

1 LO TBC

Proposed Period of Performance

1 LO

Aircraft Structural Integrity Program (ASIP) Data Integration

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

12 MO

R425 ASIP Data Integration

Limitations of Liability: High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: WAWF Applies Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001: 2015

ISO 9001-2008 2008 9001: 2000

AS9100 9100

NATO AQAP AQAP 2070

Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Period of Performance

12 MO TBC

Proposed Period of Performance

12 MO

Functional Systems Integrity Program (FSIP)

Item No.

Cost Plus Fixed Fee Quantity U/I Estimated Cost Fixed Fee COM Total Estimated Cost

1 LO

R425

FSIP

Limitations of Liability: High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: WAWF Applies Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001: 2015

ISO 9001-2008 2008 9001: 2000

AS9100 9100

NATO AQAP AQAP 2070

Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Period of Performance

1 LO TBC

Proposed Period of Performance

1 LO

Propulsion Systems Integrity Program (PSIP) Reach Back

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

1 LO

R425 PSIP Reach Back

Limitations of Liability: High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: WAWF Applies Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

Propulsion Systems Integrity Program (PSIP) Reach Back

ISO 9001: 2015

ISO 9001-2008 2008 9001: 2000

AS9100 9100

NATO AQAP AQAP 2070

Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Period of Performance

LO TBC

Proposed Period of Performance

LO

Corrosion Prevention and Control Program (CPCP)

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

12 MO

R425

CPCP

Limitations of Liability: High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: WAWF Applies Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001: 2015

ISO 9001-2008 2008 9001: 2000

AS9100 9100

NATO AQAP AQAP 2070

Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Period of

12 MO TBC

Corrosion Prevention and Control Program (CPCP)

Proposed Period of Performance

12 MO

Technical Data Sustainment (TDS)

Item No.

Cost Plus Fixed Fee Quantity U/I Estimated Cost Fixed Fee COM Total Estimated Cost

1 LO

R425

TDS

Limitations of Liability: High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: WAWF Applies Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001: 2015

ISO 9001-2008 2008 9001: 2000

AS9100 9100

NATO AQAP AQAP 2070

Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Period of Performance

1 LO TBC

Proposed Period of Performance

1 LO

Integrity Programs Material

Item No.

Cost Plus Fixed Fee Quantity U/I Estimated Cost Fixed Fee COM Total Estimated Cost

1 LO

R425 Integrity Programs Material

Integrity Programs Material

Limitations of Liability: High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: WAWF Applies Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001: 2015

ISO 9001-2008 2008 9001: 2000

AS9100 9100

NATO AQAP AQAP 2070

Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Period of Performance

1 LO TBC

Proposed Period of Performance

1 LO

Travel

Item No.

Cost Reimbursement - No Fee Quantity U/I Unit Price

12 MO

R425 Travel in accordance with PWS Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Period of Performance

12 MO TBC

Proposed Period of

DATA

Item No.

Not Separately Priced Quantity U/I Unit Price

NSP

DATA

IAW PWS

Limitations of Liability: High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001: 2015

ISO 9001-2008 2008 9001: 2000

AS9100 9100

NATO AQAP AQAP 2070

Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Period of Performance

LO TBC

Proposed Period of Performance

LO

Structural Engineering Investigations

Item No.

Cost Plus Fixed Fee Quantity U/I Estimated Cost Fixed Fee COM Total Estimated Cost

1 LO

R425 Structural Engineering Investigations

Limitations of Liability: High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: WAWF Applies Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

ISO 9001: 2015

Structural Engineering Investigations

ISO 9001-2008 2008 9001: 2000

AS9100 9100

NATO AQAP AQAP 2070

Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Period of Performance

1 LO TBC

Proposed Period of Performance

1 LO

Mechanical Engineering Investigations

Item No.

Cost Plus Fixed Fee Quantity U/I Estimated Cost Fixed Fee COM Total Estimated Cost

1 LO

R425 Mechanical Engineering Investigations

Limitations of Liability: High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: WAWF Applies Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001: 2015

ISO 9001-2008 2008 9001: 2000

AS9100 9100

NATO AQAP AQAP 2070

Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Period of

1 LO TBC

Mechanical Engineering Investigations

Proposed Period of Performance

1 LO

Avionics Engineering Investigations

Item No.

Cost Plus Fixed Fee Quantity U/I Estimated Cost Fixed Fee COM Total Estimated Cost

1 LO

R425 Avionics Engineering Investigations

Limitations of Liability: High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001: 2015

ISO 9001-2008 2008 9001: 2000

AS9100 9100

NATO AQAP AQAP 2070

Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Period of Performance

1 LO TBC

Proposed Period of Performance

1 LO

CLS Engineering Investigations

Item No.

Cost Plus Fixed Fee Quantity U/I Estimated Cost Fixed Fee COM Total Estimated Cost

1 LO

CLS Engineering Investigations

CLS Engineering Investigations

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001: 2015

ISO 9001-2008 2008 90001: 2000

AS9100 9100

NATO AQAP AQAP 2070

Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Period of Performance

1 LO TBC

Proposed Period of Performance

1 LO

Non-Severable Engineering Investigations

Item No.

Cost Plus Fixed Fee Quantity U/I Estimated Cost Fixed Fee COM Total Estimated Cost

1 LO

R425 Non-Severable Engineering Investigations

Limitations of Liability: High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001: 2015

ISO 9001-2008 2008 9001: 2000

AS9100 9100

NATO AQAP AQAP 2070

None

Non-Severable Engineering Investigations

Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Period of Performance

1 LO TBC

Proposed Period of Performance

1 LO

Proposal Preparation

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

LO

R425 Proposal Preparation Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Period of Performance

LO TBC

Proposed Period of Performance

LO

ORDERING PERIOD I: 12 MONTHS

Aircraft Structural Integrity Program (ASIP)

Item No.

Cost Plus Fixed Fee Quantity U/I Estimated Cost Fixed Fee COM Total Estimated Cost

Aircraft Structural Integrity Program (ASIP)

1 LO

R425

ASIP

Limitations of Liability: High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: WAWF Applies Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001:2015

ISO 9001-2008 2008 9001:2000

AS9100 9100

NATO AQAP AQAP 2070

Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Period of Performance

1 LO TBC

Proposed Period of Performance

1 LO

Aircraft Structural Integrity Program (ASIP) Data Integration

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

12 MO

R425 ASIP Data Integration

Limitations of Liability: High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: WAWF Applies Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001: 2015

ISO 9001-2008 2008 9001: 2000

AS9100 9100

NATO AQAP AQAP 2070

Aircraft Structural Integrity Program (ASIP) Data Integration

Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Period of Performance

12 MO TBC

Proposed Period of Performance

12 MO

Functional Systems Integrity Program (FSIP)

Item No.

Cost Plus Fixed Fee Quantity U/I Estimated Cost Fixed Fee COM Total Estimated Cost

1 LO

R425

FSIP

Limitations of Liability: High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: WAWF Applies Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001: 2015

ISO 9001-2008 2008 9001: 2000

AS9100 9100

NATO AQAP AQAP 2070

Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Period of Performance

1 LO TBC

Proposed Period of

1 LO

Propulsion Systems Integrity Program (PSIP) Reach Back

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

1 LO

R425 PSIP Reach Back

Limitations of Liability: High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: WAWF Applies Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001: 2015

ISO 9001-2008 2008 9001: 2000

AS9100 9100

NATO AQAP AQAP 2070

Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Period of Performance

LO TBC

Proposed Period of Performance

LO

Corrosion Prevention and Control Program (CPCP)

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

12 MO

R425

CPCP

Limitations of Liability: High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: WAWF Applies Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Corrosion Prevention and Control Program (CPCP)

Title Number Date Tailoring

ISO 9001: 2015

ISO 9001-2008 2008 9001: 2000

AS9100 9100

NATO AQAP AQAP 2070

Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Period of Performance

12 MO TBC

Proposed Period of Performance

12 MO

Technical Data Sustainment (TDS)

Item No.

Cost Plus Fixed Fee Quantity U/I Estimated Cost Fixed Fee COM Total Estimated Cost

1 LO

R425

TDS

Limitations of Liability: High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: WAWF Applies Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001: 2015

ISO 9001-2008 2008 9001: 2000

AS9100 9100

NATO AQAP AQAP 2070

Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Period of

Technical Data Sustainment (TDS)

Proposed Period of Performance

1 LO

Integrity Programs Material

Item No.

Cost Plus Fixed Fee Quantity U/I Estimated Cost Fixed Fee COM Total Estimated Cost

1 LO

R425 Integrity Programs Material

Limitations of Liability: High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: WAWF Applies Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001: 2015

ISO 9001-2008 2008 9001: 2000

AS9100 9100

NATO AQAP AQAP 2070

Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Period of Performance

1 LO TBC

Proposed Period of Performance

1 LO

Travel

Item No.

Cost Reimbursement - No Fee Quantity U/I Unit Price

12 MO

Travel in accordance with PWS

Travel

Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Period of Performance

12 MO TBC

Proposed Period of Performance

12 MO

DATA

Item No.

Not Separately Priced Quantity U/I Unit Price

LO NSP

DATA

IAW PWS

Exhibit: B

Structural Engineering Investigations

Item No.

Cost Plus Fixed Fee Quantity U/I Estimated Cost Fixed Fee COM Total Estimated Cost

1 LO

R425 Structural Engineering Investigations

Limitations of Liability: High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: WAWF Applies Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001: 2015

ISO 9001-2008 2008 9001: 2000

AS9100 9100

NATO AQAP AQAP 2070

Structural Engineering Investigations

Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Period of Performance

1 LO TBC

Proposed Period of Performance

1 LO

Mechanical Engineering Investigations

Item No.

Cost Plus Fixed Fee Quantity U/I Estimated Cost Fixed Fee COM Total Estimated Cost

1 LO

R425 Mechanical Engineering Investigations

Limitations of Liability: High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: WAWF Applies Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001: 2015

ISO 9001-2008 2008 9001: 2000

AS9100 9100

NATO AQAP AQAP 2070

Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Period of Performance

1 LO TBC

Proposed Period of

Avionics Engineering Investigations

Item No.

Cost Plus Fixed Fee Quantity U/I Estimated Cost Fixed Fee COM Total Estimated Cost

1 LO

R425 Avionics Engineering Investigations

Limitations of Liability: High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001: 2015

ISO 9001-2008 2008 9001: 2000

AS9100 9100

NATO AQAP AQAP 2070

Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Period of Performance

1 LO TBC

Proposed Period of Performance

1 LO

CLS Engineering Investigations

Item No.

Cost Plus Fixed Fee Quantity U/I Estimated Cost Fixed Fee COM Total Estimated Cost

1 LO

R425 CLS Engineering Investigations

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

CLS Engineering Investigations

ISO 9001: 2015

ISO 9001-2008 2008 90001: 2000

AS9100 9100

NATO AQAP AQAP 2070

Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Period of Performance

1 LO TBC

Proposed Period of Performance

1 LO

Non-Severable Engineering Investigations

Item No.

Cost Plus Fixed Fee Quantity U/I Estimated Cost Fixed Fee COM Total Estimated Cost

1 LO

R425 Non-Severable Engineering Investigations

Limitations of Liability: High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001: 2015

ISO 9001-2008 2008 9001: 2000

AS9100 9100

NATO AQAP AQAP 2070

Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Period of

Non-Severable Engineering Investigations

Proposed Period of Performance

1 LO

Proposal Preparation

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

LO

R425 Proposal Preparation Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Period of Performance

LO TBC

Proposed Period of Performance

LO

ORDERING PERIOD II: 12 MONTHS

Aircraft Structural Integrity Program (ASIP)

Item No.

Cost Plus Fixed Fee Quantity U/I Estimated Cost Fixed Fee COM Total Estimated Cost

1 LO

R425

ASIP

Limitations of Liability: High Value Item

Aircraft Structural Integrity Program (ASIP)

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: WAWF Applies Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001:2015

ISO 9001-2008 2008 9001:2000

AS9100 9100

NATO AQAP AQAP 2070

Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Period of Performance

1 LO TBC

Proposed Period of Performance

1 LO

Aircraft Structural Integrity Program (ASIP) Data Integration

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

12 MO

R425 ASIP Data Integration

Limitations of Liability: High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: WAWF Applies Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001: 2015

ISO 9001-2008 2008 9001: 2000

AS9100 9100

NATO AQAP AQAP 2070

Aircraft Structural Integrity Program (ASIP) Data Integration

Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Period of Performance

12 MO TBC

Proposed Period of Performance

12 MO

Functional Systems Integrity Program (FSIP)

Item No.

Cost Plus Fixed Fee Quantity U/I Estimated Cost Fixed Fee COM Total Estimated Cost

1 LO

R425

FSIP

Limitations of Liability: High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: WAWF Applies Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001: 2015

ISO 9001-2008 2008 9001: 2000

AS9100 9100

NATO AQAP AQAP 2070

Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Period of Performance

1 LO TBC

Proposed Period of

Propulsion Systems Integrity Program (PSIP) Reach Back

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

1 LO

R425 PSIP Reach Back

Limitations of Liability: High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: WAWF Applies Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001: 2015

ISO 9001-2008 2008 9001: 2000

AS9100 9100

NATO AQAP AQAP 2070

Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Period of Performance

LO TBC

Proposed Period of Performance

LO

Corrosion Prevention and Control Program (CPCP)

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

12 MO

R425

CPCP

Limitations of Liability: High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: WAWF Applies Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Corrosion Prevention and Control Program (CPCP)

ISO 9001: 2015

ISO 9001-2008 2008 9001: 2000

AS9100 9100

NATO AQAP AQAP 2070

Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Period of Performance

12 MO TBC

Proposed Period of Performance

12 MO

Technical Data Sustainment (TDS)

Item No.

Cost Plus Fixed Fee Quantity U/I Estimated Cost Fixed Fee COM Total Estimated Cost

1 LO

R425

TDS

Limitations of Liability: High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: WAWF Applies Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001: 2015

ISO 9001-2008 2008 9001: 2000

AS9100 9100

NATO AQAP AQAP 2070

Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Period of

Technical Data Sustainment (TDS)

Proposed Period of Performance

1 LO

Integrity Programs Material

Item No.

Cost Plus Fixed Fee Quantity U/I Estimated Cost Fixed Fee COM Total Estimated Cost

1 LO

R425 Integrity Programs Material

Limitations of Liability: High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: WAWF Applies Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001: 2015

ISO 9001-2008 2008 9001: 2000

AS9100 9100

NATO AQAP AQAP 2070

Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Period of Performance

1 LO TBC

Proposed Period of Performance

1 LO

Travel

Item No.

Cost Reimbursement - No Fee Quantity U/I Unit Price

12 MO

Travel in accordance with PWS

Travel

Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Period of Performance

12 MO TBC

Proposed Period of Performance

12 MO

DATA

Item No.

Not Separately Priced Quantity U/I Unit Price

LO NSP

DATA

IAW PWS

Exhibit: C

Structural Engineering Investigations

Item No.

Cost Plus Fixed Fee Quantity U/I Estimated Cost Fixed Fee COM Total Estimated Cost

1 LO

R425 Structural Engineering Investigations

Limitations of Liability: High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: WAWF Applies Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001: 2015

ISO 9001-2008 2008 9001: 2000

AS9100 9100

NATO AQAP AQAP 2070

Structural Engineering Investigations

Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Period of Performance

1 LO TBC

Proposed Period of Performance

1 LO

Mechanical Engineering Investigations

Item No.

Cost Plus Fixed Fee Quantity U/I Estimated Cost Fixed Fee COM Total Estimated Cost

1 LO

R425 Mechanical Engineering Investigations

Limitations of Liability: High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: WAWF Applies Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001: 2015

ISO 9001-2008 2008 9001: 2000

AS9100 9100

NATO AQAP AQAP 2070

Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Period of Performance

1 LO TBC

Proposed Period of

Avionics Engineering Investigations

Item No.

Cost Plus Fixed Fee Quantity U/I Estimated Cost Fixed Fee COM Total Estimated Cost

1 LO

R425 Avionics Engineering Investigations

Limitations of Liability: High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001: 2015

ISO 9001-2008 2008 9001: 2000

AS9100 9100

NATO AQAP AQAP 2070

Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Period of Performance

1 LO TBC

Proposed Period of Performance

1 LO

CLS Engineering Investigations

Item No.

Cost Plus Fixed Fee Quantity U/I Estimated Cost Fixed Fee COM Total Estimated Cost

1 LO

R425 CLS Engineering Investigations

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

CLS Engineering Investigations

ISO 9001: 2015

ISO 9001-2008 2008 90001: 2000

AS9100 9100

NATO AQAP AQAP 2070

Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Period of Performance

1 LO TBC

Proposed Period of Performance

1 LO

Non-Severable Engineering Investigations

Item No.

Cost Plus Fixed Fee Quantity U/I Estimated Cost Fixed Fee COM Total Estimated Cost

1 LO

R425 Non-Severable Engineering Investigations

Limitations of Liability: High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001: 2015

ISO 9001-2008 2008 9001: 2000

AS9100 9100

NATO AQAP AQAP 2070

Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Period of

Non-Severable Engineering Investigations

Proposed Period of Performance

1 LO

Proposal Preparation

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

LO

R425 Proposal Preparation Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Period of Performance

LO TBC

Proposed Period of Performance

LO

ORDERING PERIOD III: 12 MONTHS

Aircraft Structural Integrity Program (ASIP)

Item No.

Cost Plus Fixed Fee Quantity U/I Estimated Cost Fixed Fee COM Total Estimated Cost

1 LO

R425

ASIP

Limitations of Liability: High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: WAWF Applies Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Aircraft Structural Integrity Program (ASIP)

ISO 9001:2015

ISO 9001-2008 2008 9001:2000

AS9100 9100

NATO AQAP AQAP 2070

Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Period of Performance

1 LO TBC

Proposed Period of Performance

1 LO

Aircraft Structural Integrity Program (ASIP) Data Integration

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

12 MO

R425 ASIP Data Integration

Limitations of Liability: High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: WAWF Applies Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001: 2015

ISO 9001-2008 2008 9001: 2000

AS9100 9100

NATO AQAP AQAP 2070

Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Period of

Aircraft Structural Integrity Program (ASIP) Data Integration

Proposed Period of Performance

12 MO

Functional Systems Integrity Program (FSIP)

Item No.

Cost Plus Fixed Fee Quantity U/I Estimated Cost Fixed Fee COM Total Estimated Cost

1 LO

R425

FSIP

Limitations of Liability: High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: WAWF Applies Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001: 2015

ISO 9001-2008 2008 9001: 2000

AS9100 9100

NATO AQAP AQAP 2070

Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Period of Performance

1 LO TBC

Proposed Period of Performance

1 LO

Propulsion Systems Integrity Program (PSIP) Reach Back

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

1 LO

PSIP Reach Back

Propulsion Systems Integrity Program (PSIP) Reach Back

Limitations of Liability: High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: WAWF Applies Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001: 2015

ISO 9001-2008 2008 9001: 2000

AS9100 9100

NATO AQAP AQAP 2070

Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Period of Performance

LO TBC

Proposed Period of Performance

LO

Corrosion Prevention and Control Program (CPCP)

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

12 MO

R425

CPCP

Limitations of Liability: High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: WAWF Applies Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001: 2015

ISO 9001-2008 2008 9001: 2000

AS9100 9100

NATO AQAP AQAP 2070

Corrosion Prevention and Control Program (CPCP)

Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Period of Performance

12 MO TBC

Proposed Period of Performance

12 MO

Technical Data Sustainment (TDS)

Item No.

Cost Plus Fixed Fee Quantity U/I Estimated Cost Fixed Fee COM Total Estimated Cost

1 LO

R425

TDS

Limitations of Liability: High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: WAWF Applies Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001: 2015

ISO 9001-2008 2008 9001: 2000

AS9100 9100

NATO AQAP AQAP 2070

Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Period of Performance

1 LO TBC

Proposed Period of

Integrity Programs Material

Item No.

Cost Plus Fixed Fee Quantity U/I Estimated Cost Fixed Fee COM Total Estimated Cost

1 LO

R425 Integrity Programs Material

Limitations of Liability: High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: WAWF Applies Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001: 2015

ISO 9001-2008 2008 9001: 2000

AS9100 9100

NATO AQAP AQAP 2070

Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Period of Performance

1 LO TBC

Proposed Period of Performance

1 LO

Travel

Item No.

Cost Reimbursement - No Fee Quantity U/I Unit Price

12 MO

R425 Travel in accordance with PWS Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Period of

Travel

12 MO TBC

Proposed Period of Performance

12 MO

DATA

Item No.

Not Separately Priced Quantity U/I Unit Price

LO NSP

DATA

IAW PWS

Exhibit: D

Structural Engineering Investigations

Item No.

Cost Plus Fixed Fee Quantity U/I Estimated Cost Fixed Fee COM Total Estimated Cost

1 LO

R425 Structural Engineering Investigations

Limitations of Liability: High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: WAWF Applies Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001: 2015

ISO 9001-2008 2008 9001: 2000

AS9100 9100

NATO AQAP AQAP 2070

Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Period of

Structural Engineering Investigations

Proposed Period of Performance

1 LO

Mechanical Engineering Investigations

Item No.

Cost Plus Fixed Fee Quantity U/I Estimated Cost Fixed Fee COM Total Estimated Cost

1 LO

R425 Mechanical Engineering Investigations

Limitations of Liability: High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: WAWF Applies Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001: 2015

ISO 9001-2008 2008 9001: 2000

AS9100 9100

NATO AQAP AQAP 2070

Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Period of Performance

1 LO TBC

Proposed Period of Performance

1 LO

Avionics Engineering Investigations

Item No.

Cost Plus Fixed Fee Quantity U/I Estimated Cost Fixed Fee COM Total Estimated Cost

1 LO

Avionics Engineering Investigations

Avionics Engineering Investigations

Limitations of Liability: High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001: 2015

ISO 9001-2008 2008 9001: 2000

AS9100 9100

NATO AQAP AQAP 2070

Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Period of Performance

1 LO TBC

Proposed Period of Performance

1 LO

CLS Engineering Investigations

Item No.

Cost Plus Fixed Fee Quantity U/I Estimated Cost Fixed Fee COM Total Estimated Cost

1 LO

R425 CLS Engineering Investigations

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001: 2015

ISO 9001-2008 2008 90001: 2000

AS9100 9100

NATO AQAP AQAP 2070

CLS Engineering Investigations

Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Period of Performance

1 LO TBC

Proposed Period of Performance

1 LO

Non-Severable Engineering Investigations

Item No.

Cost Plus Fixed Fee Quantity U/I Estimated Cost Fixed Fee COM Total Estimated Cost

1 LO

R425 Non-Severable Engineering Investigations

Limitations of Liability: High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001: 2015

ISO 9001-2008 2008 9001: 2000

AS9100 9100

NATO AQAP AQAP 2070

Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Period of Performance

1 LO TBC

Proposed Period of

Proposal Preparation

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

LO

R425 Proposal Preparation Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Period of Performance

LO TBC

Proposed Period of Performance

LO

ORDERING PERIOD IV: 12 MONTHS

Aircraft Structural Integrity Program (ASIP)

Item No.

Cost Plus Fixed Fee Quantity U/I Estimated Cost Fixed Fee COM Total Estimated Cost

1 LO

R425

ASIP

Limitations of Liability: High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: WAWF Applies Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001:2015

ISO 9001-2008 2008 9001:2000

AS9100 9100

NATO AQAP AQAP 2070

Aircraft Structural Integrity Program (ASIP)

Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Period of Performance

1 LO TBC

Proposed Period of Performance

1 LO

Aircraft Structural Integrity Program (ASIP) Data Integration

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

12 MO

R425 ASIP Data Integration

Limitations of Liability: High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: WAWF Applies Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001: 2015

ISO 9001-2008 2008 9001: 2000

AS9100 9100

NATO AQAP AQAP 2070

Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Period of Performance

12 MO TBC

Proposed Period of

Functional Systems Integrity Program (FSIP)

Item No.

Cost Plus Fixed Fee Quantity U/I Estimated Cost Fixed Fee COM Total Estimated Cost

1 LO

R425

FSIP

Limitations of Liability: High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: WAWF Applies Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001: 2015

ISO 9001-2008 2008 9001: 2000

AS9100 9100

NATO AQAP AQAP 2070

Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Period of Performance

1 LO TBC

Proposed Period of Performance

1 LO

Propulsion Systems Integrity Program (PSIP) Reach Back

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

1 LO

R425 PSIP Reach Back

Limitations of Liability: High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: WAWF Applies Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Propulsion Systems Integrity Program (PSIP) Reach Back

ISO 9001: 2015

ISO 9001-2008 2008 9001: 2000

AS9100 9100

NATO AQAP AQAP 2070

Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Period of Performance

LO TBC

Proposed Period of Performance

LO

Corrosion Prevention and Control Program (CPCP)

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

12 MO

R425

CPCP

Limitations of Liability: High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: WAWF Applies Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001: 2015

ISO 9001-2008 2008 9001: 2000

AS9100 9100

NATO AQAP AQAP 2070

Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Period of

Corrosion Prevention and Control Program (CPCP)

Proposed Period of Performance

12 MO

Technical Data…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .