13_FA8525-24-R-0001-0002 Amended TES RFP.pdf
PDF 1 MB Posted
- Attached to
- C5M TES- Technical Engineering Services Federal contract opportunity
- Solicitation number
- FA852524R0001
About this file
This document is an amendment to a Request for Proposals (RFP) for a contract to provide sustaining engineering services for the C-5M Super Galaxy aircraft. The purpose of the amendment is to modify the CLIN nomenclature and incorporate a revised Performance Work Statement (PWS) dated 20 November 2024. Key services required include engineering investigations and analyses, deficiency resolution, and technical data sustainment to support programs such as the Aircraft Structural Integrity Program (ASIP), Functional Systems Integrity Program (FSIP), and Corrosion Prevention and Control Program (CPCP). The contract includes a base period of 12 months and four 12-month option periods. Pricing is a mix of cost-plus-fixed-fee and firm-fixed-price CLINs. No funds are presently available, and the government reserves the right to cancel the solicitation. The contracting activity is the AFLCMC/WLSKA at Robins AFB, GA.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Updated PWS November 2024.pdf | ||
| 324_FA8525-24_R-0001_TES_RFP.pdf | ||
| 324_AFMC 807 TES FINAL.pdf | ||
| 324_Transportation_DD1653.pdf | ||
| 324_Packaging_Form158.pdf | ||
| 324_C-5M TES Follow-On CDRL Package_April-10-2024.pdf | ||
| 324_GFP FA852524R0001_1.pdf | ||
| 324_DD 254 TES 1.29.24.pdf | ||
| 324_TES PWS_ Mar 2024_Final.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
JSU
2. AMENDMENT/MODIFICATION NO.
FA8525-24-R-0001-0002
3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO (If applicable)
6. ISSUED BY CODE
C-5 GALAXY, AFLCMC/WLSKA
235 BYRON ST STE 19A
BLDG 300 CML PHN 478 926 7686
ROBINS AFB GA 31098-1670
BUYER: Alisha M. Foster/WLSK alisha.foster.2@us.af.mil Phone: (478) 926- 5429) 000
7. ADMINISTERED BY (If other than item 6) CODEFA8525
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
CODE
X
9A. AMENDMENT OF SOLICITATION NO.
FA852524R0001
9B. DATED (SEE ITEM 11)
11-APR-2024
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods. ( a ) By completing Items 8 and 15, and returning copies of the amendment; ( b ) By acknowledging receipt of this amendment on each copy of the offer submitted; or ( c ) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified. 25-JAN-2025 3:30 PM
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return 1 copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
ROUTINE
15A. NAME AND TITLE OF SIGNER (Type or print)
15B. CONTRACTOR/OFFEROR
BY ________________________________________________________
(Signature of person authorized to sign)
15C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16B. UNITED STATES OF AMERICA
BY ____________________________________________________
(Signature of Contracting Officer)
16C. DATE SIGNED
FACILITY CODE
NSN 7540-01-152-8070
PREVIOUS EDITION UNUSABLE
30-105 STANDARD FORM 30 (REV. 10-83)
PRESCRIBED BY GSA
FAR (48 CFR) 53.243
X
X
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
FA8525-24-R-0001-0002
Continuation of block 14. DESCRIPTION OF AMENDMENT/MODIFICATION
The purpose of the amendment is to:
1. Modify the following CLIN nomenclature:
a. CLIN 0010, 1010, 2010, 3010, 4010 From: Structural Engineering Investigations To: Aircrew Services
b. CLIN 0011, 1011, 2011, 3011, 4011 From: Mechanical Engineering Investigations To: Depot Maintenance Support/ Field Services Representatives (FSR)
c. CLIN 0012, 1012, 2012, 3012, 4012 From: Avionics Engineering Investigations To: Engineering Investigations
d. CLIN 0013, 1013, 2013, 3013, 4013 From: CLS Engineering Investigations To: CLS Sustaining Engineering Investigations
2. Incorporate revised PWS
From: PWS dtd: 21 March 2024 To: PWS dtd: 20 November 2024
All other terms and conditions in accordance with FA852524R0001 remain unchanged.
FA852524R00010002
PART I THE SCHEDULE
SECTION B
SUPPLIES OR SERVICES AND PRICES/COSTS
This solicitation is for engineering service support for the Lockheed Martin Aero (LMA) Technical Engineering contract for the C5M aircraft. The Contractor (independently and not as an agent of the Government) shall provde Support and Sustainment to the Government as identified in the solicitation and the attachments. Performance shall be in accordance with all provisions and specifications as stipulated herein.
Notice to Offeror(s)/Supplier(s): Funds are not presently available for this effort. No award will be made under this solicitation until funds are available. The Government reserves the right to cancel this solicitation, either before or after the closing date. In the event that the Government cancels this solicitation, the Government has no obligation to reimburse an offeror for any costs.
BASIC ORDERING PERIOD: 12 MONTHS
Aircraft Structural Integrity Program (ASIP)
Item No.
Cost Plus Fixed Fee Quantity U/I Estimated Cost Fixed Fee COM Total Estimated Cost
1 LO
R425
ASIP
Limitations of Liability: High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Cost Voucher Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001:2015
ISO 90012015 2008 9001:2000
AS9100 9100
NATO AQAP AQAP 2070
Class I ODS Substance Application/Use Quantity
Aircraft Structural Integrity Program (ASIP)
None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder
_ Req No / Pri
Required Period of Performance
1 LO TBC
Proposed Period of Performance
1 LO
Aircraft Structural Integrity Program (ASIP) Data Integration
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount
12 MO
R425 ASIP Data Integration
Limitations of Liability: High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: WAWF Applies Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001: 2015
ISO 90012008 2008 9001: 2000
AS9100 9100
NATO AQAP AQAP 2070
Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder
_ Req No / Pri
Required Period of Performance
12 MO TBC
Proposed Period of Performance
12 MO
Functional Systems Integrity Program (FSIP)
Item No.
Cost Plus Fixed Fee Quantity U/I Estimated Cost Fixed Fee COM Total Estimated Cost
1 LO
R425
FSIP
Limitations of Liability: High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Cost Voucher Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001: 2015
ISO 90012015 2008 9001: 2000
AS9100 9100
NATO AQAP AQAP 2070
Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder
_ Req No / Pri
Required Period of Performance
1 LO TBC
Proposed Period of Performance
1 LO
Propulsion Systems Integrity Program (PSIP) Reach Back
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount
1 LO
R425 PSIP Reach Back
Limitations of Liability: High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: WAWF Applies
Propulsion Systems Integrity Program (PSIP) Reach Back
Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001: 2015
ISO 90012008 2008 9001: 2000
AS9100 9100
NATO AQAP AQAP 2070
Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder
_ Req No / Pri
Required Period of Performance
LO TBC
Proposed Period of Performance
LO
Corrosion Prevention and Control Program (CPCP)
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount
12 MO
R425
CPCP
Limitations of Liability: High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: WAWF Applies Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001: 2015
ISO 90012008 2008 9001: 2000
AS9100 9100
NATO AQAP AQAP 2070
Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder
_ Req No / Pri
Required Period of
Corrosion Prevention and Control Program (CPCP)
12 MO TBC
Proposed Period of Performance
12 MO
Technical Data Sustainment (TDS)
Item No.
Cost Plus Fixed Fee Quantity U/I Estimated Cost Fixed Fee COM Total Estimated Cost
1 LO
R425
TDS
Limitations of Liability: High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Cost Voucher Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001: 2015
ISO 90012015 2008 9001: 2000
AS9100 9100
NATO AQAP AQAP 2070
Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder
_ Req No / Pri
Required Period of Performance
1 LO TBC
Proposed Period of Performance
1 LO
Integrity Programs Material
Item No.
Cost Plus Fixed Fee Quantity U/I Estimated Cost Fixed Fee COM Total Estimated Cost
Integrity Programs Material
1 LO
R425 Integrity Programs Material
Limitations of Liability: High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Cost Voucher Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001: 2015
ISO 90012015 2008 9001: 2000
AS9100 9100
NATO AQAP AQAP 2070
Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder
_ Req No / Pri
Required Period of Performance
1 LO TBC
Proposed Period of Performance
1 LO
Travel
Item No.
Cost Reimbursement No Fee Quantity U/I Unit Price
12 MO
R425 Travel in accordance with PWS Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder
_ Req No / Pri
Required Period of
12 MO TBC
Travel
Proposed Period of Performance
12 MO
DATA
Item No.
Not Separately Priced Quantity U/I Unit Price
NSP
DATA
IAW PWS
Limitations of Liability: High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001: 2015
ISO 90012008 2008 9001: 2000
AS9100 9100
NATO AQAP AQAP 2070
Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder
_ Req No / Pri
Required Period of Performance
LO TBC
Proposed Period of Performance
LO
Aircrew Services
Item No.
Cost Plus Fixed Fee Quantity U/I Estimated Cost Fixed Fee COM Total Estimated Cost
1 LO
R425
Aircrew Services
Aircrew Services
Limitations of Liability: High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Cost Voucher Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001: 2015
ISO 90012015 2008 9001: 2000
AS9100 9100
NATO AQAP AQAP 2070
Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder
_ Req No / Pri
Required Period of Performance
1 LO TBC
Proposed Period of Performance
1 LO
Depot Maintenance Support/ Field Services Representatives (FSR)
Item No.
Cost Plus Fixed Fee Quantity U/I Estimated Cost Fixed Fee COM Total Estimated Cost
1 LO
R425 Depot Maintenance Support/ Field Services Representatives (FSR)
Limitations of Liability: High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Cost Voucher Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001: 2015
ISO 90012015 2008 9001: 2000
AS9100 9100
NATO AQAP AQAP 2070
Depot Maintenance Support/ Field Services Representatives (FSR)
None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder
_ Req No / Pri
Required Period of Performance
1 LO TBC
Proposed Period of Performance
1 LO
Engineering Investigations
Item No.
Cost Plus Fixed Fee Quantity U/I Estimated Cost Fixed Fee COM Total Estimated Cost
1 LO
R425 Engineering Investigations
Limitations of Liability: High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001: 2015
ISO 90012015 2008 9001: 2000
AS9100 9100
NATO AQAP AQAP 2070
Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder
_ Req No / Pri
Required Period of Performance
1 LO TBC
Proposed Period of
CLS Sustaining Engineering Investigations
Item No.
Cost Plus Fixed Fee Quantity U/I Estimated Cost Fixed Fee COM Total Estimated Cost
1 LO
R425 CLS Sustaining Engineering Investigations
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001: 2015
ISO 90012015 2008 90001: 2000
AS9100 9100
NATO AQAP AQAP 2070
Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder
_ Req No / Pri
Required Period of Performance
1 LO TBC
Proposed Period of Performance
1 LO
NonSeverable Engineering Investigations
Item No.
Cost Plus Fixed Fee Quantity U/I Estimated Cost Fixed Fee COM Total Estimated Cost
1 LO
R425 NonSeverable Engineering Investigations
Limitations of Liability: High Value Item
Inspection: Destination
Inspection/Acceptance Report: Receiving Report Required
NonSeverable Engineering Investigations
Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001: 2015
ISO 90012008 2008 9001: 2000
AS9100 9100
NATO AQAP AQAP 2070
Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder
_ Req No / Pri
Required Period of Performance
1 LO TBC
Proposed Period of Performance
1 LO
Proposal Preparation
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount
LO
R425 Proposal Preparation Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder
_ Req No / Pri
Required Period of Performance
LO TBC
Proposed Period of Performance
LO
ORDERING PERIOD I: 12 MONTHS
Aircraft Structural Integrity Program (ASIP)
Item No.
Cost Plus Fixed Fee Quantity U/I Estimated Cost Fixed Fee COM Total Estimated Cost
1 LO
R425
ASIP
Limitations of Liability: High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Cost Voucher Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001:2015
ISO 90012015 2008 9001:2000
AS9100 9100
NATO AQAP AQAP 2070
Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder
_ Req No / Pri
Required Period of Performance
1 LO TBC
Proposed Period of Performance
1 LO
Aircraft Structural Integrity Program (ASIP) Data Integration
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount
12 MO
R425 ASIP Data Integration
Limitations of Liability: High Value Item
Aircraft Structural Integrity Program (ASIP) Data Integration
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: WAWF Applies Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001: 2015
ISO 90012008 2008 9001: 2000
AS9100 9100
NATO AQAP AQAP 2070
Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder
_ Req No / Pri
Required Period of Performance
12 MO TBC
Proposed Period of Performance
12 MO
Functional Systems Integrity Program (FSIP)
Item No.
Cost Plus Fixed Fee Quantity U/I Estimated Cost Fixed Fee COM Total Estimated Cost
1 LO
R425
FSIP
Limitations of Liability: High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Cost Voucher Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001: 2015
ISO 90012015 2008 9001: 2000
AS9100 9100
NATO AQAP AQAP 2070
None
Functional Systems Integrity Program (FSIP)
Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder
_ Req No / Pri
Required Period of Performance
1 LO TBC
Proposed Period of Performance
1 LO
Propulsion Systems Integrity Program (PSIP) Reach Back
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount
1 LO
R425 PSIP Reach Back
Limitations of Liability: High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: WAWF Applies Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001: 2015
ISO 90012008 2008 9001: 2000
AS9100 9100
NATO AQAP AQAP 2070
Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder
_ Req No / Pri
Required Period of Performance
LO TBC
Proposed Period of
Corrosion Prevention and Control Program (CPCP)
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount
12 MO
R425
CPCP
Limitations of Liability: High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: WAWF Applies Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001: 2015
ISO 90012008 2008 9001: 2000
AS9100 9100
NATO AQAP AQAP 2070
Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder
_ Req No / Pri
Required Period of Performance
12 MO TBC
Proposed Period of Performance
12 MO
Technical Data Sustainment (TDS)
Item No.
Cost Plus Fixed Fee Quantity U/I Estimated Cost Fixed Fee COM Total Estimated Cost
1 LO
R425
TDS
Limitations of Liability: High Value Item
Inspection: Destination
Inspection/Acceptance Report: Cost Voucher
Technical Data Sustainment (TDS)
Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001: 2015
ISO 90012015 2008 9001: 2000
AS9100 9100
NATO AQAP AQAP 2070
Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder
_ Req No / Pri
Required Period of Performance
1 LO TBC
Proposed Period of Performance
1 LO
Integrity Programs Material
Item No.
Cost Plus Fixed Fee Quantity U/I Estimated Cost Fixed Fee COM Total Estimated Cost
1 LO
R425 Integrity Programs Material
Limitations of Liability: High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Cost Voucher Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001: 2015
ISO 90012015 2008 9001: 2000
AS9100 9100
NATO AQAP AQAP 2070
Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder
_ Req No / Pri
Required
Integrity Programs Material
1 LO TBC
Proposed Period of Performance
1 LO
Travel
Item No.
Cost Reimbursement No Fee Quantity U/I Unit Price
12 MO
R425 Travel in accordance with PWS Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder
_ Req No / Pri
Required Period of Performance
12 MO TBC
Proposed Period of Performance
12 MO
DATA
Item No.
Not Separately Priced Quantity U/I Unit Price
LO NSP
DATA
IAW PWS
Exhibit: B
Aircrew Services
Item No.
Aircrew Services
1 LO
R425 Aircrew Services
Limitations of Liability: High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Cost Voucher Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001: 2015
ISO 90012015 2008 9001: 2000
AS9100 9100
NATO AQAP AQAP 2070
Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder
_ Req No / Pri
Required Period of Performance
1 LO TBC
Proposed Period of Performance
1 LO
Depot Maintenance Support/ Field Services Representatives (FSR)
Item No.
Cost Plus Fixed Fee Quantity U/I Estimated Cost Fixed Fee COM Total Estimated Cost
1 LO
R425 Depot Maintenance Support/ Field Services Representatives (FSR)
Limitations of Liability: High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Cost Voucher Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001: 2015
ISO 90012015 2008 9001: 2000
Depot Maintenance Support/ Field Services Representatives (FSR)
AS9100 9100
NATO AQAP AQAP 2070
Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder
_ Req No / Pri
Required Period of Performance
1 LO TBC
Proposed Period of Performance
1 LO
Engineering Investigations
Item No.
Cost Plus Fixed Fee Quantity U/I Estimated Cost Fixed Fee COM Total Estimated Cost
1 LO
R425 Engineering Investigations
Limitations of Liability: High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001: 2015
ISO 90012015 2008 9001: 2000
AS9100 9100
NATO AQAP AQAP 2070
Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder
_ Req No / Pri
Required Period of Performance
1 LO TBC
Proposed
Engineering Investigations
1 LO
CLS Sustaining Engineering Investigations
Item No.
Cost Plus Fixed Fee Quantity U/I Estimated Cost Fixed Fee COM Total Estimated Cost
1 LO
R425 CLS Sustaining Engineering Investigations
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001: 2015
ISO 90012015 2008 90001: 2000
AS9100 9100
NATO AQAP AQAP 2070
Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder
_ Req No / Pri
Required Period of Performance
1 LO TBC
Proposed Period of Performance
1 LO
NonSeverable Engineering Investigations
Item No.
Cost Plus Fixed Fee Quantity U/I Estimated Cost Fixed Fee COM Total Estimated Cost
1 LO
NonSeverable Engineering Investigations
NonSeverable Engineering Investigations
Limitations of Liability: High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001: 2015
ISO 90012008 2008 9001: 2000
AS9100 9100
NATO AQAP AQAP 2070
Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder
_ Req No / Pri
Required Period of Performance
1 LO TBC
Proposed Period of Performance
1 LO
Proposal Preparation
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount
LO
R425 Proposal Preparation Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder
_ Req No / Pri
Required Period of Performance
LO TBC
Proposed Period of
ORDERING PERIOD II: 12 MONTHS
Aircraft Structural Integrity Program (ASIP)
Item No.
Cost Plus Fixed Fee Quantity U/I Estimated Cost Fixed Fee COM Total Estimated Cost
1 LO
R425
ASIP
Limitations of Liability: High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Cost Voucher Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001:2015
ISO 90012015 2008 9001:2000
AS9100 9100
NATO AQAP AQAP 2070
Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder
_ Req No / Pri
Required Period of Performance
1 LO TBC
Proposed Period of Performance
1 LO
Aircraft Structural Integrity Program (ASIP) Data Integration
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount
Aircraft Structural Integrity Program (ASIP) Data Integration
12 MO
R425 ASIP Data Integration
Limitations of Liability: High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: WAWF Applies Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001: 2015
ISO 90012015 2008 9001: 2000
AS9100 9100
NATO AQAP AQAP 2070
Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder
_ Req No / Pri
Required Period of Performance
12 MO TBC
Proposed Period of Performance
12 MO
Functional Systems Integrity Program (FSIP)
Item No.
Cost Plus Fixed Fee Quantity U/I Estimated Cost Fixed Fee COM Total Estimated Cost
1 LO
R425
FSIP
Limitations of Liability: High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Cost Voucher Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
Functional Systems Integrity Program (FSIP)
AS9100 9100
NATO AQAP AQAP 2070
Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder
_ Req No / Pri
Required Period of Performance
1 LO TBC
Proposed Period of Performance
1 LO
Propulsion Systems Integrity Program (PSIP) Reach Back
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount
1 LO
R425 PSIP Reach Back
Limitations of Liability: High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: WAWF Applies Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001: 2015
ISO 90012008 2008 9001: 2000
AS9100 9100
NATO AQAP AQAP 2070
Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder
_ Req No / Pri
Required Period of Performance
LO TBC
Proposed
Propulsion Systems Integrity Program (PSIP) Reach Back
LO
Corrosion Prevention and Control Program (CPCP)
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount
12 MO
R425
CPCP
Limitations of Liability: High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: WAWF Applies Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001: 2015
ISO 90012008 2008 9001: 2000
AS9100 9100
NATO AQAP AQAP 2070
Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder
_ Req No / Pri
Required Period of Performance
12 MO TBC
Proposed Period of Performance
12 MO
Technical Data Sustainment (TDS)
Item No.
Cost Plus Fixed Fee Quantity U/I Estimated Cost Fixed Fee COM Total Estimated Cost
1 LO
TDS
Technical Data Sustainment (TDS)
Limitations of Liability: High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Cost Voucher Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001: 2015
ISO 90012015 2008 9001: 2000
AS9100 9100
NATO AQAP AQAP 2070
Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder
_ Req No / Pri
Required Period of Performance
1 LO TBC
Proposed Period of Performance
1 LO
Integrity Programs Material
Item No.
Cost Plus Fixed Fee Quantity U/I Estimated Cost Fixed Fee COM Total Estimated Cost
1 LO
R425 Integrity Programs Material
Limitations of Liability: High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Cost Voucher Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001: 2015
ISO 90012015 2008 9001: 2000
AS9100 9100
NATO AQAP AQAP 2070
Integrity Programs Material
Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder
_ Req No / Pri
Required Period of Performance
1 LO TBC
Proposed Period of Performance
1 LO
Travel
Item No.
Cost Reimbursement No Fee Quantity U/I Unit Price
12 MO
R425 Travel in accordance with PWS Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder
_ Req No / Pri
Required Period of Performance
12 MO TBC
Proposed Period of Performance
12 MO
DATA
Item No.
Not Separately Priced Quantity U/I Unit Price
LO NSP
DATA
IAW PWS
Exhibit: C
Aircrew Services
Item No.
Cost Plus Fixed Fee Quantity U/I Estimated Cost Fixed Fee COM Total Estimated Cost
1 LO
R425 Aircrew Services
Limitations of Liability: High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Cost Voucher Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001: 2015
ISO 90012015 2008 9001: 2000
AS9100 9100
NATO AQAP AQAP 2070
Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder
_ Req No / Pri
Required Period of Performance
1 LO TBC
Proposed Period of Performance
1 LO
Depot Maintenance Support/ Field Services Representatives (FSR)
Item No.
Cost Plus Fixed Fee Quantity U/I Estimated Cost Fixed Fee COM Total Estimated Cost
1 LO
R425 Depot Maintenance Support/ Field Services Representatives (FSR)
Limitations of Liability: High Value Item
Inspection: Destination
Depot Maintenance Support/ Field Services Representatives (FSR)
Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001: 2015
ISO 90012015 2008 9001: 2000
AS9100 9100
NATO AQAP AQAP 2070
Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder
_ Req No / Pri
Required Period of Performance
1 LO TBC
Proposed Period of Performance
1 LO
Engineering Investigations
Item No.
Cost Plus Fixed Fee Quantity U/I Estimated Cost Fixed Fee COM Total Estimated Cost
1 LO
R425 Engineering Investigations
Limitations of Liability: High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001: 2015
ISO 90012008 2008 9001: 2000
AS9100 9100
NATO AQAP AQAP 2070
Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder
_ Req No / Pri
Required
Engineering Investigations
1 LO TBC
Proposed Period of Performance
1 LO
CLS Sustaining Engineering Investigations
Item No.
Cost Plus Fixed Fee Quantity U/I Estimated Cost Fixed Fee COM Total Estimated Cost
1 LO
R425 CLS Sustaining Engineering Investigations
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001: 2015
ISO 90012008 2008 90001: 2000
AS9100 9100
NATO AQAP AQAP 2070
Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder
_ Req No / Pri
Required Period of Performance
1 LO TBC
Proposed Period of Performance
1 LO
NonSeverable Engineering Investigations
Item No.
NonSeverable Engineering Investigations
1 LO
R425 NonSeverable Engineering Investigations
Limitations of Liability: High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001: 2015
ISO 90012008 2008 9001: 2000
AS9100 9100
NATO AQAP AQAP 2070
Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder
_ Req No / Pri
Required Period of Performance
1 LO TBC
Proposed Period of Performance
1 LO
Proposal Preparation
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount
LO
R425 Proposal Preparation Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder
_ Req No / Pri
Required Period of
LO TBC
Proposal Preparation
Proposed Period of Performance
LO
ORDERING PERIOD III: 12 MONTHS
Aircraft Structural Integrity Program (ASIP)
Item No.
Cost Plus Fixed Fee Quantity U/I Estimated Cost Fixed Fee COM Total Estimated Cost
1 LO
R425
ASIP
Limitations of Liability: High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Cost Voucher Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001:2015
ISO 90012015 2008 9001:2000
AS9100 9100
NATO AQAP AQAP 2070
Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder
_ Req No / Pri
Required Period of Performance
1 LO TBC
Proposed Period of
Aircraft Structural Integrity Program (ASIP) Data Integration
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount
12 MO
R425 ASIP Data Integration
Limitations of Liability: High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: WAWF Applies Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001: 2015
ISO 90012008 2008 9001: 2000
AS9100 9100
NATO AQAP AQAP 2070
Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder
_ Req No / Pri
Required Period of Performance
12 MO TBC
Proposed Period of Performance
12 MO
Functional Systems Integrity Program (FSIP)
Item No.
Cost Plus Fixed Fee Quantity U/I Estimated Cost Fixed Fee COM Total Estimated Cost
1 LO
R425
FSIP
Limitations of Liability: High Value Item
Inspection: Destination
Functional Systems Integrity Program (FSIP)
Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001: 2015
ISO 90012015 2008 9001: 2000
AS9100 9100
NATO AQAP AQAP 2070
Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder
_ Req No / Pri
Required Period of Performance
1 LO TBC
Proposed Period of Performance
1 LO
Propulsion Systems Integrity Program (PSIP) Reach Back
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount
1 LO
R425 PSIP Reach Back
Limitations of Liability: High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: WAWF Applies Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001: 2015
ISO 90012008 2008 9001: 2000
AS9100 9100
NATO AQAP AQAP 2070
Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder
_ Req No / Pri
Required
Propulsion Systems Integrity Program (PSIP) Reach Back
LO TBC
Proposed Period of Performance
LO
Corrosion Prevention and Control Program (CPCP)
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount
12 MO
R425
CPCP
Limitations of Liability: High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: WAWF Applies Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001: 2015
ISO 90012008 2008 9001: 2000
AS9100 9100
NATO AQAP AQAP 2070
Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder
_ Req No / Pri
Required Period of Performance
12 MO TBC
Proposed Period of Performance
12 MO
Technical Data Sustainment (TDS)
Item No.
Technical Data Sustainment (TDS)
1 LO
R425
TDS
Limitations of Liability: High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Cost Voucher Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001: 2015
ISO 90012015 2008 9001: 2000
AS9100 9100
NATO AQAP AQAP 2070
Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder
_ Req No / Pri
Required Period of Performance
1 LO TBC
Proposed Period of Performance
1 LO
Integrity Programs Material
Item No.
Cost Plus Fixed Fee Quantity U/I Estimated Cost Fixed Fee COM Total Estimated Cost
1 LO
R425 Integrity Programs Material
Limitations of Liability: High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Cost Voucher Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
Integrity Programs Material
AS9100 9100
NATO AQAP AQAP 2070
Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder
_ Req No / Pri
Required Period of Performance
1 LO TBC
Proposed Period of Performance
1 LO
Travel
Item No.
Cost Reimbursement No Fee Quantity U/I Unit Price
12 MO
R425 Travel in accordance with PWS Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder
_ Req No / Pri
Required Period of Performance
12 MO TBC
Proposed Period of Performance
12 MO
DATA
Item No.
Not Separately Priced Quantity U/I Unit Price
LO NSP
DATA
DATA
IAW PWS
Exhibit: D
Aircrew Services
Item No.
Cost Plus Fixed Fee Quantity U/I Estimated Cost Fixed Fee COM Total Estimated Cost
1 LO
R425 Aircrew Services
Limitations of Liability: High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Cost Voucher Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001: 2015
ISO 90012015 2008 9001: 2000
AS9100 9100
NATO AQAP AQAP 2070
Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder
_ Req No / Pri
Required Period of Performance
1 LO TBC
Proposed Period of Performance
1 LO
Depot Maintenance Support/ Field Services Representatives (FSR)
Item No.
Cost Plus Fixed Fee Quantity U/I Estimated Cost Fixed Fee COM Total Estimated Cost
1 LO
Depot Maintenance Support/ Field Services Representatives (FSR)
Depot Maintenance Support/ Field Services Representatives (FSR)
Limitations of Liability: High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Cost Voucher Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001: 2015
ISO 90012015 2008 9001: 2000
AS9100 9100
NATO AQAP AQAP 2070
Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder
_ Req No / Pri
Required Period of Performance
1 LO TBC
Proposed Period of Performance
1 LO
Engineering Investigations
Item No.
Cost Plus Fixed Fee Quantity U/I Estimated Cost Fixed Fee COM Total Estimated Cost
1 LO
R425 Engineering Investigations
Limitations of Liability: High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001: 2015
ISO 90012008 2008 9001: 2000
AS9100 9100
NATO AQAP AQAP 2070
Engineering Investigations
Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder
_ Req No / Pri
Required Period of Performance
1 LO TBC
Proposed Period of Performance
1 LO
CLS Sustaining Engineering Investigations
Item No.
Cost Plus Fixed Fee Quantity U/I Estimated Cost Fixed Fee COM Total Estimated Cost
1 LO
R425 CLS Sustaining Engineering Investigations
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001: 2015
ISO 90012008 2008 90001: 2000
AS9100 9100
NATO AQAP AQAP 2070
Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder
_ Req No / Pri
Required Period of Performance
1 LO TBC
Proposed Period of
NonSeverable Engineering Investigations
Item No.
Cost Plus Fixed Fee Quantity U/I Estimated Cost Fixed Fee COM Total Estimated Cost
1 LO
R425 NonSeverable Engineering Investigations
Limitations of Liability: High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001: 2015
ISO 90012008 2008 9001: 2000
AS9100 9100
NATO AQAP AQAP 2070
Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder
_ Req No / Pri
Required Period of Performance
1 LO TBC
Proposed Period of Performance
1 LO
Proposal Preparation
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount
LO
R425 Proposal Preparation Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder
_ Req No / Pri
Proposal Preparation
Required Period of Performance
LO TBC
Proposed Period of Performance
LO
ORDERING PERIOD IV: 12 MONTHS
Aircraft Structural Integrity Program (ASIP)
Item No.
Cost Plus Fixed Fee Quantity U/I Estimated Cost Fixed Fee COM Total Estimated Cost
1 LO
R425
ASIP
Limitations of Liability: High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Cost Voucher Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001:2015
ISO 90012015 2008 9001:2000
AS9100 9100
NATO AQAP AQAP 2070
Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder
_ Req No / Pri
Required Period of Performance
1 LO TBC
Proposed
Aircraft Structural Integrity Program (ASIP)
1 LO
Aircraft Structural Integrity Program (ASIP) Data Integration
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount
12 MO
R425 ASIP Data Integration
Limitations of Liability: High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: WAWF Applies Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001: 2015
ISO 90012008 2008 9001: 2000
AS9100 9100
NATO AQAP AQAP 2070
Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder
_ Req No / Pri
Required Period of Performance
12 MO TBC
Proposed Period of Performance
12 MO
Functional Systems Integrity Program (FSIP)
Item No.
Cost Plus Fixed Fee Quantity U/I Estimated Cost Fixed Fee COM Total Estimated Cost
1 LO
FSIP
Functional Systems Integrity Program (FSIP)
Limitations of Liability: High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Cost Voucher Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001: 2015
ISO 90012015 2008 9001: 2000
AS9100 9100
NATO AQAP AQAP 2070
Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder
_ Req No / Pri
Required Period of Performance
1 LO TBC
Proposed Period of Performance
1 LO
Propulsion Systems Integrity Program (PSIP) Reach Back
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount
1 LO
R425 PSIP Reach Back
Limitations of Liability: High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: WAWF Applies Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001: 2015
ISO 90012008 2008 9001: 2000
AS9100 9100
NATO AQAP AQAP 2070
Propulsion Systems Integrity Program (PSIP) Reach Back
Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder
_ Req No / Pri
Required Period of Performance
LO TBC
Proposed Period of Performance
LO
Corrosion Prevention and Control Program (CPCP)
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount
12 MO
R425
CPCP
Limitations of Liability: High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: WAWF Applies Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001: 2015
ISO 90012008 2008 9001: 2000
AS9100…