Solicitation - FA852023R0004 - Questions with Answers.pdf
PDF 87 KB Posted
- Attached to
- HARM Engineering Services Federal contract opportunity
- Solicitation number
- FA8520-23-R0004
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Question-Answer.pdf | ||
| FA8520-23-R-0004-0001.pdf | ||
| HARM Evaluation Spreadsheet - 13 Jun 2023.xlsx | XLSX spreadsheet | |
| FD2060-23-30022 CDRL_A003.pdf | ||
| DD-Form-254.pdf | ||
| FA8520-23-R-0004.pdf | ||
| FD2060-23-30022 CDRL_A001.pdf | ||
| FD2060-23-30022 CDRL_A004.pdf | ||
| Continuation Sheet DD254.pdf | ||
| FD2060-23-30022 CDRL_A002.pdf | ||
| PWS.pdf |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
LOGISTIC SUPPORT FACILITY MANAGEMENT ACTIVITY (LSFMA) REQUEST FOR PROPOSAL (RFP) CONTRACTOR QUESTIONS
DATE
RFP #
RFP TITLE
Q&A #
REFERENCE
P = PWS
A = Attachment G = General
REFERENCE (SOW PARAGRAPH, CLIN
STRUCTURE, GFI etc.)
QUESTIONS
1 G Solicitation Document 1 Blk 18 Schedule of
Supplies/Services Assuming that pricing requirement for contractor to hold offered prices firm for 120 days and the response is due on 30 June, would the assumed award date of the contract be Sept 23?
2 G Solicitation Cannot locate instructions for proposal preparation nor evaluation criteria. Is this proposal response going to be per FAR 15.403-5(b)(1) and Table 15-2?
3 G Solicitation CLINs 0008, 1008, 2008, 3008, Is this CLIN supposed to be a HARM Senior Electrical Design Engineer (FMS) or a HARM Senior Test Engineer (FMS)? It appears to be a duplicate from CLIN 0007, 1007, 2007, 3007 & 4007.
4 P PWS 2.0 Services Summary
Section reads "The Contractor must provide qualified personnel within ten (10) work days from a Government request for same, 95% of the time; and within fifteen (15) work days, the other 5% of the time."
These positions are very difficult to fill, is it possible to alter the requirement to (30) business days from a Government request for same, 95% of the time; and within fifteen (45) business days, the other 5% of the time?
6/8/2023
FA852023R0004
HARM Engineering Services
LOGISTIC SUPPORT FACILITY MANAGEMENT ACTIVITY (LSFMA) REQUEST FOR PROPOSAL (RFP) CONTRACTOR QUESTIONS
RESPONSE
The need and projected award date is 3 Aug 2023.
This effort is a competitive 8a set-aside. The RFP will be evaluated utilizing the spreadsheet, HARM Evaluation Spreadsheet - 13 Jun 23.
CLINs 0008, 1008, 2008, 3008, and 4008 will be corrected to "HARM Senior Test Engineer (FMS)".
The specified timelines have been established based on the understanding of the difficulty in filling these positions. The Section will remain as written.
Questions