Solicitation - FA852023R0004 - Questions with Answers.pdf

PDF 87 KB Posted

Attached to
HARM Engineering Services Federal contract opportunity
Solicitation number
FA8520-23-R0004
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Robins Air Force Base

View the file

Other files for this federal contract opportunity

Other files attached to HARM Engineering Services, newest first.
File Type Posted
Question-Answer.pdf PDF
FA8520-23-R-0004-0001.pdf PDF
HARM Evaluation Spreadsheet - 13 Jun 2023.xlsx XLSX spreadsheet
FD2060-23-30022 CDRL_A003.pdf PDF
DD-Form-254.pdf PDF
FA8520-23-R-0004.pdf PDF
FD2060-23-30022 CDRL_A001.pdf PDF
FD2060-23-30022 CDRL_A004.pdf PDF
Continuation Sheet DD254.pdf PDF
FD2060-23-30022 CDRL_A002.pdf PDF
PWS.pdf PDF
Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

LOGISTIC SUPPORT FACILITY MANAGEMENT ACTIVITY (LSFMA) REQUEST FOR PROPOSAL (RFP) CONTRACTOR QUESTIONS

DATE

RFP #

RFP TITLE

Q&A #

REFERENCE

P = PWS

A = Attachment G = General

REFERENCE (SOW PARAGRAPH, CLIN

STRUCTURE, GFI etc.)

QUESTIONS

1 G Solicitation Document 1 Blk 18 Schedule of

Supplies/Services Assuming that pricing requirement for contractor to hold offered prices firm for 120 days and the response is due on 30 June, would the assumed award date of the contract be Sept 23?

2 G Solicitation Cannot locate instructions for proposal preparation nor evaluation criteria. Is this proposal response going to be per FAR 15.403-5(b)(1) and Table 15-2?

3 G Solicitation CLINs 0008, 1008, 2008, 3008, Is this CLIN supposed to be a HARM Senior Electrical Design Engineer (FMS) or a HARM Senior Test Engineer (FMS)? It appears to be a duplicate from CLIN 0007, 1007, 2007, 3007 & 4007.

4 P PWS 2.0 Services Summary

Section reads "The Contractor must provide qualified personnel within ten (10) work days from a Government request for same, 95% of the time; and within fifteen (15) work days, the other 5% of the time."

These positions are very difficult to fill, is it possible to alter the requirement to (30) business days from a Government request for same, 95% of the time; and within fifteen (45) business days, the other 5% of the time?

6/8/2023

FA852023R0004

HARM Engineering Services

LOGISTIC SUPPORT FACILITY MANAGEMENT ACTIVITY (LSFMA) REQUEST FOR PROPOSAL (RFP) CONTRACTOR QUESTIONS

RESPONSE

The need and projected award date is 3 Aug 2023.

This effort is a competitive 8a set-aside. The RFP will be evaluated utilizing the spreadsheet, HARM Evaluation Spreadsheet - 13 Jun 23.

CLINs 0008, 1008, 2008, 3008, and 4008 will be corrected to "HARM Senior Test Engineer (FMS)".

The specified timelines have been established based on the understanding of the difficulty in filling these positions. The Section will remain as written.

Questions