ProductDescription_13Jan2021.pdf

PDF 116 KB Posted

Attached to
HC-130J Paratroop Bubble Door Modification Federal contract opportunity
Solicitation number
FA850920R0021
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Robins Air Force Base

About this file

This document outlines a federal contract opportunity for the HC-130J Paratroop Bubble Door Modification. The Air Force Materiel Command Lifecycle Management Center is seeking twenty-eight ship sets of the HC-130J Paratroop Bubble Door Modification Kit from Airdyne Aerospace, Inc on a sole source basis. Each ship set will include an Airdyne SABIR Components AS-6 BKS Door Assembly for the left and right sides, an environmental storage and loading container, an AS-6R Door Retract Installation Kit for both sides, Airdyne SABIR Door Configuration AS-6 armor for the doors, and FS737 Post Mod Installation Kits for both sides. The contractor will submit monthly status reports and ship all kits using best commercial practices. Packaging must meet Air Force standards for shipping classified materials.

View the file

Other files for this federal contract opportunity

Other files attached to HC-130J Paratroop Bubble Door Modification, newest first.
File Type Posted
Amended_Solicitation_15Jan2021.pdf PDF
Product Description_16Nov2020.pdf PDF
FORM_158.pdf PDF
Ship_to_DODAAC_Codes.pdf PDF
A001_CDRL.pdf PDF
Solicitation_Final_30Nov2020.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PURCHASE DESCRIPTION

HC-130J Paratroop Door and Integrated Armor with Spring-loaded Counter Balance System

13 January 2021

1.0 DESCRIPTION. The Contractor shall provide to the AFLCMC/WIUKA Special Operations Forces/Personnel Recovery (SOF/PR) Fixed Wing Section, Robins Air Force Base, all materials and parts necessary in support of the HC-130J Paratroop Bubble Door modification effort. The modification kit for the HC-130J Paratroop Door will include Integrated Armor with Spring-loaded Counter Balance system. There will be a quantity of twenty-eight (28) ship sets. Each ship set the contractor shall provide the following:

Item Description Airdyne SABIR Components

AS-6 BKS Door Assembly (LH & RH)

AS-6 BKS Door Environmental Storage and Loading Container (ESLC)

AS-6R Door Retract Installation Kit (LH & RH) (includes 4" Negator, Catch Lever, and Door Electrical Routing)

Airdyne SABIR Door Configuration

AS-6 NIJ Level III Door Armor Ship Set (Window IIIA LH & RH)

Other SABIR Components FS737 Post Mod Installation Kit (LH & RH)

2.0 CONTRACT DATA REQUIREMENTS LIST (CDRL)

2.1 The contractor shall submit to AFLCMC/WIUA a monthly status report to include, but not limited to, status of the kits. [CDRL A001, DI-MGMT-80368A, Monthly Status Report]

3.0 SHIPPING/TRANSPORTATION. The Contractor shall ship the kits by traceable means to the location specified in the contract. The Contractor shall use best commercial practices that are most advantageous to the Government. OEM components shall be shipped directly to the responsible units. Ship-to addresses will be provided by the Units as the kits are completed.

3.1 PACKAGING. The Contractor shall package and mark material in accordance with the contract/order Air Force Materiel Command (AFMC) Form 158, Packaging Requirements, and applicable Government regulations. The Contractor shall ensure that classified material is packaged, marked and delivered in accordance with DoD 5220.22-M, National Industrial Security Program Operating Manual (NISPOM).

File details come from the government source that posted it. Updated .