RDS_Cross_Reference_Matrix.xlsx

XLSX spreadsheet 12 KB Posted

Attached to
HC-130H RETARDANT DELIVERY SYSTEM (RDS)
Solicitation number
FA8504-19-R-0006
Issued by

View the file

Other files

File Type Posted
QA_5.pdf PDF
QA_4.pdf PDF
C-130_PAINT_revG-Sheet_6.pdf PDF
QA_3.pdf PDF
C-130_PAINT_revG-Sheet_5.pdf PDF
C-130_PAINT_revG-Sheet_4.pdf PDF
C-130_PAINT_revG-Sheet_1.pdf PDF
C-130_PAINT_revG-Sheet_3.pdf PDF
C-130_PAINT_revG-Sheet_7.pdf PDF
C-130_PAINT_revG-Sheet2.pdf PDF
C-130_PAINT_revG-Sheet_9.pdf PDF
C-130_PAINT_revG-Sheet_8.pdf PDF
QA_2.pdf PDF
QA_1.pdf PDF
GFPFA850419R0006_1.pdf PDF
Appendix_C_CDRL_Entrance_exsit_PDR_CDR.xlsx XLSX spreadsheet
All_Signed_CDRLs.pdf PDF
SOW.pdf PDF
FA8504-19-R-0006.pdf PDF
FD2060-19-31322-FORM_158.pdf PDF
CDRL_A001_RDS_(Product_Drawings).docx DOCX document
SOW_Attachment_1_(QPL_Chemicals).pdf PDF
Entrance_exsit_PDR_CDR.xlsx XLSX spreadsheet
FD20601931322_DD1653.doc DOC document
Appendix_F_BELLY_ANTENNAS.pdf PDF
SOW_Appendix_C_(CDRL_Cross_Reference)_CMRB.xlsx XLSX spreadsheet
RDS_CostPrice_Matrix_-_PZCFB.xlsx XLSX spreadsheet
Appendix_E_Grid_Test_Pattern.xlsx XLSX spreadsheet
TMCR_CAL_Fire_5_Nov_2018.pdf PDF
Special_Pacakaging_Instructions.pdf PDF
Show all 30

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Cross Ref Matrix

Attachment 1 Cross Reference Matrix
Request for Proposal (RFP) RequirementProposal Response Location
Section NumberTitleSection NumberTitlePage Number
M-900 II B. 2Technical Factor
Subfactor One: Integrated Master Schedule, SOW Para 18.2
Subfactor Two: Critical Design Factors SOW Para 6.0 and 7.0
a: Tank Design and Aircraft Integration
i) Retardant Dispersal Payload, SOW Para 6.2.a, 6.2.h, 6.2.f
ii) Load Factors, SOW Para 6.2.m2
iii) door design, SOW paragraphs 6.2.k, 6.2.m.4
b: Drop Controller, SOW Para 6.4 a,b,c,d,e,i,m,o
c: System Performance, SOW Para 6.6 and 7.0
Subfactor Three: Installation Facilities
a: DCMA approved facilities and Contractor's Flight and Ground Operations, SOW 4.7b
b: AS 9100 Quality Management Systems, SOW Para 4.8
d: Sufficient Hangar and Ramp Space, SOW Para 4.7c