RDS_Cross_Reference_Matrix.xlsx
XLSX spreadsheet 12 KB Posted
- Attached to
- HC-130H RETARDANT DELIVERY SYSTEM (RDS)
- Solicitation number
- FA8504-19-R-0006
View the file
Other files
Show all 30
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Cross Ref Matrix
| Attachment 1 Cross Reference Matrix | ||||
| Request for Proposal (RFP) Requirement | Proposal Response Location | |||
| Section Number | Title | Section Number | Title | Page Number |
| M-900 II B. 2 | Technical Factor | |||
| Subfactor One: Integrated Master Schedule, SOW Para 18.2 | ||||
| Subfactor Two: Critical Design Factors SOW Para 6.0 and 7.0 | ||||
| a: Tank Design and Aircraft Integration | ||||
| i) Retardant Dispersal Payload, SOW Para 6.2.a, 6.2.h, 6.2.f | ||||
| ii) Load Factors, SOW Para 6.2.m2 | ||||
| iii) door design, SOW paragraphs 6.2.k, 6.2.m.4 | ||||
| b: Drop Controller, SOW Para 6.4 a,b,c,d,e,i,m,o | ||||
| c: System Performance, SOW Para 6.6 and 7.0 | ||||
| Subfactor Three: Installation Facilities | ||||
| a: DCMA approved facilities and Contractor's Flight and Ground Operations, SOW 4.7b | ||||
| b: AS 9100 Quality Management Systems, SOW Para 4.8 | ||||
| d: Sufficient Hangar and Ramp Space, SOW Para 4.7c |
File details come from the government source that posted it.