QA_5.pdf

PDF 32 KB Posted

Attached to
HC-130H RETARDANT DELIVERY SYSTEM (RDS)
Solicitation number
FA8504-19-R-0006
Issued by

View the file

Other files

File Type Posted
QA_4.pdf PDF
C-130_PAINT_revG-Sheet_6.pdf PDF
QA_3.pdf PDF
C-130_PAINT_revG-Sheet_5.pdf PDF
C-130_PAINT_revG-Sheet_4.pdf PDF
C-130_PAINT_revG-Sheet_1.pdf PDF
C-130_PAINT_revG-Sheet_3.pdf PDF
C-130_PAINT_revG-Sheet_7.pdf PDF
C-130_PAINT_revG-Sheet2.pdf PDF
C-130_PAINT_revG-Sheet_9.pdf PDF
C-130_PAINT_revG-Sheet_8.pdf PDF
QA_2.pdf PDF
RDS_Cross_Reference_Matrix.xlsx XLSX spreadsheet
QA_1.pdf PDF
GFPFA850419R0006_1.pdf PDF
Appendix_C_CDRL_Entrance_exsit_PDR_CDR.xlsx XLSX spreadsheet
All_Signed_CDRLs.pdf PDF
SOW.pdf PDF
FA8504-19-R-0006.pdf PDF
FD2060-19-31322-FORM_158.pdf PDF
CDRL_A001_RDS_(Product_Drawings).docx DOCX document
SOW_Attachment_1_(QPL_Chemicals).pdf PDF
Entrance_exsit_PDR_CDR.xlsx XLSX spreadsheet
FD20601931322_DD1653.doc DOC document
Appendix_F_BELLY_ANTENNAS.pdf PDF
SOW_Appendix_C_(CDRL_Cross_Reference)_CMRB.xlsx XLSX spreadsheet
RDS_CostPrice_Matrix_-_PZCFB.xlsx XLSX spreadsheet
Appendix_E_Grid_Test_Pattern.xlsx XLSX spreadsheet
TMCR_CAL_Fire_5_Nov_2018.pdf PDF
Special_Pacakaging_Instructions.pdf PDF
Show all 30

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FA8504-19-R-0006

Questions & Answers

9 May 2019

Q1. Can the Government please clarify what is required re Para 9.17 Antenna Co-site Analysis Paragraph 9.17 of the SOW requests “co-site analysis of all antennas (new, relocated and existing antenna).”

Does this refer to ALL antennas on the aircraft (top and bottom), or only all antennas described in Appendix F (on the BOTTOM of the aircraft). The tank installation will only disrupt/relocate some of the belly antennas, and the Government has provided only data on certain belly (bottom surface) antennas in Appendix F.

If the Government intends for the Co-site analysis to cover all antennas on the aircraft (beyond what is listed in Appendix F), including those not affected by the RDS installation but located on the aircraft, then additional data on the remaining units would be relevant for the co-site analysis.

A1. As stated in the RDS SOW Para 9.17, “The contractor shall perform and deliver a co-site analysis of all antennas (new, relocated and existing antenna).” Also, as stated in the SOW 9.17 “(Use Appendix F as a guide for antenna locations)”, is provided as situational awareness of the current location of the belly antennas. Any additional information would be provided at the

IDR/PDR/CDR.

File details come from the government source that posted it.