Bldg 910 Layout.ppt
PPT presentation 143 KB Posted
- Attached to
- MAIL METERING SYSTEM
- Solicitation number
- FA8501-09-R-0012
About this file
Building 910 Layout
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Statement of Work.docx | DOCX document | |
| Wage Determination 2005-2139 | — | |
| Bldg. 301 Layout.pdf | ||
| RFQ FA8501-09-R-0012.doc | DOC document | |
| Price Schedule.xls | XLS spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment 2
METER AREA
Customer Area For PSC & USPS
USPS
Area Break
RR
Storage Storage
RR
Storage
OMM
MCM
AUTO
Lead Postal Service Center
Controlled Mail Area l Future Project to Extend Loading Dock/ Parking Pad & Install Lift Ramp
PSCM
Budget
Accountability Location In front of the Base Theater In case building 910 has to Evacuate. Everyone assigned will leave the building by the Quickest possible. Once outside the building, Go to the accountability location in front Of the base theater.
The Supervisor or The MCM will account for all assigned personnel.
Everyone will stay at this location until told otherwise.
After all assigned personnel have been accounted for. The Supervisor, MCM or the lead mail clerk will notify The chain of command as follows:
| Flight Chief | 6-2874 |
| Commander | 6-8137 |
| Help desk | 6-HELP |
For emergency 911
EVACUATION PLAN FOR BUILDING 910