Bldg 910 Layout.ppt

PPT presentation 143 KB Posted

Attached to
MAIL METERING SYSTEM
Solicitation number
FA8501-09-R-0012
Issued by

About this file

Building 910 Layout

View the file

Other files

File Type Posted
Statement of Work.docx DOCX document
Wage Determination 2005-2139 —
Bldg. 301 Layout.pdf PDF
RFQ FA8501-09-R-0012.doc DOC document
Price Schedule.xls XLS spreadsheet

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 2

METER AREA

Customer Area For PSC & USPS

USPS

Area Break

RR

Storage Storage

RR

Storage

OMM

MCM

AUTO

Lead Postal Service Center

Controlled Mail Area l Future Project to Extend Loading Dock/ Parking Pad & Install Lift Ramp

PSCM

Budget

Accountability Location In front of the Base Theater In case building 910 has to Evacuate. Everyone assigned will leave the building by the Quickest possible. Once outside the building, Go to the accountability location in front Of the base theater.

The Supervisor or The MCM will account for all assigned personnel.

Everyone will stay at this location until told otherwise.

After all assigned personnel have been accounted for. The Supervisor, MCM or the lead mail clerk will notify The chain of command as follows:

Flight Chief6-2874
Commander6-8137
Help desk6-HELP

For emergency 911

EVACUATION PLAN FOR BUILDING 910

27 ft 20 ft 20 ft

File details come from the government source that posted it. Updated .