1328049_ATTACH.pdf

PDF 8 KB Posted

Attached to
F-5 Rate of Flow Indicator
Solicitation number
FA8251-14-R-0017
Issued by

About this file

Qualification Article Requirements

View the file

Other files

File Type Posted
12_-_Q A.pdf PDF
1340754_PKGRQMT_REPORT.pdf PDF
1340068_ATTACH.pdf PDF
1340067_ATTACH.pdf PDF
1340548_TRNSPDATA_REPORT.pdf PDF
1340062_ATTACH.pdf PDF
1340535_PWS_ATTACH.pdf PDF
FA825114R0017.pdf PDF
1282856_ITMDESC_REPORT.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AFMC Form 260, 20020830, V3 PageGenerated By PRPS Using Oracle Reports Version of1 1 3

04 MAR 2014

97424 / 8DJ135LWB1 6680010613996XJ

1 1

FIRST ARTICLE REQUIREMENTS

(AFMCI 64-110, AFMCI 23-102 and FAR Part 9, Sub Part 9.3) (Additional Instructions on Page 3)

1. DATE

2. PR/MIPR NUMBER 3. CAGE / REFERENCE NUMBER 4. NSN

5. FIRST ARTICLE QUANTITY

THE FIRST ARTICLE IS UNIT(S) OF LOT/ITEM

AND WILL BE: PART OF PRODUCTION QUANTITY IN ADDITION TO PRODUCTION QUANTITYX

6. ARTICLES

XWILL WILL NOT SERVE AS A MANUFACTURING

STANDARD

7. LONG LEAD TIME ITEMS

XREQUIRED NOT REQUIRED

(See FAR 52.209-3 OR -4, alternate II)

X

8. SPECIAL REQUIREMENT/PRODUCTION FACILITIES (See FAR 52.209-3 OR -4 Alternate I)

REQUIRED NOT REQUIRED

9. TEST/INSPECTION REQUIREMENTS

A. CONTRACTOR TESTING X

GOVERNMENT TESTING

Performance or other characteristics which the First Articles must meet are

USAF Technical Order 5L6-2-58-3

B. The detailed technical requirements for First Article approval tests are contained in

USAF Technical Order 5L6-2-58-3

C. TEST PLAN REQUIRED

(Cite Spec and Para number)

Number of days for government approval/disapproval days.

D. Contractor's notification to ACO and

PCO

(Requesting Activity) of test time and location due 30 days prior to start of testing.

E. X TEST REPORT REQUIRED

(1) Forwarded to

Per DID

(2) Government written notice of approval/disapproval due 15 days after receipt of contractor's report.

F. FIRST ARTICLE DELIVERY

(1) Due within 60 calendar days from date contract.

(2) Notify 15 calendar days prior to shipment.

(3) Delivered to government at

(Set Forth Consignee and Address)

(4) Government written notice of approval/disapproval within 15 days after receipt of first article package.

"The First Article offered must be manufactured at the facilities in which that item is to be produced under the contract, or if the First Article is a component not manufactured by the contractor, such component must be manufactured at the facilities in which the component is to be produced for the contract. A certification to this effect must accompany each First Article which is offered."

AFMC Form 260, 20020830, V3 PageGenerated By PRPS Using Oracle Reports Version of1 2 3

G. Estimated cost of government testing/inspection evaluation.

$500.0000

10. DISPOSITION OF FIRST ARTICLES

X Approved First Articles will be forwarded to

Supply

(insert quantity) First Articles will be expended in testing. Residual components of dispproved First Articles will be returned to the contractor will be retained by pending disposition instructions from the contractor.

First Articles will be installed on aircraft/equipment to determine proper fit/function. Approved article will remain on the aircraft/equipment and will not be forwarded to USAF Supply, but will be considered part of the contract quantity.

will be retained by pending disposition instructions from the contractor.

On purchase requests designated as direct shipments the following disposition will apply. (NOTE: Always applicable on Foreign Military Sales (FMS)).

a. Approved First Articles will be returned to the contractor for shipment with production item.

b. Disposition of disapproved First Articles will remain the same as marked above.

Other Disposition:

11. CONDITION(S) FOR WAIVER OF FIRST ARTICLE APPROVAL

a. X

X b.

c.

d.

e.

f.

Offerors who have previously furnished production quantities of the same or similar article to the prime contractor for delivery to the

XGovernment, DoD, Air Force.

Offerors currently in production of the same or similar article for a Government, DoD, Air Force contract and who have received First Article approval under the existing contract.

Offerors who have previously furnished production quantities of the same or similar articles to the

XGovernment, DoD, Air Force, provided articles thus furnished, have exhibited satisfactory performance in service in the opinion of the Air Force.

Provided not more than months have elapsed since completion of the contract.

First Article testing will not be waived.

See Remarks in block 12 below.

A. PROCURING OFFICE B. CONTRACT NUMBER C. DATE OF CONTRACT D. SPECIFICATION NUMBER AND REVISION

X Disapproved First Articles

12. REMARKS

First Article to be tested at contractor facility.

Reveal, Charles A 04 MAR 2014NAME DATE

NOTE TO BUYER: UNDER CONDITIONS A AND C ABOVE, THE COGNIZANT ENGINEERING ACTIVITY WILL DECIDE WHETHER OR NOT THE ITEM HAS EXHIBITED SATISFACTORY PERFORMANCE IN SERVICE AND PREPARE AND RETAIN SUPPORTING DOCUMENTATION TO FULLY JUSTIFY THIS DECISION. THE BUYER MUST SOLICIT DUAL PRICES (That is, both with and without requirement for first article approval) AND MUST FURNISH THE COGNIZANT ENGINEERING ACTIVITY WITH THE FOLLOWING INFORMATION ON THE PREVIOUSLY SUPPLIED

ARTICLE:

14. COGNIZANT ENG ORGANIZATION RESPONSIBLE FOR

CONDUCTING TEST (Name, Organization, Phone)

13. COGNIZANT ENG ORGANIZATION RESPONSIBLE FOR

APPROVING TEST (Name, Organization, Phone)

Reveal, Charles A

X will be returned to the contractor

AFMC Form 260, 20020830, V3 Generated By PRPS Using Oracle Reports Version Page of 1 3 3

Reveal, Charles A

416 SCMS / GU M B C

777-7406

801-777-7406

File details come from the government source that posted it. Updated .