3680_Price_List_Phosphate_Flouride_Coating.xlsx

XLSX spreadsheet 19 KB Posted

Attached to
Phosphate Flouride Coating Federal contract opportunity
Solicitation number
FA8224-18-Q-COAT
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Hill Air Force Base

About this file

Price List

View the file

Other files for this federal contract opportunity

Other files attached to Phosphate Flouride Coating, newest first.
File Type Posted
Combined_Synopsis_and_Solicitation_-_Phosphate_Flouride_Coating.doc DOC document
3680_Phosphate_-_PWS.docx DOCX document
3680_Phosphate_-_CDRL_A001.pdf PDF
3680_Phosphate_-_PWS.docx DOCX document
3680_Phosphate_-_CDRL_A001.pdf PDF
3680_Price_List_Phosphate_Flouride_Coating.xlsx XLSX spreadsheet
Combined_Synopsis_and_Solicitation_-_Phosphate_Flouride_Coating.doc DOC document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Bomb Lift Repairs

Part number BreakdownYear 2018-2019Year 2019-2020Year 2020-2021Year 2021-2022Year 2022-2023
Services / Parts RequiredOrder Period 1 - Price (Each)Order Period 2 - Price (Each)Order Period 3 - Price (Each)Order Period 4 - Price (Each)Order Period 5 - Price (Each)
DAA3222A220-001 1620-01-297-3695B2 M Upper Drag Brace
DAA3222A221-001 1620-01-297-6591B2 M Lower Drag brace
DAA3221A227-001 3040-01-284-1637B2 Nose Mount
DAA3221A140-001 1620-01-128-6366NLG Torsion Link
DA3222A136-015 1620-01-383-3535MLG Stiker Titanium
DAA3222A136-013 1620-01-297-1520Fitting Assy- Truck Tilt Actuator MLG

The contractor shall prepare the surfaces and apply phosphate-fluoride coating to the B-2 landing gear components in accordance with (IAW) Aerospace Material Specification (AMS) 2486.

The contractor shall prime the components with MIL-PRF-23377 TYPE I, CLASS C (primer coating, epoxy, high solids) or MIL-PRF-85582 TYPE I, CLASS C2 (primer coating, epoxy, waterborne). The primer thickness shall be 0.0006-0.0013”. Parts must be primed within 24 hours of completing the phosphate fluoride coating process. The applied primer shall be free of runs, wrinkling, crazing, blistering, lifting, pitting, cupping or other defects. Lubrication holes and noted interior diameters (see drawings below, areas to be omitted have been highlighted) shall not be coated with primer.

Individual part requirements: Many of the figures below (see Appendix B) show the entire assembly including bushings, springs, screws, nuts, etc. All components will require removal of the old phosphate-fluoride coating and application of the new phosphate-fluoride coating to the entire surface of the part (unless otherwise noted in the drawing). The government will disassemble all assemblies into individual components at Hill AFB. Paint and primer will also be removed by Hill AFB. The phosphate fluoride coating is only required on the titanium components in the assembly. Masking may be required as specified in the attached drawings for paint. The contractor shall provide Certificate of Compliance with each returned component and a copy including the following: (CDRL A001)

The time and date the phosphate-fluoride process was completed.

Dry film thickness of applied primer.

The time and date the primer was applied.

This documentation shall be provided to Hill AFB with the shipment of each component.

This documentation shall be maintained by the contractor for two years from when the parts are processed.

It shall be made available to Hill AFB personnel on request.

File details come from the government source that posted it.