CDRL A004_TM-86-01N F16 EHSV Addition

View the file

Other files

Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TM-86-01N 1 April 2009 1 Data Call No: GUEE-0029

Created by: Kelly Davis/460 SCMS/GUEE/472-3773

Air Force Technical Manual Contract Requirements (TMCR) for

F-16 Electro Hydraulic Servo-Actuator Valve Test Stand (Program/Modification/Military System)

ATTACHMENT , TO CDRL SEQUENCE NUMBER , EXHIBIT_________________

REQUEST FOR PROPOSAL/CONTRACT:_______________________________________________________

Date: 13 November 2013

Technical Manual/Technical Order requirements contained herein have been cleared for use by OMB Paperwork

Reduction Project No. 0704-0188.

SECTION 1. TECHNICAL ORDER (TO) PROGRAM REQUIREMENTS

1. TMCR Tailoring (T). This TMCR document, including the associated tables, matrices and Specifica-tion/Standard Interface Records (SIRs) have been tailored specifically, for the (F-16 Electro Hydraulic

Servo-Actuator Valve Test Stand) Program Requirements. Air Force TO Acquisition procedures, in-cluding procedures for tailoring this document, are found in TO 00-5-3, AF Technical Order Life Cycle

Management. A copy is available upon request from the TO Manager. Any terms or procedures found in this document may be researched there.

2. TO Program Scope (T). The offeror shall develop and deliver a new AF technical manual (Operation and Maintenance Manual with Illustrated Part Breakdown (IPB) to support the F-16 Electro Hydraulic

Servo-Actuator Valve Test Stand program IAW Section 2, Table 1. No tailoring shall be made to these requirements without prior approval of the TM Manager and Primary Contracting Officer (PCO). Addi-tionally, the contractor shall develop source data for the manuals listed in Section 2, Table 2 of this docu-ment.

3. Commercial Manuals (T). Commercial manuals shall not be used for this program.

4. Technical Manual Specifications and Standards (TMSS) Tailoring. TMSS are tailored by selecting between options offered in paragraph 6.2 of each TMSS. The tailoring is recorded in SIRs and added to

Section 3 of this document for each TMSS required. NOTE: Tailoring must not change or delete man-datory requirements which are part of the Document Type Definition (DTD) structure.

4.1. (T). N/A.

4.2 (T). Questions concerning TMSS requirements may be resolved by written request and justified suggestions for resolution submitted through the Procuring Contracting Officer (PCO) and TO Man-ager. Deficiencies and suggested improvements shall be submitted to the TMSS Preparing Activity

(PA). Approved recommendations, corrections and clarifications will be maintained with contract documentation.

5. Subsequent TO/Data Requirements (T). Offerors shall recommend a process for notifying the gov-ernment when additional TO or source data requirements are identified subsequent to contract award.

This process shall require government review and approval of recommended additional requirements prior to contractual approval. Contractor format is acceptable.

6. TO Development (T). The Offeror shall development practices and procedures that ensure TOs and data are compatible with the (F-16 Electro Hydraulic Servo-Actuator Valve Test Stand) Program objectives.

In addition, TOs shall be written to a scope and depth of coverage sufficient to support the operations and maintenance concepts, and to the Reading Grade Level (RGL) specified in MIL-STD-38784, Standard

Practice for Manuals, Technical: General Style and Format Requirements. Sample AFTO Form 124 attached on page (10), Attachment 3

2 TM-86-01N 1 April 2009

Created by: Kelly Davis/406 SCMS/GUEE/472-3773

6.1. Page-oriented Military Specification (MILSPEC) TOs shall be formatted with text, graphics and delivery according to the TMSS specified in Section 2. The contractor shall develop TO files

(tagged instances) using Standard Generalized Markup Language (SGML) according to the

DTDs referenced in the appendix to MIL-STD-38784 and each applicable military detail or performance specification (MIL-DTL or MIL-PRF). All deliveries of SGML data shall be in a single file instance. Multiple file instances are not authorized.

6.2 (T). SGML-tagged TO files shall include required illustration (graphics) files in an approved graphics exchange format. Illustration files developed and delivered for other purposes shall be used in lieu of developing special TM illustration files whenever possible. (See Graphics Format Rec-ommendations sheet attachment 1 to this document)

6.3. (T). N/A.

6.4. (T). N/A.

6.5. (T). N/A.

7. TO Numbering (T). Offerors shall complete the TO Numbering Worksheet attached, Attachment 2, to this document for each new manuals being developed. TO numbers are not required for manuals to be used exclusively by the Offerors own personnel. AF procedures for numbering TOs are described in

TO 00-5-3 and TO 00-5-18, AF Technical Order Numbering System. A copy is available upon request from TO Manager.

8. Data Rights (T). Offerors shall propose Unlimited Rights for all source data and TOs prepared spe-cifically for the contract. Government rights in data are specified in the Defense Federal Acquisition

Regulation Supplement (DFARS), paragraphs 227-7102 through 227-7104, copies available from TO

Manager upon request.

8.1. (T). N/A.

8.2. (T). N/A.

9. Classification, Distribution, Destruction, Disclosure, and Export Control Notices (T). The offeror shall use the below statements for each TO developed. Vendor will need to request PA Case Number at the same time that the vendor request TO Number.

DISCLOSURE NOTICE - This information is furnished upon the condition that it will not be released to another nation without the specific authority of the Department of the Air Force of the United States, that it will be used for military purposes only, that individual or corporate rights originating in the information, whether patented or not, will be respected, that the recipient will report promptly to the United States, any known or suspected compromise, and that the information will be provided substantially the same degree of security afforded it by the Department of Defense of the United States. Also, regardless of any other markings on the document, it will not be downgraded or declassified without written approval of the originating United States agency

DISTRIBUTION STATEMENT D - Distribution authorized to the Department of Defense and U.S. DoD contractors only (Administrative or Operational Use) (XX Month XXXX). Other requests shall be referred to 406 SCMS/GUEE, Robins AFB, GA 31098. Questions concerning technical content shall be referred to AFLCMC/WNAEB.

WARNING - This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et seq.) or the Export Administration Act of 1979, as amended, Title 50, U.S.C., App. 2401 et seq. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25.

HANDLING AND DESTRUCTION NOTICE - Comply with distribution statement and destroy by any method that will prevent disclosure of contents or reconstruction of the document.

10. TO Quality (T). Offerors shall ensures TOs are prepared IAW this contract. Recommended QA methods must include actual performance of procedures and use of desk-top analysis for non-procedural data. Simulation (walk-through/talk-through) should be reserved for those procedures which would ac-tivate explosive devices or present a hazard to personnel or equipment. Offerors’ shall describe how the government will be allowed to interact with the contractor’s TO development team.

TM-86-01N 1 April 2009 3

10.1. Conferences and Technical Reviews (T). Offerors shall participate in sufficient conferences and reviews to allow insight into TO development processes and ensure contract compliance. Offe-rors shall participate in an initial Guidance Conference or Technical Interchange Meeting (TIM) within 60 days of contract award to ensure mutual understanding of TO contract requirements, schedules, points of contact, etc. Periodic In-Process Reviews (IPRs) and Prepublication Reviews

(PPR) ensure TOs are being developed according to contract requirements and that open discrepan-cies are cleared prior to publication. NOTE: PPRs are required for critical safety and nuclear surety procedures TOs, and may be required for other complex procedures TOs.

10.2. TO Certification. (T) The offerors shall deliver all 100% review copies with a letter certifying completion and certification that the information has been reviewed by the contractor and is accu-rate.

10.3. Verification Support (T). Offerors shall government TO Verification. This support should consist of at least engineering and technical publications personnel available to resolve questions re-sulting from verification activities.

10.4. Technical Data Assessment (TDA – originally called First Article Testing) (T). The TO Manag-er, will determine the TDA requirements for each TO type. The contractor will submit an SGML-tagged TO file, separate graphics files, and a PDF rendition of the composed SGML File to the program office concurrent with each IPR, for TDA to verify compliance of the digital files to Air

Force DSSs. Additional TDAs will be required at each succeeding review. The TDA parsing in no way relieves the contractor from correcting tagging errors that are noted during the composing effort.

Repeat TDAs shall be required whenever new DSS or DTD versions are used for TO development.

The contractor shall deliver the SGML files, Graphics Files, and the IPDF output from these files for each review.

11. TO and Source Data Maintenance. Offerors shall propose methods for maintaining accuracy, cur-rency and configuration of existing AF TOs and source data throughout the contract period of perfor-mance. Maintenance includes preparation of TO and source data updates to incorporate corrections, equipment configuration changes, and maintenance and operational concept changes.

12. TO Delivery (T). TO file delivery formats shall be according to applicable CDRLs and the tailored

TM Delivery Requirements Matrices included in Section 2 of this document.

12.1. SGML-Tagged Files (T). The contractor shall parse and compose SGML-tagged TO docu-ment files prior to delivery to the government, and verify that content tagging has been accomplished to the levels provided in the DTD. NOTE: The Government will perform completeness checks of all SGML data prior to acceptance. Any data failing final acceptance shall be returned to the con-tractor for correction then returned to the Air Force for additional testing to the Government.

12.2. SGML-Tagged Files for Use with the eTO Viewer (T). N/A.

12.3. Interactive Electronic Technical Manuals (IETM) (T). N/A.

12.4. Indexed Adobe™ Portable Document Format (IPDF) Files (T). The contractor shall validate indexing of PDF TO files using the specifications contained in the Technical Order Conversion Re-quirements. A copy is available upon request from TO Manager.

13. Schedules (T). NOTE: AF policy requires delivery of verified TOs prior to or concurrently with delivery of operational equipment to the field (AFI 63-101, Acquisition and Sustainment

Lifecycle Management). This policy will determine TO development and delivery schedules throughout the acquisition phase of a program.

14. Time Compliance Technical Orders (TCTOs) (T). N/A.

4 TM-86-01N 1 April 2009

Created by: Kelly Davis/406 SCMS/GUEE/472-3773

15. TO Reproduction Management (T). N/A

16. Program Specific Requirements.

A. The Offeror shall develop and deliver new MIL-SPEC technical manual covering the Operation and

Maintenance Instructions with Illustrated Parts Breakdown (IPB), IAW Section 2, TO types (Table 1) in

SGML format to support the (F-16 Electro Hydraulic Servo-Actuator Valve Test Stand) program’s ob-jectives.

B. The manual(s) shall be developed using the latest version of the development specifications listed in

Table 1 of this document. Data delivered for this contract shall be a combination of paper based docu-ments and digital files.

C. SGML files shall be reviewed by the Air Force during the development process to ensure compli-ance with the approved DTDs. The contractor shall submit copies of their SGML Instance, PDF file of their SGML Instance and separate graphics files use with the SGML Instance for each In-Process re-view.

D. For Graphics formats, see “Graphics Format Recommendations” attachment 1to this document, (page 5). These recommendations provide wide latitude for developing and delivering graphics. The

Contractor shall select one method from these recommendations to prepare and deliver all graphics files.

Graphic resolution shall be a minimum of 300 DPI. Graphics files shall be delivered as separate files regardless whether they are embedded in the documents or not. Digital photographs (halftones) shall

NOT be used. All graphics shall be line artwork.

E. The IPB shall require verification of the data based upon the configuration baseline engineering drawings and provisioning documentation if provisioning is accomplished. The contractor shall plan for these events in their technical manual development schedule.

F. All electronic files delivered on this project shall be unprotected and allow unlimited access to change/modify/or capture the data from the files.

G. In-Process reviews shall be held at the 35% and 70% completion point for each manual under devel-opment. Sample In-Process Completion tables are provided on page 11, Attachment 4.

H. Comments generated during ALL development reviews shall be incorporated before scheduling the next development review, for example 35% IPR comments shall be incorporated before scheduling the

70% IPR. The Contractor shall provide technical and engineering personnel to assist Air Force person-nel during the development reviews and Verification.

I. Additionally, the contractor shall develop source data in the form of Unnumbered Operational Sup-plements for the technical manuals described in Section 2, Table 2. These source data files shall docu-ment all changes between the new test set and existing hardware items which have an effect on “Form, Fit, Function or Interface”. These source files may be prepared in desktop publishing system i.e., MS

Word, Framemaker etc.

J. Calibration procedures shall be developed IAW Section 2, Table 1 for the test set.

NOTE: Contractors are responsible for selecting SGML and composition tools for this program.

AF DTDs will work with most COTS SGML editing systems (except Framemaker) however, the

FOSIs were developed to work with Datalogic Composing software ONLY. If the Contractor wishes to use any other composing software product, the Contractor is responsible for ensuring all formatted outputs are compatible with the DTL specification listed in Section 2, Table 1 of this document. Structured Framemaker files are unacceptable and shall not be submitted as an

SGML delivery to the Air Force.

TM-86-01N 1 April 2009 5

ATTACHMENT 1

Graphics Format Recommendations

GENERAL GUIDELINES

Single column graphics should not exceed 51 Picas High by 18 Picas Wide.

Full page graphics should not exceed 51 Picas High by 42 picas Wide.

Fold Out graphics should not exceed 51 Picas High (width on foldouts is not important).

Recommend 300 DPI for all graphics to help decrease file/PDF sizes due to there being really no discernable quality difference over 600 DPI.

Directorates must know what graphic file types they can utilize and sustain with software availa-ble on hand and request file types to match.

The 5 most common graphics file types are: EPS, TIFF, CGM, JPEG & DWG. Each is ad-dressed below:

EPS:

Raster based images will not be saved as EPS.

EPS files shall not be a mix of vector and raster images. Vector only.

Any source data (photos used for tracing etc.), used in aiding of creation of EPS (templates, etc.)

will be deleted from illustration prior to saving/exporting.

If multiple layers are used, then image is to be flattened into 1 single layer before exporting to minimize file size and reduce possible printing issues.

TIFF:

B&W raster images should only be saved as Bitmap and not Grayscale, RGB or CMYK.

Grayscale or Color images (screenshots, etc.) will be saved as such (Grayscale, RGB or CMYK) and will not be bitmap converted using a halftone screen.

To further aid in file size reduction for storage purposes, images should be compressed using

Group 4 compression when saving/exporting.

CGM:

Raster based images will not be saved as CGM.

Any source data used in aiding of creation of CGM (templates, etc.) will be deleted from illustra-tion prior to saving/exporting.

CGM files shall not be a mix of vector and raster images. Vector only.

If multiple layers are used, then image is to be flattened into 1 single layer before exporting to minimize file size and reduce possible printing issues..

Unless Version 4 is specifically required for hotspots and/or hyper linking, CGMs should be ex-ported as version 3 to increase cross platform compatibility.

DWG:

Raster based images will not be saved as DWG.

DWG files shall not be a mix of vector and raster images. Vector only.

Any source data used in aiding of creation of DWG (templates, etc.) will be deleted from illustra-tion prior to saving/exporting.

If multiple layers are used, then image is to be flattened into 1 single layer before exporting to minimize file size and reduce possible printing issues.

JPEG:

JPEG File format should be used as last resort. Color screenshots/photos should be saved as

TIFFs due possible system compatibility issues.

B&W Bitmaps should not be saved as JPEGs.

6 TM-86-01N 1 April 2009

Created by: Kelly Davis/406 SCMS/GUEE/472-3773

SECTION 2. TM TYPE AND DELIVERY REQUIREMENTS

NOTES:

All page-based TOs developed under this contract must conform to the general style and format requirements of MIL-

STD-38784 and the DTL or PRF specification called out on Section 2, Table 1.

Check the ASSIST database, http://dodssp.daps.dla.mil/assist.htm, for updated versions of the required TMSS prior to initiating any work on this proposal/contract.

IPBs are developed IAW MIL-PRF-38807, except that MIL-DTL-87929 will also be used for IPBs combined with work packages.

Delivery requirements are indicated in the TM Delivery Requirements matrices.

PART A – TM TYPE SELECTION TABLES.

TABLE 1

TMSS REQUIREMENTS FOR THE (F-16 Electro Hydraulic Servo-Actuator Valve Test Stand) Program

(System/Component)

Title or Type of Manuals Specification Required

1. Operation and Maintenance Instructions in Work Package Format MIL-DTL-87929

a. Operation & Maintenance Instruction Manuals MIL-DTL-87929D

b. With Illustrated Parts Breakdown (see notes) MIL-PRF-38807D

2. Calibration Procedures MIL-PRF-38793 http://dodssp.daps.dla.mil/assist.htm

TM-86-01N 1 April 2009 7

TABLE 2

ADDITIONAL TM TYPE SELECTIONS

NOTES:

Check all applicable boxes.

For commercial manual supplemental data only, under the specification heading, enter “Same style and format,” “MIL-

PRF-38807” (for IPB data), or “MIL-STD-38784.”

For existing MIL-SPEC manuals not being updated to latest specification requirements, enter “Same style and format” under the specification heading.

TO Number, Title, or

Type of Manual

Specification

Com-mercial

Manual

Change/

Revision

Supple-ment

Supple-mental

TM

Source

Data

1. 9H2-4-238-8-1

MIL-STD-

38784A

2. 9H2-4-240-8-1

MIL-STD-

38784A

3.

4.

5.

6.

7.

8.

9.

10.

11.

12.

13.

14.

15.

16.

17.

8 TM-86-01N 1 April 2009

Created by: Kelly Davis/406 SCMS/GUEE/472-3773

PART B - TM DELIVERY REQUIREMENTS

FOR F-16 ELECTRO HYDRAULIC SERVO-ACTUATOR VALVE TEST STAND

(System/Item)

TM DATA TYPE DELIVERED NEW AF MANUAL.

(TMSS/Change/Supplement/etc.)

(Replicate form for each TM type required.)

Delivery Format Requirements Codes

Digital delivery only:

P - Paper (draft or manuscript only. Cannot be used for G - Standard Generalized Mark-up Language (SGML).

final delivery) H - Hyper Text Mark-up Language (HTML)

M - Mixed paper and digital (G, H or I) I - Indexed Portable Document Format (IPDF) File.

X - Extensible Mark-up Language (XML)

EXAMPLE: M(G) / 2 [Paper and SGML / 2 copies]

NOTES:

Delivery format requirements codes indicate the media/file format to be delivered for each program event.

TCTO requirements are specified in the contract vehicle approving the TCTO.

When on-line access is a contractual requirement, copy quantity will normally be Ø (zero).

For NGS or non-standard TMSS instances, delivery shall include the associated DTDs, FOSIs/Style Sheets, XML schemas, etc.

DELIVERY SCHEDULE

Event Number of days data required prior to event

Technical

Review(s)

(30 Days)

Verification

(30 Days)

Prepublication

Review

(30 Days)

Final TO

Distribution

(60 Days)

Enter Office Symbol and Address Enter delivery requirements code/copy quantities required

Attn: Kelly Davis

406 SCMS/GULAC

235 Byron St, Ste 19A

Robins AFB, GA 31098-1670

M(P/G/I) /

M(P/G/I)/

M(P/G/I)/ 2 M(P/G/I)/ 1

CALIBRATION PROCEDURES ONLY

Attn: Brett Degler

AFMETCAL

813 Irving-Wick Dr. W, Bldg 2

Heath, OH 43056-6116

P / 1 P/ 1 P/ 1 P/ 1

Total Copies Required: 3 3 3 2

TM-86-01N 1 April 2009 9

Attachment 2

REQUEST FOR TECHNICAL ORDER NUMBER

1. PRIME WEAPON’S SYSTEM (If Applicable)

2. CONTRACT NUMBER: (If Applicable)

3. CONTRACT LINE ITEM NUMBER (CLIN) (If Applicable):

4. PURCHASE REQUEST (PR) NUMBER: (If applicable)

5. MISSION DESIGN SERIES/NOMENCLATURE (Name Of Equipment):

6. PART NUMBER(s):

7. NSN/FSN: MMAC CODE:

8. DOES MANUAL EXIST FOR SAME/SIMILAR EQUIPMENT? TO NUMBER: _________________

9. RECOMMENDED TILE OF MANUAL:

10. CLASSIFICATION OF MANUAL: CLASSIFICATION OF TITLE:

11. EQUIPMENT MOTIVATION (electric, hydraulic, mechanical) (If Applicable)

12. TYPE OF CURRENT, IF ELECTRIC (AC/DC/AC-DC):

13. KIND OF MANUAL (Opn & Maint with IPB, Overhaul, etc.):

14. KIND OF EQUIPMENT (air or ground):

15. COMMERCIAL OFF THE SHELF ITEM YES NO

16. SUGGESTED TECHNICAL ORDER NUMBER:

17. MANUAL FORMAT SPECIFICATION NUMBER: (i.e., General Style & Format MIL-STD-38784 / Work Package

MIL-DTL-87929/Commercial Off The Shelf (COTS) MIL-HDBK-1221)

18. CONTRACTOR INFORMATION: (If Applicable)

a. NAME OF VENDOR:

b. ADDRESS:

c. MANUFACTURER'S CODE:

d. POINT OF CONTACT:

19. FOREIGN MILITARY SALES (FMS) YES NO (If YES, complete item 20)

20. COUNTRY CODES (For CSTO/FMS manuals): (See TO 00-5-19 if applicable)

MAIL COMPLETED FORM TO: 406 SCMS/GUHA

460 Richard Ray Blvd. Suite 200 ROBINS AFB, GA 31098-1813

(Technical Order number assignment may require thirty days.)

PROCUREMENT BUYER OFFICE SYMBOL: TELEPHONE EXT.:

EQUIPMENT SPECIALIST: OFFICE SYMBOL: ES PHONE:

10 TM-86-01N 1 April 2009

Created by: Kelly Davis/406 SCMS/GUEE/472-3773

Attachment 3

AFTO FORM 124, 19970401 (IMT-V1) PREVIOUS EDITION IS OBSOLETE.

COMPUTATION OF TECHNICAL ORDER READING GRADE LEVEL

1. T.O. TITLE 2. T.O. NUMBER

3. T.O. DATE

4. NUMBER OF PAGES OF TEXT IN T.O 7. T.O. MANAGER /OFFICE SYMBOL/DSN

5. READING GRADE LEVEL IAW MIL-STD-38784

6. COMPUTED OVERALL GRADE LEVEL OF T.O.

8. TO COMPUTE READING GRADE LEVEL (RGL) OF T.O., USE "READABILITY" CRITERIA PRESCRIBED BY MIL-STD-38784 OR RECORD THE COMPUTER-

DERIVED RGL WHEN AVAILABLE.

SAMPLE NUMBER A

PAGE NUMBER OF

SAMPLE B

NUMBER OF WORDS

IN SAMPLE C

NUMBER OF

SENTENCES IN SAMPLE

D

NUMBER OF

SYLLABLES IN SAMPLE

E

SAMPLE GRADE LEVEL

F

9. PROJECT OFFICER GRADE OFFICE SYMBOL PHONE

10. SIGNATURE DATE

TM-86-01N 1 April 2009 11

ATTACHMENT 4

Sample Work Package Format IPR Completion Chart

TO Section 35% Complete 70% Complete

Title Page 100% -

Front Matter - 70%

Numerical Index 100% -

WP 001 00 Alphabetical Index 100% -

WP 002 00 Foreword 50% 90%

WP 003 00 Master List of Special Tools, Test

Equipment and Consumables

35% 70%

WP 004 – WP 997 Technical Work Packages At Least 1 WP 100% 70% of Re-maining WP

Complete

WP 998 Illustrated Parts Breakdown (If combined) 35% 80%

WP 999 00 Difference Data Sheets (If used) 100% -

Example of some Technical Work Packages (Task Oriented) (List not all inclusive, Vendor may need to expand depending upon equipment being developed.)

Theory of Operation

Operating Instructions

Receiving and Shipping Instructions

Remove and Replace Instructions

Troubleshooting

Schematic Diagrams

Inspection Requirements

Corrosion Prevention Instructions

Initial Setup

Fault Isolation Procedures

Lubrication Instructions

Disassembly

Cleaning

Post maintenance Operational Checkout

12 TM-86-01N 1 April 2009

Created by: Kelly Davis/406 SCMS/GUEE/472-3773

SECTION 3. SPECIFICATION/STANDARD INTERFACE RECORDS (SIRS)

NOTES:

MIL-STD-38784 must be included in all contracts/proposals for AF TMSS-developed TOs.

Most specification “Acquisition Requirements” list the same two items for paragraphs 6.2a and 6.2b.

SPECIFICATION/STANDARD INTERFACE RECORD FOR MIL-STD-38784A, 25 August 2011

Department of Defense

Standard Practice for Manuals, Technical:

General Style and Format Requirements

4.2.1c(1) Technical manuals shall be 8-1/2 x 11 inches formatted in double column format.

4.6.2 Photographs/line drawings. Delete paragraph.

4.6.4 Continuous Tone Artwork (see 3.2.8). Delete paragraph.

SPECIFICATION/STANDARD INTERFACE RECORD FOR MIL-DTL-87929D, 20 April 2012

Detail Specification

Technical Manuals, Operation and Maintenance Instructions

In Work Package Format

6.2b Technical Manuals shall be formatted in Double Column Format (paragraph 3.1).

6.2c(6) Manual Sets are not applicable.

6.2c(7) Major Accessories not applicable.

6.2d Master List of Containers not applicable.

6.2iSpecialized Manuals not applicable for the following sub paragraphs: 6.2j(1), (2), (3), (6), (8), (10), and (11)

SPECIFICATION/STANDARD INTERFACE RECORD FOR MIL-DTL-38807D, 17 September 2012

Detail Specification

Technical Manuals, Illustrated Parts Breakdown

6.2b Technical Manuals shall be formatted as WP 998 00 in a combined manual (paragraph 1.1).

6.2f Manual will be in Work Package format (paragraph 3.2.1).

6.2l Manufacturer List is not required (paragraph 3.5.13).

6.2m Reference Designators not applicable (paragraph 3.6.6.9).

6.2n Paragraph 3.6.7 not applicable.

6.2o Multiple SMR columns not required. (Paragraph 3.6.7.7.1).