Repair and Return PWS.docx

DOCX document 225 KB Posted

Attached to
Mexico F-5 Repair and Return / Overhaul
Solicitation number
FA822026RB005
Issued by

About this file

This is a Performance Work Statement (PWS) for Foreign Military Sales (FMS) unclassified F-5 repair and return/overhaul services prepared by AFLCMC/WNDI on 9 June 2026.

The contractor shall restore F-5 parts to serviceable condition (Condition Code A) in accordance with applicable Technical Orders, government standards, and industry standards listed in the PWS. The scope includes repair and overhaul services for specific F-5 components identified in Attachment 1, which include a canopy seal regulator, valve ram air, cabin air safety valve, tachometer generator engine T5, and regulator slave pressure. The contractor must be a qualified repair source with previous or current USG contract experience for the identified parts. Key performance requirements include: beginning teardown, test and evaluation (TT&E) within 45 days of contract award; providing TT&E reports, repair assessments, and firm-fixed price proposals within 45 days of part receipt; completing repairs within 120 days after receipt of order or PCO authorization; and maintaining a 90 percent rework-free rate. The contractor shall manage Critical Safety Items in accordance with the Aviation Critical Safety Item Management Handbook and AFI 20-106, with 100 percent inspection required. The contractor must establish a Quality Control Program compliant with AS9110 certification or equivalent and submit monthly status reports, TT&E reports, Over and Above reports, cost proposals, and Requests for Variance as applicable Contract Data Requirements Lists. All work shall be performed at the contractor's or subcontractor's facility; no government tooling, equipment, or materials will be provided. The government points of contact are Mr. Joseph Jackson (PM-G, AFLCMC/WNDI) and Mr. Marshall Neilson (PCO, AFLCMC/WNDT) at Hill Air Force Base, Utah.

View the file

Other files

Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PERFORMANCE WORK STATEMENT

For

Foreign Military Sales

Unclassified F-5 Repair and Return / Overhaul

Prepared by

AFLCMC/WNDI

9 Jun 2026

Change number
Date
Paragraph(s)
Description
Name
Basic
9 Jun 26

Contents

1DESCRIPTION OF SERVICES4
1.1Scope4
1.2Requirements4
2SERVICE SUMMARY6
3USG FURNISHED DOCUMENTATION, EQUIPMENT AND MATERIALS6
4GENERAL INFORMATION7
4.1Security and Access to Government Facilities and Equipment7
4.2Government Points of Contact8
4.3Contractor Point of Contact9
4.4Shipping and Transportation9
4.5Government Acceptance9
4.6Contractor Travel9
4.7Quality Control9
4.8Quality Assurance10
4.9Environmental Controls11
4.10Government Observation11
4.11Safety Requirements11
4.12Continuation of Essential DoD Contractor Services11
4.13Applicable CDRLs11

DESCRIPTION OF SERVICES

This Performance Work Statement (PWS) identifies the level of service required to establish and execute contractor activities necessary to repair and overhaul (when necessary) F-5 parts for Foreign Military Sales (FMS) customers. The identified parts require repair services due to aircraft age, lack of spare parts availability and no existing United States Air Force (USAF) depot repair.

1.1 Scope

The scope of this effort shall include repair and return services and overhaul services (when necessary) for F-5 parts at the contractor or subcontractor facility. The list of parts is identified in Attachment 1.

1.2 Requirements

The contractor shall restore to serviceable condition (Condition Code A) any of the parts listed in Attachment 1, and subsequent attachments, for which they are contracted.

1.2.1 Qualified Repair Source. The contractor shall be a qualified repair source and perform all repair work in compliance with instructions and technical data requirements contained in the applicable Technical Orders (TOs), Government and industry standards as identified in Attachment 2. A qualified repair source is defined as a prime contractor or subcontractor on a previous or current United States Government (USG) contract for repair of the identified part.

1.2.2 Production Schedule. The offeror shall provide a draft production schedule including the time, after contract award, to begin teardown, test and evaluation (TT&E) and overhaul/repair of the first inducted part. The USG target is 45 days after contract award for the contractor to be able to begin TT&E.

1.2.3 Teardown, Test and Evaluation. The contractor shall perform TT&E on every part submitted for repair. The contractor shall provide a firm-fixed price proposal for TT&E. The USG target is 45 days after receipt of a unit for repair, the contractor shall provide a TT&E report, with repair evaluation and category, acceptance test requirements (CDRL A002) and firm fixed price proposal (CDRL A004) for repair cost.

1.2.4 Repair categories include:

1.2.4.1 Beyond Repair (BR). An item is considered BR if there is no possible repair process for the existing condition.

1.2.4.2 Beyond Economical Repair (BER). An item is considered BER if the estimated cost of repair is greater than 75% of the procurement price.

1.2.5 Repair. The contractor shall provide a firm fixed price proposal, including a detailed description of the work to be performed, labor categories and hours, and subcomponents required. The contractor shall submit this report with, or as a part of, the TT&E report. (CDRL A002) The contractor shall not proceed with repairs without procuring contracting officer (PCO) approval.

1.2.6 Overhaul. The contractor shall provide firm fixed price proposal for overhaul of items, as required, per the applicable technical orders. The overhaul price shall be provided with the repair cost proposal (CDRL A004). The contractor shall not proceed with overhaul without PCO approval.

1.2.7 Over and Above (O&A). O&A is any additional repair, not identified in the initial TT&E report, that the contractor identifies while performing the repair or overhaul that is required to return the part to serviceable condition. The contractor shall notify the USG Program Office (PO) via email within 3 days after determination of an O&A. The contractor shall submit an O&A report no later than 30 days after determination to the PCO (CDRL A003), including firm fixed price proposal for the O&A repair costs (CDRL A004) with labor categories and hours, and component costs. PCO authorization is required to proceed with O&A repairs. After receipt of authorization, the contractor shall restore the unit to serviceable condition. If conflict arises between the O&A direction stated in this PWS and the DFARS clause 252.217-7028, DFARS direction takes priority.

1.2.8 If an item is determined to be BER or BR, the PCO shall provide disposition instructions to the contractor within 60 days of notification.

1.2.9 The contractor shall take no more than 120 days after receipt of order (ARO) or PCO authorization of O&A repairs, to complete repairs. If the contractor anticipates requiring additional repair time, the contractor shall notify the PCO and USG PO, addressing the reason for additional repair time, in the monthly status report. (CDRL A001)

1.2.10 Critical Safety Items. Critical Safety Items (CSIs) are identified in Attachment 1. Associated critical characteristics (CCs) and critical safety processes (CSPs) are identified for each CSI part in engineering orders (EOs). The contractor shall manage CSIs, or any subcomponents manufactured for use in the repair of CSIs, in accordance with the Aviation Critical Safety Item Management Handbook, and AFI 20-106, Management of Aviation Critical Safety Items. These items require a 100% inspection and will undergo a complete documentation review and approval by the government QA representative identified in paragraph 4.5.

1.2.11 The contractor shall provide to the government representative (see para 4.5), for each part repaired, documentation verifying serviceability to include the acceptance test procedure (ATP) results or functional test results. This documentation, and other documents as requested by the government representative for acceptance of repaired part, shall be provided to the government representative. The contractor shall include the original signed and quality assurance-stamped serviceability documentation in the shipping/packaging documentation sent with each part. The contractor shall retain a copy of this documentation package for their records. The contractor shall include the acceptance date for each part in the monthly status report. (CDRL A001)

1.2.12 After acceptance of repaired part, the contractor shall attach a completed and certified (contractor quality control (QC)/quality assurance (QA) stamped) material condition tag (DD Form 1574) to the repaired part prior to shipping.

1.2.13 Design, development or manufacture of new capability, tooling or test equipment is not a requirement under this effort.

1.2.14 The contractor shall not make changes to the end-item design under this effort.

SERVICE SUMMARY

Table 1 describes the Service Summary for the tasks as outlined in this PWS. The efforts described in this PWS are for repair and return and overhaul services.

Table 1 – Service Summary

Performance Objective
PWS Para
Performance Threshold
Method of Surveillance
Accuracy of Monthly Repair Status Reports
1.2.9, 4.7.4
Performance is acceptable when 90% of reports are accurate for the month.
100% Inspection of contractor reports
Repair Schedule Update - Contractor takes 120 days (or less) to complete repairs
1.2.9
90% of repairs shall take no more than 120 days from receipt of asset to shipment ready status.
100% Inspection of contractor reports

Rework Total - Contractor shall have minimal rework of assets

4.7.4
Performance is acceptable when 90% of repaired assets did not require re-work during the month. The USG shall base calculations on number of assets received during reporting period.
100% Inspection of assets
Repair Status Update - Contractor shall provide timely monthly status of items in repair cycle
1.2.9, 4.7.4
Performance is acceptable when 90% of reports are accurate for the month. Contractor shall provide initial reports to the PMO within 60 days of contract award or within 30 days of receipt of first asset. Contractor shall provide subsequent reports every 30 days thereafter.
100% Inspection of contractor reports

USG FURNISHED DOCUMENTATION, EQUIPMENT AND MATERIALS

1.3 The contractor shall perform all work in accordance with (IAW) Government and industry standards, publications, regulations, operating instructions and procedures listed in Attachment 2 unless otherwise identified as not applicable by the PCO. Equivalent or superseding documents may be used if available. All TOs associated with this effort are listed in the List of Applicable Publications (LOAP) (see Attachment 2). The contractor shall refer to this LOAP to identify all required TOs necessary to accomplish the requirements of this PWS. Applicability is to the most recent version unless otherwise specified. In the event a conflict or error between or within documentation is found, the contractor shall seek direction from the PCO.

1.4 The contractor shall comply with all publications, regulations, operating instructions and procedures listed in Attachment 2 in effect at the time of the award as they pertain to the procedures for executing the requirements in this PWS.

1.5 If, during the repair or overhaul effort, the contractor is unable to comply with a requirement in the documentation, the contractor shall submit to the PCO a request for variance (RFV) using a DD Form 1694 for each variance. (CDRL A005) RFVs shall include all waivers and deviations requested by the contractor. The contractor must receive RFV approval from the PCO before proceeding with implementing the variance. The USAF will retain material review board authority for all changes.

1.6 The contractor shall request any additional documents from the USG necessary to complete the requirements of the PWS.

1.7 The USG will not provide the contractor with any tooling, equipment or materials in support of the effort described in this PWS.

GENERAL INFORMATION

1.8 Security and Access to Government Facilities and Equipment

1.8.1 Security Clearance: The efforts required for this task are unclassified and shall not require contractor personnel to obtain a security clearance.

1.8.2 Access to Government Facilities and Equipment: Contractor shall perform all repair work at contractor’s facility or subcontractor facility as identified and documented in their subcontracting plan. Access to USAF facilities and equipment is not required or authorized, except for pre-existing agreements.

1.8.3 Controlled Unclassified Information (CUI). The contractor shall comply with DoDI 5200.48_DAFI16-1403, Controlled Unclassified Information, DoDM 5200.01, Vol 1_AFMAN16-1404, Vol 1, Air Force Information Security Program, and DoDM 5400.07_AFMAN33-302 Air Force Manual, DoD Freedom of Information Act (FOIA) Program. The contractor shall monitor CUI aggregation and compilation based on the potential to generate classified information pursuant to security classification guidance addressing the accumulation of unclassified data or information.

1.8.4 The Contractor shall distribute controlled unclassified information IAW DoD Instruction 3200.14, Principles and Operational Parameters of the DoD Scientific and Technical Information Program, and DoD Instruction 2040.02, International Transfer of Technology, Articles, and Services. The Contractor shall properly mark all such documents IAW DoD Instruction 5230.24, Distribution Statements on Technical Documents. Technical documents not subject to distribution are defined in DoD Instruction 5230.24, DoD Directive 5230.25, and DoD Manual 5010.12-M, Procedures for the Acquisition and Management of Technical Data.

1.8.5 Protection of Information Controlled Unclassified Information (CUI). Controlled Unclassified Information is any information that law, regulation, or government wide policy requires to have safeguarding or disseminating controls, excluding information that is classified under Executive Order 13526, Classified National Security Information, December 29, 2009, or any predecessor or successor order, or the Atomic Energy Act of 1954, as amended.

1.8.6 The National Archives and Records Administration (NARA) CUI Registry (http://www.archives.gov/cui/registry/category-list.html) identifies approved CUI categories and subcategories, provides general descriptions for each, identifies the basis for controls, and sets out procedures for the use of CUI.

1.8.7 The contractor shall comply with DoDI 5200.48_DAFI16-1403, Controlled Unclassified Information, and DAFMAN 16-1404 Vol 1-3 Air Force Information Security Program. The contractor will consult the applicable security classification guide to monitor CUI aggregation for potentially generating classified information by compilation.

1.8.8 The Contractor shall comply with DODM 5400.07_AFMAN 33-302, DoD Freedom of Information Act (FOIA) Program, requirements. Protection of CUI and unclassified DoD information not approved for public release on non-DoD Information Systems will be protected IAW DoDI 8582.01, Security of Non-DoD Information Systems Processing Unclassified Nonpublic DoD information. Unless specific categories of CUI require more stringent controls, non-DoD Information Systems must be protected using the guidelines set forth in NIST Special Publication 800-171, Protecting Controlled Unclassified Information in Nonfederal Information Systems and Organizations.

1.8.9 Covered Defense Information. The Contractor shall comply with DFARS 252.204-7012 Safeguard Covered Defense Information and Cyber Incident Reporting (Dec 2019) This subpart applies to contracts and subcontracts requiring contractors and subcontractors to safeguard covered defense information that resides in or transits through covered contractor information systems by applying specified network security controls. It also requires reporting of cyber incidents. The subpart does not abrogate any existing contractor physical, personnel, or general administrative security operations governing the protection of unclassified DoD information, nor does it impact requirements of the National Industrial Security Program.

1.8.10 Operations Security (OPSEC). The contractor shall ensure OPSEC is incorporated into the appropriate area of the contract IAW DoD Directive 5205.02E, DoD Operations Security (OPSEC) Program and AFI 10-701 Air Force OPSEC Program. The Contractor shall flow down all OPSEC requirements to subcontractors that handle Critical Information (CI). CI is defined as specific facts about friendly intentions, capabilities, or activities needed by adversaries to plan and act effectively against friendly mission accomplishment.

1.9 Government Points of Contact

The responsible USG (PO) is AFLCMC/WLDI, USAF, F-5 Program Office, Proven Aircraft FMS Programs Section, Legacy Training Aircraft International Branch. The assigned Government Program Manager (PM-G) will function as the single point of contact (POC) for program issues.

Mr. Joseph Jackson Program Manager, AFLCMC/WNDI 6057 Box Elder Lane, Bldg. 1285 Hill AFB, UT 84056 joseph.jackson.4@us.af.mil Tel: 801-586-0072

The responsible USG contracting office is AFLCMC/WNDT, Legacy Training Aircraft Contracting Branch. The assigned PCO will function as the single POC for contractual issues.

Mr. Marshall Neilson Contracting Specialist, AFLCMC/WNDT 6072 Fir Ave., Bldg. 1233 Hill AFB, UT 84056 marshall.neilson.1@us.af.mil Tel: 801-586-0424

1.10 Contractor Point of Contact

The contractor shall identify a single POC for program issues and status updates. The PO does not require monthly status meetings. However, the contractor shall support telecons or other meetings as requested by the PO.

1.11 Shipping and Transportation

1.11.1 The participating FMS customers shall be responsible for packaging and shipping costs from the country to the contractor’s facility.

1.11.2 Within two business days from completion of repair and/or overhaul, the contractor shall notify the PO via email that assets are ready to be returned to the designated shipping location.

1.11.3 Special Packing Instructions (SPI) associated with specific parts are identified in Attachment 1. If a SPI is not indicated for a part, the contractor shall follow best commercial practices when packaging parts for shipment to include electro-static discharge (ESD) protection when needed. The contractor shall reuse original packaging material/crates if appropriate and when possible.

1.12 Government Acceptance

The USG designated representative or DCMA shall be the point of contact at the contractor or subcontractor facility for monitoring the contractor’s performance and shall perform Wide Area Workflow (WAWF) acceptance. The contractor shall, when requested, notify the USG PO and PCO via email no later than two weeks prior to the start of acceptance testing and accommodate USG representative witness of testing if requested in accordance with para 4.10.

1.13 Contractor Travel

No travel is required or projected for this project. The contractor may propose travel as a separate cost, if required to complete the repair.

1.14 Quality Control

1.14.1 In compliance with FAR clause 52.246-4, “Inspection of Services,” and to ensure contractor provides specified contract requirements, the contractor shall establish a complete Quality Control Program (QCP).

1.14.2 Contractor shall provide with proposal either a complete QCP or current ISO 9000 certificate. If an ISO 9000 certificate is provided with proposal, the contractor shall make their full QCP available to the government upon request after contract award.

1.14.3 Contractor shall, at a minimum, comply with the quality management requirements for repair and overhaul identified in AS9110. AS9110 certification is preferred. However, a comprehensive description of the contractor’s AS9110 equivalent quality management system is acceptable.

1.14.4 The contractor shall have minimal rework of repaired assets. Assessment of acceptable performance by the contractor occurs when 90% of the items repaired during a calendar month period do not require rework. Contractor shall fund all rework required due to faulty repair. The USG defines rework as repairs rejected by the designated government representative (see para 4.5) that do not meet the level of repair and functionality as outlined by the applicable TO (see Attachment 2). The contractor shall report all items requiring rework on the monthly status report. (CDRL A001)

1.14.5 Nonconforming parts delivered by the contractor will be subject to USG established procedures for Supply Discrepancy Reports (SDRs). SDRs may be submitted by the end user for resolution up to one year following shipment to the CONUS location. After the end user initiates an SDR, the SDR office will conduct an assessment to validate the SDR claim. If it is determined the claim is valid, the SDR office will contact the contractor for resolution. The contractor shall cooperate with the SDR office, when contacted, to resolve the SDR claim. The contractor shall be responsible for all additional expenses resulting from the corrective action.

1.15 Quality Assurance

The USG shall evaluate the contractor’s performance by appointing a representative(s) (see para 4.5) to monitor performance per the services summary (see Table 1).

1.15.1 The USG representative(s) shall evaluate the contractor’s performance through intermittent on-site inspections of the contractor's quality control program and receipt of complaints from USG PO personnel.

1.15.2 The USG representative shall inspect each task as completed or increase the number of quality control inspections if deemed appropriate because of repeated failures discovered during quality control inspections or because of repeated customer complaints. Likewise, the USG representative may decrease the number of quality control inspections if merited by performance.

1.15.3 Quality Assurance Personnel (QAP)

1.15.3.1 The USG identifies the PM-G as the QAP to conduct assessments of contractor’s performance and accomplish yearly Contractor Performance Assessment Reporting (CPAR), if appropriate.

1.15.3.2 The USG representative identified in Para 4.5 shall inform the PCO and QAP when discrepancies occur and shall request corrective action. If the contractor does not correct the identified discrepancy in a timely manner, the PCO and QAP will issue a corrective action report (CAR).

1.15.4 The contractor shall refer any matter(s) concerning a change in scope, price, terms or conditions of this contract to the PCO and not the USG representative in Para 4.5.

1.15.5 USG representative(s) shall accomplish on-site inspection and final acceptance.

1.15.6 Work performed by the contractor during the period of performance of this contract shall be subject to review by the PCO or authorized USG representative(s) at all times.

1.16 Environmental Controls

1.16.1 Compliance with Laws and Regulations. The contractor shall be knowledgeable of and comply with all applicable international, federal, state, and local laws, regulations and requirements regarding environmental protection.

1.16.2 In the event environmental laws/regulations change during the term of this contract, the USG requires the contractor to comply with the laws/regulations as soon as they become effective.

1.16.3 If complying with the new laws/regulations increases or decreases cost, the contractor shall inform the PCO pursuant to notice requirements and negotiate a modification to the contract.

1.16.4 Material Storage and Use. The contractor shall follow manufacturer’s guidelines and professional recommendations for control of humidity, temperature, cleanliness and materials handling, including hazardous materials.

1.17 Government Observation

USG personnel, other than the PCO and QAP(s), shall, with PCO or authorized representative(s) coordination, observe contractor operations. However, these personnel shall not interfere with contractor performance or make any changes to the contract.

1.18 Safety Requirements

In performing work under this contract, the contractor is solely responsible for compliance with all federal, state and local laws, the Occupational, Safety and Health Act (OSHA) (Public Law 91-596) and the resulting standards, OSHA Standards 29 CFR 1910 and 1926, as applicable, and the protection of their employees. Additionally, the contractor is responsible for the safety and health of all subcontractor employees and visitors.

1.19 Continuation of Essential DoD Contractor Services

The requirements outlined in this PWS are not mission critical and shall not be essential during crisis in accordance with AFI 63-138.

1.20 Applicable CDRLs

The contractor shall prepare and deliver data in accordance with the CDRL form DD Form 1423. All Data Item Descriptions (DID) in the CDRL, as contained in the following table, shall be used as guides in developing the data.

Distribution Statement
CDRL
CDRL Name
DID
PWS Para
D
A001
Monthly Status Report
DI-MGMT-81928
1.2.9, 1.2.10, 4.7.4
D
A002
TT&E Report and Repair Assessment
DI-NDTI-80809B
1.2.3, 1.2.5
D
A003
Over and Above Report
DI-NDTI-80809B
1.2.7
E
A004
Cost Proposal
DI-FNCL-81116
1.2.3, 1.2.6, 1.2.7
D
A005
Request for Variance (RFV)
DI-SESS-80640E
3.3

ACRONYM LIST

Acronym
Definition
ACO
Administrative Contracting Officer
AFI
Air Force Instruction
BER
Beyond Economical Repair
BR
Beyond Repair
CAR
Corrective Action Report
CDRL
Contract Data Requirements List
CONUS
Continental United States
COR
Contracting Officer Representative
DCMA
Defense Contract Management Agency
DFARS
Defense Federal Acquisition Regulation Supplement
DID
Data Item Descriptions
DoD
Department of Defense
DODI
DoD Instruction
EO
Engineering Order
ESD
Electro-Static Discharge
FOPR
Fair Opportunity Proposal Requests FOPR
FAR
Federal Acquisition Regulation
IAW
In Accordance With
LOAP
List of Applicable Publications
MSR
Monthly Status Report
O&A
Over & Above
OCONUS
Outside Continental United States
PO
Program Office
PBSA
Performance Based Service Acquisition
PCO
Procuring Contracting Officer
PM-C
Contractor Program Manager
PM-G
Government Program Manager
PMO
Program Management Office
POP
Period of Performance
PWS
Performance Based Work Statement
QAP
Quality Assurance Program
QAR
Quality Assurance Representative
QAS
Quality Assurance Specialist
QASP
Quality Assurance Surveillance Plan
SPI
Shipping and Packaging Instruction
TO/DO
Task Order / Delivery Order
TT&E
Teardown, Test and Evaluate
USAF
United States Air Force
USG
United States Government

ATTACHMENTS

Attachment 1 List of parts for repair and return / overhaul services

NSN
P/N
SPI Number
SPI Reference
Name
CSI
4820-00-003-1821
131100
F000002XA3
TO 00-85B-3
Canopy seal regulator
No
4810-01-039-8886
1062-00-3
Valve ram air
No
4810-00-483-3925
396-00-505
Cabin air safety valve
No
6105-00-766-5191
5018T98P01
F000004XC9

Tachometer generator engine T5 No

1660-01-034-5866
57070
Regulator Slave Pressure
No

Attachment 2 Applicable TO and Government and Industry Standards.

MIL-STD-882E

11 May 2012 System Safety

MIL-B-5087B

24 Dec 1984 Bonding, Electrical and Lightning Protection for Aerospace Systems

MIL-STD-1686C

25 Oct 1995 Electrostatic Discharge Control Program for Protection of Electrical and Electronic Parts, Assemblies and Equipment

AFI 21-101
Aircraft and Equipment Maintenance

MIL-STD-461

11 Dec 2015 Electromagnetic Interference Characteristics Requirements for Equipment

MIL-STD-810

31 Oct 2008 Department of Defense Test Method Standard: Environmental Engineering Considerations and Laboratory Tests

1F-5E-01 As Dated List of Applicable Publications (LOAP)

NAVAIR 01-1A-505-1
Aircraft Electric and Electronic Wiring
00-20-1
Aerospace Equipment Maintenance Inspection, Documentation, Policies and Procedures
00-20-2
Maintenance Data Documentation

GOVERNMENT AND INDUSTRY DOCUMENTS

CFR/e-CFR
Code of Federal Regulation / Electronic Code of Federal Regulations
FAR
Federal Acquisition Regulation
DFARS
Defense Federal Acquisition Regulation Supplement

IPC/WHMA-A-

620B Requirements and Acceptance for Cable and Wire Harness Assemblies

IPC-A-610
Acceptability of Electronic Assemblies
IPC/EIA J-STD-001C
Requirements for Soldered Electrical and Electronic Assemblies
ISO 9000
Quality Systems – Model for Quality Assurance in Design, Development, Production, Installation and Servicing
AS9110
Aerospace Management System for Maintenance, Repair and Overhaul Stations
IATA
International Air Transport Association Standards, Manuals and Guidelines
DD Form 1574
Material Condition Tag

image1.png

File details come from the government source that posted it. Updated .