Section M F-4 Thermal Battery Shipping 28 Jan 26.docx

DOCX document 326 KB Posted

Attached to
Thermal Battery Shipping
Solicitation number
FA822026RB003
Issued by

About this file

This is a Section M Evaluation Factors document for a competitive, best-value source selection for Foreign Military Sales F-4 thermal battery shipping. The Government intends to award one contract for transporting 34 thermal batteries (NSN: 6135-00-488-4478ES; P/N: NAV1A1) from Greece to Hill Air Force Base, Utah, in compliance with U.S. and international hazardous materials regulations. The evaluation will follow Federal Acquisition Regulation 15.3 procedures and be based on an integrated assessment of technical approach and price, with technical factors being significantly more important than price. The Source Selection Authority may award to a higher-priced offeror if the technical approach outweighs the price difference.

The evaluation comprises two primary factors: Factor 1 (Technical) with five subfactors and Factor 2 (Price). The technical subfactors include Transportation Plan and Schedule (with a target of 45 days for pickup, transport, and delivery), Documentation (regulatory compliance for hazardous materials), Packing and Labeling (international shipping requirements), Identity/Quantity/Condition Verification, and Historical Performance (prior successful shipping of hazardous materials internationally). Within Factor 1, Subfactors 1 and 2 are weighted more heavily than Subfactors 3, 4, and 5. Each technical subfactor receives both a technical rating (Outstanding, Good, Acceptable, Marginal, or Unacceptable) and a risk rating (Low, Moderate, High, or Unacceptable). Factor 2 evaluates price reasonableness, balance, and total evaluated price, with no options or Government-furnished property included in this requirement.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Section M Evaluation Factors for Award For

Foreign Military Sales

Unclassified F-4 Thermal Battery Shipping

28 January 2026

Change number
Date
Paragraph(s)
Description
Name
Basic
28 January 2026

M. Christensen

Contents

1Source Selection1
1.1Basis for Contract Award1
1.2Number of Contracts to Be Awarded1
1.3Solicitation Requirements, Terms and Conditions1
1.4Discussions1
2Evaluation Factors2
2.1Evaluation Factors and Subfactors2
2.2Relative importance of Factors and Subfactors2
3Factor 1: Technical2
3.1Technical Subfactors2
3.1.1Strengths, Weaknesses, and Deficiencies2
3.1.2Technical Ratings3
3.1.3Technical Risk Rating3
3.2Technical Subfactors4
3.2.1Subfactor 1: Capable Repair Source4
3.2.2Subfactor 2: Technical Ability4
3.2.2.1Teardown Test & Evaluation4
3.2.2.2Overhaul5
3.2.2.3Repair5
3.2.2.4Testing5
3.2.2.5Quality5
3.2.3Subfactor 3: Ramp-up Timeline/Schedule5
3.2.4Subfactor 4: Supply Discrepancy Reporting Process6
4FACTOR 2: Price6
4.1Reasonableness6
4.2Unbalanced Pricing6
4.3Options7
4.4Government Furnished Property7
5.Appendix A ACRONYMS7

Source Selection Basis for Contract Award This is a competitive, best-value source selection conducted In Accordance With (IAW) Federal Acquisition Regulation (FAR) 15.3, Source Selection, as supplemented by the Defense Federal Acquisition Regulation Supplement (DFARS), Department of Defense (DoD) Source Selection Procedures dated 1 April 2016, and the Air Force Federal Acquisition Regulation Supplement (AFFARS). These regulations are available electronically at the Air Force (AF) FAR site, https://www.acquisition.gov/.

The Government will select the best overall offer, based upon an integrated assessment of Technical Approach/Technical Risk and Price. The contract may be awarded to the offeror who is deemed responsible IAW the FAR 9.104-1, as supplemented, whose proposal conforms to the solicitation's requirements (to include all stated terms, conditions, representations, certifications, and all other information required by Section L of this solicitation) and is judged, based on the evaluation factors and subfactors and IAW the criteria set forth below, to represent the best value to the Government. This may result in an award to a higher-rated, higher-priced offeror, where the decision is consistent with the evaluation factors, and the Source Selection Authority (SSA) reasonably determines that the technical and/or overall approach of the higherpriced offeror outweighs the price difference. The SSA will base the source selection decision on an integrated assessment of proposals against all source selection criteria in the solicitation (described below). While the Government source selection evaluation team and the SSA will strive for maximum objectivity, the source selection process, by its nature, is subjective, and therefore professional judgment is implicit throughout the entire process.

Number of Contracts to Be Awarded The Government intends to award one contract for shipping of Foreign Military Sales (FMS) F-4 thermal batteries. However, the Government reserves the right to award no contract depending on the quality of the proposals, prices submitted, and/or funds available.

Solicitation Requirements, Terms and Conditions By submitting its offer, the offeror accedes to all solicitation requirements, including terms and conditions, representations and certifications and technical requirements, in addition to those identified as evaluation factors or subfactors. Failure to comply with the solicitation's terms and conditions can result in the offeror being ineligible for award.

Discussions Each initial offer should contain the offeror's best terms from a price and technical standpoint. The Government intends to make award without discussions. If, however, the Government engages in discussions following the conclusion of these discussions, the offeror's Final Proposal Revision (FPR) will be evaluated in making the source selection decision. If the offeror's proposal has been evaluated as acceptable at the time discussions are closed, any changes in the FPR are subject to evaluation and may introduce deficiencies or risk such that the offeror's proposal may be downgraded or determined to be unacceptable and ineligible for award.

Evaluation Factors Evaluation Factors and Subfactors The award will be made to the offeror proposing the best value solution to the Government based upon an integrated assessment of the evaluation factors and subfactors described below. The following evaluation factors and subfactors will be used to evaluate each proposal:

Factor 1: Technical

· Subfactor 1:Transportation Plan and Schedule
· Subfactor 2:Documentation
· Subfactor 3:Packing and Labeling

· Subfactor 4: Identity, quantity and condition verification

· Subfactor 5: Historical Performance Factor 2: Price Relative importance of Factors and Subfactors The relative importance of each factor and subfactor is as follows: Factor 1 (Technical) is significantly more important than Factor 2 (Price). However, Factor 2 (Price) will contribute substantially to the selection decision. Technical Subfactors 1 and 2 are more important than 3, 4 or 5. However, all Technical Subfactors will contribute to the overall selection decision.

Factor 1: Technical The technical evaluation will provide an assessment of the quality of the offeror's technical approach and the risk associated with the technical approach for meeting the Government's requirements. The offeror's technical solution will be rated separately from the risk associated with its technical approach. Subfactor ratings will not be rolled up into a single rating for Factor 1 (Technical).

Technical Subfactors The following five (5) subfactors comprise Factor 1 (Technical):

· Subfactor 1:Transportation Plan and Schedule
· Subfactor 2:Documentation
· Subfactor 3:Packing and Labeling

· Subfactor 4: Identity, quantity and condition verification

· Subfactor 5: Historical Performance The Government will evaluate all Subfactors IAW paragraph 3.1.2.1, of the DoD Source Selection Procedures, DOD DFARS PGI Subpart 215.3 August 20, 2022, Methodology 1: Separate Technical/Risk Rating Process. This provides for two (2) distinct, but related, assessments: Technical and Technical Risk.

Strengths, Weaknesses, and Deficiencies The evaluation of strengths, weaknesses, significant weaknesses, and deficiencies for all Subfactors are defined as follows:

· Strength: An aspect of an offeror's proposal that has merit or exceeds specified performance or capability requirements in a way that will be advantageous to the Government during contract performance.

· Weakness: A flaw in the proposal that increases the risk of unsuccessful contract performance.

· Significant Weakness: A flaw in the proposal that appreciably increases the risk of unsuccessful contract performance.

· Deficiency: A material failure of a proposal to meet a government requirement or a combination of significant weaknesses in a proposal that increases the risk of unsuccessful contract performance to an unacceptable level.

Aspects of the offeror's proposal that receive a strength may be incorporated into the contract.

Technical Ratings All Subfactors will each receive one of the technical ratings described in Table 3.1 below. The technical rating evaluates the quality of the offeror's technical solution for meeting the Government's requirement.

TABLE 3.1 Technical Ratings

Color
Rating
Description
Blue
Outstanding
Proposal indicates an exceptional approach and understanding of the requirements and contains multiple strengths.
Purple
Good
Proposal indicates a thorough approach and understanding of the requirements and contains at least one (1) strength.
Green
Acceptable
Proposal indicates an adequate approach and understanding of the requirements.
Yellow
Marginal
Proposal has not demonstrated an adequate approach and understanding of the requirements.
Red
Unacceptable
Proposal does not meet requirements of the solicitation and, thus, contains one or more deficiencies and is not awardable.

Technical Risk Rating

1) Assessment of technical risk, which is manifested by the identification of weakness(es), considers potential for disruption of schedule, increased price, degradation of performance, the need for increased Government oversight and/or the likelihood of unsuccessful contract performance.

2) All subfactors will receive one of the technical risk ratings described in Table 3.2. below. The risk rating considers the risk associated with the technical approach in meeting the requirement.

‑Table 3.2 Technical Risk Ratings

Rating
Description
Low
Proposal may contain weakness(es) which have little potential to cause disruption of schedule, increased price or degradation of performance. Normal contractor effort and normal Government monitoring will likely be able to overcome any difficulties.
Moderate
Proposal contains a significant weakness or combination of weaknesses which may potentially cause disruption of schedule, increased price or degradation of performance. Special contractor emphasis and close Government monitoring will likely be able to overcome difficulties.
High
Proposal contains a significant weakness or combination of weaknesses which is likely to cause significant disruption of schedule, increased price or degradation of performance. Is unlikely to overcome any difficulties, even with special contractor emphasis and close Government monitoring.
Unacceptable
Proposal contains a material failure or a combination of significant weaknesses that increases the risk of unsuccessful performance to an unacceptable level.

Technical Subfactors The technical proposals will be evaluated against the following subfactor criteria and the requirements as documented in the Performance Work Statement (PWS).

Subfactor 1: Transportation Plan and Schedule This subfactor details how the Government will determine the degree to which the offeror’s transportation plan and methodology meet the requirements as identified in the PWS while reducing risk to the successful completion of those requirements.

The Government will evaluate the completeness and appropriateness of the offeror’s transportation plan and schedule. The offeror’s transportation plan is acceptable when it includes, but is not limited to, mode of transportation and route, has identified any potential risks associated to achieve the requirements of the PWS and includes a narrative description for mitigation of those identified risks.

The Government will evaluate the offeror’s proposed schedule, after contract award, to pick up, transport and deliver for acceptance the thermal batteries. This requirement is met when the offeror’s proposal meets the USG target of 45 days as identified in the PWS. The offeror may receive a more favorable rating for exceeding the target. Offers that do not meet the target may be considered awardable with a higher technical risk rating.

The Government will evaluate the offeror’s description of their methodology for maintaining chain of custody compliant with the terms of the PWS. The offeror’s methodology is considered acceptable and complete when the offeror’s proposal adequately details their chain of custody methodology to provide for 100% accountability of the assets from pick up to delivery/acceptance.

1.1.1 Subfactor 2: Documentation

This subfactor details how the Government will determine the degree to which the offeror’s narrative demonstrates a complete understanding of the documentation required for transport of hazardous materials/dangerous goods. The Government will evaluate the offeror’s narrative description of their methodology for identification and compliance with all regulatory requirements and the completeness and appropriateness of their methodology. Responses to this subfactor are considered acceptable when the offeror has completely, accurately and appropriately identified the regulatory requirements and documentation required for transportation of the thermal batteries and documented their methodology for compliance.

Subfactor 3: Packing and Labeling The Government will evaluate the offeror’s narrative description of the Special Packaging Instructions associated with the assets being shipped. The offeror’s response to this subfactor is considered acceptable when their description appropriately, correctly and completely details all unique packing, handling and labeling regulations or requirements associated with the shipment of thermal batteries internationally.

Subfactor 4: Identify, Quantity and Condition Verification The Government will evaluate the offeror’s narrative description of their methodology for inspecting and verifying the identity, quantity and condition of the assets being shipped. The offeror’s response is considered acceptable when their narrative description is appropriate, complete and details the steps that will be taken to verify identity, quantity and condition at pickup and delivery.

Subfactor 5: Historical Performance The Government will evaluate the degree to which the offeror’s evidence and/or artifacts completely and appropriately support their prior successful performance of similar effort(s) shipping hazardous materials internationally. The offeror’s response is considered acceptable when they provide appropriate evidence and/or artifacts supporting their past performance and that evidence identifies the government contract, materials transported, and/or successful delivery/acceptance of same or similar items as the thermal batteries. In the event the offeror is utilizing a subcontractor, partner or teaming agreement to meet this requirement, the response is considered acceptable when the third party has been identified and that party’s evidence and/or artifacts appropriately support their successful performance of similar effort(s).

FACTOR 2: Price The offeror’s price proposal will be evaluated for Reasonableness, Balance, and Total Evaluated Price (TEP), including all prime and major subcontractors. The TEP will be a consideration in the best value tradeoff award decision. The TEP will be computed and provided to the Source Selection Authority for award purposes only and does not become part of the contract at award. However, the Contract Line Item Number (CLIN) prices and rates proposed in the Over and Above Labor Rate Matrices used to calculate the TEP will become contractually binding.

Reasonableness The offeror's price proposal will be evaluated, using one or more of the techniques defined in FAR 15.404, to determine if it is reasonable. For a price to be reasonable, it must represent a price to the Government that a prudent person would pay in the conduct of competitive business. Reasonableness is established through adequate price competition, as described in FAR 15.404-1(b)(2)(i), or through price analysis.

Unbalanced Pricing The Government will analyze proposals to determine whether they are balanced IAW FAR 15.404-1. Unbalanced pricing exists when, despite an acceptable TEP, one or more of the proposed prices is significantly overstated or understated as indicated by the application of price analysis techniques. If the offeror proposes any advance procurement IAW Section L, paragraph 4.5, the Government will analyze proposals to determine whether they are unbalanced with respect to advance procurement. When advance procurement is part of the program, the price of components, material, parts, and effort budgeted for advance procurement shall be relatively low compared to the remaining portion of the end item's price. An offer may be rejected if the Contracting Officer determines that the lack of balance poses an unacceptable risk to the Government.

Options There are no options in connection with this award.

Government Furnished Property The Government will not provide any Government Furnished Property (GFP) to the offeror for completion of this requirement.

5. Appendix A ACRONYMS The acronyms listed in Table 5.1 are used in this document.

‑Table 5.1: Acronyms

Acronym
Definition
ACA
After Contract Award
ACO
Administrative Contracting Officer
AF
Air Force
ARO
After Receipt Of
BOE
Basis of Estimate
CAGE
Commercial and Government Entity
CAS
Cost Accounting Standards
CDRL
Contract Data Requirements List
CER
Cost Estimating Relationship
CLIN
Contract Line Item Number
COM
Cost of Money
CSI
Critical Safety Item
CUI
Controlled Unclassified Information
CWBS
Contractor Work Breakdown Structure
DCAA
Defense Contract Audit Agency
DCMA
Defense Contract Management Agency
DFARS
Defense Federal Acquisition Regulation Supplement
DoD
Department of Defense
DUNS
Data Universal Numbering System
EN
Evaluation Notice
FAR
Federal Acquisition Regulation
FFP
Firm Fixed Price
FPR
Final Proposal Revision
FPRA
Forward Pricing Rate Agreements
FPRP
Forward Pricing Rate Proposals
FPRR
Forward Pricing Rate Recommendations
FRATM
Functional Requirements Allocation Trace Matrix
FTE
Full-Time Equivalents
FY
Fiscal Year
G&A
General and Administrative
GFP
Government Furnished Property
HUBZone
Historically Underutilized Business Zone
IAW
In Accordance With
IMP
Integrated Master Plan
IMS
Integrated Master Schedule
IMTP
Integrated Master Test Plan
ITO
Instructions to Offerors
NLT
No Later Than
NTE
Not-To-Exceed
ODC
Other Direct Costs
PCO
Procurement Contracting Officer
POC
Points of Contact
POE
Program Office Estimate
RFP
Request for Proposal
SAR
Source Approval Request
SB
Small Business
SDB
Small Disadvantaged Businesses
SDVOSB
Service-Disabled Veteran-Owned Small Businesses
SF
Standard Form
SOW
Statement of Work
SSA
Source Selection Authority
SSEB
Source Selection Evaluation Board
TEP
Total Evaluated Price
TIN
Taxpayer Identification Number
VOSB
Veteran-Owned Small Business
WBS
Work Breakdown Structure
WOSB
Woman-owned Small Business