F-4 Repair Overhaul PWS A0001.docx

DOCX document 166 KB Posted

Attached to
FA822024R3002 F-4 Repair and Overhaul
Solicitation number
FA822024R3002
Issued by

About this file

This document is a Performance Work Statement (PWS) that outlines the requirements for the repair and overhaul of F-4 parts for Foreign Military Sales (FMS) customers. The scope includes repair and return services, as well as overhaul services when necessary, to be performed at the contractor's or subcontractor's facility. The parts to be repaired are listed in Attachment 1.

The key requirements include the contractor's ability to perform teardown, test and evaluation (TT&E), repair, and overhaul of the parts in accordance with applicable technical orders and industry standards. The contractor is required to provide firm fixed price proposals for TT&E, repair, and overhaul, and must obtain government approval before proceeding with any work. The contractor is also required to meet specific performance thresholds related to repair schedule, rework, and status reporting. The PWS outlines the government's quality assurance and acceptance procedures, as well as the applicable contract data requirements lists (CDRLs).

View the file

Other files

File Type Posted
FA822024R3002_0001.pdf PDF
F-4 Repair and Overhaul Section M A0001.docx DOCX document
F-4 Repair and Overhaul Section L A0001.docx DOCX document
FA822024R3002.pdf PDF
F-4 Repair and Overhaul Section L.docx DOCX document
DD1423s F-4 Repair and Overhaul.pdf PDF
F-4 Repair and Overhaul Section M.docx DOCX document
F-4 Repair Overhaul PWS.docx DOCX document
Cross Reference Matrix F-4 Repair and Overhaul.xlsx XLSX spreadsheet

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PERFORMANCE WORK STATEMENT

For

Foreign Military Sales

Unclassified F-4 Repair and Return / Overhaul

Prepared by

AFLCMC/WLDI

20 March 2024

Change number
Date
Paragraph(s)
Description
Name

Basic

M. Christensen

Rev 1
20 Mar 24
4.3
Added kick-off meeting example
M. Christensen

Contents

1DESCRIPTION OF SERVICES4
1.1Scope4
1.2Requirements4
2SERVICE SUMMARY6
3USG FURNISHED DOCUMENTATION, EQUIPMENT AND MATERIALS6
4GENERAL INFORMATION7
4.1Security and Access to Government Facilities and Equipment7
4.2Government Points of Contact7
4.3Contractor Point of Contact8
4.4Shipping and Transportation8
4.5Government Acceptance8
4.6Contractor Travel8
4.7Quality Control8
4.8Quality Assurance9
4.9Environmental Controls9
4.10Government Observation10
4.11Safety Requirements10
4.12Continuation of Essential DoD Contractor Services10
4.13Applicable CDRLs10

DESCRIPTION OF SERVICES

This Performance Work Statement (PWS) identifies the level of service required to establish and execute contractor activities necessary to repair and overhaul (when necessary) F-4 parts for Foreign Military Sales (FMS) customers. The identified parts require repair services due to aircraft age, lack of spare parts availability and no existing United States Air Force (USAF) depot repair.

1.1 Scope

The scope of this effort shall include repair and return services and overhaul services (when necessary) for F-4 parts at the contractor or subcontractor facility. The parts are identified on Attachment 1. The contactor shall return repaired parts to the designated CONUS location for return shipment.

The government intends on awarding one or more contracts but reserves the right to not award.

1.2 Requirements

The contractor shall restore to serviceable condition (Condition Code A) any of the parts listed in Attachment 1, for which they are contracted.

1.2.1 Capable Repair Source. The contractor shall be capable of performing all repair/overhaul work in compliance with instructions and technical data requirements contained in the applicable Technical Orders (TOs) and industry standards as identified in Attachment 2.

1.2.2 Production Schedule. The offeror shall provide a draft production schedule including the time, after contract award, to begin teardown, test and evaluation (TT&E) and overhaul/repair of the first inducted part. The USG target for time required from contract award to TT&E of first inducted part is 6 months.

1.2.3 Teardown, Test and Evaluation. The contractor shall perform TT&E on every part submitted for repair. The contractor shall provide a firm fixed price proposal for TT&E. Within 30 days of receipt of a unit for repair, the contractor shall provide a TT&E report, with repair evaluation and category, acceptance test requirements (CDRL A002) and firm fixed price proposal (CDRL A004) for repair cost.

1.2.4 Repair categories include:

1.2.4.1 Beyond Repair (BR). An item is considered BR if there is no possible repair process for the existing condition.

1.2.4.2 Beyond Economical Repair (BER). An item is considered BER if the estimated cost of repair is greater than 75% of the procurement price.

1.2.5 Repair. The contractor shall provide a firm fixed price proposal, including a detailed description of the work to be performed, labor categories and hours, and subcomponents required. The contractor shall submit this report with, or as a part of, the TT&E report. (CDRL A002) The contractor shall not proceed with repairs without procuring contracting officer (PCO) approval.

1.2.6 Overhaul. The contractor shall provide firm fixed price proposal for overhaul of items, as required, per the applicable TOs. The overhaul price shall be provided with the repair cost proposal (CDRL A004). The contractor shall notify the PO and provide pricing for overhaul of any item (when applicable) that is near, but not yet due, for overhaul. The contractor shall not proceed with any overhaul without PCO approval.

1.2.7 Over and Above (O&A). O&A is any additional repair, not identified in the initial TT&E report, that the contractor identifies while performing the repair or overhaul that is required to return the part to serviceable condition. The contractor shall notify the USG Program Office (PO) via email within 3 days after determination of an O&A. The contractor shall submit an O&A report no later than 30 days after determination to the PCO (CDRL A003), including firm fixed price proposal for the O&A repair costs (CDRL A004) with labor categories and hours, and component costs. PCO authorization is required to proceed with O&A repairs. After receipt of authorization, the contractor shall restore the unit to serviceable condition. If conflict arises between the O&A direction stated in this PWS and the DFARS clause 252.217-7028, DFARS direction takes priority.

1.2.8 If an item is determined to be BER or BR, the PCO shall provide disposition instructions to the contractor within 60 days of notification. Disposition instructions may include retention of the asset for cannibalization in support of other repairs for the duration of the contract.

1.2.9 The contractor shall take no more than 120 days after receipt of order (ARO) or PCO authorization of O&A repairs, to complete repairs. If the contractor anticipates requiring additional repair time, the contractor shall notify the PCO and USG PO, addressing the reason for additional repair time, in the monthly status report. (CDRL A001)

1.2.10 Critical Safety Items. Critical Safety Items (CSIs) are identified in Attachment 1. Associated critical characteristics (CCs) and critical safety processes (CSPs) are identified for each CSI part in engineering orders (EOs). The contractor shall manage CSIs, or any subcomponents manufactured for use in the repair of CSIs, in accordance with the Aviation Critical Safety Item Management Handbook, and AFI 20-106, Management of Aviation Critical Safety Items. These items require a 100% inspection and will undergo a complete documentation review and approval by the government QA representative identified in paragraph 4.5.

1.2.11 The contractor shall provide to the government representative (see para 4.5), for each part repaired, documentation verifying serviceability to include the acceptance test procedure (ATP) results or functional test results. This documentation, and other documents as requested by the government representative for acceptance of repaired part, shall be provided to the government representative. The contractor shall include the original signed and quality assurance-stamped serviceability documentation in the shipping/packaging documentation sent with each part. The contractor shall retain a copy of this documentation package for their records. The contractor shall include the acceptance date for each part in the monthly status report. (CDRL A001)

1.2.12 After acceptance of repaired part, the contractor shall attach a completed and certified (contractor quality control (QC)/quality assurance (QA) stamped) material condition tag (DD Form 1574) to the repaired part prior to shipping.

1.2.13 Design, development or manufacture of new capability, tooling or test equipment is not a requirement under this effort.

1.2.14 The contractor shall not make changes to the end-item design under this effort.

SERVICE SUMMARY

Table 1 describes the Service Summary for the tasks as outlined in this PWS. The efforts described in this PWS are for repair and return and overhaul services.

Table 1 – Service Summary

Performance Objective
PWS Para
Performance Threshold
Method of Surveillance
Accuracy of Monthly Repair Status Reports
1.2.9, 1.2.11, 4.7.4
Performance is acceptable when 90% of reports are accurate for the month.
100% Inspection of contractor reports
Repair Schedule Update - Contractor takes 120 days (or less) to complete repairs
1.2.2, 1.2.9
90% of repairs shall take no more than 120 days from receipt of asset to shipment ready status
100% Inspection of contractor reports

Rework Total - Contractor shall have minimal rework of assets

4.7.4
Performance is acceptable when 90% of repaired assets did not require rework during the month. The USG shall base calculations on number of assets received during reporting period.
100% Inspection of assets
Repair Status Update - Contractor shall provide timely monthly status of items in repair cycle
1.2.9, 1.2.11, 4.7.4
Performance is acceptable when 90% of reports are accurate for the month. Contractor shall provide initial reports to the PMO within 60 days of contract award or within 30 days of receipt of first asset. Contractor shall provide subsequent reports every 30 days thereafter
100% Inspection of contractor reports

USG FURNISHED DOCUMENTATION, EQUIPMENT AND MATERIALS

1.3 The contractor shall perform all work in accordance with (IAW) applicable TOs, Government and industry standards, publications, regulations, operating instructions and procedures listed in Attachment 2 unless otherwise identified as not applicable by the PCO. Equivalent or superseding documents may be used if available. All TOs associated with this effort are listed in the List of Applicable Publications (LOAP) (see Attachment 2). The contractor shall refer to the LOAP to identify all required TOs necessary to accomplish the requirements of this PWS. Applicability is to the most recent version unless otherwise specified. In the event a conflict or error between or within documentation is found, the contractor shall seek direction from the PCO.

1.4 The contractor shall comply with all applicable TOs, publications, regulations, operating instructions, and procedures listed in Attachment 2 in effect at the time of the award as they pertain to the procedures for executing the requirements in this PWS.

1.5 If, during the repair or overhaul effort, the contractor is unable to comply with a requirement in the documentation, the contractor shall submit to the PCO a request for variance (RFV) using a DD Form 1694 for each variance. RFVs shall include all waivers and deviations requested by the contractor. The contractor must receive RFV approval from the PCO before proceeding with implementing the variance. The USAF will retain material review board authority for all changes.

1.6 The contractor shall request any additional unclassified documents from the USG necessary to complete the requirements of the PWS.

1.7 The USG will not provide the contractor with any tooling, equipment or materials in support of the effort described in this PWS.

GENERAL INFORMATION

1.8 Security and Access to Government Facilities and Equipment

1.8.1 Security Clearance: The efforts required for this task are unclassified and shall not require contractor personnel to obtain a security clearance.

1.8.2 Access to Government Facilities and Equipment: Contractor shall perform all repair work at contractor’s facility or subcontractor facility as identified and documented in their subcontracting plan. Access to USG facilities and equipment is not required or authorized, with the exception of pre-existing agreements.

1.9 Government Points of Contact

The responsible USG (PO) is AFLCMC/WLDI, USAF, F-4 Program Office, Proven Aircraft FMS Programs Section, Legacy Training Aircraft International Branch. The assigned Government Program Manager (PM-G) will function as the single point of contact (POC) for program issues.

Ms. Maxine Christensen Program Manager 6057 Box Elder Lane, Bldg. 1285 Hill AFB, UT 84056 maxine.christensen.1@us.af.mil Tel: 801-586-2051

The responsible USG contracting office is AFLCMC/WLDKA, Legacy Training Aircraft Contracting Branch. The assigned PCO will function as the single POC for contractual issues.

Mr. Mark Parker Contracting Officer, AFLCMC/WLDK 6072 Fir Ave., Bldg. 1233 Hill AFB, UT 84056 mark.parker.12@us.af.mil Tel: 801-586-0690

1.10 Contractor Point of Contact

The contractor shall identify a single POC for program issues and status updates. The PO does not require monthly status meetings. However, the contractor shall support telecons or other meetings, such as an in-person contract kick-off meeting, as requested by the PO.

1.11 Shipping and Transportation

1.11.1 The participating FMS customers shall be responsible for packaging and shipping costs from the country to the contractor’s facility.

1.11.2 Upon completion of repair and/or overhaul, the contractor shall return asset to the designated CONUS shipping location for customs clearance and forwarding to the participating FMS customers. The specific shipping location will be identified at contract award. All return shipping costs shall be included in the contractor’s unit pricing for individual repair and return units.

1.11.3 Special Packing Instructions (SPI) associated with specific parts are identified in Attachment 1. If a SPI is not indicated for a part, the contractor shall follow best commercial practices when packaging parts for shipment to include electro-static discharge (ESD) protection when needed. The contractor shall reuse original packaging material/crates if appropriate and when possible.

1.12 Government Acceptance

The USG designated representative or DCMA shall be the point of contact at the contractor or subcontractor facility for monitoring the contractor’s performance and shall perform Wide Area Workflow (WAWF) acceptance. The contractor shall, when requested, notify the USG PO and PCO via email no later than two weeks prior to the start of acceptance testing and accommodate USG representative witness of testing if requested in accordance with para 4.10.

1.13 Contractor Travel

No travel is required or projected for this project. The contractor may propose travel as a separate cost, if required to complete the repair.

1.14 Quality Control

1.14.1 In compliance with FAR clause 52.246-4, “Inspection of Services,” and to ensure contractor provides specified contract requirements, the contractor shall establish a complete Quality Control Program (QCP).

1.14.2 Contractor shall provide with proposal either a complete QCP or current ISO 9001 certificate. If an ISO 9001 certificate is provided with proposal, the contractor shall make their full QCP available to the government upon request after contract award.

1.14.3 Contractor shall, at a minimum, comply with the quality management requirements for repair and overhaul identified in AS9110. AS9110 certification is preferred. However, a comprehensive description of the contractor’s AS9110 equivalent quality management system is acceptable.

1.14.4 The contractor shall have minimal rework of repaired assets. Assessment of acceptable performance by the contractor occurs when 90% of the items repaired during a calendar month period do not require rework. Contractor shall fund all rework required due to faulty repair. The USG defines rework as repairs rejected by the designated government representative (see para 4.5) that do not meet the level of repair and functionality as outlined by the applicable TO (see Attachment 2). The contractor shall report all items requiring rework on the monthly status report. (CDRL A001)

1.14.5 Nonconforming parts delivered by the contractor will be subject to USG established procedures for Supply Discrepancy Reports (SDRs). SDRs may be submitted by the end user for resolution up to one year following shipment to the CONUS location. After the end user initiates an SDR, the SDR office will conduct an assessment to validate the SDR claim. If it is determined the claim is valid, the SDR office will contact the contractor for resolution. The contractor shall cooperate with the SDR office, when contacted, to resolve the SDR claim. The contractor shall be responsible for all additional expenses resulting from the corrective action.

1.15 Quality Assurance

The USG shall evaluate the contractor’s performance by appointing a representative(s) (see para 4.5) to monitor performance per the services summary (see Table 1).

1.15.1 The USG representative(s) may evaluate the contractor’s performance through intermittent on-site inspections of the contractor's quality control program and receipt of complaints from USG PO personnel.

1.15.2 The USG representative shall inspect each task as completed or increase the number of quality control inspections if deemed appropriate because of repeated failures discovered during quality control inspections or because of repeated customer complaints. Likewise, the USG representative may decrease the number of quality control inspections if merited by performance.

1.15.3 Quality Assurance Personnel (QAP)

1.15.3.1 The USG identifies the PM-G as the QAP to conduct assessments of contractor’s performance and accomplish yearly Contractor Performance Assessment Reporting (CPAR), if appropriate.

1.15.3.2 The USG representative identified in Para 4.5 shall inform the PCO and QAP when discrepancies occur and shall request corrective action. If the contractor does not correct the identified discrepancy in a timely manner, the PCO and QAP will issue a corrective action report (CAR).

1.15.4 The contractor shall refer any matter(s) concerning a change in scope, price, terms or conditions of this contract to the PCO and not the USG representative in Para 4.5.

1.15.5 USG representative(s) shall accomplish on-site inspection and final acceptance.

1.15.6 Work performed by the contractor during the period of performance of this contract shall be subject to review by the PCO or authorized USG representative(s) at all times.

1.16 Environmental Controls

1.16.1 Compliance with Laws and Regulations. The contractor shall be knowledgeable of and comply with all applicable international, federal, state, and local laws, regulations and requirements regarding environmental protection.

1.16.2 In the event environmental laws/regulations change during the term of this contract, the USG requires the contractor to comply with the laws/regulations as soon as they become effective.

1.16.3 If complying with the new laws/regulations increases or decreases cost, the contractor shall inform the PCO pursuant to notice requirements and negotiate a modification to the contract.

1.16.4 Material Storage and Use. The contractor shall follow manufacturer’s guidelines and professional recommendations for control of humidity, temperature, cleanliness and materials handling, including hazardous materials.

1.17 Government Observation

USG personnel, other than the PCO and QAP(s), may, with PCO or authorized representative(s) coordination, observe contractor operations. However, these personnel shall not interfere with contractor performance or make any changes to the contract.

1.18 Safety Requirements

In performing work under this contract, the contractor is solely responsible for compliance with all federal, state, and local laws, the Occupational, Safety and Health Act (OSHA) (Public Law 91-596) and the resulting standards, OSHA Standards 29 CFR 1910 and 1926, as applicable, and the protection of their employees. Additionally, the contractor is responsible for the safety and health of all subcontractor employees and visitors.

1.19 Continuation of Essential DoD Contractor Services

The requirements outlined in this PWS are not mission critical and shall not be essential during crisis in accordance with AFI 63-138.

1.20 Applicable CDRLs

The contractor shall prepare and deliver data in accordance with the CDRL form DD Form 1423. All Data Item Descriptions (DID) in the CDRL, as contained in the following table, shall be used as guides in developing the data.

Distribution Statement
CDRL
CDRL Name
DID
PWS Para
D
A001
Contractor’s Progress and Status Report

(Monthly Status Report

DI-MGMT-81928
1.2.9, 1.2.11, 4.7.4
D
A002
Test/Inspection Report (TT&E)
DI-NDTI-80809B
1.2.3, 1.2.5
D
A003
Test/Inspection Report

(O&A)

DI-NDTI-80809B
1.2.7
E
A004
Labor Estimate, Cost Proposal
DI-FNCL-81116
1.2.3, 1.2.6, 1.2.7

ACRONYM LIST

Acronym
Definition
ACO
Administrative Contracting Officer
AFI
Air Force Instruction
BER
Beyond Economical Repair
BR
Beyond Repair
CAR
Corrective Action Report
CDRL
Contract Data Requirements List
CONUS
Continental United States
COR
Contracting Officer Representative
DCMA
Defense Contract Management Agency
DFARS
Defense Federal Acquisition Regulation Supplement
DID
Data Item Descriptions
DoD
Department of Defense
DODI
DoD Instruction
EO
Engineering Order
ESD
Electro-Static Discharge
FOPR
Fair Opportunity Proposal Requests FOPR
FAR
Federal Acquisition Regulation
IAW
In Accordance With
LOAP
List of Applicable Publications
MSR
Monthly Status Report
O&A
Over & Above
OCONUS
Outside Continental United States
PBSA
Performance Based Service Acquisition
PCO
Procuring Contracting Officer
PM-C
Contractor Program Manager
PM-G
Government Program Manager
PMO
Program Management Office
POP
Period of Performance
PWS
Performance Based Work Statement
QAP
Quality Assurance Program
QAR
Quality Assurance Representative
QAS
Quality Assurance Specialist
QASP
Quality Assurance Surveillance Plan
SPI
Shipping and Packaging Instruction
TT&E
Teardown, Test and Evaluate
USAF
United States Air Force
USG
United States Government

ATTACHMENTS

Attachment 1 List of parts for repair and return / overhaul services

NSN
P/N
QTY
SPI Number
SPI Reference
Name
CSI
1650004200406
010-58308
4
F000003XA5
TO 00-85B-3
SERVOCYLINDER (LATERAL)
No
1650007395064
50-122A
10
F000004XA3
TO 00-85B-3
SERVOVALVE (RAMPS VALVE)
No
6615009942152
139100-01-01
5
F006534931
129370-01
GYROSCOPE, DISPLACEMENT
No
4310009371374
893272
10
F007936959
890272
COMPRESSOR RECIPROCATING
No
1650001486506
32-61002-5
8
F000750579
22930-1
SERVOCYLINDER STABILATOR
CSI
1650003515726
2219000-2
8
N/A
SERVOCYLINDER (AILERON)
CSI
1650011541596
695145E
8
F007531479
695145G
CSD
No
2915008164501
60259
20
N/A
VALVE, FLOAT
No

Attachment 2 Applicable TO and Government and Industry Standards.

MIL-STD-882E

11 May 2012 System Safety

MIL-B-5087B

24 Dec 1984 Bonding, Electrical and Lightning Protection for Aerospace Systems

MIL-STD-1686C

25 Oct 1995 Electrostatic Discharge Control Program for Protection of Electrical and Electronic Parts, Assemblies and Equipment

AFI 21-101
Aircraft and Equipment Maintenance

MIL-STD-461

11 Dec 2015 Electromagnetic Interference Characteristics Requirements for Equipment

MIL-STD-810

31 Oct 2008 Department of Defense Test Method Standard: Environmental Engineering Considerations and Laboratory Tests

1F-5E-01 As Dated List of Applicable Publications (LOAP)

NAVAIR 01-1A-505-1
Aircraft Electric and Electronic Wiring
00-20-1
Aerospace Equipment Maintenance Inspection, Documentation, Policies and Procedures
00-20-2
Maintenance Data Documentation

GOVERNMENT AND INDUSTRY DOCUMENTS

CFR/e-CFR
Code of Federal Regulation / Electronic Code of Federal Regulations
FAR
Federal Acquisition Regulation
DFARS
Defense Federal Acquisition Regulation Supplement

IPC/WHMA-A-

620B Requirements and Acceptance for Cable and Wire Harness Assemblies

IPC-A-610
Acceptability of Electronic Assemblies
IPC/EIA J-STD-001C
Requirements for Soldered Electrical and Electronic Assemblies
ISO 9000
Quality Systems – Model for Quality Assurance in Design, Development, Production, Installation and Servicing
AS9110
Aerospace Management System for Maintenance, Repair and Overhaul Stations
IATA
International Air Transport Association Standards, Manuals and Guidelines
DD Form 1574
Material Condition Tag

image1.png

File details come from the government source that posted it. Updated .