Cross Reference Matrix F-4 Repair and Overhaul.xlsx

XLSX spreadsheet 22 KB Posted

Attached to
FA822024R3002 F-4 Repair and Overhaul
Solicitation number
FA822024R3002
Issued by

About this file

This document contains a cross reference matrix and related federal contract opportunity for F-4 repair and overhaul services. The cross reference matrix maps requirements from the performance work statement, contract line items, contract data requirements list, solicitation sections, and response elements. The federal contract opportunity is solicitation FA822024R3002, issued by the Department of the Air Force Materiel Command Lifecycle Management Center at Hill Air Force Base. It seeks repair and return services and overhaul services for F-4 parts identified in Attachment 1, to be performed at the contractor or subcontractor facility and shipped back to the designated CONUS location. The government intends to award one or more contracts but reserves the right to make no award. The response deadline is not specified.

View the file

Other files

File Type Posted
FA822024R3002_0001.pdf PDF
F-4 Repair and Overhaul Section M A0001.docx DOCX document
F-4 Repair Overhaul PWS A0001.docx DOCX document
F-4 Repair and Overhaul Section L A0001.docx DOCX document
FA822024R3002.pdf PDF
F-4 Repair and Overhaul Section L.docx DOCX document
DD1423s F-4 Repair and Overhaul.pdf PDF
F-4 Repair and Overhaul Section M.docx DOCX document
F-4 Repair Overhaul PWS.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

Foreign Military Sales
Unclassified F-4 Repair and Overhaul Cross Reference Matrix

Requirement Description PWS Para CLIN CDRL Section L Section M RFP offer (proposal)

Capable Repair Source1.2.1All3.1.1 Subfactor 13.2.1
Teardown Test & Evaluation1.2.3AllA002, A0033.1.2.1 Subfactor 23.2.2.1
Overhaul1.2.6All3.1.2.2 Subfactor 23.2.2.2
Repair Process1.2.1, 1.2.10All3.1.2.3 Subfactor 23.2.2.3
Testing methodology1.2.11,All3.1.2.4 Subactor 23.2.2.4
ISO 9001 Certificate or Complete QCP4.7.2All3.1.2.5 Subfactor 23.2.2.5
AS9110 Certificate or Quality Management System4.7.3All3.1.2.5 Subfactor 23.2.2.5
Ramp-up Timeline / schedule1.2.2, 1.2.9,AllA0013.1.3 Subfactor 33.2.3
Supply Discrepancy Reports4.7.5All3.1.4 Subfactor 43.2.4