CET.docx

DOCX document 28 KB Posted

Attached to
Tactical Meteorological Observation System Logistics Support
Solicitation number
FA8217-10-R-5002
Issued by

About this file

Sample Contractual Engineering Task

View the file

Other files

File Type Posted
FA821710R5002_______0004.pdf PDF
Section L 23Feb10.docx DOCX document
Section M 23Feb10.docx DOCX document
Industry Day Questions-AnswersRev2-23-10.doc DOC document
IndustryDayQuestions-AnswersRev2-17-10.doc DOC document
IndustryDayAttendees.pdf PDF
IndustryDayQuestions-Answers.doc DOC document
FA821710R5002_______0002.pdf PDF
TMOSPricingWorksheet.xlsx XLSX spreadsheet
RevisedCDRLs.pdf PDF
TMOSShipmentHistory.xls XLS spreadsheet
IndustryDayQuestions-Answers.doc DOC document
FA821710R5002_______0001.pdf PDF
TMQ053 Parts Usage 2008_2009.xls XLS spreadsheet
TMQ-53IndustryDayBrief.pptx PPTX presentation
WageDeterminations.pdf PDF
PartConsumptionTrendAnalysis.pdf PDF
RevisedPWS.pdf PDF
Section M 8Feb10.docx DOCX document
Section L 8Feb10.docx DOCX document
TMQ053 Parts Usage 2008_2009.xls XLS spreadsheet
WageDeterminations.pdf PDF
CDRLs.pdf PDF
PricingWorksheets.xlsx XLSX spreadsheet
FA821710R5002.pdf PDF
CET.docx DOCX document
PWS.pdf PDF
TMQ53 Signed Performance Plan.pdf PDF
FA821710R5002.pdf PDF
CDRLs.pdf PDF
WageDeterminations.pdf PDF
CET.docx DOCX document
PricingWorksheets.pdf PDF
PWS.pdf PDF
Section L.PDF PDF
PWS.PDF PDF
Section M Oct.docx DOCX document
Performance Plan.docx DOCX document
Draft Solicitation.pdf PDF
CDRLs.PDF PDF
Show all 40

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACTUAL ENGINEERING TASK (CET)

CET-TMOS 01 Contract No. FA8217-10-R-5002 DATE: 3 November 2009 Anthony Talbot, OO-ALC/500th CBSS/GBLG, (801) 586-2194 John Kirkland, OO-ALC/500th CBSS/GBLG, (801) 586-9127

1. SCOPE:

1.1 TITLE: Handheld Display Modification for the AN/TMQ-53 Tactical Meteorological Observing System (TMOS).

1.2 PURPOSE: Replace obsolete QMD101M Handheld Device with a function and interface equivalent.

1.3 PWS APPLICABILITY: The tasks in this CET are within the scope of the Contractor Logistics Support Contract for the AN/TMQ-53 Tactical Meteorological Observing System.

1.4 APPLICABILITY: All AN/TMQ-53 TMOS currently on contract, plus all spares.

1.5 BACKGROUND: The TMOS CLS contract provides for enhancements and upgrades due to technical refresh of component capability, obsolete component replacement, and diminished manufacturing sources. The TMOS Handheld Device has become obsolete and requires a functional replacement to be identified, integrated, and fielded. The Handheld Device provides a means to setup parameters in the TMOS Data Logger, display instrument measurements and calculations, and display equipment alarms for maintenance troubleshooting. The replacement Handheld Device will also add a wireless communications capability to the Data Logger.

2. APPLICABLE DOCUMENTS:

2.1 GOVERNMENT DOCUMENTS:

Document Number
Title
Application
T.O. 31M1-2TMQ53-1
Operation and Organizational Maintenance Instructions, Tactical Meteorology Observing System (TMOS)
All
Contract TBD dated TBD
Performance Based Work Statement for AN/TMQ-53 Tactical Meteorological Observing System (TMOS)
All

3. REQUIREMENTS:

3.1 GENERAL REQUIREMENTS.

3.1.1 System Requirements: The changes made under this CET shall not degrade the Operational Safety, Suitability & Effectiveness of the AN/TMQ-53 TMOS. The QMD101M Handheld Device replacement shall communicate over a RS-232 interface a distance of 225 feet. The QMD101M Handheld Device replacement shall interface with the QML101T Tripod/Logger, transmitting setup parameters and receiving instrument measurements and alarms as shown in T.O. 31M1-2TMQ53-1. The QMD101M Handheld Device replacement shall interface with the Pacific Crest and ArWest RF modems, and with the Iridium modem. The QMD101M Handheld Device replacement (objective) shall fit in the existing QMD101M space in the QTR101 Transit Case, or (threshold) shall fit in any of the existing TMOS Transit Cases. The QMD101M Handheld Device replacement shall be capable of duplex wireless communication with the QML101T Tripod/Logger.

3.1.2 Government Furnished Equipment (GFE): The contractor shall use the two GFP/GFE systems provided in the basic contract PWS paragraph 2.2.2.1 as required to perform this task.

3.1.3 Program Management: The contractor shall perform the program management tasks required in the basic contract IAW PWS paragraph 3.2.3.

3.2 PERFORMANCE AND COST REPORTS: The contractor shall submit a monthly status report. (CDRL A005)

3.3 ENGINEERING REQUIRED: The purpose of this CET is to perform the engineering required to complete the following task. This task will be done in two phases, with Program Office approval through the Contracting Officer required prior to proceeding on to Phase 2.

3.3.1 Phase 1: Perform market research and basic engineering as required to identify a suitable replacement for the QMD101M Handheld Device. Develop an Engineering Change Proposal (ECP) and support the government CCB approval process. Integrate the new device into the existing AN/TMQ-53 hardware and software. Develop test plans for contractor conducted developmental testing, and provide a final test report. Provide test articles and relined technical manuals to support an Operational User Evaluation (OUE) by Air Force Weather Agency personnel.

3.3.2 Phase 2: Write, perform validation/verification and field a Time Compliance Technical Order. Update AN/TMQ-53 computer based training materials and technical manuals as required. Submit Certification and Accreditation (C&A) information required to comply with Defense Information Assurance Certification and Accreditation Process (DIACAP) to maintain Authorization to Operate (AtO) on defense networks.

4. APPLICABLE DATA ITEMS:

4.1 Refer to the Contract Data Requirements List (CDRL) of the Contractor Logistics Support Contract for the AN/TMQ-53 Tactical Meteorological Observing System. The following CDRLs apply to this delivery order.

A008Engineering Change Proposal (ECP)
A009Technical Manuals and Time Compliance Technical Order (TCTO)
A010Test Plan and Test Report
A013Computer Based Training Materials

5. TRAVEL REQUIREMENTS:

5.1 TRAVEL: Contractor travel will be as directed by the Contracting Officer in the performance of this task and IAW Contract Travel CLIN.

6.0 SERVICE DELIVERY SUMMARY

Performance Objective
PWS Paragraph
Performance Threshold
Method of Surveillance
Documentation and Reports
3.0 and 4.0
98% of all reports and documentation are generated without errors.
Monthly Review of reports by Government Program Manager

7. ENGINEERING TECHNICAL POINT OF CONTACT: The government technical point of contact for this task is John Kirkland, OO-ALC/500th CBSS/GBLG (801) 586-9127, DSN 586-9127.

8. COORDINATION:

PREPARED BY:_________________________
ANTHONY TALBOT
AN/TMQ-53 PROGRAM MANAGER
OO-ALC/500th CBSS/GBLG
APPROVING AUTHORITY:__________________________
MARK J. EDMUNDS
CHIEF, WEATHER SYSTEMS FLIGHT
OO-ALC/500th CBSS/GBLG