FA821420R7002_001.pdf
PDF 183 KB Posted
- Attached to
- Missile Guidance Set Repair Contract (MGS) 3. 0
- Solicitation number
- FA821420R7002
About this file
This solicitation requests proposals for a missile guidance set repair contract to service Minuteman III missile guidance systems and associated support equipment for the Department of the Air Force Materiel Command Nuclear Weapons Center. The selected contractor will provide disassembly, refurbishment, measurement, testing, reassembly and disposal services over an ordering period of 18 years to maintain the readiness of the Minuteman III weapon system. Pricing will be cost plus award fee determined on each individual task order. Responses are due by January 18, 2021 with award by an unspecified date. The incumbent is The Boeing Company.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| FA821420R7002_______0002.pdf | ||
| CDRL_Package_MGS_3_signed.pdf | ||
| MGS_3_GRID.docx | DOCX document | |
| MGS_3_DD254_Update_Draft.pdf | ||
| MGS_3_PWS_FINAL.pdf | ||
| FA821420R7002.pdf | ||
| MGS_3_Award_Fee_Plan_SIGNED_14_Oct_20.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 1447 (REV. 8/2016)
PREVIOUS EDITION NOT USABLE Prescribed by GSA - FAR (48 CFR) 53.214(d)
23. ACCOUNTING AND APPROPRIATION DATA
SEE SCHEDULE
24. TOTAL AWARD AMOUNT (For Government Use Only)
TELEPHONE NUMBER
UNIQUE ENTITY
IDENTIFIER
CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN OFFER
NO COLLECT CALLS
4. SOLICITATION NUMBER
FA8214-20-R-7002
6.SOLICITATION ISSUE DATE
8. THIS ACQUISITION IS UNRESTRICTED OR SET ASIDE: % FOR
SMALL BUSINESS WOMEN-OWNED SMALL BUSINESS (WOSB)
ELIGIBLE UNDER THE WOSB PROGRAM
HUBZONE SMALL
BUSINESS EDWOSB
SERVICE-DISABLED VETERAN-
OWNED SMALL BUSINESS NAICS: 811219
8(A) SIZE STANDARD: $22.00
DATE SIGNED
28. UNITED STATES OF AMERICA (Signature of Contracting Officer)
26. AWARD OF CONTRACT: YOUR OFFER ON SOLICITATION NUMBER
SHOWN IN BLOCK 4 INCLUDING ANY ADDITIONS OR CHANGES WHICH
ARE SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
ROUTINE
Subject to the terms and conditions stated herein, the Contractor agrees to hold its offered prices firm for 365 days.
Minuteman III Guidance Repair Missile Guidance Set (MGS 3.0)
SEE LINE ITEM SCHEDULE
22.
AMOUNT
16. AUTHORITY FOR USING OTHER THAN 10 USC 2304 41 USC 253
FULL AND OPEN COMPETITION (c) (1 ) (c) ( )
DATE SIGNED
27. SIGNATURE OF OFFEROR/CONTRACTOR
20.
UNIT
21.
UNIT PRICE
19.
QUANTITY
13. CONTRACTOR OFFEROR CODE FACILITY CODE
11. IF OFFER IS ACCEPTED BY THE GOVERNMENT WITHIN * ___ CALENDAR DAYS (60 CALENDAR
DAYS UNLESS OFFEROR INSERTS A DIFFERENT PERIOD) FROM THE DATE SET FORTH IN BLOCK 9
ABOVE, THE CONTRACTOR AGREES TO HOLD ITS OFFERED PRICES FIRM FOR THE ITEMS
SOLICITED HEREIN AND TO ACCEPT ANY RESULTING CONTRACT SUBJECT TO THE TERMS AND
CONDITIONS STATED HEREIN. *365
RATING
DX: A2
3. AWARD/EFFECTIVE DATE
FA8214
2. CONTRACT NUMBER
X
17.
ITEM NUMBER
12. ADMINISTERED BY CODE
Total
SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK: 14 EFT:T
SCD:A
NAME AND TITLE OF SIGNER (Type or Print) NAME OF CONTRACTING OFFICER
5. SOLICITATION TYPE
SEALED BIDS NEGOTIATED
(IFB) (RFP)
15. PROMPT PAYMENT DISCOUNT
25. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN 5
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND DELIVER ALL ITEMS SETFORTH
OR OTHERWISE IDENTIFIED ABOVE AND ON ANY CONTINUATION SHEETS SUBJECT
THE TERMS AND CONDITIONS SPECIFIED HEREIN.
10. ITEMS TO BE PURCHASED (Brief Description)
SUPPLIES SERVICES Other Electronic and Precision Equipment Repair and Maintenance
9. (Agency Use)
Solicitation: Offers will be received at the Issuing office until * on * . Late offers are subject to late proposal provisions incorporated herein.
All offers are subject to such provisions, representations certifications and specifications as are attached or incorporated by reference.*
18-JAN-2021 2:00PM
X
18.
SCHEDULE OF SUPPLIES/SERVICES
14. PAYMENT WILL BE MADE BY CODE
(SEE ESP CLAUSE 252.232-7003.)
X
7. ISSUED BY CODE
DEPARTMENT OF THE AIR FORCE, DIRECTORATE OF CONTRACTING
AFNWC PZBB
6008 WARDLEIGH ROAD BLDG 1580
HILL AIR FORCE BASE UT 84056-5837
BUYER: Shila F. Weese/AFNWC shila.weese@us.af.mil Phone: (801) 586- 4939 Fax: (801) 775-2116
X
1. THIS CONTRACT IS A RATED ORDER
UNDER DPAS (15 CFR 700)SOLICITATION/CONTRACT
BIDDER/OFFEROR TO COMPLETE BLOCKS 11, 13, 15, 21, 22, & 27.
R
STANDARD FORM 1447 (REV. 8/2016) BACK
NO RESPONSE FOR REASONS CHECKED
TYPE OR PRINT NAME AND TITLE OF SIGNER
SIGNATURENAME AND ADDRESS OF FIRM (Include Zip Code)
WE DO NOT DESIRE TO BE RETAINED ON THE MAILING LIST FOR FUTURE PROCUREMENT OF THE TYPE OF
ITEMS INVOLVED
WE DO
OTHER (Specify)
UNABLE TO IDENTIFY THE ITEM(S)
CANNOT COMPLY WITH SPECIFICATIONS CANNOT MEET DELIVERY REQUIREMENT
DO NOT REGULARILY MANUFACTURE OR SELL THE TYPE
OF ITEMS INVOLVED
DATE AND LOCAL TIME 18 JAN 2021 2:00 PM
SOLICITATION NUMBER FA821420R7002
FROM: AFFIX
STAMP
HERE
TO:
ATTN: Shila F Weese/AFNWC
DEPARTMENT OF THE AIR FORCE, DIRECTORATE OF CONTRACTING
AFNWC PZBB
6008 WARDLEIGH ROAD BLDG 1580
HILL AIR FORCE BASE UT 84056-5837
FA8214-20-R-7002
PART I - THE SCHEDULE
SECTION B
SUPPLIES OR SERVICES AND PRICES/COSTS
This acquisition is for an Indefinite-Delivery Indefinite-Quantity Contract as contemplated by FAR 16.504. The total scope of the work for which orders may be issued is set forth in the attached Performance Work Statement. All requirements will be acquired by issuance of Task/Delivery Orders (T/DOs).
The following information is applicable to all T/DOs:
DESCRIPTION: To be set forth in each individual T/DO as applicable PR NUMBER: To be set forth in each individual T/DO as applicable PR LINE ITEM: To be set forth in each individual T/DO as applicable ACRN: To be set forth in each individual T/DO as applicable PERIOD OF PERFORMANCE: To be set forth in each individual T/DO as applicable
Inspection for CLINs 0101 - 1903 will be Contractor Responsibility For Inspection (FAR 52.246-1) with the following requirements:
The Boeing Company will be responsible for ensuring repaired Missile Guidance Sets comply with the requirements of the ICBM Guidance Repair Contract.
DCMA will perform quality surveillance, verify the accompnaying data packages, inspect selected critical processes, perform visual inspections and perform final acceptance for the Air Force.
In addition to the requirements of clause 52.246-1, the following inspection requirements shall apply:
(a) Definition. “Services,” as used in this clause, includes services performed, workmanship, and material furnished or used in performing services.
(b) Complete records of all inspection work performed by the Contractor shall be maintained and made available to the Government during contract performance and for as long afterwards as the contract requires.
(c) The Government has the right to inspect and test all services called for by the contract, to the extent practicable at all places and times during the term of the contract. The Government shall perform inspections and tests in a manner that will not unduly delay the work.
(d) If any of the services performed do not conform with contract requirements, the Government may require the Contractor to perform the services again in conformity with contract requirements, for no additional fee. When the defects in services cannot be corrected by reperformance, the Government may—
(1) Require the Contractor to take necessary action to ensure that future performance conforms to contract requirements; and
(2) Reduce any fee payable under the contract to reflect the reduced value of the services performed.
(e) If the Contractor fails to promptly perform the services again or take the action necessary to ensure future performance in conformity with contract requirements, the Government may—
(1) By contract or otherwise, perform the services and reduce any fee payable by an amount that is equitable under the circumstances; or
(2) Terminate the contract for default.
THE MAXIMUM CONTRACT TOTAL IS $TBD________________.
THE MINIMUM QUANTITY ORDER GUARANTEE IS $20,000,000.00 .
ORDERING PERIOD:
TBD - TBD (Ordering Period will be 18 years from date of award)
Data
Item No.
Not Separately Priced Quantity U/I Unit Price
LO NSP
DATA
DATA IAW DD 1423 ATTACHED HERE TO
Exhibit: A
Unprogrammed Work
Item No.
To Be Negotiated Quantity U/I Unit Price
LO TBN
L014 Unprogrammed Work Unprogrammed Work within Scope of the Work Specification Pricing Arrangement, ACRN, and Delivery Information will be determined on each individual order.
FY22 Guidance Repair
Item No.
Cost Plus Award Fee Quantity U/I Est Unit Cost Award Fee Total Estimated Cost
1 LO
L014 Minuteman III Guidance Repair Labor, Material, and essential repair of the Minuteman III Missile Guidance System IAW the attached Work Specification.
For Repair of Guidance Systems. Period of Performance: 28 September 2021 through 27 September 2022.
Limitations of Liability: High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Contractor Responsibility for Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 28 SEP 2021 27 SEP 2022
Proposed Period of Performance
1 LO
Inspection: Origin Acceptance: Origin FOB: Origin Shipping Instructions per Item Manager direction or Ship in Place The contractor shall be authorized to transfer all work-in-process from the GFY21 delivery order to the GFY22 delivery order upon receipt of the new order. Additional PCO authorization will not be required
FY22 Guidance Software Maintenance
Item No.
Cost Plus Award Fee Quantity U/I Est Unit Cost Award Fee Total Estimated Cost
1 LO
L014 Minuteman III Guidance Software Maintenance Equipment Software Maintenance supporting the Guidance System Repair of the Minuteman III Weapon System and Software Maintenance of the Central Data Assessment System (CDAS)
Limitations of Liability: High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Contractor Responsibility for Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 28 SEP 2021 27 SEP 2022
Proposed Period of Performance
1 LO
FY22 Guidance Support Equipment
Item No.
Cost Plus Award Fee Quantity U/I Est Unit Cost Award Fee Total Estimated Cost
1 LO
L014 Minuteman III Guidance Support Equipment Support Equipment Maintenance supporting the Guidance System Repair of the Minuteman III Weapon System Priority: R ROUTINE
Limitations of Liability: High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Contractor Responsibility for Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 28 SEP 2021 27 SEP 2022
Proposed Period of Performance
1 LO
FY23 Guidance Repair
Item No.
Cost Plus Award Fee Quantity U/I Est Unit Cost Award Fee Total Estimated Cost
1 LO
L014 Minuteman III Guidance Repair Labor, Material, and essential repair of the Minuteman III Missile Guidance System IAW the attached Work Specification.
For Repair of Guidance Systems. Period of Performance 28 September 2022 through 27 September 2023
Limitations of Liability: High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Contractor Responsibility for Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of
1 LO 28 SEP 2022 27 SEP 2023
FY23 Guidance Repair
Proposed Period of Performance
1 LO
Inspection: Origin Acceptance: Origin FOB: Origin Shipping Instructions per Item Manager direction or Ship in Place The contractor shall be authorized to transfer all work-in-process from the GFY22 delivery order to the GFY23
FY23 Guidance Software Repair
Cost Plus Award Fee Quantity U/I Est Unit Cost Award Fee Total Estimated Cost
1 LO
L014 Minuteman III Guidance Software Maintenance Equipment Software Maintenance supporting the Guidance System Repair of the Minuteman III Weapon System and Software Maintenance of the Central Data Assessment System (CDAS)
Limitations of Liability: High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Contractor Responsibility for Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 28 SEP 2022 27 SEP 2023
Proposed Period of Performance
1 LO
FY23 Guidance Support Equipment
Item No.
Cost Plus Award Fee Quantity U/I Est Unit Cost Award Fee Total Estimated Cost
FY23 Guidance Support Equipment
1 LO
L014 Minuteman III Guidance Support Equipment Support Equipment Maintenance supporting the Guidance System Repair of the Minuteman III Weapon System Priority: R ROUTINE
Limitations of Liability: High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Contractor Responsibility for Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 28 SEP 2022 27 SEP 2023
Proposed Period of Performance
1 LO
FY24 Guidance Repair
Item No.
Cost Plus Award Fee Quantity U/I Est Unit Cost Award Fee Total Estimated Cost
1 LO
L014 Minuteman III Guidance Repair Labor, Material, and essential repair of the Minuteman III Missile Guidance System IAW the attached Work Specification.
For Repair of Guidance Systems. Period of Performance 28 September 2023 through 27 September 2024
Limitations of Liability: High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Contractor Responsibility for Inspection Type / Ship To Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Delivery
1 LO 28 SEP 2023 27 SEP 2024
Proposed Delivery
Inspection: Origin Acceptance: Origin FOB: Origin Shipping Instructions per Item Manager direction or Ship in Place The contractor shall be authorized to transfer all work-in-process from the GFY23 delivery order to the GFY24
FY24 Guidance Software Repair
Cost Plus Award Fee Quantity U/I Est Unit Cost Award Fee Total Estimated Cost
1 LO
L014 Minuteman III Guidance Software Maintenance Equipment Software Maintenance supporting the Guidance System Repair of the Minuteman III Weapon System and Software Maintenance of the Central Data Assessment System (CDAS)
Limitations of Liability: High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Contractor Responsibility for Inspection Type / Ship To Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Delivery
1 LO 28 SEP 2023 27 SEP 2024
Proposed Delivery
1 LO
FY24 Guidance Support Equipment
Item No.
Cost Plus Award Fee Quantity U/I Est Unit Cost Award Fee Total Estimated Cost
1 LO
L014 Minuteman III Guidance Support Equipment Support Equipment Maintenance supporting the Guidance System Repair of the Minuteman III Weapon System Priority: R ROUTINE
Limitations of Liability: High Value Item
FY24 Guidance Support Equipment
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Contractor Responsibility for Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 28 SEP 2023 27 SEP 2024
Proposed Period of Performance
1 LO
FY25 Guidance Repair
Item No.
Cost Plus Award Fee Quantity U/I Est Unit Cost Award Fee Total Estimated Cost
1 LO
L014 Minuteman III Guidance Repair Labor, Material, and essential repair of the Minuteman III Missile Guidance System IAW the attached Work Specification.
For Repair of Guidance Systems. Period of Performance 28 September 2024 through 27 September 2025
Limitations of Liability: High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Contractor Responsibility for Inspection Type / Ship To Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Delivery
1 LO 28 SEP 2024 27 SEP 2025
Proposed Delivery
1 LO
Inspection: Origin Acceptance: Origin FOB: Origin Shipping Instructions per Item Manager direction or Ship in Place The contractor shall be authorized to transfer all work-in-process from the GFY24 delivery order to the GFY25
FY25 Guidance Software Repair
Cost Plus Award Fee Quantity U/I Est Unit Cost Award Fee Total Estimated Cost
1 LO
L014 Minuteman III Guidance Software Maintenance Equipment Software Maintenance supporting the Guidance System Repair of the Minuteman III Weapon System and Software Maintenance of the Central Data Assessment System (CDAS)
Limitations of Liability: High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Contractor Responsibility for Inspection Type / Ship To Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Delivery
1 LO 28 SEP 2024 27 SEP 2025
Proposed Delivery
1 LO
FY25 Guidance Support Equipment
Item No.
Cost Plus Award Fee Quantity U/I Est Unit Cost Award Fee Total Estimated Cost
1 LO
L014 Minuteman III Guidance Support Equipment Support Equipment Maintenance supporting the Guidance System Repair of the Minuteman III Weapon System Priority: R ROUTINE
Limitations of Liability: High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Contractor Responsibility for Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of
1 LO 28 SEP 2024 27 SEP 2025
FY25 Guidance Support Equipment
Proposed Period of Performance
1 LO
FY26 Guidance Repair
Item No.
Cost Plus Award Fee Quantity U/I Est Unit Cost Award Fee Total Estimated Cost
1 LO
L014 Minuteman III Guidance Repair Labor, Material, and essential repair of the Minuteman III Missile Guidance System IAW the attached Work Specification.
For Repair of Guidance Systems. Period of Performance 28 September 2025 through 27 September 2026
Limitations of Liability: High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Contractor Responsibility for Inspection Type / Ship To Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Delivery
1 LO 28 SEP 2025 27 SEP 2026
Proposed Delivery
1 LO
Inspection: Origin Acceptance: Origin FOB: Origin Shipping Instructions per Item Manager direction or Ship in Place The contractor shall be authorized to transfer all work-in-process from the GFY25 delivery order to the GFY26
FY26 Guidance Software Repair
FY26 Guidance Software Repair
1 LO
L014 Minuteman III Guidance Software Maintenance Equipment Software Maintenance supporting the Guidance System Repair of the Minuteman III Weapon System and Software Maintenance of the Central Data Assessment System (CDAS)
Limitations of Liability: High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Contractor Responsibility for Inspection Type / Ship To Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Delivery
1 LO 28 SEP 2025 27 SEP 2026
Proposed Delivery
1 LO
FY26 Guidance Support Equipment
Item No.
Cost Plus Award Fee Quantity U/I Est Unit Cost Award Fee Total Estimated Cost
1 LO
L014 Minuteman III Guidance Support Equipment Support Equipment Maintenance supporting the Guidance System Repair of the Minuteman III Weapon System Priority: R ROUTINE
Limitations of Liability: High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Contractor Responsibility for Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 28 SEP 2025 27 SEP 2026
Proposed Period of
Option Period 1 - FY27 Guidance Repair
Item No.
Cost Plus Award Fee Quantity U/I Est Unit Cost Award Fee Total Estimated Cost
1 LO
L014 Minuteman III Guidance Repair Labor, Material, and essential repair of the Minuteman III Missile Guidance System IAW the attached Work Specification.
For Repair of Guidance Systems. Period of Performance 28 September 2026 through 27 September 2027
Limitations of Liability: High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Contractor Responsibility for Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 28 SEP 2026 27 SEP 2027
Proposed Period of Performance
1 LO
Inspection: Origin Acceptance: Origin FOB: Origin Shipping Instructions per Item Manager direction or Ship in Place The contractor shall be authorized to transfer all work-in-process from the GFY26 delivery order to the GFY27
Option Period 1 - FY27 Guidance Software Repair
Cost Plus Award Fee Quantity U/I Est Unit Cost Award Fee Total Estimated Cost
1 LO
L014 Minuteman III Guidance Software Maintenance Equipment Software Maintenance supporting the Guidance System Repair of the Minuteman III Weapon System and Software Maintenance of the Central Data Assessment System (CDAS)
Option Period 1 - FY27 Guidance Software Repair
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Contractor Responsibility for Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 28 SEP 2026 27 SEP 2027
Proposed Period of Performance
1 LO
Option Period 1 - FY27 Guidance Support Equipment
Item No.
Cost Plus Award Fee Quantity U/I Est Unit Cost Award Fee Total Estimated Cost
1 LO
L014 Minuteman III Guidance Support Equipment Support Equipment Maintenance supporting the Guidance System Repair of the Minuteman III Weapon System Priority: R ROUTINE
Limitations of Liability: High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Contractor Responsibility for Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 28 SEP 2026 27 SEP 2027
Proposed Period of Performance
1 LO
Option Period 1 - FY28 Guidance Repair
Item No.
Option Period 1 - FY28 Guidance Repair
Quantity U/I Est Unit Cost Award Fee Total Estimated Cost
1 LO
L014 Minuteman III Guidance Repair Labor, Material, and essential repair of the Minuteman III Missile Guidance System IAW the attached Work Specification.
For Repair of Guidance Systems. Period of Performance 28 September 2027 through 27 September 2028
Limitations of Liability: High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Contractor Responsibility for Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 28 SEP 2027 27 SEP 2028
Proposed Period of Performance
1 LO
Inspection: Origin Acceptance: Origin FOB: Origin Shipping Instructions per Item Manager direction or Ship in Place The contractor shall be authorized to transfer all work-in-process from the GFY27 delivery order to the GFY28
Option Period 1 - FY28 Guidance Software Repair
Cost Plus Award Fee Quantity U/I Est Unit Cost Award Fee Total Estimated Cost
1 LO
L014 Minuteman III Guidance Software Maintenance Equipment Software Maintenance supporting the Guidance System Repair of the Minuteman III Weapon System and Software
Option Period 1 - FY28 Guidance Software Repair
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Contractor Responsibility for Inspection Type / Ship To Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Delivery
1 LO 28 SEP 2027 27 SEP 2028
Proposed Delivery
1 LO
Option Period 1 - FY28 Guidance Support Equipment
Item No.
Cost Plus Award Fee Quantity U/I Est Unit Cost Award Fee Total Estimated Cost
1 LO
L014 Minuteman III Guidance Support Equipment Support Equipment Maintenance supporting the Guidance System Repair of the Minuteman III Weapon System Priority: R ROUTINE
Limitations of Liability: High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Contractor Responsibility for Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 28 SEP 2027 27 SEP 2028
Proposed Period of Performance
1 LO
Option Period 1 - FY29 Guidance Repair
Item No.
Option Period 1 - FY29 Guidance Repair
1 LO
L014 Minuteman III Guidance Repair Labor, Material, and essential repair of the Minuteman III Missile Guidance System IAW the attached Work Specification.
For Repair of Guidance Systems. Period of Performance 28 September 2028 through 27 September 2029
Limitations of Liability: High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Contractor Responsibility for Inspection Type / Ship To Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Delivery
1 LO 28 SEP 2028 27 SEP 2029
Proposed Delivery
1 LO
Inspection: Origin Acceptance: Origin FOB: Origin Shipping Instructions per Item Manager direction or Ship in Place The contractor shall be authorized to transfer all work-in-process from the GFY28 delivery order to the GFY29
Option Period 1 - FY29 Guidance Software Repair
Cost Plus Award Fee Quantity U/I Est Unit Cost Award Fee Total Estimated Cost
1 LO
L014 Minuteman III Guidance Software Maintenance Equipment Software Maintenance supporting the Guidance System Repair of the Minuteman III Weapon System and Software Maintenance of the Central Data Assessment System (CDAS)
Limitations of Liability: High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required
Type / Ship To Quantity (U/I) Specified Date Specified Date Req No / Pri
Option Period 1 - FY29 Guidance Software Repair
Required Delivery
1 LO 28 SEP 2028 27 SEP 2029
Proposed Delivery
1 LO
Option Period 1 - FY29 Guidance Support Equipment
Item No.
Cost Plus Award Fee Quantity U/I Est Unit Cost Award Fee Total Estimated Cost
1 LO
L014 Minuteman III Guidance Support Equipment Support Equipment Maintenance supporting the Guidance System Repair of the Minuteman III Weapon System Priority: R ROUTINE
Limitations of Liability: High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Contractor Responsibility for Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 28 SEP 2028 27 SEP 2029
Proposed Period of Performance
1 LO
Option Period 1 - FY30 Guidance Repair
Item No.
Cost Plus Award Fee Quantity U/I Est Unit Cost Award Fee Total Estimated Cost
1 LO
L014 Minuteman III Guidance Repair Labor, Material, and essential repair of the Minuteman III Missile Guidance System IAW the attached Work Specification.
For Repair of Guidance Systems. Period of Performance 28 September 2029 through 27 September 2030
Option Period 1 - FY30 Guidance Repair
Limitations of Liability: High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Contractor Responsibility for Inspection Type / Ship To Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Delivery
1 LO 28 SEP 2029 27 SEP 2030
Proposed Delivery
1 LO
Inspection: Origin Acceptance: Origin FOB: Origin Shipping Instructions per Item Manager direction or Ship in Place The contractor shall be authorized to transfer all work-in-process from the GFY29 delivery order to the GFY30
Option Period 1 - FY30 Guidance Software Repair
Cost Plus Award Fee Quantity U/I Est Unit Cost Award Fee Total Estimated Cost
1 LO
L014 Minuteman III Guidance Software Maintenance Equipment Software Maintenance supporting the Guidance System Repair of the Minuteman III Weapon System and Software Maintenance of the Central Data Assessment System (CDAS)
Limitations of Liability: High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Contractor Responsibility for Inspection Type / Ship To Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Delivery
1 LO 28 SEP 2029 27 SEP 2030
Proposed
Option Period 1 - FY30 Guidance Software Repair
1 LO
Option Period 1 - FY30 Guidance Support Equipment
Item No.
Cost Plus Award Fee Quantity U/I Est Unit Cost Award Fee Total Estimated Cost
1 LO
L014 Minuteman III Guidance Support Equipment Support Equipment Maintenance supporting the Guidance System Repair of the Minuteman III Weapon System Priority: R ROUTINE
Limitations of Liability: High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Contractor Responsibility for Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 28 SEP 2029 27 SEP 2030
Proposed Period of Performance
1 LO
Option Period 1 - FY31 Guidance Repair
Item No.
Cost Plus Award Fee Quantity U/I Est Unit Cost Award Fee Total Estimated Cost
1 LO
L014 Minuteman III Guidance Repair Labor, Material, and essential repair of the Minuteman III Missile Guidance System IAW the attached Work Specification.
For Repair of Guidance Systems. Period of Performance 28 September 2030 through 27 September 2031
Limitations of Liability: High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required
Option Period 1 - FY31 Guidance Repair
Type / Ship To Quantity (U/I) Specified Date Specified Date Req No / Pri Required Delivery
1 LO 28 SEP 2030 27 SEP 2031
Proposed Delivery
1 LO
Inspection: Origin Acceptance: Origin FOB: Origin Shipping Instructions per Item Manager direction or Ship in Place The contractor shall be authorized to transfer all work-in-process from the GFY30 delivery order to the GFY31
Option Period 1 - FY31 Guidance Software Repair
Cost Plus Award Fee Quantity U/I Est Unit Cost Award Fee Total Estimated Cost
1 LO
L014 Minuteman III Guidance Software Maintenance Equipment Software Maintenance supporting the Guidance System Repair of the Minuteman III Weapon System and Software Maintenance of the Central Data Assessment System (CDAS)
Limitations of Liability: High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Contractor Responsibility for Inspection Type / Ship To Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Delivery
1 LO 28 SEP 2030 27 SEP 2031
Proposed
Option Period 1 - FY31 Guidance Support Equipment
Item No.
Cost Plus Award Fee Quantity U/I Est Unit Cost Award Fee Total Estimated Cost
1 LO
L014 Minuteman III Guidance Support Equipment Support Equipment Maintenance supporting the Guidance System Repair of the Minuteman III Weapon System Priority: R ROUTINE
Limitations of Liability: High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Contractor Responsibility for Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 28 SEP 2030 27 SEP 2031
Proposed Period of Performance
1 LO
Option Period 2 - FY32 Guidance Repair
Item No.
Cost Plus Award Fee Quantity U/I Est Unit Cost Award Fee Total Estimated Cost
1 LO
L014 Minuteman III Guidance Repair Labor, Material, and essential repair of the Minuteman III Missile Guidance System IAW the attached Work Specification.
For Repair of Guidance Systems. Period of Performance 28 September 2031 through 27 September 2032
Limitations of Liability: High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Contractor Responsibility for Inspection Type / Ship To Quantity (U/I) Specified Date Specified Date Req No / Pri
Required
1 LO 28 SEP 2031 27 SEP 2032
Option Period 2 - FY32 Guidance Repair
Proposed Delivery
1 LO
Inspection: Origin Acceptance: Origin FOB: Origin Shipping Instructions per Item Manager direction or Ship in Place The contractor shall be authorized to transfer all work-in-process from the GFY31 delivery order to the GFY32
Option Period 2 - FY32 Guidance Software Repair
Cost Plus Award Fee Quantity U/I Est Unit Cost Award Fee Total Estimated Cost
1 LO
L014 Minuteman III Guidance Software Maintenance Equipment Software Maintenance supporting the Guidance System Repair of the Minuteman III Weapon System and Software Maintenance of the Central Data Assessment System (CDAS)
Limitations of Liability: High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Contractor Responsibility for Inspection Type / Ship To Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Delivery
1 LO 28 SEP 2031 27 SEP 2032
Proposed Delivery
1 LO
Option Period 2 - FY32 Guidance Support Equipment
Item No.
Cost Plus Award Fee
Option Period 2 - FY32 Guidance Support Equipment
L014 Minuteman III Guidance Support Equipment Support Equipment Maintenance supporting the Guidance System Repair of the Minuteman III Weapon System Priority: R ROUTINE
Limitations of Liability: High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Contractor Responsibility for Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 28 SEP 2031 27 SEP 2032
Proposed Period of Performance
1 LO
Option Period 2 - FY33 Guidance Repair
Item No.
Cost Plus Award Fee Quantity U/I Est Unit Cost Award Fee Total Estimated Cost
1 LO
L014 Minuteman III Guidance Repair Labor, Material, and essential repair of the Minuteman III Missile Guidance System IAW the attached Work Specification.
For Repair of Guidance Systems. Period of Performance 28 September 2032 through 27 September 2033
Limitations of Liability: High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Contractor Responsibility for Inspection Type / Ship To Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Delivery
1 LO 28 SEP 2032 27 SEP 2033
Proposed Delivery
1 LO
Inspection: Origin Acceptance: Origin
FOB: Origin Shipping Instructions per Item Manager direction or Ship in Place The contractor shall be authorized to transfer all work-in-process from the GFY32 delivery order to the GFY33
Option Period 2 - FY33 Guidance Software Repair
Cost Plus Award Fee Quantity U/I Est Unit Cost Award Fee Total Estimated Cost
1 LO
L014 Minuteman III Guidance Software Maintenance Equipment Software Maintenance supporting the Guidance System Repair of the Minuteman III Weapon System and Software Maintenance of the Central Data Assessment System (CDAS)
Limitations of Liability: High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Contractor Responsibility for Inspection Type / Ship To Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Delivery
1 LO 28 SEP 2032 27 SEP 2033
Proposed Delivery
1 LO
FY33 Guidance Support Equipment
Item No.
Cost Plus Award Fee Quantity U/I Est Unit Cost Award Fee Total Estimated Cost
1 LO
L014 Minuteman III Guidance Support Equipment Support Equipment Maintenance supporting the Guidance System Repair of the Minuteman III Weapon System Priority: R ROUTINE
Limitations of Liability: High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required
FY33 Guidance Support Equipment
Required Period of Performance
1 LO 28 SEP 2032 27 SEP 2033
Proposed Period of Performance
1 LO
Option Period 2 - FY34 Guidance Repair
Item No.
Cost Plus Award Fee Quantity U/I Est Unit Cost Award Fee Total Estimated Cost
1 LO
L014 Minuteman III Guidance Repair Labor, Material, and essential repair of the Minuteman III Missile Guidance System IAW the attached Work Specification.
For Repair of Guidance Systems. Period of Performance 28 September 2033 through 27 September 2034
Limitations of Liability: High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Contractor Responsibility for Inspection Type / Ship To Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Delivery
1 LO 28 SEP 2033 27 SEP 2034
Proposed Delivery
1 LO
Inspection: Origin Acceptance: Origin FOB: Origin Shipping Instructions per Item Manager direction or Ship in Place The contractor shall be authorized to transfer all work-in-process from the GFY33 delivery order to the GFY34
Option Period 2 - FY34 Guidance Software Repair
Item No.
Cost Plus Award Fee Quantity U/I Est Unit Cost Award Fee Total Estimated Cost
1 LO
L014 Minuteman III Guidance Software Maintenance Equipment Software Maintenance supporting the Guidance System Repair of the Minuteman III Weapon System and Software Maintenance of the Central Data Assessment System (CDAS)
Limitations of Liability: High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Contractor Responsibility for Inspection Type / Ship To Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Delivery
1 LO 28 SEP 2033 27 SEP 2034
Proposed Delivery
1 LO
Option Period 2 - FY34 Guidance Support Equipment
Item No.
Cost Plus Award Fee Quantity U/I Est Unit Cost Award Fee Total Estimated Cost
1 LO
L014 Minuteman III Guidance Support Equipment Support Equipment Maintenance supporting the Guidance System Repair of the Minuteman III Weapon System Priority: R ROUTINE
Limitations of Liability: High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Contractor Responsibility for Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of
1 LO 28 SEP 2033 27 SEP 2034
Option Period 2 - FY34 Guidance Support Equipment
Proposed Period of Performance
1 LO
Option Period 2 - FY35 Guidance Repair
Item No.
Cost Plus Award Fee Quantity U/I Est Unit Cost Award Fee Total Estimated Cost
1 LO
L014 Minuteman III Guidance Repair Labor, Material, and essential repair of the Minuteman III Missile Guidance System IAW the attached Work Specification.
For Repair of Guidance Systems. Period of Performance 28 September 2034 through 27 September 2035
Limitations of Liability: High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Contractor Responsibility for Inspection Type / Ship To Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Delivery
1 LO 28 SEP 2034 27 SEP 2035
Proposed Delivery
1 LO
Inspection: Origin Acceptance: Origin FOB: Origin Shipping Instructions per Item Manager direction or Ship in Place
Option Period 2 - FY35 Guidance Software Repair
Cost Plus Award Fee Quantity U/I Est Unit Cost Award Fee Total Estimated Cost
1 LO
L014 Minuteman III Guidance Software Maintenance Equipment Software Maintenance supporting the Guidance System Repair of the Minuteman III Weapon System and Software
Option Period 2 - FY35 Guidance Software Repair
Limitations of Liability: High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Contractor Responsibility for Inspection Type / Ship To Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Delivery
1 LO 28 SEP 2034 27 SEP 2035
Proposed Delivery
1 LO
Option Period 2 - FY35 Guidance Support Equipment
Item No.
Cost Plus Award Fee Quantity U/I Est Unit Cost Award Fee Total Estimated Cost
1 LO
L014 Minuteman III Guidance Support Equipment Support Equipment Maintenance supporting the Guidance System Repair of the Minuteman III Weapon System Priority: R ROUTINE
Limitations of Liability: High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Contractor Responsibility for Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 28 SEP 2034 27 SEP 2035
Proposed Period of Performance
1 LO
Option Period 2 - FY36 Guidance Repair
Item No.
Option Period 2 - FY36 Guidance Repair
Quantity U/I Est Unit Cost Award Fee Total Estimated Cost
1 LO
L014 Minuteman III Guidance Repair Labor, Material, and essential repair of the Minuteman III Missile Guidance System IAW the attached Work Specification.
For Repair of Guidance Systems. Period of Performance 28 September 2035 through 27 September 2036
Limitations of Liability: High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Contractor Responsibility for Inspection Type / Ship To Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Delivery
1 LO 28 SEP 2035 27 SEP 2036
Proposed Delivery
1 LO
Inspection: Origin Acceptance: Origin FOB: Origin Shipping Instructions per Item Manager direction or Ship in Place The contractor shall be authorized to transfer all work-in-process from the GFY35 delivery order to the GFY36
Option Period 2 - FY36 Guidance Software Repair
Cost Plus Award Fee Quantity U/I Est Unit Cost Award Fee Total Estimated Cost
1 LO
L014 Minuteman III Guidance Software Maintenance Equipment Software Maintenance supporting the Guidance System Repair of the Minuteman III Weapon System and Software Maintenance of the Central Data Assessment System (CDAS)
Limitations of Liability: High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required
Type / Ship To Quantity (U/I) Specified Date Specified Date Req No / Pri
Option Period 2 - FY36 Guidance Software Repair
Required Delivery
1 LO 28 SEP 2035 27 SEP 2036
Proposed Delivery
1 LO
Option Period 2 - FY36 Guidance Support Equipment
Item No.
Cost Plus Award Fee Quantity U/I Est Unit Cost Award Fee Total Estimated Cost
1 LO
L014 Minuteman III Guidance Support Equipment Support Equipment Maintenance supporting the Guidance System Repair of the Minuteman III Weapon System Priority: R ROUTINE
Limitations of Liability: High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Contractor Responsibility for Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 28 SEP 2035 27 SEP 2036
Proposed Period of Performance
1 LO
Option Period 3 - FY37 Guidance Repair
Item No.
Cost Plus Award Fee Quantity U/I Est Unit Cost Award Fee Total Estimated Cost
1 LO
L014 Minuteman III Guidance Repair Labor, Material, and essential repair of the Minuteman III Missile Guidance System IAW the attached Work Specification.
For Repair of Guidance Systems. Period of Performance 28 September 2036 through 27 September 2037
Option Period 3 - FY37 Guidance Repair
Limitations of Liability: High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Contractor Responsibility for Inspection Type / Ship To Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Delivery
1 LO 28 SEP 2036 27 SEP 2037
Proposed Delivery
1 LO
Inspection: Origin Acceptance: Origin FOB: Origin Shipping Instructions per Item Manager direction or Ship in Place The contractor shall be authorized to transfer all work-in-process from the GFY36 delivery order to the GFY37
Option Period 3 - FY37 Guidance Software Repair
Cost Plus Award Fee Quantity U/I Est Unit Cost Award Fee Total Estimated Cost
1 LO
L014 Minuteman III Guidance Software Maintenance Equipment Software Maintenance supporting the Guidance System Repair of the Minuteman III Weapon System and Software Maintenance of the Central Data Assessment System (CDAS)
Limitations of Liability: High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Contractor Responsibility for Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of
1 LO 28 SEP 2036 27 SEP 2037
Option Period 3 - FY37 Guidance Software Repair
Proposed Period of Performance
1 LO
Option Period 3 - FY37 Guidance Support Equipment
Item No.
Cost Plus Award Fee Quantity U/I Est Unit Cost Award Fee Total Estimated Cost
1 LO
L014 Minuteman III Guidance Support Equipment Support Equipment Maintenance supporting the Guidance System Repair of the Minuteman III Weapon System Priority: R ROUTINE
Limitations of Liability: High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Contractor Responsibility for Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 28 SEP 2036 27 SEP 2037
Proposed Period of Performance
1 LO
Option Period 4 - FY38 Guidance Repair
Item No.
Cost Plus Award Fee Quantity U/I Est Unit Cost Award Fee Total Estimated Cost
1 LO
L014 Minuteman III Guidance Repair Labor, Material, and essential repair of the Minuteman III Missile Guidance System IAW the attached Work Specification.
For Repair of Guidance Systems. Period of Performance 28 September 2037 through 27 September 2038
Option Period 4 - FY38 Guidance Repair
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Contractor Responsibility for Inspection Type / Ship To Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Delivery
1 LO 28 SEP 2037 27 SEP 2038
Proposed Delivery
1 LO
Inspection: Origin Acceptance: Origin FOB: Origin Shipping Instructions per Item Manager direction or Ship in Place The contractor shall be authorized to transfer all work-in-process from the GFY37 delivery order to the GFY38
Option Period 4 - FY38 Guidance Software Repair
Cost Plus Award Fee Quantity U/I Est Unit Cost Award Fee Total Estimated Cost
1 LO
L014 Minuteman III Guidance Software Maintenance Equipment Software Maintenance supporting the Guidance System Repair of the Minuteman III Weapon System and Software Maintenance of the Central Data Assessment System (CDAS)
Limitations of Liability: High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Contractor Responsibility for Inspection Type / Ship To Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Delivery
1 LO 28 SEP 2037 27 SEP 2038
Proposed
Option Period 4 - FY38 Guidance Support Equipment
Item No.
Cost Plus Award Fee Quantity U/I Est Unit Cost Award Fee Total Estimated Cost
1 LO
L014 Minuteman III Guidance Support Equipment Support Equipment Maintenance supporting the Guidance System Repair of the Minuteman III Weapon System Priority: R ROUTINE
Limitations of Liability: High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Contractor Responsibility for Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 28 SEP 2037 27 SEP 2038
Proposed Period of Performance
1 LO
Option Period 5 - FY39 Guidance Repair
Item No.
Cost Plus Award Fee Quantity U/I Est Unit Cost Award Fee Total Estimated Cost
1 LO
L014 Minuteman III Guidance Repair Labor, Material, and essential repair of the Minuteman III Missile Guidance System IAW the attached Work Specification.
For Repair of Guidance Systems. Period of Performance 28 September 2038 through 27 September 2039
Limitations of Liability: High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Contractor Responsibility for Inspection Type / Ship To Quantity (U/I) Specified Date Specified Date Req No / Pri
Required
1 LO 28 SEP 2038 27 SEP 2039
Option Period 5 - FY39 Guidance Repair
Proposed Delivery
1 LO
Inspection: Origin Acceptance: Origin FOB: Origin Shipping Instructions per Item Manager direction or Ship in Place The contractor shall be authorized to transfer all work-in-process from the GFY38 delivery order to the GFY39
Option Period 5 - FY39 Guidance Software Repair
Cost Plus Award Fee Quantity U/I Est Unit Cost Award Fee Total Estimated Cost
1 LO
L014 Minuteman III Guidance Software Maintenance Equipment Software Maintenance supporting the Guidance System Repair of the Minuteman III Weapon System and Software Maintenance of the Central Data Assessment System (CDAS)
Limitations of Liability: High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Contractor Responsibility for Inspection Type / Ship To Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Delivery
1 LO 28 SEP 2038 27 SEP 2039
Proposed Delivery
1 LO
Option Period 5 - FY39 Guidance Support Equipment
Item No.
Cost Plus Award Fee Quantity U/I Est Unit Cost Award Fee Total Estimated Cost
L014
Option Period 5 - FY39 Guidance Support Equipment
Minuteman III Guidance Support Equipment Support Equipment Maintenance supporting the Guidance System Repair of the Minuteman III Weapon System Priority: R ROUTINE
Limitations of Liability: High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Contractor Responsibility for Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 28 SEP 2038 27 SEP 2039
Proposed Period of Performance
1 LO
6 Month Extension - FY40 Guidance Repair
Item No.
Cost Plus Award Fee Quantity U/I Est Unit Cost Award Fee Total Estimated Cost
1 LO
L014 Minuteman III Guidance Repair Labor, Material, and essential repair of the Minuteman III Missile Guidance System IAW the attached Work Specification.
For Repair of Guidance Systems. Period of Performance 28 September 2039 through 27 March 2040
Limitations of Liability: High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Contractor Responsibility for Inspection Type / Ship To Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Delivery
1 LO 28 SEP 2039 27 MAR 2040
Proposed Delivery
1 LO
Inspection: Origin Acceptance: Origin FOB: Origin
Shipping Instructions per Item Manager direction or Ship in Place The contractor shall be authorized to transfer all work-in-process from the GFY39 delivery order to the GFY40
6 Month Extension - FY40 Guidance Software Repair
Cost Plus Award Fee Quantity U/I Est Unit Cost Award Fee Total Estimated Cost
1 LO
L014 Minuteman III Guidance Software Maintenance Equipment Software Maintenance supporting the Guidance System Repair of the Minuteman III Weapon System and Software Maintenance of the Central Data Assessment System (CDAS)
Limitations of Liability: High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Contractor Responsibility for Inspection Type / Ship To Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Delivery
1 LO 28 SEP 2039 27 MAR 2040
Proposed Delivery
1 LO
6 Month Extension - FY40 Guidance Support Equipment
Item No.
Cost…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .