260_1336012305975ES.pdf
PDF 92 KB Posted
- Attached to
- AGM-86 Air Launched Cruise Missiles
- Solicitation number
- FA8213-22-Q-3008
View the file
Other files
| File | Type | Posted |
|---|---|---|
| FA8213-22-Q-3008-0002.pdf | ||
| 260_1336016004573ES.pdf | ||
| FA8213-22-Q-3008 - Extension 08.25.2022.pdf | ||
| FA8213-22-Q-3008.pdf | ||
| Attachments.pdf | ||
| FA8213-22-Q-3008.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FIRST ARTICLE REQUIREMENTS 1. DATE
27 APR 2022(AFMCI 64-110, AFMCI 23-102 and FAR Part 9, Sub Part 9.3)(Additional Instructions on Page 3)
2. PR / MIPR NUMBER 3. CAGE / REFERENCE NUMBER
54181 / 103377-29
4. NSN
1336012305975ES
5. FIRST ARTICLE QUANTITY
THE FIRST ARTICLE IS 20 UNIT(S) OF LOT / ITEM 103377
AND WILL BE: PART OF PRODUCTION QUANTITY X IN ADDITION TO PRODUCTION QUANTITY
6. ARTICLES
X WILL WILL NOT SERVE AS A MANUFACTURING STANDARD
7. LONG LEAD TIME ITEMS
X REQUIRED NOT REQUIRED
(See FAR 52.209-3 OR -4, alternate II)
8. SPECIAL REQUIREMENT/PRODUCTION FACILITIES (See FAR 52.209-3 OR -4 Alternate I)
X REQUIRED NOT REQUIRED
"The First Article offered must be manufactured at the facilities in which that item is to be produced under the contract, or if the First Article is a component not manufactured by the contractor, such component must be manufactured at the facilities in which the component is to be produced for the contract. A certification to this effect must accompany each First Article which is offered."
9. TEST / INSPECTION REQUIREMENTS
A. X CONTRACTOR TESTING
GOVERNMENT TESTING
Performance or other characteristics which the First Articles must meet are
FIRST ARTICLE WILL PROVE OUT PRODUCTION AT THE PSEMC FACILITY FOR AIR SUPPLY INITIATORS.
B. The detailed technical requirements for First Article approval tests are contained in
BOEING SPECIFICATION 232-30682 AND IN REMARKS SECTION 12
(Cite Spec and Para number)
C. X TEST PLAN REQUIRED
Number of days for government approval / disapproval 15 days.
D. Contractor's notification to ACO and
AFLCMC/EBHJ
(Requesting Activity) of test time and location due 15 days prior to start of testing.
E. X TEST REPORT REQUIRED
(1) Forwarded to
ALYSON WEBER, AFLCMC/EBHJ
(2) Government written notice of approval / disapproval due 30 days after receipt of contractor's report.
F. FIRST ARTICLE DELIVERY
(1) Due within calendar days from date contract.
(2) Notify calendar days prior to shipment.
(3) Delivered to government at
NA-FAT UNITS WILL BE RETAINED BY
THE CONTRACTOR FOR TESTING-NO
DELIVERY REQUIRED
(Set Forth Consignee and Address)
(4) Government written notice of approval / disapproval within days after receipt of first article package.
G. Estimated cost of government testing / inspection evaluation.
$5,000.0000
Page 1 of 3AFMC IMT 260, 20020830, V-3 Version 1Generated by PRPS using Jasper Reports on 04 May 2022
27 APR 2022(AFMCI 64-110, AFMCI 23-102 and FAR Part 9, Sub Part 9.3)(Additional Instructions on Page 3)
10. DISPOSITION OF FIRST ARTICLES
Approved First Articles will be forwarded to
X 20 (insert quantity) First Articles will be expended in testing. Residual components of disapproved First Articles will be returned to the contractor
X will be retained by CONTRACTOR pending disposition instructions from the contractor.
First Articles will be installed on aircraft/equipment to determine proper fit/function. Approved article will remain on the aircraft/equipment and will not be forwarded to USAF Supply, but will be considered part of the contract quantity.
Disapproved First Articles will be returned to the contractor will be retained by pending disposition instructions from the contractor.
On purchase requests designated as direct shipments the following disposition will apply. (NOTE: Always applicable on Foreign Military Sales (FMS)).
a. Approved First Articles will be returned to the contractor for shipment with production item.
b. Disposition of disapproved First Articles will remain the same as marked above.
Other Disposition:
11. CONDITION(S) FOR WAIVER OF FIRST ARTICLE APPROVAL
a. Offerors who have previously furnished production quantities of the same or similar article to the prime contractor for delivery to the Government, DoD, Air Force.
b. Offerors currently in production of the same or similar article for a Government, DoD, Air Force contract and who have received First Article approval under the existing contract.
c. X Offerors who have previously furnished production quantities of the same or similar articles to the Government, DoD, X Air Force, provided articles thus furnished, have exhibited satisfactory performance in service in the opinion of the Air Force.
d. X Provided not more than 60 months have elapsed since completion of the contract.
e. First Article testing will not be waived.
f. See Remarks in block 12 below.
NOTE TO BUYER: UNDER CONDITIONS A AND C ABOVE, THE COGNIZANT ENGINEERING ACTIVITY WILL DECIDE WHETHER OR NOT THE ITEM HAS EXHIBITED SATISFACTORY PERFORMANCE IN SERVICE AND PREPARE AND RETAIN SUPPORTING DOCUMENTATION TO FULLY JUSTIFY THIS DECISION. THE BUYER MUST SOLICIT DUAL PRICES (That is, both with and without requirement for first article approval) AND MUST FURNISH THE COGNIZANT ENGINEERING ACTIVITY WITH THE FOLLOWING INFORMATION ON THE PREVIOUSLY SUPPLIED ARTICLE:
A. PROCURING OFFICE B. CONTRACT NUMBER C. DATE OF CONTRACT D. SPECIFICATION NUMBER AND REVISION
AFLCMC/EBHJ BOEING 232-30682 LATEST REV.
12. REMARKS
Monk, David BNAME: 27 APR 2022DATE:
FIRST ARTICLE UNITS WILL BE BUILT USING THE SAME EQUIPMENT, TOOLING, PROCEDURES AND OPERATIONS AS PREVIOUS LOT EXCEPT WHERE
NEW TOOLING OR PROCEDURES ARE REQUIRED.
DELIVERY AND APPROVAL OF FIRST ARTICLE REPORT MUST BE ACCOMPLISHED PRIOR TO DELIVERY OF PRODUCTION UNITS.
* THIS FIRST ARTICLE WILL TAKE THE PLACE OF LAT TESTING FOR FIRST LOT DELIVERED AS PART OF THIS CONTRACT. QTY REQUIRED FOR FIRST
ARTICLE IS BASED ON REQUIRED LAT QUANTITIES.
TESTS TO BE INCLUDED IN THE FIRST ARTICLE TESTING ARE:
REQUIRED 100% TESTING PER THE LAT REQUIREMENTS
THERMAL SHOCK (all FAT UNITS) 232-30682 PARA. 4.2.3.2.3.7.1 VIBRATION (all FAT UNITS) 232-30682 PARA. 4.2.3.2.3.7.7 MECHANICAL SHOCK (all FAT UNITS) 232-30682 PARA. 4.2.3.2.3.7.8 HUMIDITY (all FAT UNITS) 232-30682 PARA. 4.2.3.2.3.7.2
LOW TEMPERATURE FIRINGS AT -65°F (HALF OF ALL FAT UNITS) PER LATP REQUIREMENTS
HIGH TEMPERATURE FIRINGS AT +160°F (HALF OF ALL FAT UNITS) PER LATP REQUIREMENTS.
ALL LAT REQUIREMENTS MUST BE MET IF NOT SPECIFICALLY COVERED WITH THE TESTING OUTLINED.
Page 2 of 3AFMC IMT 260, 20020830, V-3 Version 1Generated by PRPS using Jasper Reports on 04 May 2022
27 APR 2022(AFMCI 64-110, AFMCI 23-102 and FAR Part 9, Sub Part 9.3)(Additional Instructions on Page 3)
13. COGNIZANT ENG ORGANIZATION RESPONSIBLE FOR APPROVING TEST
(Name, Organization, Phone)
Weber, Alyson
AFLCMC / EB H
801-586-0918
586-0918
14. COGNIZANT ENG ORGANIZATION RESPONSIBLE FOR CONDUCTING
TEST (Name, Organization, Phone)
Page 3 of 3AFMC IMT 260, 20020830, V-3 Version 1Generated by PRPS using Jasper Reports on 04 May 2022
File details come from the government source that posted it. Updated .