Attachments.pdf
PDF 3 MB Posted
- Attached to
- AGM-86 Air Launched Cruise Missiles
- Solicitation number
- FA8213-22-Q-3008
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 260_1336012305975ES.pdf | ||
| FA8213-22-Q-3008-0002.pdf | ||
| 260_1336016004573ES.pdf | ||
| FA8213-22-Q-3008 - Extension 08.25.2022.pdf | ||
| FA8213-22-Q-3008.pdf | ||
| FA8213-22-Q-3008.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
For the best experience, open this PDF portfolio in
Acrobat X or Adobe Reader X, or later.
Get Adobe Reader Now!
http://www.adobe.com/go/reader
NOTE: THE ABOVE POP MARKINGS
ARE FOR DOD USE ONLY.
MUNITION NOTICES
NOTES
1. WRAP ITEM IN REF.-3, PLACE WRAPPED ITEM IN BARRIER BAG, REF.-4, REMOVE AIR AND SEAL.
2. CUSHION BAGGED ITEM WITH REF.-2, PLACE IN CARTON, REF.-1, USE ADDITIONAL CUSHIONING TO PREVENT MOVEMENT.
3. MAY PLACE UP TO 20 BAGGED ITEMS IN SHIPPING CONTAINER.
INTERNATIONAL STANDARDS FOR PHYTOSANITARY MEASURES
REVISION OF ISPM NO. 15
REVISION OF WOOD PACKAGING MATERIAL FOR INTERNATIONAL TRADE
THE FOLLOWING STATEMENT IS IN COMPLIANCE WITH THE UNITED NATIONS-IMPLEMENTED RESTRICTIONS ON WOOD
PACKAGING MATERIAL (WPM). THIS REQUIREMENT IS SPECIFICALLY CONCERNED WITH INVASIVE SPECIES SUCH AS THE
PINEWOOD NEMATODE. WPM IS DEFINED AS WOOD PALLETS, SKIDS, LOAD BOARDS, PALLET COLLARS, WOODEN BOXES, REELS, DUNNAGE, CRATES, FRAMES, AND CLEATS. THE STATEMENT BELOW CITES THE REQUIREMENTS IN DETAIL AND
COVERS LUMBER FOR BUILDING CONTAINERS AND PALLETS USED FOR DELIVERIES, RESULTING IN SHIPMENTS WORLDWIDE
(DIRECT, OR THROUGH AIR LOGISTICS CENTERS (ALC), CONTAINER CONSOLIDATION POINTS (CCP), OR OTHER BASES).
WOODEN LUMBER, WOODEN PALLET AND PACKAGING/CONTAINER STATEMENT:
ALL WOODEN LUMBER, WOODEN PALLETS, AND WOODEN CONTAINERS PRODUCED ENTIRELY OR IN PART OF WOOD
PACKAGING MATERIAL (WPM) SHALL BE CONSTRUCTED FROM DEBARKED WOOD IN ADDITION TO THE APPLICATION OF
HEAT-TREATED (HT) MATERIAL (HT TO 56 DEGREES CENTIGRADE OR 133 DEGREES FAHRENHEIT FOR 30 MINUTES).
CERTIFICATION/MARKING IS REQUIRED BY AN ACCREDITED AGENCY RECOGNIZED BY THE AMERICAN LUMBER STANDARDS
COMMITTEE (ALSC). FOR REFERENCE DOCUMENTATION, SEE LATEST REVISION OF "INTERNATIONAL STANDARDS FOR
PHYTOSANITARY MEASURES (ISPM NO. 15), "REGULATION OF WOOD PACKAGING MATERIAL IN INTERNATIONAL TRADE."
REFER TO MIL-STD-129 FOR MARKING
REQUIREMENTS OF PALLETIZED UNIT
LOADS OF AMMUNITION.
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP TM OTHER NDTI
D. SYSTEM/ITEM
1336012305975ES*
E. CONTRACT/PR NO.
FD2020-22-51239
F. CONTRACTOR
1. DATA ITEM NO.
B001
2. TITLE OF DATA ITEM
Test Procedure
3. SUBTITLE
First Article Inspection Report, Contractor Test
4. AUTHORITY (Data Acquisition Document No.)
DI-NDTI-80603A
5. CONTRACT REFERENCE
Airmunition Specification
6. REQUIRING OFFICE
AFLCMC/EBHJ
7. DD 250 REQ
SD
9. DIST STATEMENT
REQUIRED
B
10. FREQUENCY
1TIME
12. DATE OF FIRST SUBMISSION
BLK 16
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
N/A
11. AS OF DATE
13. DATE OF SUBSEQUENT
SUBMISSION
ASREQ
Draft
Final
Reg Repro
16. REMARKS
BLK 4: Contractor's format required. Follow content preparation instructions per the Data Item Description. Incorporate the following applicable requirements:
a. Dimension and tolerances specified on the manufacturing data shall be listed in one column with the actual corresponding reading obtained from inspection of the part, listed in another column.
b. Material utilized in the manufacture of "First Article" item shall be identified and certified as conforming to applicable data requirements.
c. Certification that identification markings, i.e. part number per MIL-STD-130 and Federal Supply manufacturer (FSCM) per H4-1 Cataloging Handbook (if applicable) have been complied with.
e. The test report will be certified by the responsible DCMA/QAR.
(Authorization for any deviations from the requirements specified by the manufacturing data must be obtained from the procuring agency prior to inclusion in the test report).
BLK 7: The electronic receiving report shall be annotated with the Lot Number, National Stock Number, and Nomenclature. Electronic receiving report required via internet Wide Area Work Flow (WAWF) at https://wawf.eb.mil. . The electronic receiving report shall be used only for this data item; do not combine other data item submittals with this requirement.
BLK 9: DISTRIBUTION STATEMENT B. Distribution authorized to U.S.
Government agencies, (Administrative/Operational Use) (Date of Contract Award). Other requests for this document shall be referred to AFLCMC/EBHJ.
WARNING - This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec.
2751, et seq.) or the Export Administration Act of 1979(Title 50, U.S.C. App. 2401 et seq.), as amended. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25.
DESTRUCTION NOTICE - Destroy by any method that will prevent disclosure of contents or reconstruction of the document.
BLK 12: Submit no later than 30 days after completion of First Article Acceptance Testing. Submit through WAWF under DoDAAC FA8213.
*1336016004573ES.
FOB DESTINATION
EBH 22-124-001
Terry McCurdy, AFLCMC/EBHEC, 586-0535
WAWF 0 1 0
DoDAAC, FA8213
15. TOTAL 0 1 0
G. PREPARED BY
mccurdy.terry.d.1075978215
H. DATE
2022/05/04
I. APPROVED BY
hargrove.eric.v.1167016843
J. DATE
18. ESTIMATED
TOTAL PRICE
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page 1 of 1 Pages
17. PRICE GROUP
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the
B002
First Article Qualification Test Plan and Procedures
Qualification Test Plan
DI-NDTI-81307A
Airmunitions Specification
DD
A
BLK4: Contractor's format required. Follow content preparation instructions per the Data Item Description.
Lot Number, National Stock Number and Nomenclature. Electronic receiving report required via internet Wide Area Work Flow (WAWF) at:
https://wawf.eb.mil. The electronic receiving report shall be used only for this data item; do not combine other data item submittals
BLK 8: Comments/approval/disapproval will be submitted within 30 working days of receipt by AFLCMC/EBHJ.
Government agencies (Administrative/Operational Use) (Date of restricted by the Arms Export Control Act (Title 22, U.S.C. Sec 2751, et seq.) or the Export Administration Act of 1979 (Title 50, U.S.C, App. 2401 et seq.), as amended. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directives 5230.25.
BLK 10, 11, 12, 13: The contractor shall provide a Qualification Test Plan/Procedures 30 days after contract award, allowing for 30 days approval time. No changes to previously approved government Test Plans shall be made without prior approval from AFLCMC/EBHJ Engineering approval, IAW Airmunitions Specification.
BLK 14: Submittals shall be in Microsoft Office software or PDF format. Submit through WAWF, DoDAAC, FA8213.
EBH 22-124-001
ITEM DESCRIPTION
NSN
1336012305975ES
CAGE
54181
REFERENCE NUMBER
103377-29
NOUN
CARTRIDGE,IMPULSE
END ITEM TCTO NUMBER TO NUMBER
11A15-1-387
CRITICALITY CODE
F
DEMILITARIZATION CODE
G
SECURITY CODE
MDC
WZH
ES CODE
W4
REMARKS
INITIATOR
NAME
KEOME.L.MADDEN1
ORGANIZATION / OFFICE SYMBOL
AFLCMC / EBHJ
DSN PHONE
775-4367
COMMERCIAL PHONE
801-775-4367
ITEM DESCRIPTION DATA
LENGTH ( IN )
1.3400
WIDTH ( IN )
0.6250
HEIGHT ( IN )
WEIGHT ( LB )
0.2600
OTHER DIMENSIONS
ITEM MATERIAL
It consists of two initiators, an ignition charge, and a propellant grain packaged in hermetically sealed stainless steel housing.
ITEM FUNCTION
prevents engine bleed air from pressurizing missile fuel tanks until it is opened by initiating this EED.
SAFETY CRITICAL SCREW
THREADED COMPONENT
ESD CEMS SENSITIVE DATA
STATEMENT OF HELIUM CONTENT (%) 0 PRECIOUS METAL INDICATOR CODE
GFM REQUIRED GFE REQUIRED GFP REQUIRED
JEWEL BEARING JEWEL BEARING RELATED
LEGACY ITEM DESCRIPTION
CART.USES 3PIN CONNECTOR DUAL BRIDGEWIRE/COMMON RTN 1.34IN LENGTH573INDIA.&625IN ACROSS HEX.MATL: STAIN- LESS
STEEL,ZIRC.,POTASSIUM PERC.
Page 1 of 1ITEM DESCRIPTION Version 2Generated by PRPS using Jasper Reports on 07 Apr 2022
ITEM DESCRIPTION
NSN
1336016004573ES
CAGE
96336
REFERENCE NUMBER
A103676-29-MOD2
NOUN
END ITEM
AGM 86
TCTO NUMBER TO NUMBER
11A15-1-387
CRITICALITY CODE
F
DEMILITARIZATION CODE
G
SECURITY CODE
MDC
WZH
ES CODE
W4
REMARKS
INITIATOR
NAME
KEOME.L.MADDEN1
ORGANIZATION / OFFICE SYMBOL
AFLCMC / EBHJ
DSN PHONE
775-4367
COMMERCIAL PHONE
801-775-4367
ITEM DESCRIPTION DATA
LENGTH ( IN )
1.3500
WIDTH ( IN )
HEIGHT ( IN )
WEIGHT ( LB )
12.0000
OTHER DIMENSIONS
ITEM MATERIAL
stainless steel, glass, Kovar
ITEM FUNCTION
Provides hot gas output to function system
SAFETY CRITICAL SCREW
THREADED COMPONENT
ESD CEMS SENSITIVE DATA
STATEMENT OF HELIUM CONTENT (%) 0 PRECIOUS METAL INDICATOR CODE
GFM REQUIRED GFE REQUIRED GFP REQUIRED
JEWEL BEARING JEWEL BEARING RELATED
LEGACY ITEM DESCRIPTION
Page 1 of 1ITEM DESCRIPTION Version 2Generated by PRPS using Jasper Reports on 07 Apr 2022
JUSTIFICATION FOR QUALIFICATION REQUIREMENTS
FAR 9.202(a) Policy and DoD 4120.24M Defense Standardization
Program, Policy and Procedures
Section A: Item Identification
1. Stock Numbers (NSN): 1336-01-230-5975ES or
1336-01-600-4573ES
2. Part Number (P/N): 232-30682
Contractor Part Number(s): 103377-29, A103676-29
3. Noun: Air Supply Ordnance Initiator
4. Application: AGM-86 Cruise Missile
Section B: Justification for Establishing a Qualification Requirement and Reason Why
Qualification Requirement Must Be Demonstrated Prior to Any Contract Award.
1. The Air Supply Ordnance Initiator is a critical safety item (CSI). Characteristics associated with the manufacture of the initiator, if not correct, would result in aircraft malfunction and ultimately loss of missile system. This item and performs a critical function on the aircraft and special equipment is required for its manufacture and testing. Special care and attention is required but not limited to finish, processing, assembly, performance, and part interchangeability of this item.
2. The prospective bidder must interpret engineering drawings and specifications and conduct the execution of the qualification requirements specified herein to verify the structural and functional integrity and/or form, fit, and function of the item being procured.
3. Failure to procure this item from a fully qualified source could result in failure of the part, degradation of aircraft mission capability, or loss of aircraft.
4. Completion of the specified pre-contract award qualification requirements, will ensure the government that the prospective offeror is technically capable of producing the item in compliance with the applicable technical specifications and associated drawings and within the schedule and economic constraints of our contracts. To protect the interests of the Air
Force, only United States and Canada suppliers will be considered. There are sufficient technical and schedule risks, which can only be minimized by completion of the requirements prior to contract award.
Section C: Qualification Requirements That Must be Satisfied to Become a Qualified
Source and Qualification Waiver Requirements.
1. Prequalification Notice. The offeror shall notify AFLCMC/EBHJ CAD/PAD IPT or, if responding to a solicitation, the contracting officer in AFLCMC/EBHKB of intent to qualify as a source for this item.
2. Facilities. The offeror must certify to the design control activity (AFLCMC/EBHJ
CAD/PAD IPT) that they have the required facilities and equipment to manufacture, inspect, test, and package the item. The offeror shall make their facilities, equipment, tooling, and personnel available for evaluation and inspection by the government.
3. Data Verification. A complete data package, qualification test procedure per DI-NDTI-
80604, and a qualification test report per DI-NDTI-80604 shall be provided through the
AFLCMC/EBHKB contracting office to the AFLCMC/EBHJ CAD/PAD IPT. Qualification testing must be accomplished in accordance with Boeing specification 232-30682.
4. Process Verification. The offeror shall identify sources for materials and standards for internally used processes. The offeror shall further define/provide written procedures for the utilization of any special test or inspection facilities and/or equipment. This documentation shall also include a diagnostic procedure showing the process the items being produced would undergo. The production process shall show how the offeror shall test, inspect, diagnose, produce and perform a final functional checkout. Development of special test procedures not available from the government is required. The offeror shall develop those procedures for review and approval by the design control activity identified in paragraph 2 above. The contractor must be capable of locating alternative components to minimize any diminishing manufacturing sources (DMS) problems. The offeror must show compliance with Unique
Identification (UID) requirements in accordance with DFARS 211.274 as prescribed in the
CAD/PAD Marking Instruction version 1.1. Given this item is a safety critical item the offeror must provide evidence in their management process that they will manage the CSI and all of the critical characteristics.
5. Test and Evaluation and/or Verification. The offeror shall submit to the design control activity an explanation of how they will certify that the test methods and production procedures meet the specifications for the item. The government retains the option to inspect the offeror’s production and testing facilities. To allow for government inspection, the offeror’s facilities shall be made available to government inspection during the qualification effort upon 10 days written notice.
6. Qualification Article. Upon satisfactory compliance with the provisions of paragraphs 1 to 5 above, the offeror shall build and test the item in accordance with 232-30682 (latest revision) to demonstrate production capability, form and function and also provide an inert initiator to demonstrate proper fit. This production and testing shall be done at the offeror’s expense.
7. Sensitive Military Technology. Not applicable.
8. Testing and Production Evaluation. The offeror shall be required to submit a complete test report for the production capability demonstration verifying compliance with all performance, environmental, mechanical, and quality assurance requirements, including top level drawing and all related item and source control drawings. In addition the test report shall contain detailed documentation describing the testing procedures during production.
This data shall describe in detail the point(s) in the production process that testing occurred, and if failures were noted, the corrective action taken and the results of the retest. The government retains the option to inspect the production and testing process, including on-site witnessing of any or all production and testing activities. The offeror is responsible and liable for ensuring compliance with all applicable system and item requirements. The offeror will provide notification to the government of testing and evaluation 30 days in advance so the government can witness, if desired, as well as coordinate needed activities, support, etc.
9. Time Completion Estimate. The design control activity estimates completion of qualification efforts should require 360 days. This is based on complexity and hazards associated with the item and other factors. This is not a deadline but a notification to a potential offeror of the time believed to be required. Events that occur during the qualification process may increase or perhaps decrease, this time depending on individual circumstances.
10. Time Limitation. An offeror may not be denied the opportunity to submit and have considered, an offer for a contract if the offeror can demonstrate to the satisfaction of the contracting officer and cognizant engineering activity that the offeror (or its product) meets these standards for qualification or can meet them before the date specified for award of the contract. The award will not be delayed to provide the contractor with an opportunity to demonstrate its ability to meet the standard specified in this source qualification statement.
11. Evaluation of Proposals Not Previously Qualified. The offeror must be fully qualified in order to be eligible for a contract award. Therefore, the offeror must fulfill all of the requirements stated, in writing, in this Justification for Qualification Requirements before the date specified for award of the contract. The government reserves the right to award a contract at the time specified for award, to a qualified source even though other sources may not have finished qualifying.
12. Waiver. Any offeror who has had previous experience in the production of the initiator or other similar items may apply to the design control activity identified in paragraph 2 for a waiver of all or part of the above requirements. A waiver will be granted only if the design control activity can establish the qualification of the offeror from previous knowledge/interface or from written inputs from the offeror.
13. Approval. Once the qualification requirements are met, the offeror will be listed as an approved source for this item. Approval, however, does not guarantee subsequent contract award.
Approved Sources: Cage Code Vendor P/N
Pacific Scientific (PSEMC) 54181 103377-29
Ensign-Bickford (EBA&D) 96336 A103676-29
Section D: Signatures.
Alyson K Weber
Project Engineer, AFLCMC/EBHJ
Kevin G Flinders, NH-04, DAF
Chief, Systems Support Contracting Division AFLCMC/PKZ (Hill)
2022-05-05T13:02:03-0600
WEBER.ALYSON.KIM.1158367560
2022-05-12T08:40:26-0600
FLINDERS.KEVIN.G.1231477949
REPSHIP Data Requirements for Individual Shipments of Hazardous Material (HAZMAT) and Inert Component Parts - Continental United States (CONUS) to CONUS, CONUS to Overseas or From All
Overseas Locations FROM: Shipping Activity To: Domestic Customer or Transshipping Activity Clearance Authority (Ocean) or Customer Service
Branch (CSB) (Air) or CONUS Sea Terminal
INFO: GACP TRANSPORTATION, HILL AFB UT - (AFLCMC / EBHMB)
email: ooalc.gacp.transportation@us.af.mil or FAX (801) 777-1089.
INFO: Sponsoring Service Accountable Supply Activity Ultimate Consignee/ Final Destination
SUBJ: Report of Shipment (REPSHIP)
1. Shipment Date written as a three-digit day of the year (Julian)
2. Estimated Time of Arrival (ETA) written as a three-digit day of the year (Julian) (Observe Standard Transit
Time (STT), if CONUS Truck Shipment and no Required Delivery Date (RDD) identified)
3. Required Delivery Date (RDD) or Delivery Date (DD), if specified
4. Carrier
5. Bill of Lading (BL) Number (Notes 1, 2, 3, 4)
6. Military Traffic Expediting-Greater Security (MTX-GS) Service Number (Notes 1, 2, 3)
7. Air Release Number (Notes 1, 2, 3) or for Surface Shipments, Export Traffic Release (ETR) Number and
Vessel Name and/or Voyage Document Number
8. Shipment (Cargo) Name (Example: Bombs)
9. Container and Seal Number (if applicable):
a. Container Transportation Control Number (TCN)
b. Total Weight of Contents
c. Rounds, Pieces, Weight, Cube, Condition code, and Lot Numbers (Note 4)
10. Security Risk Category (SRC), (E.G., Security Risk Category I, II, III, IV, Unclassified, Confidential, Secret, None)
11. Controlled Item Inventory Code (CIIC)
12. Total Net Explosive Weight (NEW)
13. Hazard Classification (s)
14. Department of Defense Identification Code / Navy Ammunition Logistic Code (DODIC/NALC). (Note 4).
15. Name, address, and phone number of person responsible for information contained in REPSHIP
NOTES:
1. When the conveyance contains more than one shipment unit, repeat the data elements in separately lettered paragraphs for each shipment unit.
2. Cargo for more than one vessel or flight, but shipped to Port of Embarkation (POE) in a single conveyance, is included in a single REPSHIP. When cargo for a single vessel is moved to the Seaport of Embarkation (SPOE) in more than one conveyance, repeat all the data elements as above in separate numbered paragraphs for each conveyance or REPSHIP.
3. A separate REPSHIP is used for each mode of shipment to the POE.
4. Lot number, DODIC and NALC are not mandatory fields. If available, they may be provided in the electronic
RESHIP or in the template above. If a CBL is used, the lot number and ammunition condition code should be included in the remarks section. Weapons must be identified on the CBL by each serial number contained within the shipment.
5. DODIC and NALC are codes used specifically for logistic administration and control of ammunition.
Attachment 1 mailto:ooalc.gacp.transportation@us.af.mil
1. Shipment Date written as a three-digit day of the year (Julian)
2. Estimated Time of Arrival (ETA) written as a three-digit day of the year (Julian) (Observe Standard Transit Time (STT), if CONUS Truck Shipment and no Required Delivery Date (RDD) identified)
3. Required Delivery Date (RDD) or Delivery Date (DD), if specified
4. Carrier
5. Bill of Lading (BL) Number (Notes 1, 2, 3, 4)
6. Military Traffic Expediting-Greater Security (MTX-GS) Service Number (Notes 1, 2, 3)
7. Air Release Number (Notes 1, 2, 3) or for Surface Shipments, Export Traffic Release (ETR) Number and Vessel Name and/or Voyage Document Number ...
8. Shipment (Cargo) Name (Example: Bombs)
9. Container and Seal Number (if applicable):
a. Container Transportation Control Number (TCN)
b. Total Weight of Contents
c. Rounds, Pieces, Weight, Cube, Condition code, and Lot Numbers (Note 4)
10. Security Risk Category (SRC), (E.G., Security Risk Category I, II, III, IV, Unclassified, Confidential, Secret, None)
11. Controlled Item Inventory Code (CIIC)
12. Total Net Explosive Weight (NEW)
13. Hazard Classification (s)
15. Name, address, and phone number of person responsible for information contained in REPSHIP
NOTES:
Statement of Work March 2021
PRESERVATION, PACKAGING & MARKING REQUIREMENTS
The contractor shall develop, implement and maintain the preservation, packaging and packing of all items to be delivered under the terms of this contract. Packaging procedures will be established in accordance with AFMCI 24-201, specifically Paragraph 3.7 and MIL-STD-2073-1, Standard Practice for Military Packaging, Packaging requirements are identified in the AFMC Form 158, Packaging Requirements submitted by the responsible packaging specialist. All “markings and labeling” of shipments shall conform to MIL-STD-129, DoD Standard Practice, Military Marking for Shipment and Storage. The contractor shall affix a completed DD Form 1574, Serviceable Tag-Materiel or DD Form 1574-1, Serviceable Label- Materiel to each unit pack or intermediate container and prime outer container(s). The tag or label will indicate the condition(s) of the materiel and to identify the individual article or contents, bundle, container to which they are securely attached.
INTERNATIONAL STANDARDS FOR PHYTOSANITARY MEASURES
(ISPM 15) REQUIREMENTS
The contractor shall use the wood packaging material regulation for international trade which describes Phytosanitary (including treatments) that have been approved for wood packaging material and provides for the approval of new or revised treatments. Use the latest revision of (ISPM 15), and the following statement complies with the United Nations-implemented restrictions on wood packaging material (WPM).
“This requirement is specifically concerned with invasive species such as pinewood nematode. WPM is defined as wood pallets, skids, load boards, pallet collars, wooden boxes, reels, dunnage, crates, frames, and cleats. The statement below cites the requirements in detail and covers lumber for building containers and pallets used for deliveries resulting in worldwide shipments (direct vendor deliveries, Air Logistics complex (ALC), Container Consolidation Points (CCP), Aerial Ports, Water Ports, or other DoD installations).
ELECTROSTATIC MATERIAL (When Applicable) The Contractor shall apply provisions of MIL-STD-2073-1, when identifying all solid-state devices and modules containing diodes, translators, integrated circuits and/or other microelectronic components sensitive to electrostatic forces. All such items shall be packaged IAW MIL-STD-2073-1 in conjunction with ANS/ESD S20.20, using electrostatic free barrier materials and shall clearly bear “Electrostatic Sensitive Device” labels IAW MIL-STD-129, Department of Defense Standard Practice Military Marking for Shipment and Storage.
PALLETIZED UNIT LOADS
The Contractor shall apply provisions and methods of MIL-STD-147, Palletized Unit Loads to contracts requiring the preparation and shipment of bonded palletized unit loads for DoD facilities when applicable.
SPECIALIZED SHIPPING CONTAINERS
The contractor shall apply provisions of MIL-STD-648, Department of Defense Design Criteria Standard, Specialized Shipping Containers. This standard establishes general design guidelines and associated tests for specialized shipping containers used by the Department of Defense. Definitive requirements for specific containers will be defined by the individual specification, acquisition, or task order. This standard is intended to be used as the basic reference document in all specifications and standards prescribing performance requirements to be applied to a specialized shipping container. Compliance with this intent is expected through normal application of the specification or standard preparation and revision processes.
Statement of Work (Cont)
HAZARDOUS MATERIALS (When Applicable) The contractor shall ensure Hazardous shipments comply with International Civil Aviation Organization (ICAO), U.S. Code of Federal Regulations (CFR) Title 49, International Air Transport Association (IATA) Dangerous Goods Regulation, International Maritime Dangerous Goods Code (IMDG, Annex 1), and AFMAN 24-604, Preparing Hazardous Materials for Military Air Shipments. Packaging shall meet “DOT specification or a United Nation (UN) specification ” manufactured in accordance with 49 CFR, Part 178 and the final packages assembled IAW 49 CFR, Parts 100-185 as applicable. A Competent Authority Approval (CAA) shall be acquired from the responsible Associate Administrator or other designated Department official to perform a function requiring prior consent under the Hazardous Material Regulation (HMR). Package(s) shall be marked IAW MIL-STD-129, DoD Standard Practice, Military Marking for Shipment and Storage.
The contractor shall affix a completed DD Form 1574, Serviceable Tag-Materiel or DD Form 1574-1, Serviceable Label- Materiel to each unit pack or intermediate container and prime outer container(s). The tag or label will indicate the condition(s) of the materiel and to identify the individual article or contents, bundle, container to which they are securely attached. If a symbol is used to represent the manufacturer or the approval agency certifying compliance with 49 CFR 178, subparts L and M, the symbol must be registered with the U.S. Department of Transportation. A copy of the Contractor’s Test Report and signed certification that the package configuration meets both CFR and UN requirements shall be made available to the procuring contract office, as required, prior to acceptance or shipment of any portion of the product IAW Contract Data Requirements List (CDRL DI-PACK-81059B) (Reference AFMC Form 158). Safety Data Sheets (SDS) are required for known hazardous items and applicable items shown in FED-STD-313, Tables I and II. The SDS shall have any applicable identification number, such as National Stock Number or Special Item Number. A copy of the SDS shall be mailed or e-mailed no later than five (5) days prior to contractual delivery of items:
FAR clause 52.223-3, Hazardous Material Identification and Material Safety Data
SPECIAL PACKAGING INSTRUCTIONS RETRIEVAL & EXCHANGE SYSTEM
(SPIRES)
Contractors may request the use of SPIRES website to view item packaging requirements or search for Special Packaging Instruction drawings via the following website: https://spires.wpafb.af.mil/
REUSABLE CONTAINERS
The contractor shall safeguard all received reusable shipping containers that meet the requirements of the AFMC Form 158 and are suitable for return shipment of serviceable assets. The contractor shall dispose of and replace unserviceable containers with new containers that meet requirements of the AFMC Form 158.
Contact the Product Support Manager and Administering Contracting Office (ACO) for disposition instructions and replacement when Long Life Reusable Container(s) are received in an unserviceable condition.
https://spires.wpafb.af.mil/
REPORTING DISCREPANCIES
The contractor shall use Web Supply Discrepancy Report (WebSDR) to submit/reply to a Supply Discrepancy Report (SDR), when improperly packed assets are received/shipped in other than the contracted packaging requirements (coded data or Special Packaging Instructions (SPI) drawings) from Department of Defense (DoD) components or contractor activities. The contractor shall request a WebSDR account via the following website: https://www.transactionservices.dla.mil/daashome/homepage.asp
(See Defense Logistics Management (DLM) 4000.25-M, Volume 2, Supply Standard and Procedures, Chapter 17, Supply Discrepancy Reporting) http://www.dla.mil/HQ/InformationOperations/DLMS/
Exceptions when no damage has occurred are as follows:
- Items packaged before the current SPIdate.
- An alternate pack may be used, provided the prime Air Force Sustainment Complex, Packaging Office at the Air Logistics Complex (ALC) approves and issues a waiver, deviation number, which would be annotated on the exterior container on the lower right hand portion of the identification side of thecontainer.
- In accordance with Technical Order (TO) 00-85B-3, How to Package Air Force Spares, the contractor may substitute the next larger size fast pack, of the type I or type II to ship transportation priorities 1 and 2 shipments as long as there is no decrease in any of the container dimensions without the requirement of a waiver deviation. TO 00- 85B-3, para 4.2 can be accessed via the website:
- https://www.tinker.af.mil/Portals/106/Documents/Technical%20Orders/AFD-082416-00-85B-3.pdf
ASSIST Documents for Specifications Listed in the GSA Index of Federal Specifications, Standards and Commercial Item Descriptions The contractor shall use the ASSIST website to access specification, standards, data item descriptions documents listed in this contract solicitation:
FAR 52-211-2 Availability of Specifications, Standards, and Data Item Descriptions listed in the Acquisition Streamlining and Standardization Information System https://quicksearch.dla.mil/
AFSC
406 SCMS/GULAA
Attn: Dustin Hale
DSN: 777-8841
COMM: 801-777-8841
Email: dustin.hale@us.af.mil https://www.transactionservices.dla.mil/daashome/homepage.asp http://www.dla.mil/HQ/InformationOperations/DLMS/ https://www.tinker.af.mil/Portals/106/Documents/Technical%20Orders/AFD-082416-00-85B-3.pdf https://quicksearch.dla.mil/%23/
APPLICABLE GOVERNMENT PACKAGING DOCUMENTS
NOTE: UTILIZE THE MOST RECENT REVISION
AFI 24-602V2_AFGM2018-01, Preparation and Movement of Air Force Cargo
AFMAN 24-604, Preparing Hazardous Materials for Military Air Shipments
DLMS 4000.25, Defense Logistics Management Systems, Volume 2, Change 10, Supply Standards and Procedures, Chapter 17, Supply Discrepancy Reporting
DOT Title 29, Occupational Safety and Health Administration, Labor
DOT Title 49, Code of Federal Regulations (49 CFR), Transportation
International Civil Aviation Organization (ICAO) Technical Instructions
International Air Transport Association (IATA) Dangerous Goods Regulation
International Maritime Dangerous Goods (IMDG) Code
ISPM 15, International Standard Phytosanitary Measure Note: Marking Requirements may be found in the American Lumber Standards Committee, Incorporated Wood Packaging Material Enforcement Regulations dated November 07, 2014 and ISPM 15.
MIL-STD-2073-1E, Change 4, Standard Practice, for Military Packaging
MIL-STD-129R, Change 1, Department of Defense Standard Practice Military Marking for Shipment and Storage
MIL-STD-648E, Department of Defense Design Criteria Standard, Specialized Shipping Containers
MIL-STD-147E, Change 1, Palletized Unit Loads
MIL-HDBK-773B, Electrostatic Discharge Protective Packaging
TO 00-85B-3, How to Package Air Force Spares
FED-STD-313E, Federal Standard: Material Safety Data, Transportation Data and Disposal Data for Hazardous Materials Furnished to Government Activities
Statement of Work (Cont)
HAZARDOUS MATERIALS (When Applicable)
SPECIAL PACKAGING INSTRUCTIONS RETRIEVAL & EXCHANGE SYSTEM (SPIRES)
REUSABLE CONTAINERS
Statement of Work (Cont)
REPORTING DISCREPANCIES
Exceptions when no damage has occurred are as follows:
ASSIST Documents for Specifications Listed in the GSA Index of Federal Specifications, Standards and Commercial Item Descriptions
AFSC
Statement of Work (Cont)
ATTACHMENT 2
USAF & USN CAD/PAD STATEMENT OF WORK - AMMUNITION DATA CARDS
January, 2018
1. Ammunition Data Cards (ADC) shall be prepared in accordance with MIL-STD-1168 (current revision) and shall follow the format required by the application identified as Worldwide Ammunition-data Repository Program (WARP). All of the requirements of MIL-STD-1168 apply but some are tailored in accordance with MIL-STD-962 to meet CAD/PAD program requirements as listed below.
2. The criteria and procedures for the assignment of lot numbers for energetic materials
(pyrotechnics, propellants, explosives) including their constituents shall be in accordance with
MIL-STD-1168.
3. All energetic materials (pyrotechnics, propellants, explosives) used in assemblies and sub-assemblies/components (i.e., igniter cartridges, delay elements, primer assemblies, explosive cord, etc.) shall be entered in the ADC using the common name, actual/original manufacturer’s part number & revision, lot number, and date of manufacture. Traceability shall be ensured by the original manufacturer’s documentation such as Certificate of Conformance (COC), Certificate of Analysis (COA), Quality Assurance Record (QAR) Quality Inspection Record (QIR), Quality Assurance Documents (QAD), Batch Record, or other equivalent documentation that would provide positive traceability in the event of a future product recall.
4. The contractor may list their own internal part number for energetic material that they re-designate or re-characterize but must also list the actual manufacturer’s part number, lot number, and date of manufacture in parentheses in a format that is searchable in WARP. Any GFM/GFP provided under contract to the vendor should retain government provided part/lot numbers and nomenclature to retain traceability. Ingredients which are used to synthesize or that are blended in a process to make the end item energetic material are not required to be listed. Examples of blended or synthesized energetic materials that shall be listed are HNS, Lead Azide, BKNO3, ZPP, HES 8028, etc. If the ages of energetic materials are older than the ages specified on the Airmunitions Specification or as specified elsewhere in the contract at the time the CAD/PAD devices become hermetically sealed, the date of energetic material recertification or any associated approved Request for Variance (RFV) shall be notated in the waivers and deviation description section.
5. Hardware components shall be fully traceable and identified by the original manufacturer’s lot identification information/documentation or qualified distributor’s documentation such as Certificate of Conformance (COC), Certificate of Analysis (COA), Quality Assurance Record (QAR), Batch Record, or other equivalent documentation that would provide positive traceability in the event of a future product recall. The actual date of manufacture is not required for any non-age degradable materials such as metal housings, tubes, sleeves, firing pins, nuts, bolts, washers, etc. The COC, COA, QAR, or Batch Record date(s) may be used for the DOM. Epoxies, sealants, curative, O-rings, and other organic materials shall be fully traceable to OEM with DOM and traceable via the original manufacturer’s lot identification documentation such as Certificate of Conformance (COC), Certificate of Analysis (COA), Quality Assurance Record (QAR) Batch Record, or other equivalent documentation that would provide positive traceability in the event of a future product recall. Materials or components that do not affect the reliability or safety of the end item (i.e., solvents, paints, lacquers, labels, dust caps, etc.) do not need to be listed on the ADC.
6. The ADC data and information entered in WARP for all materials and components ideally shall stand alone for traceability to the actual manufacture’s information (i.e. Mfg P/N, Mfg date (as applicable), Mfg lot number etc.). If contractor uses their own P/N, reference date for acceptance or other “trace”/traceability identification used internally for the non-critical piece parts/materials, it shall be noted in the remarks section, i.e. “trace ID, or PO used for the
ATTACHMENT 2 (continued) following piece parts: (parts shall identified/listed)”, provided the field/entry method is searchable in WARP. If traceability documentation is “questionable” or in conflict and needs clarification, the applicable engineer or equipment specialist shall be contacted to resolve any issues.
7. A “sample” ADC is generated in WARP the first time an ADC is submitted by the contractor for applicable government reviews and approvals. Upon approval of the sample ADC, a final version for each production lot shall be completed in WARP and uploaded for Invoicing, Receipt, Acceptance, and Property Transfer (iRAPT - formerly WAWF) for review and acceptance prior to shipment of product by the applicable government authority. The WARP ADC program will not allow the submission of additional ADCs until such time as the sample ADC has been approved in the system. The sample ADC does not require the use of a “Z” interfix number used to identify it as a sample.
8. If any unique situations exist that may conflict with compliance, a resolution should be proposed by the contractor prior to contract award to determine possible work-around.
9. A hard copy of the applicable ADC(s) shall also be included with each shipment per applicable
ADC CDRL.
WARP will reside within the Munitions History Program (MHP). Additional details on these WARP applications are provided below.
MHP-WARP Access Procedures
• Government or Contractor employee with CAC and AKO account:
(a) Click on the MHP hyperlink which is https://mhp.redstone.army.mil/
(b) Enter CAC PIN when prompted
(c) Click on WARP (ADC)
(d) Click on Help
(e) Click on WARP Request Access and follow instructions
• Contractor or Government employee without CAC and AKO account: MHP-WARP uses PKI authentication requiring a DoD approved digital certificate as a security measure to protect the integrity of stored data. There are three vendors that have been approved to issue DoD approved certificates per an External Certification Authority (ECA) program. You are required to use one of the approved vendors listed on the following DISA website:
http://iase.disa.mil/pki/eca/index.html A nominal fee is charged for each certificate. The Contractor, including any subcontractors, shall assume the responsibility for all costs of obtaining each digital certificate needed.
• After the required certificate is obtained:
(a) Click on the MHP-WARP hyperlink: https://mhpwarp.redstone.army.mil/
(b) Enter ECA password
(c) Click on Help and follow the instructions for obtaining the necessary access
• HELP Numbers are as follows:
MHP Access – (256)313-2143; DSN 897-2143 JMC Quality Administrators for WARP issues – (309)782-2697 or (309)782-7107 https://mhp.redstone.army.mil/ http://iase.disa.mil/pki/eca/index.html https://mhpwarp.redstone.army.mil/
ATTACHMENT 2 (continued)
• Worldwide Ammunition-data Repository Program (WARP)
An online user’s manual will provide additional help and criteria in the development of an ammunition data card. It is recommended that you download and read the user’s manual prior to creating and filling out your initial ammo data card. The user's manual also contains screen shots, which depict what the data entry person will see during the ADC input process.
• Ammunition Data Card Input
ADC input allows current contractors and government facilities the capability to create, and submit for approval, both sample ADCs and production lot ADCs which meet the format requirements of MIL-STD-1168 and as specified in this SOW for ADCs. ADCs are automatically forwarded to the respective Government Agency Responsible for Acceptance (GARA). The GARA in most cases is the Defense Contract Management Agency (DCMA) Quality Assurance Representative (QAR), who reviews contractor input for accuracy and completeness, and after updating the disposition code for the specific lot, submits the ADC to the database. The contractor’s data entry person is granted access only to ADCs identified with its specific manufacturing code, as identified in MIL-HDBK-1461, Manufacturer's Symbols. The use of previously inputted ADCs through the TEMPLATE option significantly reduces input effort, while increasing accuracy and consistency of data.
• Email Notification WARP provides immediate, automated notification to process participants when actions are required. When the producer has completed an ADC submission, an email message is routed to the GARA advising that an ADC awaits review and approval. If the GARA approves the ADC as submitted, the ADC is released to the WARP database and an email, with approved data card, is routed back to the originator. If the ADC requires modification or correction to conform with MIL- STD-1168 and/or the approved format and technical content as approved by the government, an email is provided to the ADC originator advising that corrective action is required prior to approval.
• Information Updates It is important that the System Administrators are apprised when a producer receives a new contract. The producer shall notify usarmy.RIA.jmc.mbx.warp@mail.mil within 30 days after receipt of a new contract. Information to be included shall be the contract number, item, GARA, Manufacturer's identification symbol and the names of the individuals who will be inputting ADCs into the system. If you are a new producer and do not have a Manufacturer's identification symbol, you can obtain one by sending an email to usarmy.RIA.jmc.mbx.warp@mail.mil. The email must contain manufacturer's name, address where performance of the contract will take place, and a point of contact.
(End of statement of work)
AIRMUNITION SPECIFICATION
DATE: 4 May 2022
NSN: 1336012305975ES/1336016004573ES
1. The contractor shall provide an advanced Report of Shipment (REPSHIP) to the consignee no later than 24 hours prior to the shipment arrival, and for ammunition shipments no later than two hours after shipment departure. A (REPSHIP) shall include all the following data in accordance with ATTACHMENT 1.
2. Department of Defense Identification Code (DODIC): KY94
3. Ammunition Data Cards (ADC) shall be filled out; input in accordance with Attachment 2, Statement of Work – Ammunition Data Cards; and state quantity/serial number of lot acceptance test units in the remarks block. One hard copy of the ADC shall accompany shipments to each shipping location. CDRL (DI-MISC-80043B)
4. Items shall be marked in accordance with CAD/PAD Item Marking Instruction Version 1.5, 1 May 2019, reference attachment.
5. Shelf Life Code marking NOT required per MIL-STD-129.
6. Hazard Classification Information: See attached JHCS and IHC Records
NSN: 1336012305975ES
Hazard Class/Division: 1.4 Storage Compatibility Group: S DOT Marking/EX Number: IGNITERS / EX1987070195 DOT Shipping Labels: EXPLOSIVE 1.4S UN Number: 0454 Proper Shipping Name: IGNITERS Net Explosive Weight per item (NEW): 0.000300 NEW Unit of Measurement: LBS
NSN: 1336016004573ES
Hazard Class/Division: 1.4 Storage Compatibility Group: C DOT Marking/EX Number: CARTRIDGES, POWER DEVICE DOT Shipping Labels: EXPLOSIVES 1.4C UN Number: 0276 Proper Shipping Name: CARTRIDGES, POWER DEVICE Net Explosive Weight per item (NEW): 0.000302 NEW Unit of Measurement: LBS
NEW for all packaging/shipping documents shall reflect the NEW identified above per JHCS or IHC.
If NEW is altered to adjust item performance and is greater than the weight listed, an ECP shall be submitted to the government prior to manufacturing or at least 60 days prior to shipping and shall include the SDS (formerly MSDS) and applicable supporting documentation.
7. All Engineering Change Proposals (ECPs), Notice of Revisions (NORs), and Request For
Variances (RFVs formerly RFD/RFWs) affecting the approved product baseline configuration, acceptance test procedures, or manufacturing process of any item(s) on this contract shall be in accordance with EIA-649-B. Major ECPs with NORs and Critical/Major RFVs shall be submitted to the responsible Government Engineering Authority for review/disposition by CCB.
Minor/Administrative ECPs with NORs and Minor RFVs shall be processed by the:
COGNIZANT GOVERNMENT ENGINEER
ECPs -- CDRL (DI-SESS-80639E) NORs – CDRL (DI-SESS-80642E) RFVs – CDRL (DI-SESS-80640E)
Distribution Statement: B, Reason: Administrative or Operational (ref. DoDI 5230.24)
8. Item(s) must pass both gross and fine leak checks. MIL-STD-883K(2), Method 1014.16 may be used as guidance. The existing leak rate limit established for this item(s) will remain the same.
Contractor shall generate a Lot Acceptance Test Plan (LATP/ATP) with an analysis or test results showing compliance for Hill AFB engineering approval at least 90 days prior to commencement of Lot Acceptance Testing allowing for 30 days approval time after submission.
CDRL (DI-QCIC-80553A)
9. Lot Acceptance Test Requirements are: IAW LATEST GOVERNMENT APPROVED ATP:
Contractor
10. The contractor shall furnish a Lot Acceptance Test/Inspection Report in the following system(s): WAWF
CDRL: (DI-NDTI-80809B)
11. LOT ACCEPTANCE TEST: In the event of an end item failure, the contractor shall notify the PCO/ACO and Air Force Engineering Organization within 1 business day.
Air Force Engineering Organization: AFLCMC/EBHJ Organization E-mail: david.monk.1@us.af.mil
12. In the event of test failure(s), a Failure Summary and Analysis Report with proposed corrective actions/recommendations is required. CDRL: (DI-SESS-80255B)
13. The age of the energetic materials and components (i.e. ALL explosives, propellants, pyrotechnics, cartridges, and/or initiators) used in the manufacture of these items or sub-components shall not exceed 24 months based on the original manufacturing date. All energetic materials and components must be traceable to the original DoD qualified manufacturer and compliant with the ITAR part 120 and 121 (http://www.pmddtc.state.gov/regulations_laws/itar.html).
14. Raw (non-blended) ingredients & materials used in blended/mixed energetic materials such as, but not limited to: fuels, oxidizers, binders, curatives, sensitizers, plasticizers, stabilizers etc., shall not exceed 24 months since date of manufacture and comply with original manufacture’s Specification or MIL-STD. The government may waive the energetic and constituent material requirements listed above or portions thereof, on a case-by-case basis (when acceptable to the government) provided the contractor furnishes all details of the reason for the variance and the age, lot numbers, traceability, and other pertinent information/ test data and Certificate of Analysis/ Conformance (COA/COC) of the subject materials or components. The variance shall be submitted as a RFV and may be subject to, but not limited to, conditions such as sensitivity testing, stabilizer and analysis and/or dehumidification at vendor’s cost; therefore, vendor must plan accordingly. RFV not required provided vendor has approved energetic material and constituent management and recertification plan approved by HAFB technical authority for this specific contract and contract is executed with materials in compliance with said plan.
Recertification test data for materials shall be provided by vendor upon request at no additional charge to the government. All raw ingredients, materials and components must be traceable to the original DoD qualified manufacturer and compliant with the ITAR part 120 and 121.
15. This item is designated as a Critical Safety Item (CSI). Documentation for critical characteristics may be found in the contract, TDP, assembly/inspection procedures or QALI.
MRB approval authority shall be retained by government engineer. Other characteristics requiring inspection or special oversight from DCMA:
16. First Article Test/Inspection Report IAW AFMC Form 260. CDRL (DI-NDTI-80603A)
17. First Article Test Plan and Procedures.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .