QALI.pdf

PDF 857 KB Posted

Attached to
F-35 Flexible Linear Shape Charge Assembly Federal contract opportunity
Solicitation number
FA8213-20-R-3038
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Hill Air Force Base

About this file

This document contains a quality assurance letter of instruction and related federal contract opportunity notice. The quality assurance letter outlines inspection requirements for explosive ordnance items to be produced under federal contract number 20-50104, awarded on an unspecified date for delivery by an unspecified final delivery date. Inspection points include verification of part numbers, leak testing, radiographic examination, lot acceptance testing, and certification of energetic materials. The related federal contract opportunity is solicitation number FA8213-20-R-3038 for explosive ordnance items including flexible linear shape charges, rapid deflagrating cord transfer lines, donors, arm-fire handles, acceptors, and hot gas initiators. Delivery locations include Indian Head, Maryland and quantity estimates range from 385 to 2,545 units depending on the item. The awarded contractor will be Pacific Scientific Energetic Materials of Hollister, California.

View the file

Other files for this federal contract opportunity

Other files attached to F-35 Flexible Linear Shape Charge Assembly, newest first.
File Type Posted
CDRLs_FA821320R3038_Rev1.pdf PDF
FA821320R3038-0001.pdf PDF
CDRLs_FA821320R3038.pdf PDF
SPI_PHST_337.pdf PDF
SOW_Ammunition_Data_Cards.pdf PDF
SOW.pdf PDF
CADPAD_IMI_V15.pdf PDF
AIR_SPEC_Revision_2.pdf PDF
Item_Descriptions.pdf PDF
SPI_PHST_338.pdf PDF
FA821320R3038.pdf PDF
Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Contractor Name CAGE code

DCMA QAR Reviewer

Date Review Completed

Date Issued to Contractor

PR No. FD2020-

Date Contract Awarded

Final Delivery Date (FDD)

Program Name

DODIC

Part Number

The contractor is required to impose the listed below DCMA Inspection Points into the appropriate Work Orders.

All Work Orders pertaining to CRITICAL FLIGHT ITEMS must be identified on folders.

Mandatory - M: Stamp and/ or Signature on original documentation (i.e., Mfg. Planning, ATP, FAT Report, etc.)

Witness - W: GSI required to attend, may reduce level of effort after 50% of production lots found acceptable Verification - V: Stamp and/or Signature required unless noted otherwise (may be done by written verification) Monitor - R: Will monitor testing, may reduce to verification Notify - N: By phone or daily schedule 24( R ) - 48 ( NR ) hours in advance

Additional requirements: (DCMA reserves the right to impose additional inspection points as deemed necessary.)

Prepared by:

Date

Concurrence Signature by QAR/DCMA:

QAR/DCMA Signature

THIS PLANNING SHEET WILL BE UPDATED IF NECESSARY.

QUALITY ASSURANCE LETTER OF INSTRUCTION

Planning Requirements

COMMENTS

NOTICE

Engineer Signature

Date

Rev Date: 30 April 2019

Sheet1

Text49:
Text46: 4 May 2020
2020-05-04T12:10:47-0600
KRAMER.LAWRENCE.C.1141472808
undefined_9: N
Text32: 9. Additional Requirements
undefined_8: V
Text31: 8. Shippers (DD250, DD1149, Reports)
undefined_7: V
Text30: 7. AMMO Data Card Review
undefined_6: V
Text29: 6. Preparation for Shipment
undefined_5: W
Text28: 5. LAT
undefined_4: M
Text27: 4. LAT Sample Selection
undefined_3: V
Text26: 3. X-Ray/N-Ray
undefined_2: V
Text25: 2. Leak Test
undefined: V
Text36: 1. Verify that the Explosive Weight is identified and meets drawing and hazard classification requirements as applicable.

2. Verify gross/fine leak checks are performed per ATP requirements

3. Ensure film labeling correct. Ensure radiographic film readable / well-defined. DCMA not required to interpret film.

4. Randomly select LAT units per latest government approved ATP.

5. Prior to LAT ensure proper calibration and validation of all test equipment. Testing should occur in accordance with latest government approved ATP.

6. Ensure Paperwork is correct. EELS have been submitted with corresponding ELACS.

7. Verify all energetic materials: list original manufacturer, original lot no., and latest certification/recertification date < 24 months.

8. Ensure Paperwork is correct. Verify Packaging, Packing, Preservation & Marking (PPP&M)

9. Notify and obtain approval from the Project Engineer for any additional requirements imposed by DCMA.

Text24: 1.Inspection
Part Number: 876085-123, -143, -144, -145, -146, 876065-01, 831147-01, 876070-01, 876100-03, & 833767-01
Text23:
DODIC: JN59, JN58, JN57,JN56, JN60, JN64, JN61, JN65, JN62, JN55
Text22:
Text21:
Text20: 06331
Text19: PSEMC
Part Number Line 2:
Contract No: 20-50104
Date Contract Awarded:
Final Delivery Date FDD:
Program Name: F-35 Transparancey Removal System (TRS)

File details come from the government source that posted it. Updated .