3_Quality_Assurance_Letter_of_InstructionI_F_16_CJRM.pdf

PDF 129 KB Posted

Attached to
F-16 Rocket Motor
Solicitation number
FA8213-20-R-0080
Issued by

About this file

This document contains a quality assurance letter of instruction and related federal contract opportunity notice for rocket motors used in F-16 aircraft. The quality assurance letter provides inspection requirements for critical flight items to be imposed on work orders, including mandatory stamping and witness requirements. Specific inspection points are listed for explosive weight verification, leak testing, radiographic film reviews, lot acceptance testing sample selection and procedures, preparation for shipment, ammunition data card reviews, shipping documentation verification, and additional requirements. The related federal contract opportunity is a pre-solicitation notice seeking rocket motors identified by national stock numbers, part numbers, and descriptions for the F-16 aircraft. The opportunity specifies line items, quantities, destinations as FMS countries, an electronic solicitation procedure, and a contract period through final production and delivery of all units. The contracting agency is identified as the Department of the Air Force Materiel Command Lifecycle Management Center located at Hill Air Force Base.

View the file

Other files

File Type Posted
FA821320R0080_______0001.RTF RTF text file
14d_Engineering_Data_List_5499ES.pdf PDF
14a_Engineering_Data_List_7872ES.pdf PDF
16c_JFQR_01_327_7873_F16_CJRM.pdf PDF
7_Report_of_Shipment.pdf PDF
16d_JFQR_01_517_5499_F16_CJRM.pdf PDF
FA821320R0080.RTF RTF text file
14c_Engineering_Data_List_7873ES.pdf PDF
2_Ammunition_Data_Cards.doc DOC document
1_Airmunition_Specification.docx DOCX document
18_Section_M_Lowest_Price.rtf RTF text file
13d_Item_Description_5499ES.pdf PDF
13c_Item_Description_7873ES.pdf PDF
8_CADPAD_Item_Marking.pdf PDF
15_Bid_Sets.doc DOC document
9_Contract_Data_Requirements_List.pdf PDF
13a_Item_Description_7872ES.pdf PDF
10_AFMC_Form_158_Packaging_Requirements.pdf PDF
16a_JFQR_01_327_7872_F16_CJRM.pdf PDF
17_Section_L_Lowest_Price.rtf RTF text file
12_Special_Packaging_Instructions_F01_058_0122.pdf PDF
14b_Engineering_Data_List_5493ES.pdf PDF
17-GFPFA8213-20-R-0080.pdf PDF
5_REPSHIP_of_HAZMAT.doc DOC document
16b_JFQR_01_517_5493_F16_CJRM.pdf PDF
13b_Item_Description_5493ES.pdf PDF
ES7034Rework_and_RepairofNonconformingMaterial.pdf PDF
11_SOW_for_Packaging_and_Preservation.pdf PDF
Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Contractor Name CAGE code

DCMA QAR Reviewer

Date Review Completed

Date Issued to Contractor

PR No. FD2020-

Date Contract Awarded

Final Delivery Date (FDD)

Program Name

DODIC

Part Number

The contractor is required to impose the listed below DCMA Inspection Points into the appropriate Work Orders.

All Work Orders pertaining to CRITICAL FLIGHT ITEMS must be identified on folders.

Mandatory - M: Stamp and/ or Signature on original documentation (i.e., Mfg. Planning, ATP, FAT Report, etc.)

Witness - W: GSI required to attend, may reduce level of effort after 50% of production lots found acceptable

Verification - V: Stamp and/or Signature required unless noted otherwise (may be done by written verification)

Monitor - R: Will monitor testing, may reduce to verification

Notify - N: By phone or email

Additional requirements: (DCMA reserves the right to impose additional inspection points as deemed necessary.)

Prepared by:

Date

Concurrence Signature by QAR/DCMA:

QAR/DCMA

THIS PLANNING SHEET WILL BE UPDATED IF NECESSARY.

QUALITY ASSURANCE LETTER OF INSTRUCTION

Planning Requirements

COMMENTS

NOTICE

Engineer

Date

Sheet1

Contract No: 20-50080
Date Contract Awarded:
Final Delivery Date FDD:
Program Name: F-16
DODIC: MT33, MT34
undefined: V
undefined_2: V
undefined_3: V
undefined_4: M
undefined_5: W
undefined_6: V
undefined_7: V
undefined_8: V
undefined_9: N
undefined_10:
undefined_11:
undefined_12:
Text19:
Text20:
Text21:
Text22:
Text23:
Text24: 1.Inspection
Text25: 2. Leak Test
Text26: 3. X-Ray/N-Ray
Text27: 4. LAT Sample Selection
Text28: 5. LAT
Text29: 6. Preparation for Shipment
Text30: 7. AMMO Data Card Review
Text31: 8. Shippers (DD250, DD1149, Reports)
Text32: 9. Additional Requirements
Text33:
Text34:
Text35:
Text36: 1. Verify that the Explosive Weight is identified and meets drawing and hazard classification requirements.

2. Verify gross/fine leak checks are performed per ATP requirements

3. Ensure film labeling correct. Ensure radiographic film readable / well-defined. DCMA not required to interpret film.

4. Randomly select LAT units per latest government approved ATP.

5. Prior to LAT ensure proper calibration and validation of all test equipment. Testing should occur in accordance with latest government approved ATP.

6. Ensure Paperwork is correct.

7. Verify all energetic materials: list original manufacturer, original lot no., and latest certification/recertification date < 24 months.

8. Ensure Paperwork is correct. Verify Packaging, Packing, Preservation & Marking (PPP&M)

9. Notify and obtain approval from the Project Engineer for any additional requirements imposed by DCMA.

2018-05-30T15:54:10-0600
TIDWELL.QUINN.RAY.1241451913
Text46: 29 April 2019
Text49:
Type name_1:
Type name_4:
Part Number:
Noun: 1517-001, 1517-002, 55000-1, 55000-2