1_Airmunition_Specification.docx

DOCX document 25 KB Posted

Attached to
F-16 Rocket Motor Federal contract opportunity
Solicitation number
FA8213-20-R-0080
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Hill Air Force Base

About this file

This specification document outlines requirements for rocket motors and associated ammunition to be procured through a federal contract opportunity. Key details include that the contractor must provide advanced shipment notices, contact the DCMA for transportation guidance on foreign military sales deliveries, and mark items in accordance with specified standards. The contractor must also pass leak checks, generate test plans for approval, and report any test failures with corrective actions. The opportunity involves rocket motors with product numbers 55000-2, 1517-002, 2820100-2 and 55000-1, 1517-001, 2820100-1 to be delivered to foreign military customers, and has a contract period through completion of all production and deliveries.

View the file

Other files for this federal contract opportunity

Other files attached to F-16 Rocket Motor, newest first.
File Type Posted
FA821320R0080_______0001.RTF RTF text file
18_Section_M_Lowest_Price.rtf RTF text file
17_Section_L_Lowest_Price.rtf RTF text file
17-GFPFA8213-20-R-0080.pdf PDF
13a_Item_Description_7872ES.pdf PDF
8_CADPAD_Item_Marking.pdf PDF
15_Bid_Sets.doc DOC document
2_Ammunition_Data_Cards.doc DOC document
14c_Engineering_Data_List_7873ES.pdf PDF
5_REPSHIP_of_HAZMAT.doc DOC document
13c_Item_Description_7873ES.pdf PDF
12_Special_Packaging_Instructions_F01_058_0122.pdf PDF
16c_JFQR_01_327_7873_F16_CJRM.pdf PDF
10_AFMC_Form_158_Packaging_Requirements.pdf PDF
14b_Engineering_Data_List_5493ES.pdf PDF
13d_Item_Description_5499ES.pdf PDF
14a_Engineering_Data_List_7872ES.pdf PDF
16a_JFQR_01_327_7872_F16_CJRM.pdf PDF
9_Contract_Data_Requirements_List.pdf PDF
7_Report_of_Shipment.pdf PDF
16d_JFQR_01_517_5499_F16_CJRM.pdf PDF
13b_Item_Description_5493ES.pdf PDF
16b_JFQR_01_517_5493_F16_CJRM.pdf PDF
14d_Engineering_Data_List_5499ES.pdf PDF
11_SOW_for_Packaging_and_Preservation.pdf PDF
ES7034Rework_and_RepairofNonconformingMaterial.pdf PDF
3_Quality_Assurance_Letter_of_InstructionI_F_16_CJRM.pdf PDF
FA821320R0080.RTF RTF text file
Show all 28

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

19 Sep 2019

AIRMUNITION SPECIFICATION

FD2020-20-50080

NSN:1377-01-327-7872ES (MT34)
1377-01-327-7873ES (MT33)
1377-01-517-5493ES (JM44)
1377-01-517-5499ES (JM43)

1. The contractor shall provide an advanced Report of Shipment (REPSHIP) to the consignee no later than 24 hours prior to the shipment arrival, and for ammunition shipments no later than two hours after shipment departure. A (REPSHIP) shall include all the following data in accordance with Attached REPSHIP.

2. Contractor shall contact their nearest Defense Contract Management Agency (DCMA) Office for transportation guidance and assistance for all Foreign Military Sales (FMS) deliveries prior to shipment; and ensure that the DCMA provides one information copy of completed Notice of Availability (NOA) including FMS case and requisition numbers by mail to: AFLCMC/EBHMB Attn: FMS Transportation 6043 Elm Lane, Hill AFB, UT 84056-5819, or Fax to: (801) 777-1089 or Email to ooalc.gacp.transportation@us.af.mil.

3. Department of Defense Identification Code (DODIC): See attached.

4. Government Furnished Material:

Stock Number(s):
1377-01-198-7480ES
1377-01-108-1438ES
Part Number(s):
51281-729
851AS110
Noun(s):
DTA TLX line
PVU-1 Primer

Quantities:

5. Ammunition Data Cards (ADC) shall be filled out; input in accordance with Attachment 2, Statement of Work – Ammunition Data Cards; and state quantity/serial number of lot acceptance test units in the remarks block. One hard copy of the ADC shall accompany shipments to each shipping location.

CDRL (DI-MISC-80043B)

6. Items shall be marked in accordance with CAD/PAD Item Marking Instruction Version 1.5, 1 May 2019, reference attachment.

7. Shelf Life Code marking NOT required per MIL-STD-129R.

8. Hazard Class/Division: 1.3 Storage Compatibility Group: C DOT Marking/EX Number: EX1988040111A UN Number: 0186 Proper Shipping Name: UN0186, Rocket Motors, 1.3C Net Explosive Weight (NEW): 068790 NEW Unit of Measurement: pounds

NEW for all packaging/shipping documents shall reflect the NEW identified above per JHCS or IHC. If NEW is altered to adjust item performance and is greater than the weight listed, an ECP shall be submitted to the government prior to manufacturing or at least 60 days prior to shipping and shall include the SDS (formerly MSDS) and applicable supporting documentation.

9. All Engineering Change Proposals (ECPs), Notice of Revisions (NORs), and Request For Variances (formerly RFD/RFWs) affecting the approved product baseline configuration, acceptance test procedures, or manufacturing process of any item(s) on this contract shall be in accordance with EIA-649-B. Major ECPs with NORs and Critical/Major RFVs shall be submitted to the responsible Government Engineering Authority for review/disposition by CCB. Minor/Administrative ECPs with NORs and Minor RFVs shall be processed by the: GOVERNMENT ENGINEER

ECPs - CDRL (DI-SESS-80639D)
NORs – CDRL (DI-SESS-80642D)
RFVs - CDRL (DI-SESS-80640D)

Distribution Statement: B , Reason: Administrative or Operational

10. Item(s) must pass both gross and fine leak checks. MIL-STD-883K(2). Method 1014.16 may be used as guidance. The existing leak rate limit established for this item(s) will remain the same. Contractor shall generate a Lot Acceptance Test Plan (LATP/ATP) with an analysis or test results showing compliance for Hill AFB engineering approval at least 90 days prior to commencement of Lot Acceptance Testing allowing for 30 days approval time after submission.

CDRL (DI-QCIC-80553A)

11. Lot Acceptance Test Requirements are:

IAW latest Government approved ATP Contractor

12. The contractor shall furnish a Lot Acceptance Test/Inspection Report in the following system(s):

WAWF

CDRL: (DI-NDTI-80809B)

13. LOT ACCEPTANCE TEST: In the event of an end item failure, the contractor shall notify the PCO/ACO and Air Force Engineering Organization with 1 business day Air Force Engineering Organization: AFLCMC/EBHJ E-mail: quinn.tidwell@us.af.mil

14. In the event of test failure(s), a Failure Summary and Analysis Report with proposed corrective actions/recommendations is required.

CDRL: (DI-SESS-80255A)

15. If Hexanitrostilbene (HNS) explosive material is used in the manufacture of this item, the HNS shall meet the requirements of Government Document WS5003F (or latest revision), Purchase Description of HNS Explosive; and maximum particle size shall not exceed 250 microns.

16. The age of the energetic materials and components (i.e. ALL explosives, propellants, pyrotechnics, cartridges, and/or initiators) used in the manufacture of these items or sub-components shall not exceed 24 months based on the original manufacturing date. All energetic materials and components must be traceable to the original DoD qualified manufacturer and compliant with the ITAR part 120 and 121 (http://www.pmddtc.state.gov/regulations_laws/itar.html).

17. Raw (non-blended) ingredients & materials used in blended/mixed energetic materials such as, but not limited to: fuels, oxidizers, binders, curatives, sensitizers, plasticizers, stabilizers etc., shall not exceed 24 months since date of manufacture and comply with original manufacture’s Specification or MIL-STD. The government may waive the energetic and constituent material requirements listed above or portions thereof, on a case-by-case basis (when acceptable to the government) provided the contractor furnishes all details of the reason for the variance and the age, lot numbers, traceability, and other pertinent information/ test data and Certificate of Analysis/ Conformance (COA/COC) of the subject materials or components. The variance shall be submitted as a RFV and may be subject to, but not limited to, conditions such as sensitivity testing, stabilizer and analysis and/or dehumidification at vendor’s cost; therefore, vendor must plan accordingly. RFV not required provided vendor has approved energetic material and constituent management and recertification plan approved by HAFB technical authority for this specific contract and contract is executed with materials in compliance with said plan. Recertification test data for materials shall be provided by vendor upon request at no additional charge to the government. All raw ingredients, materials and components must be traceable to the original DoD qualified manufacturer and compliant with the ITAR part 120 and 121.

18. Percussion primers shall have been certified /recertified by performing sensitivity (all- fire/no fire) and dud testing per applicable specification within the past 24 months unless they are Navy certified and have a 2 year certification. Primers shall be stored in a temperature and humidity controlled environment and in a sealed container with desiccant from time of primer manufacturing, shipping, storage and through final installation in end item. All primers shall be X-rayed in top and side views for critical defects prior to use.

19. This item is designated as a Critical Safety Item (CSI). Documentation for critical characteristics may be found in the contract, TDP, assembly/inspection procedures or QALI. MRB approval authority shall be retained by government engineer. Other characteristics requiring inspection or special oversight from DCMA: see attached QALI

20. Approval from government engineer is required prior to rework and repair of nonconforming material (see ES7034).

21. Contracts involving ammunition and explosives (AE) will contain:

-DFARS Title 48 Part 252.223-7002, Safety Precautions for Ammunition and Explosives-DFARS Title 48 Part 252.223-7003, Change in Place of Performance – Ammunition and Explosives

Additionally, if the scope of work includes air shipment of explosives, the safety specification should require contractor compliance with:

-AFMAN 24-204(I), Preparing Hazardous Materials for Military Air Shipments