MJU-53B_Requests_for_Clarification_&_Responses.docx
DOCX document 240 KB Posted
- Attached to
- MJU-53/B Federal contract opportunity
- Solicitation number
- FA8213-19-R-3008
About this file
This document contains requests for clarification and responses regarding technical drawings for the MJU-53/B flare, decoy countermeasure system.
The government acknowledges that some corrections may be needed to clarify drawing requirements but responds that all changes must go through official modification channels such as engineering change proposals after contracts have been awarded. Responses reference technical drawings for the MJU-53/B components including the case, grain and igniter assembly, pellet holder, slurry holder, foil strip, aluminum foil tape, closure cap, end cap, pellet holder, slurry holder, piston, silicone, low linear density polyethylene, and spacers. Clarifications sought include scale corrections, missing dimensions, interface fits, material callouts and notes. The government maintains that questions through this process do not constitute official drawing modifications and changes will be addressed after contract award through established engineering processes.
Request for Clarifications and Responses
View the file
Other files for this federal contract opportunity
Show all 35
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Drawing
| Revision |
| Description |
| Page |
| Zone |
| Request for Clarification |
| Government Response |
3830AS100
D
FLARE, DECOY, MJU-53/B
| 1 |
| B8 |
| Change Note 9 to read as follows: |
EXTERIOR ENVELOPE OF 2.053 MAX × .983 MAX ALLOWABLE WITHIN AREA INDICATED.
The USG acknowledges some typos or other corrections may be required to be altered to clarify requirements, all of these changes will need to be changed through official channels such as AEO, ECP, RFV, RFP questions are not considered an official drawing modification channel. At this time no ECPs, RFVs, or AEOs will be processed until after contract(s) are awarded.
| 1 |
| A4 |
| Confirm that scale of DETAIL A should be 2:1 instead of 4:1. |
| The USG acknowledges some typos or other corrections may be required to be altered to clarify requirements, all of these changes will need to be changed through official channels such as AEO, ECP, RFV, RFP questions are not considered an official drawing modification channel. At this time no ECPs, RFVs, or AEOs will be processed until after contract(s) are awarded. |
| 1 |
| D6 |
| Confirm that first line of Advisory Note 1 should be deleted, “AID INSERTION OF GRAIN / IGNITER/PISTON ASSEMBLY INTO CASE.” This line appears to be copy of last line of Advisory Note 3. |
| The USG acknowledges some typos or other corrections may be required to be altered to clarify requirements, all of these changes will need to be changed through official channels such as AEO, ECP, RFV, RFP questions are not considered an official drawing modification channel. At this time no ECPs, RFVs, or AEOs will be processed until after contract(s) are awarded. |
| 1 |
| - |
| Confirm that vendor is to build the -30 configuration only. |
| The USG is purchasing the MJU-53/B which can be either basic configuration or -30 configuration as described on 3830AS100 rev D page 1 |
| 2 | |
| C6 | |
| Confirm the .60 dimension is missing the operative word “MAX” and that its left extension line originates from the wrong side of the Case’s flange (see below). | |
| 3830AS100D | 3830AS101B (Zone D5) |
The USG acknowledges some typos or other corrections may be required to be altered to clarify requirements, all of these changes will need to be changed through official channels such as AEO, ECP, RFV, RFP questions are not considered an official drawing modification channel. At this time no ECPs, RFVs, or AEOs will be processed until after contract(s) are awarded.
| 2 | |
| B4-C4 | |
| Change upper leader line of DESCRIPTIVE MARKING as follows: | |
| From | To |
The USG acknowledges some typos or other corrections may be required to be altered to clarify requirements, all of these changes will need to be changed through official channels such as AEO, ECP, RFV, RFP questions are not considered an official drawing modification channel. At this time no ECPs, RFVs, or AEOs will be processed until after contract(s) are awarded.
| 2 |
| B7 |
| Characteristic M103 is missing “MAX” as it corresponds to the Case’s .970 ±.005 dimension just as M102 @ 2.045 MAX corresponds to the Case’s 2.040 ±.005 dimension. |
| The USG acknowledges some typos or other corrections may be required to be altered to clarify requirements, all of these changes will need to be changed through official channels such as AEO, ECP, RFV, RFP questions are not considered an official drawing modification channel. At this time no ECPs, RFVs, or AEOs will be processed until after contract(s) are awarded. |
| 2 |
| C7 |
| Remove .983 MAX dimension and NOTE 9 flag in their entirety (refer to NOTE 9 alteration above) because the necessary corresponding 2.053 MAX dimension for the Case’s other axis is missing currently. |
| The USG acknowledges some typos or other corrections may be required to be altered to clarify requirements, all of these changes will need to be changed through official channels such as AEO, ECP, RFV, RFP questions are not considered an official drawing modification channel. At this time no ECPs, RFVs, or AEOs will be processed until after contract(s) are awarded. |
| DL3830AS100 |
| C |
| DATA LIST |
| 2 |
| - |
| Cage codes corrected to (98747) and EOs added for PLANK [15A0826-H] and GRAIN CHEMICAL COMPOSITION (ATOMIZED) [13A1271-H & 15A0827-H]. |
See attachment for mark-ups.
The cage codes listed on the revision C of DL 3830AS100 are correct, for example drawing 98747 3830AS100 does not exist but 30003 3830AS100 does.
Drawing 3830AS120* EO 15A0826-H applies, alternate normalization processes will be allowed once reviewed and approved by the government procuring activity.
Drawing 3830AS126* EO 13A1271-H adds a requirement of apparent density it could be incorporated if required. EO 15A0827-H applies
| 3830AS101 |
| B |
| CASE |
| 1 |
| C2 |
| Confirm that .037 +.000/–.010 dimension should be 4X .037 +.000/–.010 or be followed by the phrase “ALL AROUND”. |
| The USG acknowledges some typos or other corrections may be required to be altered to clarify requirements, all of these changes will need to be changed through official channels such as AEO, ECP, RFV, RFP questions are not considered an official drawing modification channel. At this time no ECPs, RFVs, or AEOs will be processed until after contract(s) are awarded. |
| 1 |
| B3 |
| Confirm that the 1.980 dimension’s feature control frame has a non-diametric tolerance zone (i.e., is really “.010” and not “Ø.010”). |
| The USG acknowledges some typos or other corrections may be required to be altered to clarify requirements, all of these changes will need to be changed through official channels such as AEO, ECP, RFV, RFP questions are not considered an official drawing modification channel. At this time no ECPs, RFVs, or AEOs will be processed until after contract(s) are awarded. |
| 3830AS102 |
| B |
| GRAIN/IGNITER ASSEMBLY |
| 1 |
| D8 |
| Confirm that NOTE 1 only applies when energetics are being assembled. |
| The USG acknowledges some typos or other corrections may be required to be altered to clarify requirements, all of these changes will need to be changed through official channels such as AEO, ECP, RFV, RFP questions are not considered an official drawing modification channel. At this time no ECPs, RFVs, or AEOs will be processed until after contract(s) are awarded. |
| 3830AS103 |
| B |
| PELLET HOLDER WITH IGNITION COMPOSITION |
| 1 |
| D8 |
| Confirm that re-drying is permitted as specified in NOTE 4 of 3830AS105 drawing. |
Confirm that storage, if required, is permitted as specified in NOTE 5 of 3830AS105 drawing.
The USG acknowledges some typos or other corrections may be required to be altered to clarify requirements, all of these changes will need to be changed through official channels such as AEO, ECP, RFV, RFP questions are not considered an official drawing modification channel. At this time no ECPs, RFVs, or AEOs will be processed until after contract(s) are awarded.
| 3830AS105 |
| B |
| SLURRY HOLDER WITH IGNITION COMPOSITION |
| 1 |
| D8 |
| Confirm that Item 2 in NOTE 3 refers to the slurry derived from mixing Items 2 through 6. |
| The USG acknowledges some typos or other corrections may be required to be altered to clarify requirements, all of these changes will need to be changed through official channels such as AEO, ECP, RFV, RFP questions are not considered an official drawing modification channel. At this time no ECPs, RFVs, or AEOs will be processed until after contract(s) are awarded. |
| 3830AS106 |
| B |
| FOIL STRIP |
| 1 |
| A2 |
| Confirm drawing scale should be 1.5:1 instead of 1:1. |
| The USG acknowledges some typos or other corrections may be required to be altered to clarify requirements, all of these changes will need to be changed through official channels such as AEO, ECP, RFV, RFP questions are not considered an official drawing modification channel. At this time no ECPs, RFVs, or AEOs will be processed until after contract(s) are awarded. |
| 2 |
| A2 |
| Confirm drawing scale should be 1.5:1 instead of 2:1. |
| The USG acknowledges some typos or other corrections may be required to be altered to clarify requirements, all of these changes will need to be changed through official channels such as AEO, ECP, RFV, RFP questions are not considered an official drawing modification channel. At this time no ECPs, RFVs, or AEOs will be processed until after contract(s) are awarded. |
| 3830AS109 |
| A |
| WRAP, FOIL |
| 1 |
| D4 |
| Confirm that NOTE 3 should be LINER instead of BACKING to align with 3830AS110 nomenclature. |
Confirm that NOTE 5 should be LINER instead of BACKING to align with 3830AS110 nomenclature.
The USG acknowledges some typos or other corrections may be required to be altered to clarify requirements, all of these changes will need to be changed through official channels such as AEO, ECP, RFV, RFP questions are not considered an official drawing modification channel. At this time no ECPs, RFVs, or AEOs will be processed until after contract(s) are awarded.
| 3830AS110 |
| B |
| ALUMINUM FOIL TAPE (LINERED) |
| 1 |
| C5 |
| Drawing only provides nominal dimensions. Tolerances or Min/Max dimensions needed to determine acceptable items. |
Vendor suggests changing VALUE to TYPICAL VALUES.
The USG acknowledges some typos or other corrections may be required to be altered to clarify requirements, all of these changes will need to be changed through official channels such as AEO, ECP, RFV, RFP questions are not considered an official drawing modification channel. At this time no ECPs, RFVs, or AEOs will be processed until after contract(s) are awarded.
| 3830AS111 |
| B |
| SPACER, RUBBER |
| This drawing was absent from the TDP we received and is required BASIC configuration. Confirm that vendor is to build the -30 configuration only. |
| The USG acknowledges some typos or other corrections may be required to be altered to clarify requirements, all of these changes will need to be changed through official channels such as AEO, ECP, RFV, RFP questions are not considered an official drawing modification channel. At this time no ECPs, RFVs, or AEOs will be processed until after contract(s) are awarded |
Vendor will need to request drawing from Contracting Officer
| 3830AS112 |
| B |
| CLOSURE CAP |
| 1 |
| C2 |
| Confirm that text is to be filled (solid) rather than outlined as shown on drawing (see below). |
MJU-53/B instead of MJU-53/B The USG acknowledges some typos or other corrections may be required to be altered to clarify requirements, all of these changes will need to be changed through official channels such as AEO, ECP, RFV, RFP questions are not considered an official drawing modification channel. At this time no ECPs, RFVs, or AEOs will be processed until after contract(s) are awarded.
| 1 |
| A2 |
| Confirm drawing scale should be 3:1 instead of 2:1. |
| The USG acknowledges some typos or other corrections may be required to be altered to clarify requirements, all of these changes will need to be changed through official channels such as AEO, ECP, RFV, RFP questions are not considered an official drawing modification channel. At this time no ECPs, RFVs, or AEOs will be processed until after contract(s) are awarded. |
3830AS113
B
END CAP
| 1 |
| D7 |
| NOTE 1: Designation per ASTM D3935 should be PC0140G10A12340 because TABLE A is being utilized for tensile strength, Izod impact, flexural modulus and deflection temperature in lieu of TABLE PC. |
| The USG acknowledges some typos or other corrections may be required to be altered to clarify requirements, all of these changes will need to be changed through official channels such as AEO, ECP, RFV, RFP questions are not considered an official drawing modification channel. At this time no ECPs, RFVs, or AEOs will be processed until after contract(s) are awarded. |
| 1 |
| C6 |
| Confirm that .14 dimension should be 4X .14 to compliment the 4X 45° in Zone C7. |
| The USG acknowledges some typos or other corrections may be required to be altered to clarify requirements, all of these changes will need to be changed through official channels such as AEO, ECP, RFV, RFP questions are not considered an official drawing modification channel. At this time no ECPs, RFVs, or AEOs will be processed until after contract(s) are awarded. |
| 1 |
| A2 |
| Confirm drawing scale should be 2:1 instead of 1:1. |
| The USG acknowledges some typos or other corrections may be required to be altered to clarify requirements, all of these changes will need to be changed through official channels such as AEO, ECP, RFV, RFP questions are not considered an official drawing modification channel. At this time no ECPs, RFVs, or AEOs will be processed until after contract(s) are awarded. |
| 3830AS115 |
| B |
| PELLET HOLDER |
| 1 |
| A2 |
| Confirm dimension .091 should be 3X .091 or labeled CONTINUOUS FEATURE (or the symbol applied in lieu of that phrase). |
| The USG acknowledges some typos or other corrections may be required to be altered to clarify requirements, all of these changes will need to be changed through official channels such as AEO, ECP, RFV, RFP questions are not considered an official drawing modification channel. At this time no ECPs, RFVs, or AEOs will be processed until after contract(s) are awarded. |
| B3 |
| Confirm dimensions: There is a potential .006" interference fit with the Slurry Holder due to its .834"±.005" (Zone C3) width and 2X .070"±.005" (Zone B6-B7) wall thickness. |
| The USG acknowledges some typos or other corrections may be required to be altered to clarify requirements, all of these changes will need to be changed through official channels such as AEO, ECP, RFV, RFP questions are not considered an official drawing modification channel. At this time no ECPs, RFVs, or AEOs will be processed until after contract(s) are awarded. |
| 3830AS116 |
| B |
| SLURRY HOLDER |
| 1 |
| C3 |
| Confirm dimensions: There is a potential .006" interference fit with the Pellet Holder due to its .680"±.005" (Zone B3) width. |
| The USG acknowledges some typos or other corrections may be required to be altered to clarify requirements, all of these changes will need to be changed through official channels such as AEO, ECP, RFV, RFP questions are not considered an official drawing modification channel. At this time no ECPs, RFVs, or AEOs will be processed until after contract(s) are awarded. |
| 1 |
| C4 |
| Confirm dimension .200 should be 2X Ø.200 (to capture cylindrical feature projecting off of Datum A). |
| The USG acknowledges some typos or other corrections may be required to be altered to clarify requirements, all of these changes will need to be changed through official channels such as AEO, ECP, RFV, RFP questions are not considered an official drawing modification channel. At this time no ECPs, RFVs, or AEOs will be processed until after contract(s) are awarded. |
| 3830AS118 |
| B |
| PISTON |
| 1 |
| C5 |
| Confirm GD&T information for Ø.37 dimension. If Datum C is a feature of surface, not of size, the application of MMC is incorrect. It is possible this feature really should be tied to Datum D instead in which case the application of the MMC modifier would be appropriate/correct. |
| The USG acknowledges some typos or other corrections may be required to be altered to clarify requirements, all of these changes will need to be changed through official channels such as AEO, ECP, RFV, RFP questions are not considered an official drawing modification channel. At this time no ECPs, RFVs, or AEOs will be processed until after contract(s) are awarded. |
| 3830AS123 |
| B |
| SILICONE, ONE-COMPONENT |
| 1 |
| C4 |
| Drawing only provides nominal dimensions. Tolerances or Min/Max dimensions needed to determine acceptable items. Vendor suggests VALUE be changed to TYPICAL VALUES. |
| The USG acknowledges some typos or other corrections may be required to be altered to clarify requirements, all of these changes will need to be changed through official channels such as AEO, ECP, RFV, RFP questions are not considered an official drawing modification channel. At this time no ECPs, RFVs, or AEOs will be processed until after contract(s) are awarded. |
| 3830AS127 |
| A |
| LOW LINEAR DENSITY POLYETHYLENE MOLDING MATERIAL |
| 1 |
| C2 |
| Confirm ASTM reference. ASTM D3585 is titled "Standard Specification for ASTM Reference Fluid for Coolant Tests" and has nothing to do with testing LLDPE. The correct ASTM appears to be D3835 which is titled "Standard Test Method for Determination of Properties of Polymeric Materials by Means of a Capillary Rheometer". |
| The USG acknowledges some typos or other corrections may be required to be altered to clarify requirements, all of these changes will need to be changed through official channels such as AEO, ECP, RFV, RFP questions are not considered an official drawing modification channel. At this time no ECPs, RFVs, or AEOs will be processed until after contract(s) are awarded. |
| 9826399 |
| D |
| SPACER, SILICONE |
| 1 |
| C4 |
| Per Table IV of MIL-R-46089, .1875" thick material has a tolerance ±.03125". Suggest that this dimension either be made "reference" (i.e., (.1875)) or deleted altogether and the end of NOTE 3 be changed to read "…, GRADE, FORM S, .1875 THICK." |
| The USG acknowledges some typos or other corrections may be required to be altered to clarify requirements, all of these changes will need to be changed through official channels such as AEO, ECP, RFV, RFP questions are not considered an official drawing modification channel. At this time no ECPs, RFVs, or AEOs will be processed until after contract(s) are awarded. |
| 3830AS111 |
| B |
| SPACER, RUBBER |
| - |
| - |
| This drawing is missing from the TDP which Is required for the BASIC configuration of 3830AS100. Confirm that vendor is to build only the -30 configuration of 3830AS100. |
| Vendor will need to request drawing from Contracting Officer. |
The USG is purchasing the MJU-53/B which can be either basic configuration or -30 configuration as described on 3830AS100 rev D page 1.
OES-3026
C
PURCHASE DESCRIPTION FLARE, DECOY MJU-53/B
| 6 |
| 4.4.b |
| Confirm that the hours are regularly scheduled work hours and not continuous hours. |
| Does intend continuous hours |
| 7 |
| 4.4.e |
| What is the minimum inspection lot size, excluding test samples? |
| There is not a minimum lot size. The economics of only paying for deliverables will self-drive toward the maximum, no minimum is needed. |
| 10 |
| 4.5.1.1 |
| Can we define a maximum rate for escaping bubbles or a maximum number of bubbles that can escape from the flare over the test period? |
| Discussions regarding leak testing can occur during MSE (AIE/SIE) submission process. |
| 10 |
| 4.5.1.3 |
| Which squib should we use? All versions of the MJU-53/B’s end item specification OES-3026 have called for use of a BBU-36/B (only the original version stated “… BBU-36/B, CCU-144/A or equivalent …” in ¶4.5.1.3) impulse cartridges. Hill AFB replaced that with the BBU-36A/B by mid-2015 and modified contract FA8213-15-C-0015 for its procurement. It is reasonable to assume that the BBU-36A/B is what will be used with the MJU-53/B in the field. |
| It is intended to be used with the BBU-36A/B, either are acceptable BBU-36/B or BBU-36A/B. |
| 15 |
| 6.2, Note 3 |
| Confirm replacement of Miller-Stephenson MS907 (no longer available) with Devcon 5 Minute Epoxy which has been approved internally for use in testing for other programs including the MJU-68/B. |
| Discussions regarding IR testing methods can occur during MSE submission process. Other epoxies can be considered for IR testing. |
FA8213-19-R-3008
Solicitation
| Section J |
| - |
| 19-48-4116/110F – The solicitation incorrectly refers to this drawing as the base document but it is Revision 5 dated August 2005. Solicitation needs to be updated to reference this drawing correctly. |
Also, the solicitation must be updated to include the following drawings that are related to unitization:
· 19-48-4116 Rev. 13
· 12982865K
· 12999545J
· 13060578(–)
· 13064136A
· ACV00561G
· ACV00831(–)
The revision date will be updated at contract award.
| - |
| - |
| Confirm that there is no GFM or GFE for this contract. |
| No GFM or GFE will be provided for this contract. |
image3.png image4.png image5.emf
DL3830AS100C_wCorrections.docx
DATA LIST
APPLICATION
REVISIONS
NEXT ASSY
USED ON
REV
DESCRIPTION
DATE
APPROVED
3830AS100
MJU-53/B
CC* SEE EO NO. 18A0806-H
2018/9/4
LZPEX RELEASE
Click here to enter text.
Click here to enter text.
B
DESIGN TRANSFERRED TO OO-ALC, SEE EO NO. 18A0377-H
2018/5/2
LZPEX RELEASE
Click here to enter text.
Click here to enter text.
Click here to enter text.
Click here to enter a date.
Click here to enter text.
DATA LIST
FOR
DRAWING 3830AS100 CAGE CODE 30003
NSN 1370-01-503-1455
NOTES:
DRAWINGS MARKED WITH AN ASTERISK (*) ARE CLASSIFIED. OBTAIN FROM PROGRAM ENGINEER AT MUNITIONS SUSTAINMENT DIVISION COMPONENTS BRANCH, 6033 ELM LN, BLDG 1247, HILL AFB 84056.
DISTRIBUTION STATEMENT D – DISTRIBUTION AUTHORIZED TO DEPARTMENT OF DEFENSE AND DOD CONTRACTORS ONLY; CRITICAL TECHNOLOGY. 2019-04-152019-03-25. OTHER REQUESTS FOR THIS DOCUMENT SHALL BE REFERRED TO THE MUNITIONS SUSTAINMENT DIVISION COMPONENTS BRANCH AT 6033 ELM LANE BLDG 1247, HILL AFB UT. 84056.
WARNING - THIS DOCUMENT CONTAINS TECHNICAL DATA WHOSE EXPORT IS RESTRICTED BY THE ARMS EXPORT CONTROL ACT (TITLE 22, U.S.C. SEC 2751 ET SEQ.) OR EXECUTIVE ORDER 12470. VIOLATIONS OF THESE EXPORT LAWS ARE SUBJECT TO SEVERE CRIMINAL PENALTIES. DISSEMINATION OF THIS DOCUMENT IS CONTROLLED UNDER DOD DIRECTIVE 5230.25 AND AFI 61-204.
DESTRUCTION NOTICE - FOR UNCLASSIFIED, LIMITED DOCUMENTS, DESTROY BY ANY METHOD THAT WILL PREVENT DISCLOSURE OF CONTENT OR RECONSTRUCTION OF THE DOCUMENT.
All SHEETS SAME REVISION LEVEL
UNLESS OTHERWISE SPECIFIED
DIMENSIONS ARE IN INCHES
TOLERANCE ON
FRACTIONS DECIMALS ANGLES
CONTRACT NUMBER
DEPARTMENT OF THE NAVY
NAVAL AIR SYSTEMS COMMAND
WASHINGTON, D.C. 20360
Click here to enter text.
DRAFTSMAN/ PRPARER
DATE
MORONI CUMMINGS
2018/4/24
FLARE, DECOY, MJU-53/B
± 1/32~ .X ± . 3~ ± 3º
CHECKER
DATE
.XX ± .10~
RODNEY GOULD
2018/5/2
.XXX ± . 125~
PROJECT ENGINEER
DATE
DO NOT SCALE DRAWING
MORONI CUMMINGS
2018/4/24
ENGINEERING APPROVAL
DATE
98747
JAY HENSLEY
2018/5/2
AF AUTHENTICATION
DATE
CAGE
DRAWING NUMBER
REV
CURRENT CAGE CODE
JAY HENSLEY
2018/5/2
30003 DL3830AS100
CC*
AIR FORCE RELEASE
DATE
SCALE
WEIGHT
SHEET
Click here to enter text.
Click here to enter a date.
N/A
N/A
AFMC Form 1652 (MS WORD) emption to Form 1652 approved by HQ AFMC/ENP (MS WORD)
CAGE CODE
DRAWING NO.
REV
PAGE NO.
CAGE CODE
DRAWING OR DOCUMENT NO
REV
NOMENCLATURE OR DESCRIPTION
SHEETS
ECP/EO
9874730003
3830AS100
D
FLARE, DECOY, MJU-53/B
9874730003
3830AS101
B
CASE
9874730003
3830AS102
B
GRAIN / IGNITER ASSEMBLY
9874730003
3830AS103
B
PELLET HOLDER WITH IGNITION COMPOSITION
9874730003
3830AS104
B
SLURRY HOLDER/GRAIN WITH FOIL WRAP
9874730003
3830AS105
B
SLURRY HOLDER WITH IGNITION COMPOSITION
9874730003
3830AS106
B
FOIL STRIP
9874730003
3830AS107
A
MAGNESIUM POWDER #1
9874730003
3830AS108
A
MAGNESIUM POWDER #2
9874730003
3830AS109
A
WRAP, FOIL
9874730003
3830AS110
B
ALUMINUM FOIL TAPE (LINERED)
9874730003
3830AS111
B
SPACER, RUBBER
9874730003
3830AS112
B
CLOSURE CAP
9874730003
3830AS113
B
END CAP
9874730003
3830AS114
B
CUP, SQUIB
9874730003
3830AS115
B
PELLET HOLDER
9874730003
3830AS116
B
SLURRY HOLDER
9874730003
3830AS117
B
SLIDER
9874730003
3830AS118
B
PISTON
9874730003
3830AS119
B
GRAIN
9874730003
3830AS123
B
SILICONE, ONE-COMPONENT
9874730003
3830AS124
A
FOIL AND TALCUM
9874730003
3830AS125
A
RESIN, NYLON
9874730003
3830AS127
A
LOW LINEAR DENSITY POLYETHYLENE MOLDING MATERIAL
9874730003
3830AS128
A
COPOLYMER
9874730003
3830AS139
B
SPRING, COMPRESSION
9874730003
3830AS140
A
MAGNESIUM POWDER #3
98747
966139
G
RUBBER, HYDROGEN ABSORBING (HAR)
98747
9826399
E
SPACER, SILICONE
98747
200530483
B
PELLET, CAST
9874730003
SA3830AS129
A
CASE RE-SIZING FIXTURE
9874730003
SA3830AS130
A
CRIMPER
9874730003
SA3830AS131
A
FLOATING RAM
9874730003
SA3830AS133
A
EXTRUSION DIE
9874730003
SA3830AS136
A
LOADING FIXTURE, GRAIN/IGNITER/PISTON
9874712255
OES-3026
C
PURCHASE DESCRIPTION
9874712255
OES-3026 CLASSIFIED ADDENDUM*
C
PURCHASE DESCRIPTION CLASSIFIED ADDENDUM
30003
3830AS120*
PLANK
15A0826-H
30003
3830AS121*
IGNITION COMPOSITION
30003
3830AS122*
GRAIN CHEMICAL COMPOSITION (GROUND)
30003
3830AS126*
GRAIN CHEMICAL COMPOSITION (ATOMIZED)
13A1271-H & 15A0827-H
CAGE CODE
DRAWING NO.
REV
PAGE
30003 DL3830AS100 CC* 3
AFMC Form 1652 (MS WORD) emption to Form 1652 approved by HQ AFMC/ENP (MS WORD) image6.png image7.jpeg image1.png image2.png
File details come from the government source that posted it. Updated .