ES6200ADC26Mar19.pdf

PDF 136 KB Posted

Attached to
MJU-53/B Federal contract opportunity
Solicitation number
FA8213-19-R-3008
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Hill Air Force Base

About this file

This document provides details on a federal contract opportunity for MJU-53/B flares and related components. The solicitation will be released on December 18, 2018 by the Department of the Air Force Materiel Command Lifecycle Management Center located at Hill Air Force Base. The contract type will be firm fixed price for a base year plus two option years. Line item 0001 is for 120 MJU-53/B flares to be delivered within 180 days of award. Line item 0002 is for an estimated 200,000 MJU-53/B flares to be delivered within 365 days of first article approval. Additional line items include data items, engineering support, and potential foreign military sales. The document specifies qualification requirements and lists approved manufacturers.

ES 6200 Ammunition Data Card

View the file

Other files for this federal contract opportunity

Other files attached to MJU-53/B, newest first.
File Type Posted
MJU-53B_Requests_for_Clarification_&_Responses.docx DOCX document
Q&A_MJU-53B.docx DOCX document
FA821319R3008_______0003.pdf PDF
SectionL23Apr19.pdf PDF
SectionM16Apr19.pdf PDF
FA821319R3008_______0002.pdf PDF
Q&A_MJU-53B.docx DOCX document
SectionL16Apr19.pdf PDF
AirmunitionSpecification26Mar19.pdf PDF
FA821319R3008_______0001.pdf PDF
SectionM27Mar19.pdf PDF
19484116110f.pdf PDF
SectionL27Mar19.pdf PDF
Q&A_MJU-53B.docx DOCX document
FairOpportunity28Mar19.pdf PDF
Q&A_MJU-53B.docx DOCX document
Attachment3_DescriptionSheetsQARequirement.pdf PDF
AIR_SPECFD2020-18-63809.pdf PDF
Attachment5_ES7034Rework.pdf PDF
REPSHIP.pdf PDF
SOW.pdf PDF
FA821319R3008.pdf PDF
18-51348-EDL.pdf PDF
JQRMJU53Final.pdf PDF
Attachment4_ES6200ADC.pdf PDF
Attachment6_ES7650_Oct2000-MILSTD1916.pdf PDF
TransInstruction4.pdf PDF
WARPAttachment2.pdf PDF
FORM158.pdf PDF
1653.pdf PDF
CDRLS_Updated.pdf PDF
SectionM_11Feb19.pdf PDF
MJU53_SPI_REVAB.pdf PDF
SectionL_11Feb19.pdf PDF
FairOpportunityOrderingProcedures.pdf PDF
Show all 35

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 4

Revised 26 March 2019

ES6200

Ammunition Data Cards (End Item Component Listing)

Jan 2012 (revision)

When to Use: When a "Detailed End Item Component Listing" for ADC reporting is specified as a requirement per the Airmunitions specification. End Item

Component Listing with Drawing Number (s) and Nomenclature (s) must be provided by the government for sections "c" and "d".

Only if a "Detailed End Item Component Listing" for ADC reporting is specified as a requirement per the Airmunitions Specification—

Text:

Detailed requirements and guidance for the preparation of Ammunition Data

Cards (ADCs) are contained in MIL-STD-1168B, DI-MISC-80043 and the Worldwide

Ammunition-data Repository Program (WARP) online user's manual. Detailed requirements for obtaining and using a manufacturer's identification symbol, which is an integral component of the ammunition lot number, can be found in

MIL-HDBK- 14 61.

(a) The supplier shall develop and submit ADCS in accordance with the requirements of this clause, MIL-STD-1168B, and the user manual located on the WARP database. The WARP application is accessed through the Munitions

History Program (MHP) website. The ADC requirement is a flow-down requirement that applies to contractors and their suppliers, vendors or subcontractors.

(b) The supplier shall prepare an ADC for each lot of item (s) being produced under this contract, regardless of whether or not those lots are accepted or rejected by the Government. The ADC shall comply with MIL-STD-

1168B and WARP requirements.

(c) Unless otherwise authorized by the Procuring Contracting Officer, the supplier shall include, in the components sections on the ADC representing the deliverable item, as a minimum; all assemblies, sub-assemblies , components, explosives, and propellants listed below for the item being procured .

End Item Component Listing:

Drawing Number Nomenclature

3830AS1OO Flare, Decoy, MJU-53/B

3830AS101 Case

3830AS102 Grain/ Igniter Assembly

3830AS112 Closure Cap

3830AS113 End Cap

3830AS114 Cup, Squib

9826399 Spacer Silicone

200530483 Pellet, Cast

(d) The component items identified below are from paragraph (c) above and will be required to be listed on the ADC.

Drawing Number from paragraph (c) above 3830AS102, components as follows:

Component

Drawing Number Nomenclature

3830AS103 Pellet Holder with Ignition Composition

3830AS104 Slurry Holder/ Grain with Foil Wrap

3830AS117 Slider

3830AS118 Piston

3830AS139 Spring , Compression

Drawing Number from paragraph (c) above 200530483, components as follows:

966139 Rubber, Hydrogen Absorbing (HAR) or alternate material

Drawing Number from paragraph (d) above 3830AS103, components as follows:

3830AS115 Pellet Holder

3830AS121 Ignition Composition

Drawing Number from paragraph (d) above 383OAS104, components as follows:

3830AS105 Slurry Holder with Ignition Composition

3830AS106 Foil Strip

3830AS124 Foil and Talcum

3830AS119 Grain

Drawing Number from paragraph (d) above 383OAS105, components as follows:

3830AS108 Magnesium Powder No. 2

3830AS116 Slurry Holder

TYPE II PTFE MOLDING MATERIAL

Other components to be included from DL-3830AS100, if used, as follows:

3830AS107 Magnesium Powder No. 1

3830AS140 Magnesium Powder No. 3

3830AS128 Copolymer

TYPE II PTFE MOLDING MATERIAL

OTHER PTFE, specify type and part No.

(e) When required by the technical data package, all component lot numbers shall be in accordance with MIL—STD-1168B lot number convention. When not required by technical data package, component lot number may be constructed through producer lot number convention.

(f) The flow-down of the requirement for component ADCS generated via WARP is highly encouraged for other items not identified in paragraph (d) above when the prime contractor is purchasing components, assemblies, and subassemblies from subcontractors or vendors .

(g) All component RFD/ECPs shall be listed on the ADC for the deliverable item, as well as on the component ADC, when that component is identified in paragraph (d) above. The WARP user manual provides information on the level of detail required.

(h) A sample ADC shall be developed and submitted to the WARP system 30 days prior to First Article testing or 30 days prior to production in the event a first article is not required. The WARP ADC program will not allow the submission of additional ADCs until such time as the sample ADC has been approved in the system.

(End of clause)

(ES6200)

File details come from the government source that posted it. Updated .