14_-_QUALITY_ASSURANCE_LETTER_OF_INSTRUCTION.pdf

PDF 89 KB Posted

Attached to
5 Year CAD PAD Multiple Award IDIQ
Solicitation number
FA8213-19-R-0119
Issued by

About this file

14 - QUALITY ASSURANCE LETTER OF INSTRUCTION

View the file

Other files

File Type Posted
Updated_Ordering_Procedures.pdf PDF
Updated_Section_M.pdf PDF
FA821319R0119_______0001.pdf PDF
16_-_REPSHIP.doc.pdf PDF
18_-_Transportation_Data.pdf PDF
3-JQR_1377-00-918-8533_Fire_Ext_Ctg.pdf.pdf PDF
2-JQR_1377-00-280-0272_Fire_Ext_Ctg.pdf.pdf PDF
12-_Item_Description_For_All_Ten_NSNs.pdf PDF
25_-_SPI_F01-674-2649.pdf PDF
23_-_SPI_F01-454-7651.pdf PDF
1-JQR_1377-00-188-4086_Fire_Ext_Ctg.pdf.pdf PDF
21_-_SPI_F01-255-2382.pdf PDF
22_-_SPI_F01-271-7161.pdf PDF
7-_AMMUNITION_DATA_CARDS.pdf PDF
5-_JQR_1377-01-044-6367_Fire_Ext_Ctg.pdf.pdf PDF
27_-_Section_M.pdf PDF
10-_Engineering_Data_Lists_.pdf PDF
15_-_REPORT_OF_SHIPMENT.pdf PDF
9-_Contract_Data_Requirements_Lists.pdf PDF
20_-_SPI_F00-280-0272.pdf PDF
24_-_SPI_F01-566-6246.pdf PDF
26_-_Section_L.pdf PDF
8-_CAD_PAD_Item_Marking_Version_1.3.doc.pdf PDF
FA8213-19-R-0119.pdf PDF
19_-_SPI_F00-236-4782.pdf PDF
17_-_REWORK_&_REPAIR_OF_NONCONFORMING.pdf PDF
11-_Packaging_Requirements.pdf PDF
6-_AIRMUNITION_SPECIFICATION.docx.pdf PDF
28_-_Ordering_Procedures.pdf PDF
13-SOW_for_Packaging_&_Preservation.pdf PDF
4-JQR_1377-01-037-8538_Fire_Ext_Ctg.pdf.pdf PDF
Show all 31

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Contractor Name CAGE code

DCMA QAR Reviewer

Date Review Completed

Date Issued to Contractor

PR No. FD2020-

Date Contract Awarded

Final Delivery Date (FDD)

Program Name

DODIC

Part Number

The contractor is required to impose the listed below DCMA Inspection Points into the appropriate Work Orders.

All Work Orders pertaining to CRITICAL FLIGHT ITEMS must be identified on folders.

Mandatory - M: Stamp and/ or Signature on original documentation (i.e., Mfg. Planning, ATP, FAT Report, etc.)

Witness - W: GSI required to attend, may reduce level of effort after 50% of production lots found acceptable

Verification - V: Stamp and/or Signature required unless noted otherwise (may be done by written verification)

Monitor - R: Will monitor testing, may reduce to verification

Notify - N: By phone or email

Additional requirements: (DCMA reserves the right to impose additional inspection points as deemed necessary.)

Prepared by:

Date

Concurrence Signature by QAR/DCMA:

QAR/DCMA

THIS PLANNING SHEET WILL BE UPDATED IF NECESSARY.

QUALITY ASSURANCE LETTER OF INSTRUCTION

Planning Requirements

COMMENTS

NOTICE

Engineer

Date

Sheet1

Contract No: 19-50119
Date Contract Awarded:
Final Delivery Date FDD:
Program Name: E-3, F-15, A-10, UH-1
DODIC: ZY02, RY49, MT41, MM70, UY12
undefined: V
undefined_2: V
undefined_3: V
undefined_4: M
undefined_5: W
undefined_6: V
undefined_7: V
undefined_8: V
undefined_9: N
undefined_10:
undefined_11:
undefined_12:
Text19: PSEMC (AZ), AETC
Text20: 54181, 57597
Text21:
Text22:
Text23:
Text24: 1.Inspection
Text25: 2. Leak Test
Text26: 3. X-Ray
Text27: 4. LAT Sample Selection
Text28: 5. LAT
Text29: 6. Preparation for Shipment
Text30: 7. AMMO Data Card Review
Text31: 8. Shippers (DD250, DD1149, Reports)
Text32: 9. Additional Requirements
Text33:
Text34:
Text35:
Text36: 1. Verify that the Explosive Weight is identified and meets drawing and hazard classification requirements.

2. Verify gross/fine leak checks are performed per ATP requirements

3. Ensure film labeling correct. Ensure radiographic film readable / well-defined. DCMA not required to interpret film.

4. Randomly select LAT units per latest government approved ATP.

5. Prior to LAT ensure proper calibration and validation of all test equipment. Testing should occur in accordance with latest government approved ATP.

6. Ensure Paperwork is correct.

7. Verify all energetic materials: list original manufacturer, original lot no., and latest certification/recertification date < 24 months.

8. Ensure Paperwork is correct. Verify Packaging, Packing, Preservation & Marking (PPP&M)

9. Notify and obtain approval from the Project Engineer for any additional requirements imposed by DCMA.

2018-11-08T09:52:32-0700
TANNER.MATTHEW.W.1379435919
Text46: 2018-11-08-Th
Text49:
Type name_1:
Type name_4:
Part Number:
Noun: 30903801, 200430, 30903802-1, 201250, 30903823, 200770, 13083-5, 200730, 30900400, 200830

File details come from the government source that posted it.