Synopsis_of_FA8211-15-R-0001_AVCI.docx
DOCX document 20 KB Posted
- Attached to
- T-38C Avionics Component Integration and Contractor Logistics Support Federal contract opportunity
- Solicitation number
- FA8211-15-R-0001
About this file
Synopsis for the AvCI effort RFP FA8211-15-R-0001.
View the file
Other files for this federal contract opportunity
Show all 50
T-38C Avionics Component Integration and Contractor Logistics Support has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SYNOPSIS
for T-38C Avionics Component Integration and Contractor Logistics Support (AvCI), FA8211-15-R-0001
Date: 3 December
Year: 2014
Contracting Office Zip Code: 84056
Classification Code: R – Professional, Administrative, and Management Support Services
Contracting Office Address: Department of the Air Force
AFLCMC/WLDKA
6072 Fir Avenue Bldg. 1233 Hill Air Force Base, UT 84056 Subject: T-38C Avionics Component Integration and Contractor Logistics Support - AvCI Solicitation Number: FA8211-15-R-0001 Closing Response Date: N/A Contact Points:
Contracting Officer: Chad J. Galioto Phone 801-586-0690 Fax 801-777-5777 Email: chad.galioto@us.af.mil
Contract Specialist: Casey Hodson Phone 801-777-8416 Fax 801-777-5777 Email: casey.hodson@us.af.mil
Contract Award: Estimated as September 2015 Contract Award Dollar Amount: Estimated $855,000,000.00 Ceiling Contract Line Item Numbers:
0001 - Mission Display Processor (MDP): Replacement, Overhaul, or Refurbishment, & Procurement 0002 - Heads Up Display (HUD): Replacement, Overhaul, or Refurbishment, & Procurement 0003 - Automatic Dependent Surveillance-Broadcast (ADS-B) Development & Procurement 0004 - VHF Communication/VHF Navigation Radios (VHF) Development & Procurement 0005 - Program Management 0006 - Combs Labor Cost 0007 - FSR Labor Cost 0008 - COMBS & FSR Overtime 0009 - CLS, Material Cost Per Flight Hour 0010 - Government Damaged Parts 0011 - Engineering Services 0012 - Software Applications Support 0013 - Courseware Support 0014 - Out-Of-Cycle Modifications, FFP 0015 - Out-Of-Cycle Modifications, CPFF 0016 - Special Studies 0017 - Block Upgrades 0018 - Travel 0019 - FSR Travel Support 0020 - Over & Above, FFP 0021 - Over & Above, CPFF 0022 - Permanent Change of Base Location 0023 - Transition Phase-In 0024 - Transition Phase-Out 0025 - Life-Time/Last-Time Buy Requirements Anticipated Contract Award Date: September 2015 Contractor: TBD (Source Selection) Description: The Air Force anticipates awarding a contract for T-38C Avionics Component Integration and Contractor Logistics Support services, IAW the Performance Work Statement (PWS) and Statement of Objectives (SOO). The period of performance is anticipated to be September 2015 through September 2020 for the basic 5 year period with an additional 5 year option period. In addition to the period of performance, a 90 day transition period is included for this requirement if applicable. This requirement will utilize full and open competition. All Government requirements have been identified and can be referenced in the CLINs listed above. Requirements consist of Replacement, Overhaul, or Refurbishment, & Procurement for the MDP and HUD. The Government requires a solution to integrate the Federal Aviation Administration (FAA) mandated ADS-B system/functionality and also the VHF Communication/VHF Navigation radios. Also, required is Contractor Logistics Support (CLS), Contractor Operated and Maintained Base Supply (COMBS), systems and sustaining engineering, software development support, and other hardware/software modifications. The contractor will be responsible for Diminishing Manufacturing Sources and Material Shortages (DMSMS) support for the period of performance of this contract to include the cost for all parts, hardware and software development/modification and integration into the T-38C Avionics System. Operational locations and COMBS facility locations are outlined in the AvCI Performance Work Statement. This acquisition will utilize Lowest Price Technically Acceptable (LPTA) source selection procedures in accordance with FAR 15.101-2, as supplemented. Technical tradeoffs will not be made and no additional credit will be given for exceeding acceptability. Award will be made to the technically acceptable offer with the lowest evaluated cost/price, which is deemed responsible in accordance with the Federal Acquisition Regulations and whose proposal conforms to the solicitation requirements. The solicitation requirements include all stated terms, conditions, representations, certifications, and all other information required by Section L of the solicitation. The Government reserves the right to award without discussions. Therefore, each initial offer should contain the offerors best terms from a price and technical standpoint. See Draft Request for Proposal for further details.
Delivery schedule: TBD on each Delivery Order Duration of the contract period: The total duration of this contract, including the exercise of any options shall not exceed 11 years total. The duration of this contract is comprised of a 5 year basic period and a 5 year option period for ordering, to include an additional 1 year for delivery.
Solicitation Procedures: A competitive Request for Proposal (RFP) using Lowest Price Technically Acceptable (LPTA) procedures will be used to award this contract. Release of the RFP is anticipated in January 2015. At time of RFP release, all responsible sources may submit a bid, proposal, or quotation which shall be considered by the agency.
Place of Contract Performance: TBD Set-aside Status: N/A
File details come from the government source that posted it. Updated .