ATTACHMENT_3_HUD_SOO.pdf
PDF 952 KB Posted
- Attached to
- T-38C Avionics Component Integration and Contractor Logistics Support Federal contract opportunity
- Solicitation number
- FA8211-15-R-0001
About this file
Heads Up Display (HUD) Statement of Objectives (SOO)
View the file
Other files for this federal contract opportunity
Show all 50
T-38C Avionics Component Integration and Contractor Logistics Support has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment 3
FA821114R0001
T-38C AVIONICS COMPONENT
INTEGRATION (AvCI)
STATEMENT OF OBJECTIVES (SOO)
Heads-Up Display (HUD)
System Replacement & Integration
T-38 Systems Program Office (SPO)
AFLCMC/WLDMA
Hill AFB UT 84056
Date 23 October 2014
Page ii of iv
Table of Contents 1 Overview
1.1 Purpose
1.2 Background
2 Objectives
2.1 Development Concept
2.2 Notional Development Schedule
2.3 Key Performance Parameters
3 Scope of Work
3.1 Administration
3.2 Program Management
3.3 Data Rights
3.4 Quality Assurance
3.5 Corrosion Prevention and Management
3.6 Configuration Management
3.7 Risk Management
3.8 Software Management
4 Engineering Change Proposal
4.1 ECP Content
5 Test and Test Support Activities
5.1 System Test and Integration
5.2 Primary Flight Reference Endorsement
5.3 Developmental Test (DT) and Force Development Evaluation (FDE)
6 Certifications and Approvals
6.1 Authority to Test and Authority to Operate
6.2 Platform Information Assurance
6.3 Airworthiness
6.4 CNS-ATM
7 Formalize Change after Successful Test
Page iii of iv
7.1 Finalize configuration and Release Documents
8 Hardware and Production and Delivery
8.1 A Kits - Aircraft Modification Kit
8.2 B Kits – System LRUs
8.3 Production Schedule
8.4 Packaging
8.5 Contract Field Team
9 Diminishing Manufacturing and Material Shortages (DMSMS)
9.1 DMSMS Management
9.2 DMSMS Reporting
9.3 DMSMS Mitigation
10 Government Furnished Equipment
10.1 Systems Integration Lab (SIL)
11 Associate Contractor Agreement
12 Conditions and Assumptions
13 Compliance Directives and Reference Documents
13.1 T-38C Performance Requirements
13.2 Department of Defense Instructions
13.3 Air Force Instructions & Directives
13.4 Air Force Manuals & Pamphlets
13.5 Military Standards and Specifications
13.6 Military Handbooks
13.7 Civilian Aviation Directives
14 Deliverables:
15 Technical Data Package (TDP)
Page iv of iv
Table of Tables Table 2-1 Heads-Up Display System Components
Table 2-2 Notional Development schedule
Table 6-1 Minimum Documents Required for ATT/ATO
Table 8-1 T-38C Aircraft locations
1 Overview
1.1 Purpose
This SOO provides the basis for a priced proposal to develop and integrate a replacement, overhaul or refurbishment solution for the T-38C Heads-Up Display (HUD) system. The requirement is to provide a single operational and fully integrated solution to ensure system supportability throughout the T-38C lifecycle currently projected to be the end of
2029. The solution shall include all drawings, technical data and Time Compliance
Technical Order (TCTO) information outlining installation requirements. Required documentation shall be based on the Offeror’s proposed solution and system change classification in accordance with MIL-HDBK-61.
1.2 Background
The current HUD system on the T-38C was designed approximately 20 years ago and is currently in use on 456 aircraft. Diminishing Manufacturing and Material Shortage
(DMSMS) reporting indicates that the current HUD system will be difficult to support beyond CY2017. The HUD system includes three Line Replaceable Units (LRUs), the Pilot
Display Unit (HUD-PDU), HUD Power Supply Unit (HUD-PSU), and Up Front Control Panel
(UFCP). The rate at which the parts are becoming obsolete has been accelerating dramatically in recent years, creating supportability issues for the T-38C aircraft and mission.
2 Objectives
2.1 Development Concept
The concept of development (replacement, overhaul or refurbishment) shall be Form-Fit-
Function Interface (F3I). To minimize impact to the T-38C mission, the Government requires, to the extent possible, an F3I replacement for all components developed.
Although F3I is one of the primary objectives, it is understood that some variance may be required. The intent is to negate any impact to cockpit configuration and minimize any impact to avionics system operation and aircrew workload. Variance in the equipment bay(s) may be necessary but should not exceed T-38C weight and balance limitations or standard engineering practices.
Installation of components into the aircraft will be the responsibility of the Government.
The Government desires that the modification is accomplished at the field level via Time
Compliance Technical Order (TCTO) to reduce aircraft downtime and programmed maintenance impact. Field Level TCTOs are limited to approximately 25 man-hours.
Proposals shall provide an estimate of the time required for equipment retrofit. If the estimate exceeds 25 man-hours, the contractor shall provide a recommended retrofit solution. The current components that comprise the “HUD System” are listed below in
Table 2-1.
Table 2-1 Heads-Up Display System Components
Part Number Description Supplier CAGE Unit(s)
Per Assembly
4452-1000-01 HEAD UP DISPLAY (HUD)
ELOP Electro Optical
Industries LTD
SC067 1
4477-1000-80 HUD POWER SUPPLY UNIT
ELOP Electro Optical
Industries LTD
SC067 1
4453-1000-00
UP-FRONT CONTROL PANEL
(UFCP)
ELOP Electro Optical
Industries LTD
SC067 2
2.2 Notional Development Schedule
Table 2-2 depicts a notional schedule. The contractor will use this schedule as a basic timeline for development of the Integrated Master Schedule (IMS) required in Section 4 and Material Fielding plan for this effort. It is understood by the Government that there will be deviations from what is depicted in Table 2-2 based on the Offeror’s proposed solution.
Table 2-2 Notional Development schedule
2.3 Key Performance Parameters
The HUD system (new development, overhauled or refurbished) shall meet or exceed the current system specifications. Refer to the following documents.
2.3.1 T-38C System Performance Specification, Revision H, dated 14 February 2011, (Attachment 2)
2.3.2 Drawings 71J267011_76301 (Sheet 1 – 4 and Drawing Change Notice)
2.3.3 Form-Fit-Function & Interface Specification, 71_267011a1, 71_267011b1
3 Scope of Work
3.1 Administration
3.1.1 The Contractor shall perform administrative functions, to include scheduling meetings, arranging facilities, providing status reports, documenting official decisions and actions assigned, and maintaining charter documents, records, and databases referenced within this document.
3.1.2 The Contractor shall appoint a primary Point of Contact (POC) for this contract. This individual shall be the primary representative and have the Contractor’s full authority to act on matters pertaining to the performance of the services under this contract.
3.1.3 To meet the requirements of this contract the contractor shall be required to develop and deliver information to the Government in accordance with the Contract Data Requirements List (CDRL). Where possible the contractor shall submit one CDRL to encompass the program requirements. (e.g. Configuration Management Plan should include the HUD, MDP, ADS-B, VHF Nav/Comm development and integration and overall T-38C avionics system management)
3.1.4 All documents sited in this PWS refer to the base document but shall include the latest revision. Document may be available on ASSIST or other Government document repository sites. (https://assist.dla.mil/online/start/index.cfm) (http://www.e-publishing.af.mil/) (http://www.e-publishing.af.mil/otherpublishingsites.asp)
3.2 Program Management
3.2.1 The Contractor shall develop and deliver an Engineering Change Proposal (ECP) (CDRL
A014)
3.2.2 The Contractor shall develop and maintain an Integrated Master Schedule (IMS). (CDRL
A001)
3.2.3 Kickoff Meeting: The Contractor shall host a kickoff meeting within 30 working days after receipt of order (ARO) and provide meeting minutes within five working days of meeting (CDRL A017)
3.2.4 The Contractor shall host Technical Interchange Meetings (TIM). TIMs will be conducted, at an expected frequency of two per year. Levels of participation will be based on the subject matter. Meeting minutes shall be provided within five working days of the conclusion of the meeting. (CDRL A017)
3.2.5 The Contractor shall host Program Management Reviews (PMR). PMRs shall be utilized to brief program status to Government Systems Program Office personnel. The
Government will coordinate/notify the Contractor of the meeting schedule. There will be a maximum of two meetings per year. The PMR location will alternate between the https://assist.dla.mil/online/start/index.cfm http://www.e-publishing.af.mil/ http://www.e-publishing.af.mil/ http://www.e-publishing.af.mil/otherpublishingsites.asp
Contractor’s facility and a government facility. Meeting minutes shall be provided by the Contractor within 5 working days of the conclusion of the meeting. (CDRL A003)
3.3 Data Rights
3.3.1 The Government requires Unlimited or Government Purpose Rights for all developed items, components, processes, computer software, and technical data used in the execution of this contract.
3.3.2 Software procured by the Contractor shall have the licensing agreement(s) assigned or transferred to the Government, giving the Government the same direct rights against suppliers that the Contractor would have.
3.3.3 The Contractor shall obtain prior written approval from the Procuring Contracting
Officer (PCO) prior to committing to the use of any private and mixed funds developed items, components, processes, computer software, and technical data which it:
A. Intends to deliver with Limited Rights
B. Intends to deliver with Government Purpose License Rights
C. Intends to deliver with Restricted Rights
D. May have less than Unlimited Rights
E. Will use in the performance of this Contract
F. Cannot meet the requirements outlined in paragraph 3.3.1 through 3.3.2
3.4 Quality Assurance
3.4.1 The Contractor shall implement and maintain a Quality Assurance (QA) program IAW
AS9100 and AS9110 standards as applicable. As part of this QA program the Contractor shall maintain a responsive surveillance system that continually monitors, documents, and corrects deficiencies in processes and procedures. When requested, the Contractor shall allow the Government access to their QA program documents and processes.
3.4.2 The Contractor shall submit a Quality Control Plan. (CDRL A025)
3.4.3 The Contractor Quality Organization shall provide support of requirement peer reviews, monitoring of activities to ensure processes are being followed, review of products generated (e.g., System Change Description) and support of meetings (staff, program status, Technical Interchange, etc.) to ensure compliance with established Contractor quality standards.
3.4.4 Contracting Officer Representative (COR): The Program Office COR(s) will review and approve Contractor submitted metrics and deliverables for purposes of billing and acceptance. Program Office CORs must receive and concur with Contractor-submitted metrics prior to DCMA acceptance of invoices in Wide Area Work Flow (WAWF).
3.4.5 The Contractor will be notified by letter upon contract award of the Primary and
Alternate CORs assigned to this contract.
3.5 Corrosion Prevention and Management
3.5.1 Using MIL-HDBK-1568 as a guide, develop a Corrosion Prevention and Control
Management Plan. (CDRL A034)
3.5.2 Identify production manufacture and repair facility corrosion prevention and control procedures. (AC 43.206 - Inspection, Prevention, Control, and Repair of Corrosion on
Avionics Equipment or equivalent)
3.6 Configuration Management
3.6.1 Using MIL-HDBK-61 for guidance, the Contractor shall develop, implement and maintain a Configuration Management Plan (CMP) that describes how the T-38C configuration documentation is to be maintained during the Contract Period of Performance (PoP).
The plan shall describe the processes to: (CDRL A006)
A. Maintain the existing configuration identification
B. Establish configuration control to evaluate proposed engineering changes and determine affected items and means of approval
1. The Contractor shall perform a Physical Configuration Audit (PCA) to ensure the design matches the specifications of the equipment being delivered to the Government.
2. The Contractor shall perform a Functional Configuration Audit (FCA) to ensure that the equipment being delivered to the Government meets the documented performance specifications and meets or exceeds the performance specifications specified in the T-38C System Performance
Specification.
C. Provide updates to Technical Orders/Technical Manuals in accordance with TM-86-
01N, Attachment 9 of this proposal (CDRL A029)
D. Provide updates to engineering drawings (CDRL A033)
E. Provide change documentation and update the Technical Data Package (TDP) as required for this effort. The TDP is defined in Section 15 of this document. (CDRL
A029)
F. Provide for and deliver to the Government the necessary Configuration Status accounting documents (CDRL A037)
3.6.2 The Contractor shall ensure suppliers maintain configuration control IAW Contractor developed Configuration Management Plan and Engineering Change Proposal
3.7 Risk Management
3.7.1 The Contractor shall develop the criteria, methods, and procedures used for identifying critical risks associated with the implementation of this Contract. Using the latest
Department of Defense (DoD) Risk Management Guide as reference, the Contractor shall implement a risk management process and provide a Risk Management Plan (RMP) that efficiently identifies, analyzes, mitigates, and tracks potential impacts to mission success.
3.7.2 The Contractor shall develop, implement, and maintain a RMP using AFI 63-101/20-101, AFMCI 63-1201 and AFPAM 63-128 as guidance. The RMP will be delivered to and approved by the Government. (CDRL A002)
3.7.3 The Contractor’s RMP shall identify risk, assess or analyze risk and implement procedures to reduce or eliminate risk to achieve program goals.
3.7.4 The Contractor’s RMP shall be implemented by Integrated Product Teams and managed as part of systems engineering/program management processes.
3.7.5 The Contractor shall provide on-going identification, analysis, abatement, and risk tracking.
3.7.6 The Contractor shall maintain a system risk summary and provide regular status reporting of key risk areas to the Government Program Manager.
3.8 Software Management
3.8.1 The Contractor shall design, fabricate, integrate, test, and evaluate the hardware, software, facilities, personnel subsystems, training, and the principle items necessary to satisfy program requirements, and to support and operate the system. This includes the requirements analysis, design, coding and unit testing, component integration and testing, and Computer Software Configuration Item (CSCI) level testing for software. This also includes system development and operational test and evaluation, software quality, configuration management, and support for software.
3.8.2 The Contractor shall develop and maintain a Software Management Plan. (CDRL A021)
4 Engineering Change Proposal
4.1 ECP Content
4.1.1 The ECP shall be Firm Fixed Price (FFP).
4.1.2 The Contractor shall conduct necessary system and design reviews and provide meeting minutes within five working days (CDRL A017). The minimum requirements are:
A. Systems Requirements Review (SRR)
B. Preliminary Design Review (PDR)
C. Critical Design Review (CDR)
D. Test Readiness Review (TRR)
E. Production Readiness Review (PRR)
4.1.3 The ECP shall contain an Integrated Master Schedule (IMS) to encompass all
Government/Contractor interrelationships. (CDRL A001)
A. The IMS shall integrate the tasks of all Government stakeholders and the
Contractor’s teams.
B. The IMS shall use critical path methodology to define and emphasize the program’s critical elements.
C. The IMS shall contain all control points (milestones) and all requirements for reviews, audits, and meetings required by this SOO.
4.1.4 The ECP shall provide a detail system design and include integration into the current T-
38C avionics system.
4.1.5 The ECP shall identify all hardware components by manufacturer, manufacturer source/cage code, manufacture part number, quantity and nomenclature
4.1.6 Software items required to integrate and test the solution shall be identified by developer, developer source/cage code, title, and version identification number. All software executable code, source code (including developer notes) shall be delivered with Unlimited Rights to the Government. (CDRL A005)
4.1.7 The ECP shall Identify and define any environmental qualification testing that may be required to include additional testing that may be required for Commercial Off-The-
Shelf (COTS) or Non-Developmental Items (NDI) that do not meet the T-38C specifications.
4.1.8 The contractor shall develop the overall ESOH risk management approach for the HUD replacement as part of the Systems Engineering (SE) Process per MIL-STD-882 and
National Environmental Policy Act (NEPA).
4.1.9 The Contractor shall perform weight and balance computations of proposed configurations and provide the results to the Government program office and
Government engineering for determination and approval.
4.1.10 The Contractor shall provide drawing and Technical Order (TO) changes for all TOs affected by the aircraft system changes. The contactor shall comply with TM-86-01N, Air
Force Technical Manual Contract Requirements (TMCR). The Contractor shall:
A. Provide mark-ups in accordance with TM-86-01N for all TOs and aircrew flight manuals affected by the aircraft system changes. (CDRL A029)
B. Provide all required changes to the Technical Manuals and installation drawings.
(CDRL A033)
C. Prepare and deliver a Time Compliant Technical Order (TCTO) for the installation of the HUD system into the T-38C (CDRL A029)
4.1.11 The Contractor shall provide information and technical support during development of the Technical Engineering Review Board (TERB) and Configuration Control Board (CCB) documentation and provide telephone support during these meetings.
5 Test and Test Support Activities
5.1 System Test and Integration
5.1.1 All performance/environmental test results shall meet or exceed current T-38C
Performance Specifications. Test reports shall be delivered to the Government Program
Office. (CDRL A036)
5.1.2 Bird strike testing shall be planned for and conducted unless waived by the
Government. The contractor shall provide an analysis and recommendation report to the Government. The Government will make a determination as to whether Bird Strike testing is necessity. Minimum determining factors: (CDRL A036)
Combiner glass is unable to fold down in the same manner and with the same forces as the current HUD combiner glass
Combiner glass materials or thicknesses change
Unable to determine whether combiner glass will cut through the windscreen or break into lethal ballistic projectiles
(See ATP-T-38 for Bird-Resistant Laminated Front Windshield Transparencies for T-38
Aircraft para 3.2.1.1.1).
5.1.3 The developed system and all proposed replacement equipment shall meet or exceed the Mean Time Between Failure (MTBF) rate(s) identified in the Form-Fit-Function &
Interface Specification.
5.1.4 The Contractor shall identify requirements for any additional test or support equipment and deliver requirements to the Government. (CDRL A038)
5.1.5 The Contractor shall install and evaluate the HUD system for proper fit in the aircraft.
5.1.6 The HUD system installation procedures and hardware configurations shall comply with
USAF aircraft hardware and maintenance practices. Reference: 1-1A-XX series Technical
Manuals.
5.1.7 The Contractor shall develop new or adapt existing Acceptance Test Procedures (ATP) for the HUD system. (CDRL A036) The Government will provide current system test procedures.
5.1.8 Using the Systems Integration Lab (SIL), the Contractor shall perform the T-38C Avionics
ATP for the HUD system equipment and deliver the resulting test report to the
Government. (CDRL A036)
5.2 Primary Flight Reference Endorsement
5.2.1 HUD system requires HQ AF/A3O Primary flight Reference (PFR) endorsement. The contractor shall prepare the PFR Endorsement Package for submission and assist the
Government in the approval process.
5.2.2 The contractor shall ensure the HUD system meets the requirements of MIL-STD-1787C for positioning, arrangement of flight information elements and symbology. The Flight
Symbology Development Group (FSDG) may require, at a minimum, one visit to see a fully functional simulation of the actual cockpit presentation.
5.3 Developmental Test (DT) and Force Development Evaluation (FDE)
5.3.1 The Contractor shall prepare and deliver a pre-DT release letter and configuration memo. (CDRL A015)
5.3.2 The Contractor shall provide inputs to the test team at Edwards AFB for the DT test plan.
5.3.3 The Contractor shall install and evaluate the HUD system for proper fit in the aircraft.
5.3.4 The Contractor shall perform on-aircraft ground operational checkout in accordance with the current T.O. 1T-38C-2-12 procedures or newly developed procedures as required.
5.3.5 The Contractor shall perform on-aircraft Electromagnetic Compatibility/Interference
(EMC/EMI) Safety of Flight (SOF) testing and deliver the test report to the Government.
(CDRL A036)
5.3.6 The Contractor shall provide engineering support during DT flight tests at Edwards AFB.
5.3.7 The Contractor shall prepare and deliver a pre- Force Development Evaluation (FDE) release letter and configuration memo.
5.3.8 The Contractor shall assist the test team at Randolph AFB in the development of the FDE test plan.
5.3.9 The Contractor shall provide engineering support during FDE at Randolph AFB.
5.3.10 The Contractor shall support all Government system test review boards, as required.
6 Certifications and Approvals
6.1 Authority to Test and Authority to Operate
The Contractor shall develop and coordinate the documents below with the T-38 Systems
Program Office (SPO) and other government agencies to ensure systems(s) receive
Authority to Test (ATT) and Authority to Operate (ATO). (CDRL A029)
Table 6-1 Minimum Documents Required for ATT/ATO
Document Purpose
Time Compliance Technical Order Installation instruction and required support
Program Introduction Document Test organization requirements and objectives e.g.
instrumentation requirements, data analysis plan
Deficiency Reports Make the test organization aware of potential issues to assign risk
Suggested Flight Test Plans for all phases of testing (DT, FDE)
Test techniques, test points, limitations, and management information
6.2 Platform Information Assurance
The Contractor shall provide information and technical support during the development of the update to the USAF Platform Information Technology (PIT), Architecture Analysis
Report (AAR) for the T-38C Talon. (CDRL A039)
6.3 Airworthiness
6.3.1 The Contractor shall provide support for airworthiness risk assessment activities.
6.3.2 The Contractor shall comply with all relevant Airworthiness requirements cited in MIL-
HDBK-516B and provide documentation of compliance to the Government and assist with the following processes or approvals: (CDRL A040)
A. Impact Assessment
B. Modified Airworthiness Certification Criteria
C. Risk Assessment
D. System Program Office Engineering and T-38 Chief Engineer approval
E. Air Force Material Command, Director of Engineering Approval
6.4 CNS-ATM
6.4.1 The contractor shall provide technical assistance and act as the T-38C Subject Matter
Expert (SME) for all CNS/ATM compliance requirements. The contractor is responsible for all processes and administration to support the Government in obtaining a CNS/ATM
Type 2 Data Chain Letter of Acceptance (LOA) and all applicable certifications required for any hardware/software development, sustainment and operation efforts. (Reference
AFI63-137)
6.4.2 The contractor shall maintain and update as required for certification currency, all T-38C
CNS/ATM documentation throughout the period of performance IAW AFI63-137. At a minimum, CNS/ATM documentation consists of the following: (CDRL A015)
A. T-38C RNAV/RNP/VNAV Tailored Performance Matrixes (TPMs)
B. T-38C Data Compliance Plan
C. T-38C NavData Architecture
D. T-38C RNAV/RNP/VNAV Performance Assessment (PA)
7 Formalize Change after Successful Test
7.1 Finalize configuration and Release Documents
7.1.1 The Contractor shall prepare release documents for Government approval.
7.1.2 The Contractor shall deliver final drawings and final TCTO(s) requirements.
7.1.3 The Contractor shall acquire final release approval from the Government.
7.1.4 The Contractor shall provide all final system documentation and deliverables to the government.
8 Hardware and Production and Delivery
The contractor shall provide the necessary Kits/materials to modify 456 aircraft. The
Contractor shall deliver a list of all procurable hardware to include: (CDRL A042)
8.1 A Kits - Aircraft Modification Kit
8.1.1 A Kits will include all components and hardware required to modify the T-38C aircraft to accept the new HUD system.
8.2 B Kits – System LRUs
8.2.1 B Kits will include HUD system LRU components (Packaged Separately).
8.3 Production Schedule
8.3.1 The Contractor shall provide a projected schedule for kit production and delivery assuming quantities sufficient to modify 456 T-38C aircraft. The schedule should highlight ramp up periods and maximum monthly deliveries once full rate production is achieved.
8.3.2 The Contractor shall provide an equipment fielding/basing plan. (CDRL A010)
8.4 Packaging
8.4.1 All kits will be packaged in accordance with ASTM D 3951-98 (2004)
8.5 Contract Field Team
8.5.1 This is an optional requirement to be exercised at Government discretion.
8.5.2 The Contract shall provide an estimate for system installation by a contractor provided contract field team.
8.5.3 The estimate shall be a Firm-Fixed-Price for a single team to retrofit the aircraft by operating location and should coincide with the Material Fielding Plan. Once an operating location is completed the team will move to the next location. For estimating purposes use table 8-1.
Table 8-1 T-38C Aircraft locations
Operating Locations
(July 2014)
Command
*Assigned
Aircraft
COMBS
Columbus AFB, MS AETC 87 YES Laughlin AFB, TX AETC 65 YES Randolph AFB, TX AETC 90 YES Sheppard AFB, TX AETC 123 YES Vance AFB, OK AETC 66 YES Holloman AFB, NM AFMC 4 NO Edwards AFB, CA AFMC 11 NO Patuxent River, MD USN 10 NO
Number of aircraft may change due to unforeseen circumstances
9 Diminishing Manufacturing and Material Shortages
(DMSMS)
9.1 DMSMS Management
9.1.1 The Contractor shall acquire and deliver the HUD System Bill of Materials (BOM). (CDRL
A035)
9.1.2 The Contractor shall ensure all BOM information is entered into the Government and
Industry Data Exchange Program (GIDEP).
9.1.3 The Contractor shall develop and submit a DMSMS Management Plan for managing the potential loss of manufacturers or supplier(s) of parts and/or material required for performance of this SOO. At a minimum, the plan shall address the following: (CDRL
A008)
A. Means and approach for providing the Government with information regarding obsolescence and DMSMS issues
B. Planned resolution of discovered DMSMS issues
C. Parts list screening
D. Parts list monitoring
E. Communication with and availability of information to the Government
F. Means and approach for establishing obsolescence and DMSMS solutions
G. Process for data entry and extraction from predictive tools used. GIDEP shall be used and is the minimum requirement.
9.2 DMSMS Reporting
9.2.1 The Contractor shall prepare and submit to the Government a report upon discovery or notification of any obsolescence issues affecting components utilized in the replacement
HUD system. (CDRL A007)
9.2.2 The Contractor shall continue to update the report provided in paragraph 9.2.1 until the issue is successfully mitigated. (Successfully mitigated is defined as “no impact to the
Government or future supportability of the HUD system”.)
9.3 DMSMS Mitigation
9.3.1 The Contractor shall be responsible for the costs of investigating part availability, inter-changeability and substitutability, locating part replacement, vendor interface, engineering efforts, testing requirements, drawing changes, and all other actions associated with this SOO/ECP.
9.3.2 During the period of performance the Contractor shall prevent any additional costs from being incurred by the Government due to obsolescence.
10 Government Furnished Equipment
10.1 Systems Integration Lab (SIL)
10.1.1 The Contractor shall have use of the T-38C Systems Integration Lab (SIL), located at the
Boeing St. Louis facility. The use shall be on a non-interference basis and shall be scheduled in advance to preclude schedule and performance conflicts.
10.1.2 Location of SIL:
The Boeing Company
5890 N. Lindbergh Blvd.
Hazelwood, MO 63402
10.1.3 Current T-38C avionics system Acceptance Test Procedures will be provided by the
Government to the awardee.
11 Associate Contractor Agreement
Offeror shall enter into Associate Contractor Agreement (ACA) in the accomplishment of this requirement. The agreement shall include the basis for sharing information, data, technical knowledge, expertise, and/or resources essential to the accomplishment of the
AvCI Program Task Orders which shall ensure the greatest degree of cooperation for the development of the program to meet the terms of the contract. (IAW Clause H040 of the basic AvCI contract)
12 Conditions and Assumptions
Preliminary Test (PT), and Developmental Test (DT) will be conducted at Edwards AFB, CA.
The Government will provide aircraft, pilots, fuel, and facilities during the test period.
FDE will be conducted at Randolph AFB, TX. The Government will provide aircraft, pilots, fuel, and facilities during the test period.
13 Compliance Directives and Reference Documents
The Contractor’s shall be familiar with and use the following documents for reference when executing the requirements within this document.
13.1 T-38C Performance Requirements
T-38C System Performance Specification, Revision H, dated 14 Feb 2011.
13.2 Department of Defense Instructions
DoDI 8510.01, Risk Management Framework (RMF) for DoD Information
Technology (IT) (DIACAP)
DoD Directive 4715.1E – Environment, Safety, and Occupational Health
13.3 Air Force Instructions & Directives
AFI 33-200, IA Management
AFI 33-210, Air Force Certification and Accreditation (C&A) Program (AFCAP)
AFI 62-601, USAF Airworthiness and Airworthiness Bulletins
AFPD 62-6, USAF Airworthiness
AFI 63-101 Integrated Life Cycle Management
AFI 63-131 Modification Management
AFI 63-137, Assurance of Communications, Navigation, Surveillance/Air Traffic
Management (CNS/ATM) Navigation Safety, and Next Generation Air
Transportation System (NEXGEN) Performance.
AFMCI 63-1201 Implementing Operational Safety, Suitability, and Effectiveness
(OSS&E) and Life Cycle Systems Engineering
13.4 Air Force Manuals & Pamphlets
AFM 36-2234, Instructional Systems Development, Courseware Development
Standards HQ AETC/A3F
AFPAM 63-119, Certification of System Readiness for Dedicated Operational
Testing
13.5 Military Standards and Specifications
MIL-STD-882, Department Of Defense Standard Practice for System Safety
MIL-STD-411, Aircrew Station Alerting Systems
MIL-STD-461, Requirements for the Control of Electromagnetic Interference
Characteristics of Subsystems and Equipment
MIL-STD-464, Electromagnetic Environmental Effects Requirements for Systems
MIL-STD-704, Aircraft Electric Power Characteristics
MIL-STD-1472, Human Engineering
MIL-STD-1787, Aircraft Display Symbology
MIL-DTL-5096, Manuals, Technical: Inspection and Maintenance Requirements;
Acceptance and Functional Check Flight Procedures and Checklists; Inspection
Work Cards; and Checklists; Preparation of
MIL-DTL-38804, Time Compliance Technical Order Specification
MIL-DTL-38807, Technical Manuals - Illustrated Parts Breakdown
MIL-STD-38784, Standard Practice for Manuals, Technical: General Style and
Format Requirements
AFGS-87219B, Electrical Power Systems, Aircraft (Attachment 7)
AFGS-87256, Integrated Diagnostics
13.6 Military Handbooks
MIL-HDBK-516, Airworthiness Certification Criteria
MIL-HDBK-419A, Grounding, Bonding, and Shielding for Electronic Equipment and Facilities, Volume 1 & 2
MIL-HDBK-454B, General Guidelines for Electronic Equipment
MIL-HDBK-1568, Materials and Processes for Corrosion Prevention and Control in Aerospace Weapons Systems
MIL-DTL-5920G, Manuals, Technical: Sample Basic Weight Checklists and Loading
Data
MIL-DTL-5096G, Manuals, Technical: Inspection and Maintenance Requirements;
Acceptance and Functional Check Flight Procedures and Checklists, Inspection
Work Cards, and Checklists, Preparation of (Attachment 5)
13.7 Civilian Aviation Directives
AS 9100C Quality Management Systems - Requirements for Aviation, Space and
Defense Organizations
AS 9110 Quality Maintenance Systems – Aerospace – Requirements for
Maintenance Organizations
Federal Aviation Administration Advisory Circular, AC 20-153A, Acceptance of
Aero Data Processes and Associated Databases
Radio Technical Commission for Aeronautics, RTCA/DO-200A, Standard for
Processing Aeronautical Data and AC 20-153A, Acceptance of Aeronautical Data
Processes and Associated Databases
14 Deliverables:
CDRL
Number
Number
Short Name Full Name Paragraph DID
A001 IMS Integrated Program Management
Report (IPMR)
3.2.2, 4.1.3 DI-MGMT-81861
A002 RMP Contractor’s Risk Management Plan 3.7.2 DI-MGMT-81808
A003 Status Report Contractor’s Progress, Status and
Management Report
3.2.5 DI-MGMT-80227
A004 Report Manhour Estimate, Technical Cost
Proposals
DI-FNCL-81116
A005 Software Applications Computer Software Product End Items 4.1.6 DI-MCCR-80700
A006 CMP Contractor’s Configuration Management
Plan
3.6.1 DI-CMAN-80858B
A007 Obsolescence Report Progress Report (Studies) 9.2.1 DI-ADMN-81313A
A008 DMSMS Management
Plan
Diminishing Material Shortages and
Material Management Plan
9.1.3 DI-MGMT-81949
A009 Engineering Analysis Human Engineering System Analysis
Report
DI-HFAC-80745B
A010 Material Fielding and
Basing Plan Engineering Change Proposal (ECP) 8.3.2 DI-MGMT-80004A
A011 CAP Corrective Action Plan DI-RELI-80254
A012 Database Database Design Description (DBDD) DI-IPSC-81437A
A013 Analysis Producibility Analysis Report DI-MGMT-80797
A014 ECP Engineering Change Proposal (ECP) 3.2.1 DI-CMAN-80639C
A015 Evaluation Primary
Flight Reference
Endorsement Package
Technical Report-Study/Services 5.3.1, 6.4.2 DI-MISC-80508B
A016 Block Upgrade Process Management Plan DI-MGMT-80004A
A017 Meeting Minutes and
Action Items Report, Record of Meeting/Minutes 3.2.3, 3.2.4, 4.1.3 DI-ADMN-81505
A018 System Change
Description
Revisions to Existing Government
Documents
DI-ADMN-80925
A019
Specification Change
Notices SCN, Requirements Change
Notice
Specification Change Notices (SCN) DI-CMAN-80643C
Number
Number
Short Name Full Name Paragraph DID
A020 AvCI Avionics
Roadmap
Management Plan DI-MGMT-80004A
A021 Software
Management Plan Management Plan 3.8.2 DI-MGMT-80004A
A022 Courseware Delivery Web-Based Courseware DI-SESS-81699
A023 ATD Software Changes Computer Software Product End Items DI-MCCR-80700
A024 Safety and Health
Mgmt Report
Contractor's Progress, Status and
Management Report
DI-MGMT-80227
A025 Quality Control Plan Management Plan 3.4.1 DI-MGMT-80004A
A026 Safety Plan Environmental Health and Safety Plan
(HSP)
DI-ENVR-81375
A027 Phase-in/out
Transition Plan
Management Plan DI-MGMT-80004A
A028 Government Owned
Equipment Inventory Checklist/Record (ICL/R) DI-MISC-81191A
A029 Document Changes Document Changes 3.6.1.C, 3.6.1.E, 4.1.10.A, 4.1.10.C, 6.1
DI-MISC-80358
A030 DAL Data Accession List (DAL) DI-MGMT-81453A
A031 Property Management
Plan Management Plan DI-MGMT-80004A
A032 Safety Accident/Incident Report DI-SAFT-81563
A033 Drawings Product Drawings/Models and
Associated Lists
3.6.1 D, 4.1.10 B DI-SESS-81000E
A034 Corrosion Prevention Corrosion Prevention and Control Plan 3.5.1 DI-MFFP-81403
A035 Data for Forecasting Source Data for Forecasting DMSMS 9.1.1 DI-SESS-81656
A036 ATR Acceptance Test Report (ATR) 5.1.1, 5.1.2, 5.1.7, 5.1.8, 5.3.5
DI-QCIC-81891
A037 CSA Configuration Status Accounting
Information
3.6.1 F DI-CMAN-81253A
A038 Equipment
Requirements List
Maintenance Test and Support
Equipment Requirements List
5.1.4 DI-SESS-80294B
A039 Sys. Architectural
Analysis
DoD Architecture Framework
Documentation
6.2 DI-MGMT-81644B
A040 Specifications Airworthiness Specification 6.3.2 DI-SESS-81766
A041 Airworthiness Report Airworthiness Certification Criteria
Report
DI-SESS-81768
A042 Procurable Hardware Provisioning Parts List Section 8 DI-SESS-81715
A043 Corrective Action Plan Contractor’s Correction Action Plan DI-MGMT-80501
Number
Number
Short Name Full Name Paragraph DID
A044 50/50 Reporting 10 USC 2466 (50/50) Requirements
Report
DI-MGMT-81749A
A045 Cost-Per-Flight Hour
Report Technical Report-Study/Services DI-MGMT-80508B
15 Technical Data Package (TDP)
1. T-38C Avionics System Performance Specifications
2. T-38C ATD Performance Specifications
3. List of Government Furnished Equipment (GFE) at Suppliers/Vendors
4. GFE List Supplement, Equipment at L-3 DS
5. T-38 System Integration Lab – Avionics
6. T-38 System Integration Lab – Test Equipment
7. T-38 System Integration Lab – Computing Equipment
8. Equipment Planned for T-4 Engine Test Cell
9. Training Support Equipment (Items used for Courseware support)
10. GFE TCNO Computers
11. List of Aircraft Panels in Storage at COMBS facilities
12. Group A Parts Inventory and Consumption
13. Group B Inventory and Consumption
14. T-38C Air Vehicle Drawings
15. T-38C Avionics System Architecture Diagram
16. T-38C Form Fit Function & Interface (F3I) Specifications
17. T-38C Interface Control Documents (ICDs) T-38C Avionics Architecture Diagram
18. GFI T-38C Air Vehicle Technical Manuals
19. List of Software Components
20. T-38C Contractor Furnished Test Equipment List
21. DMSMS Data from predictive Tools/Database
22. ACMI Parameters
23. List of MFL/PFL
24. ATD Equipment at Contractor
25. T-38C ATD Drawings
26. T-38C ATD Architecture Diagram
27. ATD System Interface Control Documents (ICD)
28. GFI T-38C ATD Technical Manuals
29. IMIS Historical Data
File details come from the government source that posted it. Updated .