Questions and Answers Document.docx
DOCX document 21 KB Posted
- Attached to
- Shuttle Wagon
- Solicitation number
- FA820121Q0009
About this file
This document provides questions and answers regarding a solicitation for shuttle wagons issued by the Department of the Air Force Materiel Command Air Force Sustainment Center. Offerors must submit quotes by September 3, 2021 at 4:00 PM Mountain Time addressing both price and technical specifications. The technical quote should demonstrate how the offered product meets the requirements in Attachment J-1, also known as the Performance Specifications document. No other documentation or forms need be completed beyond the required clauses in Attachment 3. The solicitation seeks to procure shuttle wagons to the agency's required specifications.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Questions and Answers 31AUG2021.docx | DOCX document | |
| 2. Attachment J-1 Performance Specifications.pdf | ||
| 1. Combined Syn_Sol 2021.docx | DOCX document | |
| 2. Performance Specifications.pdf | ||
| 4. 52.204-24.pdf | ||
| 3. FA820121Q0009 updated.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Questions and Answers Document Shuttle Wagon Last Updated: 12 August 2021
1. The instruction for Electronic Submission by email to both your attention by 4:00pm MDT on 03 September 2021…however the Solictation/Contract/Order for Commercial Terms states in “block 8” it is due 20 August 2021 4pm MDT?
0. Thank you for letting us know- **The due date for all quotes is 03 September 2021 at 4:00 P.M. Mountain Daylight Time.** All questions regarding this acquisition must be submitted by 13 August at 4:00 P.M. Mountain Daylight Time (MDT) to allow for the Government to assess the inquiry and provide a response.
1. From the list of available files for download I did not see “Attachment J-1: Product Specification Details”…however, I was able to download document “2.+Performance+Specifications.pdf”…is this the same document?
1. Correct- those are the same documents. The name has been updated accordingly
1. I would like to receive clarity about offeror documents to be returned? Please confirm…
2. Section 3: of the Combined Synopsis and Solicitation: Are there any special instructions for submitting specific document nomenclature “Volume I – Price and Contract Documentation”?
0. No, please submit a quote in your preferred format, just make sure it follows all of the guidelines in Section 3.
2. Section 3, 3.1.4: of the Combined Synopsis and Solicitation: Shall document “4.+52.204-24.pdf” with relevant acknowledgements checked, be submitted as separate document or “bound” within “Volume I – Price and Contract Document”?
1. Please fill out the clause that is provided as an attachment (FAR 52.204-24) and return it with your quote.
2. Shall document “3.+FA820121Q0009+updated.pdf” with blocks 12, 17, 23, 24 and 30 completed be returned, submitted with Volume I – Price and Contract Document?
2. No. That document is used ONLY for clause details. We realize that this can be confusing, but we are only utilizing the clause portion of that document- nothing else.
2. Section 4: of the Combined Synopsis and Solicitation: Are there any special instructions for submitting specific document nomenclature “Volume II – Technical”?
3. Your quote should provide the technical piece of the requirement. Anything that you feel as though is pertinent technical information should be included. Read through the Product Specifications and address how your product will technically meet the request. We have to be able to deem your proposal “technically acceptable/unacceptable” based on the information (quote) you give our team.
2. Section 4, 4.1.General: I was unable to located “set forth Addendum FAR Clause 52.212-2” within the solicitation. However, I do recognize “Factor 2 – Technical”. Should the actual clause be in the solicitation?
4. The clause is included in the combo document on page 5.
2. Section 4.1 General/Section 4.2 Technical Exceptions: Per question 2 above, Attachment J-1 relates to Technicals, as of now I do not see this document listed in the posting at sam.gov.
5. The name of the attachment has been updated.