Atch_2_Inspection_Checklist.pdf
PDF 31 KB Posted
- Attached to
- Treaty Support Services Federal contract opportunity
- Solicitation number
- FA8201-18-R-0001
About this file
Inspection Checklist
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Questions_and_Answers.docx | DOCX document | |
| Atch_1_PWS_REVISED.docx | DOCX document | |
| FA8201-18-R-0001-00001_Treaty_Support_Services.pdf | ||
| FA8201-18-R-0001_Treaty_Support_Services.pdf | ||
| Atch_1_PWS.docx | DOCX document | |
| Atch_3_WD.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
75 ABW/ XPO INTERGRATED INSPECTION SUPPORT CHECKLIST
Item No Description Refere nce Para Pass /
Fail 1 Was the Contractor available for all NST
Inspections? PWS 1.3.2.9
Did the Contractor arrive within 2 hours of
Start Inspection Team arrival for all Inspections?
PWS 1.3.1.2
3 Did the Contractor properly prepare inspection booklets prior to all inspections? PWS 1.3.1.3
Did the Contractor assist in preparing / presenting briefings for distinguished visitors?
PWS 1.3.2.7
5 Did the Contractor assist in coordinating inspection lodgistics? PWS 1.3.1.7
Did the Contractor assist in arranging support efforts from tennant orginizations for all treaty inspections?
PWS 1.3.1.6
7 Did the Contractor participate in all onsite inspections? PWS 1.3.1.1
8 Did the contractor provide virbal input for After Action Reports postinspections? PWS 1.3.1.9
Did the Contractor provide techinical support on all treaties and agreements affecting the Arms Control Office?
PWS 1.3.2.8
Did the Contractor work independently carrying out work assigned by the Office Chief?
PWS 1.3.2.1
Performance Objectives
| Dropdown1: [Fail] |
| Dropdown2: [Fail] |
| Dropdown3: [Fail] |
| Dropdown4: [Fail] |
| Dropdown5: [Fail] |
| Dropdown6: [Fail] |
| Dropdown7: [Fail] |
| Dropdown8: [Fail] |
| Dropdown9: [Pass] |
| Dropdown10: [Pass] |
| Comments: |
| Text12: 75 ABW / XPO Signature |
| Text13: Contractor Signature |
File details come from the government source that posted it.