SITE VISIT Q&A

FA8201-16-R-0006, ROOFING IDIQ

15 June 2016, 9:30 AM MDT

Met at Hill Aerospace Museum parking lot. Nine interested parties were present. Site visit location was Seed Project work site, Bldg 2403.

1. Q: Who are the asbestos abatement companies?

A: Environmental Abatement and Eagle Abatement. Contact information is in the basic

SOW.

2. Q: Do we replace/repair duct work present on the roof?

A: No.

3. Q: Is there a curb requirement? Will we need to raise equipment present on roof (i.e.

ducts)?

A: Curb requirement is 8 inches. Will only raise equipment when it is possible. For example, fixed ducts will not be lifted, but fans will be.

4. Q: Is contractor responsible for re-certifying the lightning protection system?

A: Yes, reference the Seed Project SOW for additional information.

5. Q: Can interested parties submit alternative adhesives?

A: Interested parties may submit alternative adhesives and they will be considered;

however, no guarantee can be made alternative adhesives will be found to be technically acceptable. Review Sections L, M, and the base/seed SOWs for more information.

6. Q: Does Perlight need to be removed?

A: Not necessarily, this is up to the contractor.

7. Q: What is the material on the inside ceiling?

A: Tectum panels

8. Q: How many tectum panels are damaged and need to be replaced?

A: Approximately a dozen.