20160615_Site_Visit_QandA_FA8201-16-R-0006.pdf

PDF 183 KB Posted

Attached to
Roofing Repair IDIQ Federal contract opportunity
Solicitation number
FA8201-16-R-0006
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Hill Air Force Base

About this file

Questions and Answers

View the file

Other files for this federal contract opportunity

Show all 12

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SITE VISIT Q&A

FA8201-16-R-0006, ROOFING IDIQ

15 June 2016, 9:30 AM MDT

Met at Hill Aerospace Museum parking lot. Nine interested parties were present. Site visit location was Seed Project work site, Bldg 2403.

1. Q: Who are the asbestos abatement companies?

A: Environmental Abatement and Eagle Abatement. Contact information is in the basic

SOW.

2. Q: Do we replace/repair duct work present on the roof?

A: No.

3. Q: Is there a curb requirement? Will we need to raise equipment present on roof (i.e.

ducts)?

A: Curb requirement is 8 inches. Will only raise equipment when it is possible. For example, fixed ducts will not be lifted, but fans will be.

4. Q: Is contractor responsible for re-certifying the lightning protection system?

A: Yes, reference the Seed Project SOW for additional information.

5. Q: Can interested parties submit alternative adhesives?

A: Interested parties may submit alternative adhesives and they will be considered;

however, no guarantee can be made alternative adhesives will be found to be technically acceptable. Review Sections L, M, and the base/seed SOWs for more information.

6. Q: Does Perlight need to be removed?

A: Not necessarily, this is up to the contractor.

7. Q: What is the material on the inside ceiling?

A: Tectum panels

8. Q: How many tectum panels are damaged and need to be replaced?

A: Approximately a dozen.